Net Power Inc. (NPWR)
SIC breadcrumb: Manufacturing > Electronic And Other Electrical Equipment And Components, Except Computer Equipment > SIC 3620 Electrical Industrial Apparatus
SEC company page: https://www.sec.gov/edgar/browse/?CIK=1845437. Latest filing source: 0001845437-26-000009.
Informational only. Descriptive public-record data — not a rating, forecast, or investment advice. See Disclaimer.
At a glance
Peer & cluster context
Peer percentile fingerprint
Percentile = share of the N covered peers reporting that ratio whose value is lower (ties counted half); computed among grepcent-covered companies in SIC major-group 36 Electronic And Other Electrical Equipment And Components, Except Computer Equipment, not the whole market. A higher percentile means a higher value of the ratio, not a better company. Ratios with fewer than 8 reporting peers are omitted. Latest reported values per company; fiscal periods may differ. Descriptive arithmetic - not a score, rating, or ranking.
Selected Fundamentals
| Metric | Value | Unit | FY | Filed |
|---|---|---|---|---|
| Net income | -578,628,000 | USD | 2025 | 2026-03-09 |
| Assets | 599,701,000 | USD | 2025 | 2026-03-09 |
Financials
Annual standardized facts from SEC companyfacts as of latest extracted filing date 2026-03-09. Source: https://data.sec.gov/api/xbrl/companyfacts/CIK0001845437.json. Derived margins, ratios, and free cash flow are computed from the extracted annual SEC facts.
| Metric | 2021 | 2022 | 2023 | 2024 | 2025 |
|---|---|---|---|---|---|
| Net income | -9,797,289 | -54,778,000 | -49,191,000 | -578,628,000 | |
| Operating income | -697,131 | -50,025,000 | -181,321,000 | -1,791,748,000 | |
| Gross profit | 305,000 | 219,000 | 0.00 | ||
| Diluted EPS | -14.79 | -0.67 | -7.34 | ||
| Operating cash flow | -1,332,128 | -16,630,000 | -31,649,000 | -120,784,000 | |
| Capital expenditures | 115,000 | 68,651,000 | 33,214,000 | ||
| Assets | 348,369,430 | 78,137,000 | 599,701,000 | ||
| Liabilities | 42,318,573 | 13,735,000 | 64,496,000 | ||
| Stockholders' equity | -38,949,143 | 64,402,000 | 203,904,000 | ||
| Cash and cash equivalents | 5,164,000 | 536,927,000 | 329,230,000 | 199,430,000 | |
| Free cash flow | -16,745,000 | -100,300,000 | -153,998,000 |
Ratios
| Metric | 2021 | 2022 | 2023 | 2024 | 2025 |
|---|---|---|---|---|---|
| Return on equity | -85.06% | -283.77% | |||
| Return on assets | -2.81% | -70.11% | -96.49% | ||
| Liabilities / equity | 0.21 | 0.32 | |||
| Current ratio | 6.40 | 0.89 | 53.31 | 28.65 | 7.24 |
Industry Peer Context
ROE peer context
ROA peer context
Financial Bridges
Free cash flow = operating cash flow - capital expenditures
Figure provenance: SEC companyfacts FY 2025. Operating cash flow: accession 0001845437-26-000009; concept NetCashProvidedByUsedInOperatingActivities; source concepts us-gaap:NetCashProvidedByUsedInOperatingActivities | Capital expenditures: accession 0001845437-26-000009; concept PaymentsToAcquirePropertyPlantAndEquipment; source concepts us-gaap:PaymentsToAcquirePropertyPlantAndEquipment | Free cash flow: accession 0001845437-26-000009; concept NetCashProvidedByUsedInOperatingActivities - PaymentsToAcquirePropertyPlantAndEquipment; source concepts us-gaap:NetCashProvidedByUsedInOperatingActivities; us-gaap:PaymentsToAcquirePropertyPlantAndEquipment
Financial Charts
Figure provenance: SEC companyfacts. Latest point: FY 2025 ended 2025-12-31; accession 0001845437-26-000009; filed 2026-03-09. Concept: NetIncomeLoss. Source concepts: us-gaap:NetIncomeLoss.
Figure provenance: SEC companyfacts. Latest point: FY 2025 ended 2025-12-31; accession 0001845437-26-000009; filed 2026-03-09. Concept: OperatingIncomeLoss. Source concepts: us-gaap:OperatingIncomeLoss.
Figure provenance: SEC companyfacts. Latest point: FY 2025 ended 2025-12-31; accession 0001845437-26-000009; filed 2026-03-09. Concept: GrossProfit. Source concepts: us-gaap:GrossProfit.
Figure provenance: SEC companyfacts. Latest point: FY 2025 ended 2025-12-31; accession 0001845437-26-000009; filed 2026-03-09. Concept: EarningsPerShareDiluted. Source concepts: us-gaap:EarningsPerShareDiluted.
Figure provenance: SEC companyfacts. Latest point: FY 2025 ended 2025-12-31; accession 0001845437-26-000009; filed 2026-03-09. Concept: NetCashProvidedByUsedInOperatingActivities. Source concepts: us-gaap:NetCashProvidedByUsedInOperatingActivities.
Figure provenance: SEC companyfacts. Latest point: FY 2025 ended 2025-12-31; accession 0001845437-26-000009; filed 2026-03-09. Concept: PaymentsToAcquirePropertyPlantAndEquipment. Source concepts: us-gaap:PaymentsToAcquirePropertyPlantAndEquipment.
Figure provenance: SEC companyfacts. Latest point: FY 2025 ended 2025-12-31; accession 0001845437-26-000009; filed 2026-03-09. Concept: Assets. Source concepts: us-gaap:Assets.
Figure provenance: SEC companyfacts. Latest point: FY 2025 ended 2025-12-31; accession 0001845437-26-000009; filed 2026-03-09. Concept: Liabilities. Source concepts: us-gaap:Liabilities.
Figure provenance: SEC companyfacts. Latest point: FY 2025 ended 2025-12-31; accession 0001845437-26-000009; filed 2026-03-09. Concept: StockholdersEquityIncludingPortionAttributableToNoncontrollingInterest. Source concepts: us-gaap:StockholdersEquityIncludingPortionAttributableToNoncontrollingInterest.
Figure provenance: SEC companyfacts. Latest point: FY 2025 ended 2025-12-31; accession 0001845437-26-000009; filed 2026-03-09. Concept: CashAndCashEquivalentsAtCarryingValue. Source concepts: us-gaap:CashAndCashEquivalentsAtCarryingValue.
Figure provenance: SEC companyfacts. Latest point: FY 2025 ended 2025-12-31; accession 0001845437-26-000009; filed 2026-03-09. Concept: NetCashProvidedByUsedInOperatingActivities - PaymentsToAcquirePropertyPlantAndEquipment. Source concepts: us-gaap:NetCashProvidedByUsedInOperatingActivities; us-gaap:PaymentsToAcquirePropertyPlantAndEquipment.
As-reported value updates
Quarterly
Quarterly standardized facts from SEC companyfacts as of latest extracted filing date 2026-11-12. Source: https://data.sec.gov/api/xbrl/companyfacts/CIK0001845437.json.
| Quarter | End Date | Revenue | Net Income | Diluted EPS | Method |
|---|---|---|---|---|---|
| 2023-Q2 | 2023-09-30 | 0.00 | -30,564,000 | -0.44 | reported discrete quarter |
| 2024-Q1 | 2024-03-31 | 0.00 | -11,421,000 | -0.16 | reported discrete quarter |
| 2024-Q2 | 2024-06-30 | 238,000 | -4,268,000 | -0.06 | reported discrete quarter |
| 2024-Q3 | 2024-09-30 | 12,000 | 818,000 | 0.01 | reported discrete quarter |
| 2024-Q4 | 2024-12-31 | 0.00 | -34,320,000 | derived Q4 = FY annual - nine-month YTD | |
| 2025-Q1 | 2025-03-31 | 0.00 | -119,350,000 | -1.55 | reported discrete quarter |
| 2025-Q2 | 2025-06-30 | 0.00 | -28,142,000 | -0.36 | reported discrete quarter |
| 2025-Q3 | 2025-09-30 | 0.00 | -411,498,000 | -5.28 | reported discrete quarter |
| 2025-Q4 | 2025-12-31 | 0.00 | -19,638,000 | derived Q4 = FY annual - nine-month YTD | |
| 2026-Q1 | 2026-03-31 | -9,857,000 | -0.12 | reported discrete quarter | |
| 2026-Q2 | 2026-06-30 | -80,291,000 | -0.91 | reported discrete quarter | |
| 2026-Q3 | 2026-09-30 | -6,464,000 | -0.07 | reported discrete quarter |
Quarterly Charts
Figure provenance: SEC companyfacts. Latest point: FY 2025 ended 2025-12-31; accession 0001845437-26-000009; filed 2026-03-09. Concept: Revenues. Source concepts: us-gaap:Revenues.
Figure provenance: SEC companyfacts. Latest point: FY 2026 ended 2026-09-30; accession 0001845437-26-000040; filed 2026-11-12. Concept: NetIncomeLoss. Source concepts: us-gaap:NetIncomeLoss.
Figure provenance: SEC companyfacts. Latest point: FY 2026 ended 2026-09-30; accession 0001845437-26-000040; filed 2026-11-12. Concept: EarningsPerShareDiluted. Source concepts: us-gaap:EarningsPerShareDiluted.
Business
Read NPWR's verbatim Item 1 Business section from its latest 10-K: Business.
Risk Factors
Read NPWR's verbatim Item 1A Risk Factors from its latest 10-K: Risk Factors.
Latest quarter (10-Q)
Latest 10-Q source: 0001845437-26-000040.
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations
The following management’s discussion and analysis (“MD&A”) provides information that management believes is relevant to an assessment and understanding of our condensed consolidated results of operations and financial condition and includes forward-looking statements that involve risks, uncertainties and assumptions, including those described in “Cautionary Note Regarding Forward-Looking Statements” included in the forepart of this Quarterly Report on Form 10-Q (our “Quarterly Report”), in Part II, Item 1A Risk Factors in this Quarterly Report, and in Part I, Item 1A Risk Factors in our Annual Report on Form 10-K for the year ended December 31, 2025 (our “Annual Report”), as filed with the SEC on March 9, 2026.
The following MD&A should be read in conjunction with our condensed consolidated financial statements and related notes included in Part I, Item 1 in this Quarterly Report and our audited consolidated financial statements and related notes included in our Annual Report.
Overview
We are an energy technology and project development company focused on the rapid deployment of natural gas power generation behind the meter to serve co-located data centers and other large-load customers. To meet growing demand for reliable power on accelerated timelines, we have repositioned our business from its historical focus on developing an oxy-combustion power generation system with integrated carbon capture. Under our current strategy, our projects are expected to generate revenue principally from the sale of electricity and related services under long-term energy services or power offtake agreements.
Our current projects do not include carbon capture, and our current business plan does not depend on carbon capture or related tax credits. Our Initial Project is not being designed to accommodate the later addition of carbon capture, a change from our earlier descriptions of equipment designed to accommodate it in later phases. We continue to evaluate carbon capture for later phases or projects where customer requirements, commercial arrangements and financing support it, but we have not committed capital or adopted a timetable for its deployment. See Part II, Item 1A “Risk Factors” and “Cautionary Note Regarding Forward-Looking Statements.”
If carbon capture is deployed at any later phase or project, captured CO₂ and associated environmental attributes could also generate revenue, but we have not entered into any agreement for the sale, transportation, or sequestration of CO₂, and there can be no assurance that we will do so on acceptable terms or at all.
We do not have any plans to resume development of the Oxy-Combustion Cycle. In September 2026, we entered into agreements with affiliates of Baker Hughes that indefinitely suspend the BHES JDA and the related commercial agreement and amend the related license agreement (see Note 12 to our condensed consolidated financial statements); we have adjusted our workforce in areas affected by these changes, and we have recognized a full impairment of the related developed technology assets (see Note 5 to our condensed consolidated financial statements).
Key Factors Affecting Our Prospects and Future Results
We believe that our performance and future success depend on a number of factors that present significant opportunities for us but also pose risks and challenges, including, but not limited to, those associated with: our ability to negotiate and enter into binding energy services or power offtake agreements at prices and on terms sufficient to support project financing and an FID; our ability to agree on the relocation of, and to resume work under, the EPC Agreement and to fund the related payments; the timing and outcome of permitting, including the pause in the issuance of permits for data center projects directed by the Governor of Texas on September 21, 2026, and the policies of the administration taking office in January 2027; our ability to obtain site rights for our projects; the decisions of our prospective customer and of the third-party developer of the site regarding the timing and location of the data center that our Initial Project would serve; and our access to the capital needed to finance the development of our projects. These and other factors are described in “Cautionary Note Regarding Forward-Looking Statements” and Part II, Item 1A “Risk Factors.”
28
Table of Contents
Commencing Commercial Operations
We are developing our initial natural gas power generation project to supply power behind the meter, without a connection to the ERCOT grid, to a co-located data center at a site in Texas that we have not yet secured and that is separate from our Project Permian site (the “Initial Project”). In August 2026, we acquired the owner’s position under the EPC Agreement with Saulsbury for ten reciprocating engine generating sets with aggregate nominal capacity of approximately 123 MW, and we intend to use those units in our Initial Project, subject to a change order relocating the work under the EPC Agreement that has not been executed. The configuration we are evaluating for the Initial Project would also require additional generating capacity that we have not secured. We are negotiating an energy services agreement for the Initial Project with a leading developer of frontier artificial intelligence models, the prospective customer that is party to the Cost Reimbursement Agreement, but neither party is obligated to enter into it. We have not obtained site rights, permits, or financing for the Initial Project, and we have not entered into a binding energy services or power offtake agreement for its output.
We previously described the approximately 123 MW reciprocating-engine facility, and the two gas turbine generator sets for which we have contracted, as intended for deployment in the first phase of Project Permian. We now intend to deploy the reciprocating engine equipment at the proposed site described above for our Initial Project, subject to obtaining the necessary site rights, contractual amendments, permits, customer commitments, and financing, and we have not determined the project at which the gas turbine generator sets will be used.
We continue to develop Project Permian in West Texas on a longer timeline than our Initial Project. We lease a portion of the Project Permian site from a subsidiary of Occidental Petroleum, which is a significant stockholder and a related party of the Company. Developing Project Permian beyond the capacity our existing leasehold supports would require additional land rights, which we have not obtained and which are the subject of ongoing negotiations. In addition, future phases may require interconnection to the ERCOT grid, which would be subject to the processes described in Part II, Item 1A. The configuration, carbon capture scope, and timing of any phase of Project Permian will depend on customer requirements, commercial arrangements, the availability of post-combustion carbon capture technology on acceptable terms, permits, equipment availability, and financing.
We have not made a final investment decision for any project. There can be no assurance that we will enter into a binding energy services or power offtake agreement, project-level financing agreement, or definitive site or land-use arrangement for our Initial Project or for any phase of Project Permian beyond our existing lease, that our projects will be developed in the configuration at the sites or on the timelines described, or that carbon capture will be deployed at any project. We do not expect to make an FID for any project during 2026 or before a binding energy services or power offtake arrangement is executed, and the timing of any FID and of the commencement of commercial operations remains uncertain. Any FID will depend on, among other things, execution of one or more binding energy services or power offtake arrangements at pricing and other terms supportive of the project’s economics, and on obtaining the necessary site rights, financing, equipment, permits and other approvals. To meet prospective customer requirements for first power, we have committed, and expect to continue to commit, capital to power generation equipment and engineering before executing a binding energy services or power offtake agreement and reaching FID, as described under “Commitments and Contractual Obligations” below.
Texas Regulatory Developments
On August 3, 2026, the Governor of Texas directed a verification and audit of data centers advancing through ERCOT’s interconnection process. On September 21, 2026, the Governor directed the Texas Commission on Environmental Quality (“TCEQ”) to pause the issuance of all permits related to data center projects until ERCOT completes its review. ERCOT has stated that it intends to publish its report on or before December 10, 2026, but no date has been set for the pause to end. The directive contemplates that TCEQ will then use information from the audits to review proposed permits, so the completion of ERCOT’s review will not by itself determine when permits for data centers will be issued. On October 19, 2026, TCEQ informed the Governor that it had paused the issuance of all permits related to the construction or development of infrastructure directly supporting data centers, that it was screening pending applications and had paused those subject to the directive,
29
Table of Contents
and that it was suspending, where possible, authorizations for data center activities claimed without an affirmatively issued permit. We expect the pause to apply to the air permits our Initial Project requires. On October 21, 2026, TCEQ announced that it had temporarily shut down its electronic permitting system to modify it to allow staff review before authorizations are issued. On November 9, 2026, TCEQ confirmed that electronic submissions were available for applications under its Construction, Multi-Sector and Concrete Production General Permits. Those applications require staff review to determine whether they relate to data centers and no longer receive automatic approval or provisional coverage. The restoration of electronic submissions does not lift the permitting pause for data center projects or establish when applications for our Initial Project will be processed or authorizations issued. On November 3, 2026, Texas voters elected a new Governor, who will take office in January 2027 and who called during the campaign for a moratorium on new data center approvals until the Texas legislature adopts statewide rules governing them and has reaffirmed that position since the election. The Texas legislature convenes in regular session in January 2027. Whether a moratorium or other restrictions will be adopted, and their scope and timing, are uncertain. We cannot predict when or whether TCEQ will resume issuing permits for data center projects, whether we will obtain the authorizations our Initial Project requires, or whether any authorization we obtain will be affected by later action. If these actions delay or prevent the permitting of our projects or commitments by prospective customers, our final investment decisions could be further delayed or may not occur, and the timing of our capital requirements and project-level financing would be affected. See Part II, Item 1A “Risk Factors.”
Key Components of Results of Operations
We are a pre-revenue company. Because our historical spending was primarily directed toward the Oxy-Combustion Cycle, the La Porte Demonstration Facility and SN1, none of which we are actively developing today, our historical results may not be indicative of future results. The impairment of the Developed Technology Asset Group, indefinite suspension of the BHES JDA, workforce reductions and changes in project development activities materially affect comparability between per
[Excerpt truncated for page length; source filing is linked above.]
Latest 10-K MD&A (excerpt)
Latest 10-K Item 7 source: 0001845437-26-000009. The complete FY 2025 MD&A is published at /company/NPWR/mda/fy2025/.
Overview
We are an energy technology and project development company focused on delivering low-carbon gas power solutions. Historically, our sole business has been the development of a novel oxy-combustion power generation system designed to produce reliable and affordable electricity from natural gas while capturing virtually all atmospheric emissions (the “Oxy-Combustion Cycle”). Recently, we have broadened the scope of our business to include the generation of power using natural gas turbines paired with PCC technology that we intend to license from Entropy.
Key Factors Affecting Our Prospects and Future Results
We believe that our performance and future success depend on a number of factors that present significant opportunities for us but also pose risks and challenges, including, but not limited to, our ability to license PCC technology from Entropy, potential supply chain issues, changes in tax policies and other incentives supporting carbon capture, our access to the capital needed to finance the development of our projects, and development of competing energy technologies sooner or at a lesser cost than our products. Supply chain issues related to the manufacturing and transportation of key equipment, including as a result of tariffs imposed by the U.S. or other countries or other trade barriers, measures, or conflicts, may lead to a delay in our commercialization efforts, which could impact our results of operations, financial condition and prospects. Also, currency fluctuations, inflation, and tariffs and other trade barriers, measures or conflicts may significantly increase freight charges, raw material costs and other expenses associated with our business, and such increased costs could materially and adversely affect our results of operations, financial condition and prospects.
Commencing Commercial Operations
Net Power is progressing its first clean firm power hub at the Project Permian site in West Texas. The project is being sized to accommodate up to one gigawatt of clean firm power generation capacity. We intend for Phase I of the project to utilize readily available gas turbines paired with Entropy’s PCC technology. On November 12, 2025, we entered into an agreement to purchase two modular gas turbine generator sets with nominal gross power of approximately 30 megawatts each for use at Project Permian. Final investment decision (“FID”) for Phase I is expected in the third quarter of 2026 with targeted commercial operations by early 2029, which would make it the first commercial clean gas power project in the United States.
Key Components of Results of Operations
We are a development stage company and our historical results may not be indicative of our future results, particularly considering the recent shift in the anticipated timing of our technology development of the Oxy-Combustion Cycle and the introduction of the Clean Gas Product. Accordingly, the drivers of our future financial results, as well as the components of such results, may not be comparable to our historical or future results of operations.
46
Results of Operations
Comparison of the Year Ended December 31, 2025 to the Year Ended December 31, 2024
The following table sets forth our consolidated results of operations data for the periods presented:
| Year Ended December 31, | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| $ in thousands | 2025 | 2024 | $ Change | % Change | ||||||||||
| Revenue | $ | — | $ | 250 | (250) | (100) | % | |||||||
| Cost of revenue | — | 31 | (31) | (100) | % | |||||||||
| Gross profit | — | 219 | ||||||||||||
| Operating expenses | ||||||||||||||
| General and administrative | 40,345 | 30,267 | 10,078 | 33 | % | |||||||||
| Sales and marketing | 4,912 | 3,865 | 1,047 | 27 | % | |||||||||
| Research and development | 99,508 | 63,853 | 35,655 | 56 | % | |||||||||
| Project development | 72,379 | 1,932 | 70,447 | 3,646 | % | |||||||||
| Impairment and other charges | 1,512,217 | — | 1,512,217 | n/a | ||||||||||
| Depreciation, amortization, and accretion | 62,387 | 81,623 | (19,236) | (24) | % | |||||||||
| Total operating expenses | 1,791,748 | 181,540 | ||||||||||||
| Operating loss | (1,791,748) | (181,321) | ||||||||||||
| Other income | ||||||||||||||
| Interest income | 20,297 | 31,389 | (11,092) | (35) | % | |||||||||
| Change in Earnout Shares liability and Warrant liability | 72,391 | (25,656) | 98,047 | (382) | % | |||||||||
| Change in Tax Receivable Agreement liability | 21,317 | — | 21,317 | n/a | ||||||||||
| Other income | 11 | 364 | (353) | (97) | % | |||||||||
| Net other income | 114,016 | 6,097 | ||||||||||||
| Net loss before income tax | (1,677,732) | (175,224) | ||||||||||||
| Income tax benefit | 4,305 | 10,580 | (6,275) | (59) | % | |||||||||
| Net loss after income tax | (1,673,427) | (164,644) | ||||||||||||
| Net loss attributable to non-controlling interests | (1,094,799) | (115,453) | ||||||||||||
| Net loss attributable to Net Power Inc. | $ | (578,628) | $ | (49,191) |
General and administrative
General and administrative expenses increased by $10.1 million, or 33%, for the year ended December 31, 2025, as compared to amounts for the year ended December 31, 2024. During the second quarter of 2025, we terminated the employment of our former Chief Operating Officer, our former Chief Financial Officer, our former Chief Accounting Officer, and certain other employees. Such terminations resulted in $3.1 million in severance payments to these employees, as well as $1.1 million of stock-based compensation for related vesting accelerations. There also was an overall increase of $2.8 million in compensation expense due to growth in employee headcount and stock-based compensation awards granted during 2025. Additionally, we incurred a $3.0 million increase in professional fees, primarily for engineering, tax, and legal services.
Sales and marketing
Sales and marketing expenses consist primarily of personnel-related costs and consultants costs directly associated with our sales and marketing activities, which include general publicity efforts for the Company. Sales and marketing expenses increased by $1.0 million, or 27%, for the year ended December 31, 2025, as compared to the year ended December 31, 2024. This increase was primarily attributable to higher employee
47
headcount as well as severance costs and related accelerated stock-based compensation, partially offset by lower professional fees.
Research and development
R&D expenses consist primarily of labor expenses and fees paid to third parties working on and testing specific aspects of the Oxy-Combustion Cycle technology, including testing at our La Porte Demonstration Facility and development activities under the BHES JDA. R&D expenses increased by $35.7 million, or 56%, for the year ended December 31, 2025, as compared to the year ended December 31, 2024. This increase was primarily due to $27.9 million associated with development activities under the BHES JDA which includes $7.4 million for the BHES JDA Make-Whole Payments. During the fourth quarter of 2025, the Company reversed $3.3 million in previously recognized share-based compensation expense subsequent to the Business Combination related to the BHES Bonus Shares as the milestone targets were no longer probable. The Company also recorded $1.3 million in accelerated share-based compensation expense related to shares issued in connection with signing of the BHES JDA. Additionally, plant and utility expenses increased $6.2 million due to the validation testing campaigns at the La Porte Demonstration Facility that began in the fourth quarter of 2024 and was suspended during the fourth quarter of 2025. The Company also incurred higher engineering consulting fees of $2.0 million and $1.5 million in costs related to expansion of its engineering headcount to support the Oxy-Combustion Cycle technology development efforts.
Project development
Project development expenses consist of labor expenses and fees paid to third parties developing commercial scale projects. Project development expenses increased by $70.4 million, or 3,646%, for the year ended December 31, 2025, as compared the year ended December 31, 2024. In March 2025, the Company suspended further long-lead equipment releases for the Oxy-Combustion Cycle technology project. Accordingly, the Company began expensing costs associated with the project as management assessed the Oxy-Combustion Cycle technology project’s feasibility throughout 2025. These costs were capitalized during the year ended December 31, 2024. For the year ended December 31, 2025, the Company incurred $24.8 million of costs related to Project Permian Oxy-Combustion Cycle technology project. Additionally, in the second quarter of 2025, the Company incurred $19.5 million in milestones payments for the purchase of long lead materials with BHES under the Letter of Limited Notice to Proceed (“BHES LNTP”). In the fourth quarter of 2025, the Company notified Baker Hughes of its intent to terminate the BHES LNTP in connection with the Company’s suspension of the Amended and Restated JDA, which resulted in $26.1 million of contract termination fees recognized in 2025.
Impairment and other charges
During the first quarter of 2025, the Company assessed its goodwill for impairment due to a change in the Company’s business plan and related sustained decrease in the Company’s market capitalization. As a result, the Company fully impaired goodwill for an impairment loss of $359.8 million. Also in the first quarter of 2025, the Company expensed $56.1 million of costs associated with the construction of SN1 as management initiated a value engineering process to assess the project’s feasibility and optimize its design and temporarily paused further long lead equipment releases. In the third quarter of 2025, the Company recognized an impairment loss of $1,095.8 million related to its long-lived assets as a result of the responsiveness from potential customers to the Company’s technology and integrated product offering, the estimated cost reductions achieved in Project Permian, and the resulting revisions to the Company’s forecasted future unit deployments and related cash flows based upon the perceived marketability and commercial viability of the Company’s technology.
Depreciation, amortization, and accretion
Our depreciation, amortization, and accretion expenses consist primarily of depreciation on our La Porte Demonstration Facility and amortization of intangible assets. Depreciation, amortization, and accretion expense decreased by $19.2 million, or 24%, for the year ended December 31, 2025, as compared to amounts for the
48
same period in 2024, primarily due to lower depreciation and amortization rates as a result of the long-lived asset impairment during the third quarter of 2025.
Interest income
Interest income decreased by $11.1 million, or 35%, for the year ended December 31, 2025, as compared to amounts for the same period in 2024. This decrease was due to lower interest-bearing cash and investment balances, declines in interest rates, and lower investment accretion.
Change in Earnout Shares liability and Warrant liability
The Change in Earnout Shares liability and Warrant liability relates to movements in fair value of earnout shares and warrants which have been classified as liability instruments. The changes are primarily due to fluctuations in the market price of our Class A Common Stock and related volatility.
Change in Tax Receivable Agreement liability
In March 2025, the Company reduced the Tax Receivable Agreement (“TRA”) liability of $21.3 million to zero as payments related to the TRA were not considered probable. In May 2025, pursuant to its rights under the TRA, the Company delivered to the agent of the TRA holders notice of the Company’s intent to
[Excerpt truncated for page length; the complete text is on the linked full-MD&A page.]
MD&A history
Prior-year 10-K MD&A spans are extracted from SEC filings with the same bounded parser used for the latest filing. Each year's full verbatim text is on its own sub-page.
Macro cross-references for NPWR
- INDPRO - Industrial Production: Total Index
- TCU - Capacity Utilization: Total Index
- PPIACO - Producer Price Index by Commodity: All Commodities
- GDPC1 - Real Gross Domestic Product
- DGS10 - Market Yield on U.S. Treasury Securities at 10-Year Constant Maturity
- FEDFUNDS - Federal Funds Effective Rate
- CES0500000003 - Average Hourly Earnings of All Employees, Total Private
- PAYEMS - All Employees, Total Nonfarm