Read WULF's verbatim Item 1 Business section from its latest 10-K: Business.
Risk Factors
Read WULF's verbatim Item 1A Risk Factors from its latest 10-K: Risk Factors.
Selected Fundamentals
| Metric | Value | Unit | FY | Filed |
|---|---|---|---|---|
| Revenue | 168,455,000 | USD | 2025 | 2026-02-27 |
| Net income | -661,416,000 | USD | 2025 | 2026-02-27 |
| Assets | 6,558,182,000 | USD | 2025 | 2026-02-27 |
Financials
Annual standardized facts from SEC companyfacts as of latest extracted filing date 2026-02-27. Source: https://data.sec.gov/api/xbrl/companyfacts/CIK0001083301.json. Derived margins, ratios, and free cash flow are computed from the extracted annual SEC facts.
| Metric | 2010 | 2011 | 2015 | 2016 | 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Revenue | 69,229,000 | 140,051,000 | 168,455,000 | ||||||||||
| Net income | -65,061 | -226,147 | 139,465 | -813,558 | -439,320 | -95,683,000 | -90,791,000 | -73,421,000 | -72,418,000 | -661,416,000 | |||
| Operating income | -22,004 | -464,609 | 225,819 | -956,676 | -1,786,020 | -43,399,000 | -43,745,000 | -29,421,000 | -76,216,000 | -186,213,000 | |||
| Gross profit | 6,144,592 | 6,236,910 | 5,730,545 | 6,254,027 | 5,397,189 | 3,905,077 | 3,950,000 | 37,025,000 | 69,794,000 | 66,045,000 | |||
| Diluted EPS | -0.03 | -0.11 | 0.07 | -0.41 | -0.22 | -1.13 | -0.82 | -0.35 | -0.21 | -1.66 | |||
| Operating cash flow | 916,947 | 204,689 | 1,224,765 | -477,031 | -398,828 | -24,099,000 | -34,066,000 | 4,263,000 | -24,422,000 | -123,180,000 | |||
| Capital expenditures | 2,064,426 | 230,089 | 543,145 | 478,353 | 149,916 | 109,072,000 | 61,116,000 | 75,168,000 | 267,940,000 | 1,060,189,000 | |||
| Share buybacks | 15,130 | 2,079 | 300,466 | 49,595 | 0.00 | 0.00 | 118,217,000 | 33,292,000 | |||||
| Assets | 18,295,994 | 16,924,230 | 17,419,218 | 16,879,541 | 15,435,399 | 264,911,000 | 317,687,000 | 378,106,000 | 787,511,000 | 6,558,182,000 | |||
| Liabilities | 4,836,834 | 3,966,299 | 4,308,188 | 4,622,843 | 3,596,053 | 141,732,000 | 199,933,000 | 155,617,000 | 543,066,000 | 6,417,737,000 | |||
| Stockholders' equity | 13,459,160 | 12,957,931 | 13,111,030 | 12,256,698 | 11,839,346 | 123,179,000 | 117,754,000 | 222,489,000 | 244,445,000 | 140,445,000 | |||
| Cash and cash equivalents | 1,048,713 | 929,700 | 1,623,137 | 963,649 | 3,693,845 | 43,448,000 | 1,279,000 | 54,439,000 | 274,065,000 | 3,266,389,000 | |||
| Free cash flow | -1,147,479 | -25,400 | 681,620 | -955,384 | -548,744 | -133,171,000 | -95,182,000 | -70,905,000 | -292,362,000 | -1,183,369,000 |
Ratios
| Metric | 2010 | 2011 | 2015 | 2016 | 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Net margin | -106.06% | -51.71% | |||||||||||
| Operating margin | -42.50% | -54.42% | -110.54% | ||||||||||
| Return on equity | -0.48% | -1.75% | 1.06% | -6.64% | -3.71% | -77.68% | -77.10% | -33.00% | -29.63% | -470.94% | |||
| Return on assets | -0.36% | -1.34% | 0.80% | -4.82% | -2.85% | -36.12% | -28.58% | -19.42% | -9.20% | -10.09% | |||
| Liabilities / equity | 0.36 | 0.31 | 0.33 | 0.38 | 0.30 | 1.15 | 1.70 | 0.70 | 2.22 | 45.70 | |||
| Current ratio | 6.89 | 9.44 | 6.87 | 4.49 | 2.17 | 1.48 | 0.11 | 0.40 | 5.43 | 2.00 |
Industry Peer Context
Net margin peer context
Operating margin peer context
ROE peer context
ROA peer context
Financial Bridges
Income statement bridge from reported figures
Figure provenance: SEC companyfacts FY 2025. Revenue: accession 0001083301-26-000031; concept Revenues; source concepts us-gaap:Revenues | Gross profit: accession 0001083301-26-000031; concept GrossProfit; source concepts us-gaap:GrossProfit | Operating income: accession 0001083301-26-000031; concept OperatingIncomeLoss; source concepts us-gaap:OperatingIncomeLoss | Net income: accession 0001083301-26-000031; concept NetIncomeLoss; source concepts us-gaap:NetIncomeLoss
Free cash flow = operating cash flow - capital expenditures
Figure provenance: SEC companyfacts FY 2025. Operating cash flow: accession 0001083301-26-000031; concept NetCashProvidedByUsedInOperatingActivities; source concepts us-gaap:NetCashProvidedByUsedInOperatingActivities | Capital expenditures: accession 0001083301-26-000031; concept PaymentsToAcquirePropertyPlantAndEquipment; source concepts us-gaap:PaymentsToAcquirePropertyPlantAndEquipment | Free cash flow: accession 0001083301-26-000031; concept NetCashProvidedByUsedInOperatingActivities - PaymentsToAcquirePropertyPlantAndEquipment; source concepts us-gaap:NetCashProvidedByUsedInOperatingActivities; us-gaap:PaymentsToAcquirePropertyPlantAndEquipment
Financial Charts
Figure provenance: SEC companyfacts. Latest point: FY 2025 ended 2025-12-31; accession 0001083301-26-000031; filed 2026-02-27. Concept: Revenues. Source concepts: us-gaap:Revenues.
Figure provenance: SEC companyfacts. Latest point: FY 2025 ended 2025-12-31; accession 0001083301-26-000031; filed 2026-02-27. Concept: NetIncomeLoss. Source concepts: us-gaap:NetIncomeLoss.
Figure provenance: SEC companyfacts. Latest point: FY 2025 ended 2025-12-31; accession 0001083301-26-000031; filed 2026-02-27. Concept: OperatingIncomeLoss. Source concepts: us-gaap:OperatingIncomeLoss.
Figure provenance: SEC companyfacts. Latest point: FY 2025 ended 2025-12-31; accession 0001083301-26-000031; filed 2026-02-27. Concept: GrossProfit. Source concepts: us-gaap:GrossProfit.
Figure provenance: SEC companyfacts. Latest point: FY 2025 ended 2025-12-31; accession 0001083301-26-000031; filed 2026-02-27. Concept: EarningsPerShareDiluted. Source concepts: us-gaap:EarningsPerShareDiluted.
Figure provenance: SEC companyfacts. Latest point: FY 2025 ended 2025-12-31; accession 0001083301-26-000031; filed 2026-02-27. Concept: NetCashProvidedByUsedInOperatingActivities. Source concepts: us-gaap:NetCashProvidedByUsedInOperatingActivities.
Figure provenance: SEC companyfacts. Latest point: FY 2025 ended 2025-12-31; accession 0001083301-26-000031; filed 2026-02-27. Concept: PaymentsToAcquirePropertyPlantAndEquipment. Source concepts: us-gaap:PaymentsToAcquirePropertyPlantAndEquipment.
Figure provenance: SEC companyfacts. Latest point: FY 2025 ended 2025-12-31; accession 0001083301-26-000031; filed 2026-02-27. Concept: PaymentsForRepurchaseOfCommonStock. Source concepts: us-gaap:PaymentsForRepurchaseOfCommonStock.
Figure provenance: SEC companyfacts. Latest point: FY 2025 ended 2025-12-31; accession 0001083301-26-000031; filed 2026-02-27. Concept: Assets. Source concepts: us-gaap:Assets.
Figure provenance: SEC companyfacts. Latest point: FY 2025 ended 2025-12-31; accession 0001083301-26-000031; filed 2026-02-27. Concept: Liabilities. Source concepts: us-gaap:Liabilities.
Figure provenance: SEC companyfacts. Latest point: FY 2025 ended 2025-12-31; accession 0001083301-26-000031; filed 2026-02-27. Concept: StockholdersEquity. Source concepts: us-gaap:StockholdersEquity.
Figure provenance: SEC companyfacts. Latest point: FY 2025 ended 2025-12-31; accession 0001083301-26-000031; filed 2026-02-27. Concept: CashAndCashEquivalentsAtCarryingValue. Source concepts: us-gaap:CashAndCashEquivalentsAtCarryingValue.
Figure provenance: SEC companyfacts. Latest point: FY 2025 ended 2025-12-31; accession 0001083301-26-000031; filed 2026-02-27. Concept: NetCashProvidedByUsedInOperatingActivities - PaymentsToAcquirePropertyPlantAndEquipment. Source concepts: us-gaap:NetCashProvidedByUsedInOperatingActivities; us-gaap:PaymentsToAcquirePropertyPlantAndEquipment.
Quarterly
Quarterly standardized facts from SEC companyfacts as of latest extracted filing date 2026-05-08. Source: https://data.sec.gov/api/xbrl/companyfacts/CIK0001083301.json.
| Quarter | End Date | Revenue | Net Income | Diluted EPS | Method |
|---|---|---|---|---|---|
| 2022-Q2 | 2022-06-30 | -0.10 | reported discrete quarter | ||
| 2022-Q3 | 2022-09-30 | -0.32 | reported discrete quarter | ||
| 2023-Q1 | 2023-03-31 | -0.16 | reported discrete quarter | ||
| 2023-Q2 | 2023-06-30 | 15,456,000 | -17,540,000 | -0.08 | reported discrete quarter |
| 2023-Q3 | 2023-09-30 | 18,955,000 | -19,099,000 | -0.09 | reported discrete quarter |
| 2023-Q4 | 2023-12-31 | 23,285,000 | -10,525,000 | derived Q4 = FY annual - nine-month YTD | |
| 2024-Q1 | 2024-03-31 | 42,433,000 | -9,613,000 | -0.03 | reported discrete quarter |
| 2024-Q2 | 2024-06-30 | 35,574,000 | -10,876,000 | -0.03 | reported discrete quarter |
| 2024-Q3 | 2024-09-30 | 27,059,000 | -22,733,000 | -0.06 | reported discrete quarter |
| 2024-Q4 | 2024-12-31 | 34,985,000 | -29,196,000 | derived Q4 = FY annual - nine-month YTD | |
| 2025-Q1 | 2025-03-31 | 34,405,000 | -61,418,000 | -0.16 | reported discrete quarter |
| 2025-Q2 | 2025-06-30 | 47,636,000 | -18,370,000 | -0.05 | reported discrete quarter |
| 2025-Q3 | 2025-09-30 | 43,375,000 | -455,050,000 | -1.13 | reported discrete quarter |
| 2025-Q4 | 2025-12-31 | 26,140,000 | -126,578,000 | derived Q4 = FY annual - nine-month YTD | |
| 2026-Q1 | 2026-03-31 | 12,990,000 | -427,634,000 | -1.01 | reported discrete quarter |
Quarterly Charts
Figure provenance: SEC companyfacts. Latest point: FY 2026 ended 2026-03-31; accession 0001083301-26-000092; filed 2026-05-08. Concept: RevenueFromContractWithCustomerIncludingAssessedTax. Source concepts: us-gaap:RevenueFromContractWithCustomerIncludingAssessedTax.
Figure provenance: SEC companyfacts. Latest point: FY 2026 ended 2026-03-31; accession 0001083301-26-000092; filed 2026-05-08. Concept: NetIncomeLoss. Source concepts: us-gaap:NetIncomeLoss.
Figure provenance: SEC companyfacts. Latest point: FY 2026 ended 2026-03-31; accession 0001083301-26-000092; filed 2026-05-08. Concept: EarningsPerShareDiluted. Source concepts: us-gaap:EarningsPerShareDiluted.
Macro Cross-References
- CPIAUCSL - Consumer Price Index for All Urban Consumers: All Items in U.S. City Average
- UNRATE - Unemployment Rate
- FEDFUNDS - Federal Funds Effective Rate
- CES0500000003 - Average Hourly Earnings of All Employees, Total Private
- DFEDTARU - Federal Funds Target Range - Upper Limit
- DFEDTARL - Federal Funds Target Range - Lower Limit
- DGS3MO - Market Yield on U.S. Treasury Securities at 3-Month Constant Maturity
- DGS2 - Market Yield on U.S. Treasury Securities at 2-Year Constant Maturity
- DGS10 - Market Yield on U.S. Treasury Securities at 10-Year Constant Maturity
- DGS30 - Market Yield on U.S. Treasury Securities at 30-Year Constant Maturity
- T10Y2Y - 10-Year Treasury Constant Maturity Minus 2-Year Treasury Constant Maturity
- CPILFESL - Consumer Price Index for All Urban Consumers: All Items Less Food and Energy
- CPIUFDSL - Consumer Price Index for All Urban Consumers: Food
- CPIENGSL - Consumer Price Index for All Urban Consumers: Energy
- CUSR0000SAH1 - Consumer Price Index for All Urban Consumers: Shelter
- PCEPI - Personal Consumption Expenditures: Chain-type Price Index
- PCEPILFE - Personal Consumption Expenditures Excluding Food and Energy: Chain-type Price Index
- PPIACO - Producer Price Index by Commodity: All Commodities
- T10YIE - 10-Year Breakeven Inflation Rate
- U6RATE - Total Unemployed, Plus All Marginally Attached Workers Plus Total Employed Part Time for Economic Reasons
- PAYEMS - All Employees, Total Nonfarm
- CIVPART - Labor Force Participation Rate
- EMRATIO - Employment-Population Ratio
- UNEMPLOY - Unemployed
- CE16OV - Employment Level
- ICSA - Initial Claims
- JTSJOL - Job Openings: Total Nonfarm
- JTSQUR - Quits: Total Nonfarm
- GDPC1 - Real Gross Domestic Product
- A191RL1Q225SBEA - Real Gross Domestic Product: Percent Change from Preceding Period
- INDPRO - Industrial Production: Total Index
- TCU - Capacity Utilization: Total Index
- HOUST - New Privately-Owned Housing Units Started: Total Units
- PERMIT - New Privately-Owned Housing Units Authorized in Permit-Issuing Places: Total Units
- RSAFS - Advance Retail Sales: Retail Trade
- PCE - Personal Consumption Expenditures
- DSPIC96 - Real Disposable Personal Income
- PSAVERT - Personal Saving Rate
- M2SL - M2
- BOPGSTB - U.S. International Trade in Goods and Services: Balance
- MSPUS - Median Sales Price of Houses Sold for the United States
- HSN1F - New One Family Houses Sold: United States
- RHORUSQ156N - Homeownership Rate in the United States
- TTLCONS - Total Construction Spending: Total Construction in the United States
- RRVRUSQ156N - Rental Vacancy Rate in the United States
- TOTALSL - Total Consumer Credit Owned and Securitized
- REVOLSL - Revolving Consumer Credit Owned and Securitized
- DRCCLACBS - Delinquency Rate on Credit Card Loans, All Commercial Banks
- GDP - Gross Domestic Product
- GPDI - Gross Private Domestic Investment
- GCE - Government Consumption Expenditures and Gross Investment
- PCEC - Personal Consumption Expenditures
- NETEXP - Net Exports of Goods and Services
- GFDEBTN - Federal Debt: Total Public Debt
- GFDEGDQ188S - Federal Debt: Total Public Debt as Percent of Gross Domestic Product
- FYFSD - Federal Surplus or Deficit
- FGRECPT - Federal Government Current Receipts
- FGEXPND - Federal Government: Current Expenditures
- MANEMP - All Employees, Manufacturing
- USCONS - All Employees, Construction
- USTRADE - All Employees, Retail Trade
- USFIRE - All Employees, Financial Activities
- USGOVT - All Employees, Government
- AWHAETP - Average Weekly Hours of All Employees, Total Private
- DGORDER - Manufacturers' New Orders: Durable Goods
- NEWORDER - Manufacturers' New Orders: Nondefense Capital Goods Excluding Aircraft
- BUSINV - Total Business Inventories
- EXPGS - Exports of Goods and Services
- IMPGS - Imports of Goods and Services
- IR - Import Price Index (End Use): All Commodities
- PPIFIS - Producer Price Index by Commodity: Final Demand
Latest quarter (10-Q)
Latest 10-Q source: 0001083301-26-000092.
ITEM 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations
The following Management’s Discussion and Analysis of Financial Condition and Results of Operations should be read in conjunction with a review of the other Items included in this Quarterly Report on Form 10-Q, as well as our audited consolidated financial statements and related notes as disclosed in our Annual Report on Form 10-K for the fiscal year ended December 31, 2025. All figures presented below represent results from continuing operations, unless otherwise specified. Capitalized terms used but not otherwise defined herein shall have the meanings ascribed to such terms in the consolidated financial statements. Unless the context otherwise requires, references in this Quarterly Report on Form 10-Q to the “Company,” “TeraWulf,” “we,” “us” or “our” refers to TeraWulf Inc. and its consolidated subsidiaries, unless otherwise indicated. Certain statements contained in this Management’s Discussion and Analysis of Financial Condition and Results of Operations may be deemed forward-looking statements. See “Forward-Looking Statements.”
Overview
We are a vertically integrated owner, developer, and operator of digital infrastructure assets in the United States, purpose-built to support HPC workloads, including AI, machine learning, and advanced cloud applications.
During the three months ended March 31, 2026, HPC leasing revenue represented a majority of total revenue for the first time, reflecting the continued ramp of long-term contracted capacity at the Lake Mariner Data Campus.
The Company has undergone a deliberate strategic transition toward HPC hosting as its primary business. While TeraWulf historically operated bitcoin mining facilities and leveraged flexible compute loads to support early infrastructure development, the Company has begun to curtail and repurpose portions of this infrastructure to support HPC development, and going forward capital allocation, development activities, and operating focus are centered on HPC data center development, long-term hosting arrangements, and infrastructure supporting AI-driven compute workloads.
Our strategy is grounded in controlling infrastructure at utility scale and pairing compute-optimized facilities with reliable, long-duration power resources. By controlling land use through ownership or long-term ground leases, together with interconnection rights, electrical and cooling infrastructure, and, where appropriate, on-site generation, the Company delivers resilient, cost-efficient capacity to hyperscale and enterprise customers under multi-year hosting arrangements. These hosting arrangements are typically structured as long-term data center leases, generally ranging from 10 to 25 years, and in certain cases benefit from investment-grade credit support, enhancing the durability and finance ability of contracted revenues. These arrangements are expected to provide long-term revenue visibility and support project-level financing as the platform scales.
This infrastructure-first approach enables TeraWulf to serve Tier-1 counterparties while maintaining operational control, development flexibility, and disciplined capital allocation.
The Company’s platform is differentiated by long-term control of utility-scale infrastructure, deep in-house power and grid expertise, and a scalable development model supported by long-term, credit-enhanced customer contracts.
Strategy Execution and Capital Allocation
Management’s execution of the Company’s strategy is focused on converting advantaged infrastructure positions into long-dated, contracted HPC capacity. This includes the phased conversion of existing infrastructure, where appropriate, to support HPC workloads. This execution model emphasizes vertical integration, long-duration customer contracts supported by credit enhancement, and phased development aligned with customer deployment schedules and power availability.
A core element of this approach is infrastructure control. By retaining control over land use, interconnection rights, electrical and cooling systems, and on-site generation where appropriate, the Company is able to manage development risk, optimize capital deployment, and maintain operational oversight throughout the lifecycle of its facilities. Management believes this approach reduces execution risk relative to third-party development models and supports infrastructure-style returns.
48
The Company’s contracting strategy prioritizes multi-year hosting arrangements with credit-supported counterparties, which reduces exposure to commodity-driven revenue streams, including bitcoin price volatility, as the Company’s revenue mix continues to shift toward contracted HPC leasing. These arrangements provide long-dated revenue visibility, support project-level financing, and reduce cash flow volatility as the platform scales. Credit enhancement associated with certain customer contracts has been a key factor in accelerating development timelines and enabling third-party financing.
Each campus is designed for modular, multi-phase expansion. Initial phases deliver near-term contracted capacity, while subsequent phases are aligned with customer deployment schedules and infrastructure readiness, including power availability and interconnection timing. Management believes this phased approach allows the Company to scale efficiently while maintaining capital discipline.
While the Company currently derives a significant portion of its revenue from bitcoin mining, HPC hosting is now the Company’s primary growth driver and operating focus.
Strategic Transactions
Acquisition of Beowulf E&D
On May 21, 2025 (the “Acquisition Date”), the Company acquired 100% of the membership interests in Beowulf Electricity & Data LLC, Beowulf E&D (NY) LLC and Beowulf E&D (MD) LLC (collectively, “Beowulf E&D”). Additional detail regarding the consideration paid and contingent consideration associated with the Beowulf E&D acquisition is included in Note 3 to the condensed consolidated financial statements.
The acquisition materially expanded the Company’s internal capabilities across power infrastructure development, site operations, engineering, and project execution. Approximately 94 employees transitioned to the Company as part of the transaction. Management believes this acquisition strengthened operational integration and execution capability as the Company scales its HPC platform.
Cayuga Site Ground Lease
On August 12, 2025, the Company entered into a long-term ground lease for approximately 183 acres in Lansing, New York. Upon completion of permitting and site development, the Cayuga Site has the potential for up to 400 MW of gross capacity, supporting approximately 320 MW of critical IT load. The Cayuga Site provides an additional anchor location with existing interconnection and supporting infrastructure and represents a key component of the Company’s forward development pipeline.
Abernathy Joint Venture
On October 27, 2025, the Company entered into an amended and restated limited liability company agreement governing the Abernathy Joint Venture. The Company holds a 50.1% equity interest in the joint venture. The Abernathy HPC Campus is designed for 168 MW of critical IT load, representing the full build-out of the site. The campus is 100% pre-leased to Fluidstack under a 25-year data center sublease with contractual rent escalators and options for term contraction. Lease obligations are supported by investment-grade credit enhancement provided by Google, materially strengthening the credit profile of the contracted revenues and facilitating third-party debt financing.
Management believes the Abernathy Joint Venture reflects the extension of the Company’s commercial relationship with Fluidstack, supported by continued credit enhancement from Google, to an additional site.
Hawesville Site
In February 2026, the Company entered into an Agreement of Purchase and Sale for a former industrial site in Hawesville, Kentucky (the “Hawesville Site”). The Hawesville Site is a strategically located brownfield infrastructure site which includes more than 250 buildable acres with immediate access to power infrastructure, including multiple high-voltage transmission lines, an on-site energized substation, and a direct connection to the regional transmission network. We plan on constructing and operating a HPC/AI data center on the Hawesville Site and are in discussions with potential customers for the site. The Hawesville Site has up to 480 MW of gross power availability; construction is expected to commence in 2026, with a phased buildout extending through 2027, subject to site planning and permitting approvals. Hawesville is expected to further diversify the Company’s geographic footprint and support future HPC customer demand.
49
Operations Overview
Lake Mariner Data Campus
The Lake Mariner Data Campus is TeraWulf’s flagship HPC campus and a core component of the Company’s contracted HPC platform. The Lake Mariner Data Campus is located in Barker, New York on the site of a former coal-fired power plant that was retired and repurposed into a modern digital infrastructure campus with operations that commenced in March 2022. The site benefits from substantial existing transmission infrastructure and is designed for scalable expansion.
As of March 31, 2026, the Lake Mariner Data Campus operated 145 MW of legacy bitcoin mining capacity and had 60 MW of critical IT HPC capacity. The campus is undergoing phased expansion to support additional HPC contracted deployments with gross capacity of approximately 500 MW in the near term,a and with potential expansion to approximately 750 MW, subject to additional approvals from the NYISO. During the quarter, certain mining facilities were curtailed or repurposed to support HPC development, consistent with the Company’s strategic transition.
The Lake Mariner Data Campus sources power from the NYISO Zone A grid, which is characterized by low-cost, low-carbon energy. Of the campus’s total power needs, 90 MW is allocated under an agreement with the New York Power Authority (“NYPA”) executed in February 2022, providing high-load factor power under a ten-year term commencing with NYPA’s initial power delivery.
The Lake Mariner Data Campus is designed to support multiple hyperscale and enterprise tenants through modular, phased development and incorporates advanced liquid-cooling systems, redundant electrical architectures, and scalable mechanical and network infrastructure optimized for high-density GPU deployments.
TeraWulf operates the Lake Mariner Data Campus through its subsidiaries La Lupa Data LLC (“La Lupa”) and Akela Data LLC (“Akela”). Collectively, La Lupa and Akela represent 438 MW of contracted critical IT HPC capacity at the Lake Mariner Data Campus, with some deliveries having commenced in 2025 and others extending into 2026.
La Lupa
In December 2024, La Lupa entered into long-term data center lease agreements with Core42 (the “Core42 Leases”), pursuant to which we committed to deliver 60 MW of critical IT load. The Core42 Leases have an initial ten-year term with two five-year renewal options and include customary provisions governing operating standards, service levels, and expansion rights. Construction commenced in 2024 and continued into 2025 and 2026; commissioning activities commenced in 2025 with phased deliveries aligned to meet Core42’s deployment schedule. Operationally, we continue to execute on our buildout. As of March 31, 2026, we had fully delivered CB-2, representing the full contracted capacity under the Core42 Leases currently in service.
Akela
In August 2025, Akela entered into three data center lease agreements (the “Akela Fluidstack Leases”) with Fluidstack USA I Inc. (together with its affiliates, “Fluidstack”), a leading AI cloud platform. Under the Akela Fluidstack Leases, we will provide 378 MW of critical
[Excerpt truncated for page length; source filing is linked above.]
Latest 10-K MD&A
ITEM 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations
The following Management’s Discussion and Analysis of Financial Condition and Results of Operations should be read in conjunction with the other Items included in this Annual Report and with the accompanying consolidated financial statements and notes thereto included elsewhere in this report. All figures presented below represent results from continuing operations, unless otherwise specified. Certain statements contained in this Management’s Discussion and Analysis of Financial Condition and Results of Operations may be deemed forward-looking statements. See “Forward-Looking Statements.”
25
Table of Contents
This MD&A generally discusses 2025 and 2024 items and year-to-year comparisons between 2025 and 2024. Discussions of 2023 items and year-to-year comparisons between 2024 and 2023 are not included, and can be found in "Management’s Discussion and Analysis of Financial Condition and Results of Operations” in Part II, Item 7 of the Company’s Annual Report on Form 10-K for the year ended December 31, 2024.
Overview
We are a vertically integrated owner, developer, and operator of digital infrastructure assets in the United States, purpose-built to support HPC workloads, including AI, machine learning, and advanced cloud applications.
The Company has undergone a deliberate strategic transition toward HPC hosting as its primary business. While TeraWulf historically operated bitcoin mining facilities and leveraged flexible compute loads to support early infrastructure development, going forward the Company’s capital allocation, development activities, and operating focus are centered on HPC data center development, long-term hosting arrangements, and infrastructure supporting AI-driven compute workloads.
Our strategy is grounded in controlling infrastructure at utility scale and pairing compute-optimized facilities with reliable, long-duration power resources. By controlling land use through ownership or long-term ground leases, together with interconnection rights, electrical and cooling infrastructure, and, where appropriate, on-site generation, the Company delivers resilient, cost-efficient capacity to hyperscale and enterprise customers under multi-year hosting arrangements.
The Company’s platform is differentiated by long-term control of utility-scale infrastructure, deep in-house power and grid expertise, and a scalable development model supported by long-term, credit-enhanced customer contracts.
Strategy Execution and Capital Allocation
Management’s execution of the Company’s strategy is focused on converting advantaged infrastructure positions into long-dated, contracted HPC capacity. This execution model emphasizes vertical integration, long-duration customer contracts supported by credit enhancement, and phased development aligned with customer deployment schedules and power availability.
A core element of this approach is infrastructure control. By retaining control over land use, interconnection rights, electrical and cooling systems, and on-site generation where appropriate, the Company is able to manage development risk, optimize capital deployment, and maintain operational oversight throughout the lifecycle of its facilities. Management believes this approach reduces execution risk relative to third-party development models and supports infrastructure-style returns.
The Company’s contracting strategy prioritizes multi-year hosting arrangements with credit-supported counterparties. These arrangements provide long-dated revenue visibility, support project-level financing, and reduce cash flow volatility as the platform scales. Credit enhancement associated with certain customer contracts has been a key factor in accelerating development timelines and enabling third-party financing.
Each campus is designed for modular, multi-phase expansion. Initial phases deliver near-term contracted capacity, while subsequent phases are developed in line with customer demand and power availability. Management believes this phased approach allows the Company to scale efficiently while maintaining capital discipline.
Consistent with this strategy, the Company has deliberately shifted capital allocation away from new bitcoin mining investments and toward HPC data center development. While legacy mining operations continue to utilize existing infrastructure, management does not intend to deploy incremental growth capital to mining activities.
Strategic Transactions
Acquisition of Beowulf E&D
On May 21, 2025 (the “Acquisition Date”), the Company acquired 100% of the membership interests in Beowulf Electricity & Data LLC, Beowulf E&D (NY) LLC and Beowulf E&D (MD) LLC (collectively, “Beowulf E&D”). Additional detail regarding the consideration paid and contingent consideration associated with the Beowulf E&D acquisition is included in Note 3 to the consolidated financial statements.
26
Table of Contents
The acquisition materially expanded the Company’s internal capabilities across power infrastructure development, site operations, engineering, and project execution. Approximately 94 employees transitioned to the Company as part of the transaction. Management believes this acquisition strengthened operational integration and execution capability as the Company scales its HPC platform.
Cayuga Site Ground Lease
On August 12, 2025, the Company entered into a long-term ground lease for approximately 183 acres in Lansing, New York. Upon completion of permitting and site development, the Cayuga Site has the potential for up to 400 MW of gross capacity, supporting approximately 320 MW of critical IT load. The Cayuga Site provides an additional anchor location with existing interconnection and supporting infrastructure and represents a key component of the Company’s forward development pipeline.
Abernathy Joint Venture
On October 27, 2025, the Company entered into an amended and restated limited liability company agreement governing the Abernathy Joint Venture. The Company holds a 50.1% equity interest in the joint venture. The Abernathy HPC Campus represents the extension of the Company’s commercial relationship with Fluidstack, supported by the same credit enhancement framework, to an additional site.
The Abernathy HPC Campus is designed for 168 MW of critical IT load, representing the full build-out of the site. The campus is 100% pre-leased to Fluidstack under a 25-year data center sublease with contractual rent escalators and options for term contraction. Lease obligations are supported by investment-grade credit enhancement provided by Google, materially strengthening the credit profile of the contracted revenues and facilitating third-party debt financing.
Management believes the Abernathy Joint Venture reflects the extension of the Company’s commercial relationship with Fluidstack, supported by continued credit enhancement from Google, to an additional site.
Operations Overview
The Company’s primary operating campus is the Lake Mariner Data Campus, located in Barker, New York on the site of a former coal-fired power plant that was retired and repurposed into a modern digital infrastructure campus. The site benefits from substantial existing transmission infrastructure and is designed for scalable expansion.
As of December 31, 2025 the Lake Mariner Data Campus operated 245 MW of legacy bitcoin mining capacity and had 18 critical IT MW of HPC capacity. The Company commenced HPC leasing operations at the Lake Mariner Data Campus in July 2025 and is executing a phased expansion to support additional contracted HPC deployments.
The campus is capable of scaling to approximately 500 MW of gross capacity in the near term, with potential expansion to approximately 750 MW subject to additional approvals from the NYISO. Power for the Lake Mariner Data Campus is sourced from the NYISO Zone A grid, with 90 MW allocated under a long-term arrangement with the New York Power Authority.
The Company operates the Lake Mariner Data Campus through La Lupa and Akela. Together, the Company’s contracted HPC platform represents 522 MW of critical IT load, including the Company’s 50.1% attributable share of the Abernathy HPC Campus. As of December 31, 2025, the Company had energized 18 critical IT MW of HPC capacity and remains on track to deliver additional contracted capacity in phases aligned with customer deployment schedules.
Regional Diversification and Platform Resilience
The development of the Abernathy HPC Campus through the Abernathy Joint Venture provides the Company with meaningful regional diversification. By expanding its HPC platform beyond New York into the Southwest Power Pool region, the Company reduces concentration risk related to power markets, regulatory frameworks, weather events, construction timelines, and operational disruptions.
Geographic diversification also helps mitigate the potential impact of localized physical security incidents, natural disasters, and certain cyber events by distributing infrastructure across multiple regions and operating environments. Management believes this diversification enhances overall platform resilience, supports customer deployment flexibility, and strengthens the Company’s ability to maintain continuity of operations across its portfolio.
27
Table of Contents
Power Strategy
The Company’s power strategy emphasizes reliability, efficiency, and responsible integration with regional electric grids. The Company’s development and operations team brings deep experience in power generation, transmission, interconnection, and large-scale energy infrastructure, which informs site selection, facility design, and operational execution.
This power and infrastructure expertise enables the Company to evaluate complex, power-intensive sites efficiently and provides meaningful differentiation relative to data center developers without comparable in-house energy capabilities. The Company expects certain sites to include on-site generation, battery storage and other dispatchable resources to enhance reliability for mission-critical compute and to support grid operations where appropriate.
Liquidity and Capital Resources
The Company’s primary sources of liquidity include cash on hand, cash generated from operations, sale proceeds from bitcoin, equity issuances, debt financing, and project-level financing arrangements. Capital requirements are driven primarily by HPC data center development, construction activities, and associated infrastructure investments.
Management expects future capital deployment to be focused on contracted HPC projects and disciplined expansion of the Company’s development pipeline. The Company continues to evaluate financing alternatives to support growth while managing balance sheet risk.
Outlook
The Company expects future results to be increasingly influenced by the development and operation of its HPC data center platform. As contracted HPC capacity is delivered and energized under existing hosting arrangements, management expects the Company’s revenue mix to continue shifting toward HPC leasing and away from legacy bitcoin mining operations.
Future performance will depend on the timing of construction, commissioning, customer deployment schedules, access to power and interconnection, and the availability of project-level financing. Management expects capital deployment in future periods to be focused primarily on contracted HPC projects and disciplined expansion of the Company’s development pipeline.
The table below presents the lease and nonlease components of HPC lease revenue for the years ended December 31, 2025, 2024, and 2023.
| Year Ended December 31, | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|
| 2025 | 2024 | 2023 | ||||||||
| HPC lease revenue(1) | ||||||||||
| Rent | $ | 13,750 | $ | — | $ | — | ||||
| Power passthrough(2) | 1,404 | — | — | |||||||
| Tenant fit out, maintenance and other | 1,745 | — | — | |||||||
| Total HPC lease revenue | $ | 16,899 | $ | — | $ | — | ||||
| Cost of revenue (exclusive of depreciation)(2) | $ | 2,464 | $ | — | $ | — |
(1) Certain of the Core42 Leases commenced in 2025 which comprised 18 critical IT MW HPC lease capacity as of December 31, 2025. The remainder of the HPC Leases are expected to commence in 2026.
(2) Cost of revenue (exclusive of depreciation) represents power costs which are passed through to the customer without markup and are included on a gross basis in HPC lease revenue as well as includes costs incurred by the Company in connection with its fit-out services under the HPC Leases.
Bitcoin Mining Operations
As of December 31, 2025, we owned approximately 54,100 miners, with approximately 49,400 operational at our bitcoin mining facilities on the Lake Mariner Data Campus (the “LMD Bitcoin Mining Facilities”) and the remainder
28
Table of Contents
undergoing maintenance, awaiting disposal or on standby to replace miners under repair. These miners were comprised as follows:
| Vendor and Model | Number of miners | |
|---|---|---|
| Bitmain S19 XP | 4,300 | |
| Bitmain S19j XP | 13,400 | |
| Bitmain S19k Pro | 1,500 | |
| Bitmain S21 | 8,200 | |
| Bitmain S21 Pro | 26,700 | |
| 54,100 |
As of December 31, 2025, our fleet of miners ranged in age from 0.7 years to 3.6 years and have an average age of approximately 1.2 years. We do not have scheduled downtime for our miners and while we periodically perform unscheduled maintenance on our miners, such downtime has not been significant historically. When performing unscheduled maintenance, depending on the length of estimated repair time, we may replace a miner with a substitute miner to limit overall downtime. As of December 31, 2025, our fleet of miners at the LMD Bitcoin Mining Facilities had a range of energy efficiency from 15 to 23 joules per terahash (“j/th”) and has an average energy efficiency of 17.2 j/th.
Bitcoin Mining - Share of Global Hashrate
Several factors influence our ability to mine bitcoin profitably, including bitcoin’s USD value, mining difficulty, global hashrate, power costs, fleet energy efficiency, and overall data center efficiency. Among these, energy efficiency is a critical driver of profitability, as power costs represent the most significant direct expense in bitcoin mining. We believe we operate a highly efficient mining fleet, optimized to maximize output while minimizing energy consumption. To assess operational performance and effectiveness, the Company tracks key metrics, which we believe are also valuable to investors for evaluating our progress and benchmarking against industry peers.
The table below presents our miner efficiency and computing power as compared to the global computing power as of December 31, 2025 and 2024:
| December 31, 2025 | December 31, 2024(1) | ||||
|---|---|---|---|---|---|
| Global hashrate (EH/s)(2) | 980.2 | 704.0 | |||
| Miner efficiency (w/th)(3) | 17.5 | 19.0 | |||
| TeraWulf operational hashrate (EH/s)(4) | 9.3 | 9.7 | |||
| TeraWulf % of Global hashrate | 0.9 | % | 1.4 | % |
(1) Results as of December 31, 2024 reflect hashrate of mining operations at the LMD Bitcoin Mining Facilities and TeraWulf’s net share of hashrate produced at the Nautilus Cryptomine Facility.
(2) Total global hashrate obtained from YCHARTS (https://ycharts.com/indicators/bitcoin_network_hash_rate)
(3) Joules of energy required to produce each terahash of processing power
(4) While nameplate at the LMD Bitcoin Mining Facilities was 10.9 EH/s and 9.7 EH/s as of December 31, 2025 and 2024, respectively, actual operational hashrate depends on a variety of factors, including (but not limited to) performance tuning to increase efficiency and maximize margin, scheduled outages (scopes to improve reliability or performance), unscheduled outages, curtailment due to participation in various cash generating demand response programs, derate of ASICS due to adverse weather and ASIC maintenance and repair.
As of December 31, 2025, our operating hashrate represented approximately 0.9% of the total global hashrate, aligning with our share of global blockchain rewards. As of that date, this translated to approximately 4 bitcoin mined per day. To maintain profitability, we focus on optimizing operational efficiency and cost management, ensuring that our mining rewards consistently cover direct operating expenses.
29
Table of Contents
Bitcoin Mining - Average Cost of Bitcoin Mined
The table below presents the average cost of mining each bitcoin, including bitcoin mined at the LMD Bitcoin Mining Facilities and the Company’s net share of bitcoin mined at the Nautilus Cryptomine Facility, for the years ended December 31, 2025 and 2024 and the total energy cost per kWh utilized within the facilities.
| Year Ended December 31, | |||||||
|---|---|---|---|---|---|---|---|
| Cost of mining - Analysis of costs to mine one bitcoin | 2025 | 2024 | |||||
| Cost of mining - LMD Bitcoin Mining Facilities and net share of the Nautilus Cryptomine Facility | |||||||
| Cost of energy per bitcoin mined | $ | 53,609 | $ | 25,227 | |||
| Other direct costs of mining - non energy utilities per bitcoin mined | $ | 72 | $ | 41 | |||
| Cost to mine one bitcoin(1) | $ | 53,681 | $ | 25,268 | |||
| Value of each bitcoin mined(2) | $ | 101,307 | $ | 62,889 | |||
| Cost to mine one bitcoin as % of value of bitcoin mined | 53.0 | % | 40.2 | % | |||
| Statistics | |||||||
| LMD Bitcoin Mining Facilities and net share of the Nautilus Cryptomine Facility | |||||||
| Total bitcoin mined(3) | 1,496 | 2,728 | |||||
| Total value of bitcoin mined(2) ($ in thousands) | $ | 151,556 | $ | 171,547 | |||
| Total MWhs utilized | 1,344,760 | 1,601,061 | |||||
| Total energy expense, net of expected demand response proceeds(4) ($ in thousands) | $ | 80,199 | $ | 68,815 | |||
| Cost per kWh | $ | 0.060 | $ | 0.043 | |||
| Energy expense, net as % of value of bitcoin mined | 52.9 | % | 40.1 | % | |||
| Other direct costs of mining ($ in thousands) | $ | 108 | $ | 111 |
(1) “Cost to mine one bitcoin” is a cash cost metric and does not include depreciation. Although the Company recognizes depreciation with respect to its mining assets, it does not consider depreciation in determining whether it is economical to operate its mining equipment. As a result, the Company does not consider the sunk costs or depreciation of past capital investments in its historical or forecasted breakeven analysis. If depreciation of our miner fleet were factored into the above cost of mining analysis, it would add $41,930 and $22,086 per bitcoin mined for the years ended December 31, 2025 and 2024, respectively, bringing the total “cost to mine one bitcoin” to $95,611 and $47,354 for the years ended December 31, 2025 and 2024, respectively.
(2) Computed as the weighted-average opening price of bitcoin on each respective day the mined bitcoin is earned. Excludes bitcoin earned from profit sharing associated with a bitcoin miner hosting agreement that expired in February 2024 at the LMD Bitcoin Mining Facilities.
(3) Excludes bitcoin earned from profit sharing associated with a bitcoin miner hosting agreement that expired in February 2024 at the LMD Bitcoin Mining Facilities of 0 and 6 bitcoin for the years ended December 31, 2025 and 2024, respectively, and includes TeraWulf’s net share of bitcoin mined at the Nautilus Cryptomine Facility, based on the hashrate share attributed to the Company.
(4) Excludes energy expenses associated with a bitcoin miner hosting agreement that expired in February 2024 at the LMD Bitcoin Mining Facilities and includes TeraWulf’s net share of energy expense at the Nautilus Cryptomine Facility, based on aggregate nameplate power consumption of deployed miners attributed to TeraWulf’s contribution to Nautilus.
Power costs are the most significant expense in our bitcoin mining operations, accounting for 52.9% and 40.1% of the total value of bitcoin mined for the years ended December 31, 2025 and 2024, respectively. The increase in power costs as a percentage of bitcoin mined in 2025 compared to 2024 was primarily driven by an approximate 30% increase in the realized cost per kWh and a near doubling of network difficulty and the bitcoin halving event in April 2024, which reduced block rewards. These impacts were partially offset by growth in our average operating hashrate for a portion of 2025 and an increase in the average market value of each bitcoin mined.
Energy prices are highly volatile, influenced by global events that can drive nationwide fluctuations in power costs. At the LMD Bitcoin Mining Facilities, power costs are subject to variable market rates, which can change hourly based on wholesale electricity pricing. While this introduces some unpredictability, it also provides us with the flexibility to actively manage our energy consumption, optimizing for profitability and efficiency. Energy prices are also highly sensitive to weather conditions, such as winter storms and polar vortices, which can increase regional power demand and drive up costs. During such events, we may curtail operations to avoid consuming power at peak rates, or we may be curtailed under demand response programs in which we participate. For the years ended December 31, 2025 and 2024, the average aggregate realized power prices at the LMD Bitcoin Mining Facilities and Nautilus Cryptomine Facility were $0.060 and $0.043 per kilowatt hour, respectively.
30
Table of Contents
Our management team continuously monitors market conditions to determine when and for how long to curtail operations. If curtailment is not mandated under demand response programs, we make real-time decisions to curtail mining whenever power prices exceed the value of the fixed bitcoin reward. As a result, curtailment increases when bitcoin’s value declines or energy prices rise, and decreases when bitcoin’s value appreciates or energy costs fall. These decisions are actively managed on an hour-by-hour basis to optimize profitability.
During the years ended December 31, 2025 and 2024, we curtailed operations at the LMD Bitcoin Mining Facilities in response to weather events, energy price spikes, and participation in demand response programs. The Company records expected payments to be received for demand response programs as a reduction in cost of revenue, which amounted to $17.7 million and $8.6 million for the years ended December 31, 2025 and 2024, respectively.
The Company has purchased all miners with cash, without relying on limited recourse equipment financing for miner acquisitions. To support operations, invest in our previously owned Nautilus joint venture, and purchase miners and other fixed assets, we have raised capital through both equity issuances and corporate-level debt. Costs related to these capital raises are not included in this analysis.
Miner acquisition costs, or capital expenditures, are not factored into the cost of mining analysis, as they do not impact the marginal cost of producing one bitcoin. Instead, these costs are recorded as property, plant, and equipment in the consolidated balance sheets. Depreciation of property, plant, and equipment is calculated using the straight-line method, with estimated useful lives of four years for miners and five years for computer equipment.
During the year ended December 31, 2025, the Company recorded accelerated depreciation expense of $19.6 million related to a certain miner building and related miners of which the Company shortened their useful lives based on expected shutdown of operations for purposes of supporting the HPC operations. During the year ended December 31, 2024, the Company recorded accelerated depreciation expense of $5.1 million related to certain miners of which the Company shortened their estimated useful lives based on replacement by April 30, 2024. While our standard depreciation period for miners is four years, historically low power costs may allow for a longer actual useful life in certain cases. However, if depreciation were included in the cost of mining analysis, it would add $41,930 and $22,086 per bitcoin mined for the years ended December 31, 2025 and 2024, respectively.
Estimating asset useful lives requires management judgment, particularly given the rapid evolution of next-generation mining rigs in industrial-scale bitcoin mining. Depreciation schedules may be adjusted if events, regulatory changes, or shifts in operating conditions indicate a need for revision. Management continuously evaluates factors such as future energy market conditions, operating costs, maintenance practices, and capital investment needs to ensure depreciation assumptions remain reasonable. When an asset’s estimated useful life is adjusted—either shortened or extended—depreciation provisions are updated accordingly, which could have a material impact on future financial results.
Recent Developments
On February 2, 2026, the Company entered into an Agreement of Purchase and Sale for a former industrial site in Hawesville, Kentucky (“Hawesville”). The Company exercised an exclusivity option to purchase Hawesville, which includes more than 250 buildable acres with immediate access to power infrastructure, including multiple high-voltage transmission lines, an on-site energized substation, and a direct connection to the regional transmission network. The Hawesville seller was granted a 6.8% minority equity interest in TeraWulf’s Hawesville development entity, which is intended to develop and own a high-performance computing/artificial intelligence data center on the property. The Hawesville seller has the right to request the redemption of its minority interest starting on the first anniversary of the data center’s commencement of operations (the “Operations Anniversary Date”). The Hawesville seller will not participate in the development, financing, construction, management or operation of the data center and will not have any obligations to contribute capital, unless its minority interest is not redeemed in full within 30 days after the Operations Anniversary Date. The Hawesville acquisition does not require any third-party consents or regulatory approvals and closed effective February 2, 2026.
Additionally, on February 2, 2026, the Company issued a press release announcing the entry into an Equity and Asset Purchase Agreement (the “Morgantown Purchase Agreement”) for the Morgantown generating station in Charles County, Maryland, The Morgantown Purchase Agreement was signed in late 2025 and contemplates the acquisition of the Morgantown generating station, a grid-connected power generation facility with approximately 210 MW of current operational capacity, including electrical infrastructure, associated real property, contracts and other assets (“Morgantown”). The closing of the Morgantown acquisition is subject to certain third-party consents and customary regulatory approvals, including from the Federal Energy Regulatory Commission. The Company expects to close on the Morgantown acquisition in the second quarter of 2026, subject to receiving these consents and approvals.
31
Table of Contents
Results of Operations - Comparative Results for the Years Ended December 31, 2025 and 2024
The Company generates revenue in the form of bitcoin by providing hash computation services to a mining pool operator to mine bitcoin and validate transactions on the global bitcoin network using miners owned by the Company. The earned bitcoin are routinely sold for U.S. dollars. The Company also previously earned revenue by providing bitcoin miner hosting services to third parties.
In July 2025, the Company commenced its HPC leasing operations. HPC lease revenue is generated by leasing datacenter space and providing related services to our HPC customers. These leasing agreements include lease components, nonlease components (such as power delivery, physical security, maintenance), as well as non-component elements such as taxes. Under these leases, customers pay fixed payments (based on electric capacity) and variable payments on a recurring basis. HPC power costs are passed through to the customer without markup and are included on a gross basis in HPC lease revenue.
The Company’s business strategy centers on maximizing revenue and profitability of our bitcoin mining fleet while expanding our datacenter infrastructure to support HPC leasing activities. We plan to operate infrastructure necessary for profitable bitcoin mining while pursuing high-value HPC leasing opportunities that leverage our power utilization and digital infrastructure. We are confident our expertise in power infrastructure and digital asset mining can be favorably applied to the design, development, and operation of large-scale datacenters. These datacenters are optimized for high-value applications such as cloud computing, machine learning, and artificial intelligence. We are actively seeking opportunities to expand into these areas using our knowledge, expertise, and existing infrastructure wherever favorable market opportunities arise.
Revenue
The following table presents revenue (in thousands):
| Year Ended December 31, | ||||||
|---|---|---|---|---|---|---|
| 2025 | 2024 | |||||
| Revenue: | ||||||
| Digital asset revenue | $ | 151,556 | $ | 140,051 | ||
| HPC lease revenue | 16,899 | — | ||||
| Total revenue | $ | 168,455 | $ | 140,051 | ||
| Percentage of total revenue | ||||||
| Digital asset revenue | 90 | % | 100 | % | ||
| HPC lease revenue | 10 | % | 0 | % | ||
| Total revenue | 100 | % | 100 | % |
Total revenue for the years ended December 31, 2025 and 2024 was $168.5 million and $140.1 million, respectively, representing an increase of $28.6 million.
Digital asset revenue for the years ended December 31, 2025 and 2024 was $151.6 million and $140.1 million, respectively, an increase of $11.5 million. The increase was primarily attributed to an increase in the average price of bitcoin during the year ended December 31, 2025 of $101,658 as compared to $65,824 during 2024. This increase was partially offset by a decrease in the total bitcoin mined to 1,496 bitcoin during the year ended December 31, 2025 as compared to 2,177 bitcoin mined during the same period in the prior year. Although the Company expanded its mining infrastructure capacity at the LMD Bitcoin Mining Facilities to approximately 245 MW as of December 31, 2025 as compared to 195 MW as of December 31, 2024, total bitcoin mined decreased due to the halving in April 2024 and the increase in network hashrate.
During the years ended December 31, 2025 and 2024, revenue from bitcoin miner hosting was $0 and $0.8 million, respectively, a decrease due to the expiration of the Company’s bitcoin miner hosting contract with a customer in February 2024.
32
HPC lease revenue for the year ended December 31, 2025 was $16.9 million. In July 2025, the Company commenced its HPC leasing operations and as of December 31, 2025 had energized 18 critical IT MW of HPC leasing capacity at the Lake Mariner Data Campus.
Costs and Expenses
The following table presents cost of revenue (exclusive of deprecation) (in thousands):
| Year Ended December 31, | ||||||
|---|---|---|---|---|---|---|
| 2025 | 2024 | |||||
| Cost of revenue (exclusive of depreciation) | $ | 82,663 | $ | 62,608 |
Cost of revenue (exclusive of depreciation) for the years ended December 31, 2025 and 2024 was $82.7 million and $62.6 million, respectively, an increase of approximately $20.1 million. Cost of revenues is primarily comprised of power expense which increased for the year ended December 31, 2025 as compared to the year ended December 31, 2024, resulting from higher realized power prices during the 2025 period partially offset by higher proceeds from participation in demand response programs.
Proceeds from participation in demand response programs are recorded as a reduction in cost of revenue in the period in which the underlying program occurs. These proceeds totaled $17.7 million and $8.6 million for the years ended December 31, 2025 and 2024, respectively. The Company is actively expanding its enrollment in such available programs in New York State.
The following table presents operating expenses (in thousands):
| Year Ended December 31, | ||||||
|---|---|---|---|---|---|---|
| 2025 | 2024 | |||||
| Operating expenses | $ | 12,115 | $ | 3,387 | ||
| Operating expenses - related party | 7,632 | 4,262 | ||||
| $ | 19,747 | $ | 7,649 |
Operating expenses (including related party expenses) for the years ended December 31, 2025 and 2024 were approximately $19.7 million and $7.6 million, respectively, a net increase of $12.1 million. Operating expenses increased primarily due to higher miner repairs of $2.9 million and increased site labor of $2.6 million driven by the expansion of operations at the Lake Mariner Data Campus. Operating expense - related party increased primarily due higher rent subsequent to the New Ground Lease in October 2024 of $4.4 million, partially offset by $1.0 million of site labor at the Lake Mariner Data Campus which was previously reported in operating expenses-related party and since the acquisition of Beowulf E&D in May 2025 is included in operating expenses.
The following table presents selling, general and administrative expenses (in thousands):
| Year Ended December 31, | ||||||
|---|---|---|---|---|---|---|
| 2025 | 2024 | |||||
| Selling, general and administrative expenses | $ | 139,465 | $ | 57,883 | ||
| Selling, general and administrative expenses - related party | 8,292 | 12,695 | ||||
| $ | 147,757 | $ | 70,578 |
Selling, general and administrative expenses (including related party expenses) for the years ended December 31, 2025 and 2024 were $147.8 million and $70.6 million, respectively, a net increase of $77.2 million. Selling, general and administrative expenses increased primarily due to increased expense during the year ended December 31, 2025 as compared to the same period in the prior year of (i) employee compensation and benefits of $47.7 million, (ii) stock-based compensation of $20.0 million, (iii) travel expenses of $2.4 million, (iv) legal and other professional fees of $5.1 million, (v) and Beowulf E&D acquisition-related costs of $1.5 million.
Selling, general and administrative expenses – related party decreased a net $4.5 million primarily due to a full year of fees incurred under the Services Agreement with Beowulf E&D for the year ended December 31, 2024 as compared
33
to 2025 in which fees were only incurred up to the termination of the Services Agreement in May 2025 upon the acquisition of Beowulf E&D.
Depreciation for the years ended December 31, 2025 and 2024 was $88.6 million and $59.8 million, respectively. The increase was primarily due to mining and HPC infrastructure constructed and placed in service between December 31, 2024 and December 31, 2025 at the Lake Mariner Data Campus. Additionally, during the year ended December 31, 2025, the Company recorded accelerated depreciation expense of $19.6 million related to a certain miner building and related miners of which the Company shortened their useful life based on expected shutdown of operations for purposes of supporting the HPC operations. The increase was partially offset by (i) decrease in depreciation on certain electrical equipment and leasehold improvements related to a change in accounting estimate of useful lives in connection with the New Ground Lease in October 2024 and (ii) accelerated depreciation expense of $5.1 million during the year ended December 31, 2024 related to certain miners of which the Company shortened their estimated useful lives based on expected replacement by April 2024.
Loss (gain) on fair value of digital assets, net for the years ended December 31, 2025 and 2024 was $0.6 million and $(2.2) million due to the volatility in the price of bitcoin during the year ended December 31, 2025 as compared to a steady increase during the year ended December 31, 2024.
Change in fair value of contingent consideration was $10.4 million during the year ended December 31, 2025 related to fair value remeasurement of contingent consideration liabilities related to the acquisition of Beowulf E&D based on milestones achieved during the year ended December 31, 2025.
During the year ended December 31, 2025, the Company sold or otherwise disposed of 17,228 miners and received proceeds of $11.6 million resulting in a net loss on disposal of property, plant and equipment of $4.9 million in the consolidated statement of operations. During the year ended December 31, 2024, the Company sold or otherwise disposed of 62,970 miners and received proceeds of $23.3 million resulting in a net loss on disposal of property, plant and equipment of $17.8 million in the consolidated statement of operations.
Interest expense for the years ended December 31, 2025 and 2024 was $80.2 million and $19.8 million, respectively, an increase of $60.4 million. The increase is primarily attributed to stated interest expense of $58.0 million and amortization of debt issuance costs of $22.2 million related to the 2030 Secured Notes, 2031 Convertible Notes and 2032 Convertible Notes which were issued during the year ended December 31, 2025 as well as the 2030 Convertible Notes issued in October 2024. The $19.8 million of interest expense recognized in the year ended December 31, 2024, primarily related to the borrowings under the Loan, Guaranty and Security Agreement with Wilmington Trust (the “Term Loans”), which were fully repaid in July 2024 ahead of maturity.
Change in fair value of warrant and derivative liabilities during the year ended December 31, 2025 was $429.8 million related to the Google Warrants and the conversion feature of the 2031 Convertible Notes which was originally accounted for separately as a derivative liability.
Loss on extinguishment of debt during the year ended December 31, 2024 was $6.3 million related to voluntary prepayment of the Term Loans in February and July 2024, reflecting $1.3 million of prepayment fees and the derecognition of unamortized debt discount of $5.0 million associated with the principal repaid. No loss on extinguishment of debt was recorded during the year ended December 31, 2025.
Income tax provision was $76,000 and $0 for the years ended December 31, 2025 and 2024, respectively. Based upon the level of historical U.S. losses and future projections over the period in which the net deferred tax assets are deductible, at this time, management believes it is more likely than not that the Company will not realize the benefits of the remaining deductible temporary differences, and as a result the Company has recorded a full valuation allowance against its net deferred tax assets as of December 31, 2025 and 2024, except for a $76,000 deferred tax liability as of December 31, 2025 arising from indefinite-lived assets (e.g., tax-deductible goodwill related to the acquisition of Beowulf E&D) that cannot be used as a source of taxable income to support the realization of deferred tax assets when a full valuation allowance is in place.
Equity in net loss of investee, net of tax for the year ended December 31, 2025 was $4.1 million which represents TeraWulf’s proportional share of net loss of the Abernathy Joint Venture which was formed in October 2025 and has not yet commenced operations. The $3.4 million equity in net income of investee, net of tax for the year ended December 31, 2024 represents TeraWulf’s proportional share of the net income of Nautilus prior to the Company’s divestiture of its entire 25% equity interest in Nautilus in October 2024.
34
Additionally the Company recorded a gain on sale of equity interest in investee of $22.6 million in the consolidated statement of operations for the year ended December 31, 2024 as a result of the sale of its interest in Nautilus in October 2024.
Non-GAAP Measure
To provide investors with additional information in connection with our results as determined in accordance with generally accepted accounting principals in the United States (“U.S. GAAP”), we disclose Adjusted EBITDA as a non-GAAP measure. This measure is not a financial measure calculated in accordance with U.S. GAAP, and it should not be considered as a substitute for net loss, operating loss, or any other measure calculated in accordance with U.S. GAAP, and may not be comparable to similarly titled measures reported by other companies.
We define Adjusted EBITDA as net loss adjusted for (i) impacts of interest, taxes, depreciation and amortization; (ii) stock-based compensation expense, amortization of right-of-use asset and related party expense to be settled with respect to common stock, all of which are non-cash items that the Company believes are not reflective of its general business performance, and for which the accounting requires management judgment, and the resulting expenses could vary significantly in comparison to other companies; (iii) one-time, non-recurring transaction-based compensation expense related to the 2030 Convertible Notes (iv) equity in net (loss) income of investee, net of tax, related to the Abernathy Joint Venture and Nautilus and the gain on sale of interest in Nautilus; (v) other income which is related to interest income or income for which management believes is not reflective of the Company’s ongoing operating activities; (vi) change in fair value of contingent consideration, change in fair value of warrant and derivative liabilities, loss on extinguishment of debt and net losses on disposals of property, plant and equipment, net, which are not reflective of the Company’s general business performance; and (vii) acquisition-related transaction costs which management believes are not reflective of the Company’s ongoing operating activities. The Company’s Adjusted EBITDA also includes the impact of distributions from investee received in bitcoin related to a return on the Nautilus investment, which management believes, in conjunction with excluding the impact of equity in net (loss) income of investee, net of tax, is reflective of assets available for the Company’s use in its ongoing operations as a result of its investment in Nautilus.
Management believes that providing this non-GAAP financial measure allows for meaningful comparisons between the Company's core business operating results and those of other companies, and provides the Company with an important tool for financial and operational decision making and for evaluating its own core business operating results over different periods of time. In addition to management's internal use of non-GAAP Adjusted EBITDA, management believes that Adjusted EBITDA is also useful to investors and analysts in comparing the Company’s performance across reporting periods on a consistent basis. Management believes the foregoing to be the case even though some of the excluded items involve cash outlays and some of them recur on a regular basis (although management does not believe any of such items are normal operating expenses necessary to generate the Company’s revenues). For example, the Company expects that share-based compensation expense, which is excluded from Adjusted EBITDA, will continue to be a significant recurring expense over the coming years and is an important part of the compensation provided to certain employees, officers, directors and consultants.
The Company’s Adjusted EBITDA measure may not be directly comparable to similar measures provided by other companies in the Company’s industry, as other companies in the Company’s industry may calculate non-GAAP financial results differently. The Company's Adjusted EBITDA is not a measurement of financial performance under U.S. GAAP and should not be considered as an alternative to net loss or any other measure of performance derived in accordance with U.S. GAAP. Although management utilizes internally and presents Adjusted EBITDA, the Company only utilizes that measure supplementally and does not consider it to be a substitute for, or superior to, the information provided by U.S. GAAP financial results. Accordingly, Adjusted EBITDA is not meant to be considered in isolation of, and should be read in conjunction with, the information contained in the Company’s consolidated financial statements, which have been prepared in accordance with U.S. GAAP.
35
The following table is a reconciliation of the Company’s Adjusted EBITDA to its most directly comparable U.S. GAAP measure (i.e., net loss) for the periods indicated (in thousands):
| Year Ended December 31, | ||||||
|---|---|---|---|---|---|---|
| 2025 | 2024 | |||||
| Net loss | $ | (661,416) | $ | (72,418) | ||
| Adjustments to reconcile net loss to non-GAAP Adjusted EBITDA: | ||||||
| Gain on sale of equity interest in investee | — | (22,602) | ||||
| Equity in net loss (income) of investee, net of tax | 4,130 | (3,363) | ||||
| Distributions from investee, related to Nautilus | — | 22,776 | ||||
| Income tax provision | 76 | — | ||||
| Other income | (39,044) | (3,927) | ||||
| Loss on extinguishment of debt | — | 6,300 | ||||
| Change in fair value of warrants and derivatives | 429,793 | — | ||||
| Interest expense | 80,248 | 19,794 | ||||
| Loss on disposals of property, plant, and equipment, net | 4,895 | 17,824 | ||||
| Change in fair value of contingent consideration | 10,397 | — | ||||
| Depreciation | 88,597 | 59,808 | ||||
| Amortization of right-of-use asset | 4,456 | 1,373 | ||||
| Stock-based compensation expense | 50,909 | 30,927 | ||||
| Transaction-based compensation expense | — | 3,885 | ||||
| Related party expense to be settled with respect to common stock | 2,375 | — | ||||
| Beowulf E&D acquisition-related transaction costs | 1,475 | — | ||||
| Non-GAAP adjusted EBITDA | $ | (23,109) | $ | 60,377 |
Liquidity and Capital Resources
As of December 31, 2025, the Company had balances of cash and cash equivalents of $3,266.4 million, working capital of $1,742.4 million, total stockholders’ equity of $140.4 million and an accumulated deficit of $993.7 million. The Company incurred a net loss of $661.4 million for the year ended December 31, 2025. The Company began mining bitcoin in March 2022 and had 9.3 EH/s of operating capacity as of December 31, 2025. In 2025, the Company commenced its HPC operations. To date, the Company has relied primarily on proceeds from the sale of bitcoin, both self-mined and distributed from the joint venture which owned the Nautilus Cryptomine Facility, and its issuances of debt and equity to fund its principal operations.
The principal uses of cash are for the operation and buildout of data center facilities, debt service, and general corporate activities and, to a lesser extent in 2024, investments in the Nautilus joint venture related to mining facility buildout and activities. Cash flow information is as follows (in thousands):
| Year Ended December 31, | ||||||
|---|---|---|---|---|---|---|
| 2025 | 2024 | |||||
| Cash provided by (used in): | ||||||
| Operating activities: | ||||||
| Continuing operations | $ | (123,180) | $ | (24,422) | ||
| Discontinued operations | — | — | ||||
| Total operating activities | (123,180) | (24,422) | ||||
| Investing activities | (1,368,945) | (91,159) | ||||
| Financing activities | 4,940,835 | 335,207 | ||||
| Net change in cash and cash equivalents and restricted cash | $ | 3,448,710 | $ | 219,626 |
36
Operating activities
Cash used in operating activities for continuing operations was $123.2 million and $24.4 million for the years ended December 31, 2025 and 2024, respectively, reflecting an increase of $98.8 million. During the year ended December 31, 2025, the Company began HPC operations which resulted in segment profit of $7.1 million. While the Company continued to profitably mine bitcoin during the year ended December 31, 2025, the Company reported $10.9 million lower digital asset segment profit as compared to the prior year primarily due to the halving in April 2024 and the increase in network hashrate as compared to prior year. The Company also received inflows from (i) prepaid rent from customers net of commissions paid of $51.6 million and (ii) interest income proceeds net of interest paid of $28.1 million, partially offset by outflows resulting from (i) increased selling, general and administrative expenses (including related party, but exclusive of noncash stock based compensation) of $57.2 million and (ii) cash paid for unearned HPC tenant fit-out of $11.0 million, during the year ended December 31, 2025 as compared to the prior year.
Additionally, prior to the repayment of the Term Loans in July 2024, the Company converted its bitcoin holdings nearly immediately to cash and the related proceeds from sales of digital assets of $97.6 million were included within cash flows from operating activities in the consolidated statements of cash flows.
Investing activities
Cash used in investing activities was $1,368.9 million and $91.2 million for the years ended December 31, 2025 and 2024, respectively, reflecting an increase of $1,277.8 million. The increase is primarily attributed to (i) an increase in purchases of plant and equipment of $792.2 million related to infrastructure intended to support expansion into HPC leasing operations, (ii) lower proceeds from sales of property, plant and equipment of $11.7 million, (iii) investments in joint venture of $450.0 million, and (iv) $21.7 million for the acquisition of Beowulf E&D. The increase in cash used in investing activities were partially offset by increases in cash provided by investing activities related to proceeds from sales of digital assets of $84.0 million during the year ended December 31, 2025 as compared to the prior year, as the Company began classifying proceeds from sales of digital assets in investing activities starting July 2024. Additionally, during the year ended December 31, 2024, the Company received proceeds from sale of equity interest in investee of $86.1 million related to the sale of Nautilus.
Financing activities
Cash provided by financing activities was $4,940.8 million and $335.2 million for the years ended December 31, 2025 and 2024, respectively. reflecting an increase of $4,605.6 million. The increase is primarily attributed to the proceeds from issuance of long-term debt and convertible notes, net of issuance costs paid, of $5,106.7 million for the year ended December 31, 2025 as compared to $487.1 million in the prior year. Additionally, the Company purchased treasury stock of $33.3 million during the year ended December 31, 2025 as compared to $118.2 million in the prior year. These increases were partially offset by increases in cash used to purchase capped calls of $40.6 million, payments related to finance leases of $8.2 million, and payments for tax withholdings related to net share settlements of stock-based compensation awards of $4.8 million. Additionally, during the year ended December 31, 2024, the Company made principal payments of long-term debt of $139.4 million as compared to $0 during the year ended December 31, 2025.
Financial Condition
The Company incurred a net loss of $661.4 million and reported cash used in operating activities of $123.2 million for the year ended December 31, 2025. As of December 31, 2025, the Company had balances of cash and cash equivalents of $3,266.4 million, working capital of $1,742.4 million, total stockholders’ equity of $140.4 million and an accumulated deficit of $993.7 million. For the year ended December 31, 2025, the Company leveraged its strategic transition toward HPC leasing and execution of long-term lease agreements with Fluidstack, which benefit from substantial credit support provided by Google, to enable efficient financing and funding of the phased development of the La Lupa and Akela facilities. Prior to these developments, the Company historically relied primarily on proceeds from sales of digital assets, both self-mined and distributed from the joint venture which owned the Nautilus Cryptomine Facility, and its issuances of debt and equity to fund its principal operations.
Critical Accounting Estimates
The above discussion and analysis of the Company’s financial condition and results of operations are based upon its consolidated financial statements, which have been prepared in accordance with U.S. GAAP. The preparation of the Company’s consolidated financial statements requires management to make estimates and assumptions about future events that affect the amounts reported in the financial statements and accompanying notes. Future events and their effects cannot
37
be determined with absolute certainty. Therefore, the determination of estimates requires the exercise of judgment. Actual results inevitably will differ from those estimates, and such differences may be material to the financial statements.
See Note 2 of the Notes to Consolidated Financial Statements included in Item 8 of this Annual Report for a summary of the Company’s significant accounting policies.
HPC Leasing
In December 2024, the Company entered into long-term datacenter lease agreements (the “HPC Leases”) with a customer for specified datacenter infrastructure at the Lake Mariner Data Campus to support the customer’s HPC operations. In accordance with ASC 842, Leases, the Company determined at contract inception that these agreements contained a lease, comprising lease components related to the right to use datacenter space and nonlease components for power delivery, physical security, and maintenance services. Certain of the HPC Leases commenced in 2025 and the remainder of the HPC Leases are expected to commence in 2026.
The Company has elected the practical expedient available under ASC 842, Leases, to combine the nonlease revenue components that have the same pattern of transfer as the related operating lease components into a single combined component. The single combined component is accounted for under ASC 842 as an operating lease if the lease components are the predominant components and is accounted for under ASC 606 if the nonlease components are the predominant components. The lease components are the predominant components in the Company’s long term lease agreements and the single combined component in these arrangements are accounted for under the operating lease guidance of ASC 842. Recognition of HPC lease revenue begins when the Company determines the asset has been made available for the customer’s use.
The Company has concluded that it is probable that substantially all of the payments will be collected over the term of the arrangements and recognize the total combined fixed payments under the agreements on a straight-line basis over the noncancellable term. The Company recognizes the difference between straight-line revenue recognized during the period and the lease payments due pursuant to the underlying arrangement as deferred rent liability or accrued rent receivable in the consolidated balance sheets. Certain arrangements include options to extend the term. These extension options are not reasonably certain to be exercised and are excluded from the lease term and calculation of lease payments at lease commencement.
Payments for physical security and other routine maintenance services are included in the fixed lease payments. The lease agreements provide for variable payments for power delivery. Power delivery services represent a stand-ready obligation to make power available to the customer over the coterminous lease term and have the same pattern of transfer as the related operating lease components. Customers are charged monthly for actual power costs incurred at current utility rates. These payments from customers for power delivery are recognized as variable lease payments in accordance with the practical expedient elected. Variable lease payments are presented on a gross basis and are included in HPC lease revenue in the consolidated statements of operations.
The lease agreements also provide for variable payments for certain fit-out services as requested by the customer and the Company recognizes revenues as performance obligations are satisfied. In the course of providing its services, the Company routinely subcontracts for services and incurs other direct costs on behalf of its customers. These costs are passed through to the customers, generally with a mark-up, and, in accordance with U.S. GAAP, are included in the Company’s HPC lease revenue.
Digital assets
Digital assets is comprised of bitcoin earned as noncash consideration in exchange for providing hash computation services to a mining pool as well as consideration for bitcoin miner hosting services. From time to time, the Company also receives bitcoin as distributions-in-kind from its joint venture.
Bitcoin are accounted for as intangible assets with indefinite useful life and is included in current assets in the consolidated balance sheets due to the Company’s ability to sell it in a highly liquid marketplace and because the Company reasonably expects to liquidate its bitcoin to support operations within the next twelve months. The Company elected to early adopt ASU 2023-08 effective January 1, 2024, which requires digital assets to be valued at fair value each reporting period in accordance with ASC 820 with changes in fair value recorded in net income. Gains and losses from the remeasurement of digital assets are included within gain on fair value of digital assets, net in the consolidated statements of operations. The Company sells bitcoin and gains and losses from such transactions, measured as the difference between the
38
cash proceeds and the cost basis of bitcoin as determined on a first-in-first-out basis, are also included within gain on fair value of digital assets, net in the consolidated statements of operations.
Prior to the adoption of ASU 2023-08, bitcoin was assessed for impairment annually, or more frequently if events or changes in circumstances indicate it is more likely than not that the asset is impaired. The Company elected to bypass the optional qualitative impairment assessment and to track its bitcoin activity daily for impairment assessment purposes. The Company performed an analysis each day to identify whether events or changes in circumstances, principally decreases in the quoted price of bitcoin on the active trading platform, indicated that it was more likely than not that its bitcoin were impaired. For impairment testing purposes, the lowest intraday trading price of bitcoin was identified at the single bitcoin level (one bitcoin). The excess, if any, of the carrying amount of bitcoin and the lowest daily trading price of bitcoin represented a recognized impairment loss. To the extent an impairment loss was recognized, the loss established the new cost basis of the asset. Subsequent reversal of previously recorded impairment losses was prohibited.
Bitcoin earned through mining activities is recorded as an adjustment in the consolidated statements of cash flows, reconciling net loss to cash flows from operating activities. Bitcoin received as distributions-in-kind from equity investees is disclosed in supplemental noncash investing activities.
Prior to the repayment of the Term Loans in July 2024 (see Note 10), bitcoin sales proceeds were included in cash flows from operating activities, as bitcoin was converted into cash immediately during that period. Following repayment of the Term Loans, bitcoin sales proceeds are now classified under cash flows from investing activities, as the Company no longer converts bitcoin into cash immediately upon mining.
Long-lived Assets
Property, plant and equipment are recorded at cost, net of accumulated depreciation. Judgment is necessary in estimating the Company’s various assets’ useful lives. This includes evaluating the Company’s own usage experience with its currently owned assets, the quality of materials used in construction-related projects and, for its miners, the rate of technological advancement and market-related factors such as the price of bitcoin and the bitcoin network hashrate, which impact the value of the miners. Depreciation is computed using the straight-line method over the estimated useful lives of the assets (generally 5 years for computer equipment and 4 years for miners). Leasehold improvements and electrical equipment are depreciated over the shorter of their estimated useful lives or the lease term. Changes in depreciation and amortization, generally accelerated depreciation, are determined and recorded when estimates of the remaining useful lives or residual values of long-term assets change.
The Company reviews its long-lived assets, including property, plant and equipment, for impairment whenever events or changes in circumstances indicate that the carrying amount of an asset, or asset group, may not be recoverable. Recoverability of assets to be held and used is measured by a comparison of the carrying amount of an asset to undiscounted cash flows expected to be generated by the asset. Significant judgment is used when estimating future cash flows, particularly the price of bitcoin and the network hashrate. Any impairment loss recorded is measured as the amount by which the carrying value of the assets exceeds the fair value of the assets. Should our estimates of useful lives, undiscounted cash flows, or asset fair values change, additional and potentially material impairments may be required, which could have a material impact on our reported financial results.
Stock-based compensation
The Company measures stock-based compensation cost related to share-based payment awards at the grant date of the award, based on the estimated fair value of the award. For restricted stock units (“RSUs”) with time-based vesting, the fair value is determined by the Company’s common stock price on the date of the grant. For RSUs with vesting based on market conditions (“PSUs”), the effect of the market condition is considered in the determination of fair value on the grant date using a Monte Carlo simulation model. Stock-based compensation expense for PSUs is recorded over the derived service period unless the market condition is satisfied in advance of the derived service period, in which case a cumulative catch-up is recognized as of the date of achievement. Stock-based compensation for PSUs is recorded regardless of whether the market conditions are met unless the service conditions are not met. The Company accounts for forfeitures as they occur. The Company uses significant judgment in determining the likelihood of meeting milestones and market conditions. Inputs into valuation models such as Monte Carlo simulations include both the Company’s and guideline public company historical and expected annual volatility and, depending on the inputs selected, the Company could calculate significantly different estimated grant date fair values, materially impacting the valuation of our stock-based awards and the stock-based compensation expense we recognize in future periods.
39
Income Taxes
The Company accounts for income taxes pursuant to ASC 740, Income Taxes (“ASC 740”), which requires, among other things, an asset and liability approach to calculating deferred income taxes. The asset and liability approach requires the recognition of deferred tax assets and liabilities for the expected future tax consequences of temporary differences between the carrying amounts and the tax bases of assets and liabilities. A valuation allowance is provided to offset any net deferred tax assets for which management believes it is more likely than not that the net deferred tax asset will not be realized. The Company follows the provision of ASC 740 related to accounting for uncertain income tax positions. When tax returns are filed, it is more likely than not that some positions taken would be sustained upon examination by the taxing authorities, while others are subject to uncertainty about the merits of the position taken or the amount of the position that would be ultimately sustained. In accordance with the guidance of ASC 740, the benefit of a tax position is recognized in the financial statements in the period during which, based on all available evidence, management believes it is more likely that not that the position will be sustained upon examination, including the resolution of appeals or litigation processes, if any. Tax positions taken are not offset or aggregated with other positions. The tax benefits recognized in the consolidated financial statements from such positions are then measured based on the largest benefit that has a greater than 50% likelihood of being realized upon settlement with the applicable taxing authority. The portion of the benefits associated with the tax positions taken that exceeds the amount measured as described above should be reflected as a liability for uncertain tax benefits in the Company’s balance sheets along with any associated interest and penalties that would be payable to the taxing authorities upon examination. The most critical estimate for income taxes is the determination of whether to record a valuation allowance for any net deferred tax asset, including net loss carryforwards, whereby management must estimate whether it is more likely than not that the deferred tax asset would be realized.
Assets Acquired and Liabilities Assumed in a Business Combination
The Company accounts for business combinations under the acquisition method of accounting in accordance with ASC 805 - Business Combinations, by recognizing the identifiable tangible and intangible assets acquired and liabilities assumed, measured at the acquisition date fair value. The determination of fair value involves assumptions,estimates and judgments. Any purchase consideration in excess of the estimated fair values of net assets acquired is recorded as goodwill.
Goodwill Impairment
Goodwill is not subject to amortization, and instead, assessed for impairment annually, or more frequently when events or changes in circumstances indicate it is more likely than not that the fair value of a reporting unit is less than its carrying amount in accordance with ASC 350.
MD&A history
Prior-year 10-K MD&A spans are extracted from SEC filings with the same bounded parser used for the latest filing. The latest 10-K appears above; prior years are below.
FY 2024 10-K MD&A
SEC filing source: 0001083301-25-000018.
ITEM 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations
The following Management’s Discussion and Analysis of Financial Condition and Results of Operations should be read in conjunction with the other Items included in this Annual Report on Form 10-K (the “Annual Report”) and with the accompanying consolidated financial statements and notes thereto included elsewhere in this report. All figures presented below represent results from continuing operations, unless otherwise specified. Capitalized terms used but not otherwise defined herein shall have the meanings ascribed to such terms in the Consolidated Financial Statements. Unless the context otherwise requires, references in this Annual Report to the “Company,” “TeraWulf,” “we,” “us” or “our” refers to TeraWulf Inc. and its consolidated subsidiaries. Certain statements contained in this Management’s Discussion and Analysis of Financial Condition and Results of Operations may be deemed forward-looking statements. See “Forward-Looking Statements.”
28
Table of Contents
This MD&A generally discusses 2024 and 2023 items and year-to-year comparisons between 2024 and 2023. Discussions of 2022 items and year-to-year comparisons between 2023 and 2022 are not included, and can be found in "Management’s Discussion and Analysis of Financial Condition and Results of Operations” in Part II, Item 7 of the Company’s Annual Report on Form 10-K for the year ended December 31, 2023.
Overview
We are a vertically integrated owner and operator of next-generation digital infrastructure, purpose-built to support bitcoin mining and HPC workloads. With a strong commitment to sustainability, our operations are powered predominantly by zero-carbon energy, reinforcing our focus on environmentally responsible data center operations in the United States. By leveraging clean, cost-effective, and reliable energy sources, we aim to drive long-term efficiency and resilience within the digital infrastructure sector.
Our primary operations are centered at the Lake Mariner Facility, strategically located on the shores of Lake Ontario. Developed on the site of a decommissioned coal-fired power plant, this expansive facility is designed for scalable growth, with the ability to expand up to 500 MW in the near term and up to 750 MW with targeted transmission upgrades. Purpose-built to support both bitcoin mining and GPU-driven HPC workloads, the Lake Mariner Facility is well-positioned to meet the rising demand for compute-intensive applications. This dual-purpose strategy enhances operational efficiency, diversifies revenue streams, and strengthens our position in the evolving digital economy.
Bitcoin and Blockchain
Bitcoin, introduced in 2008, revolutionized digital finance by enabling a decentralized system for exchanging and storing value without reliance on traditional financial institutions. It operates on a public ledger known as the “blockchain,” which records every transaction transparently and securely. This decentralized structure eliminates the need for intermediaries, enhancing transaction efficiency while making the network resilient to censorship and fraud. Unlike fiat currencies, bitcoin is not controlled by any government or central bank, reinforcing its role as a scarce, independent store of value.
Bitcoin mining is the process of validating transactions and securing the network through proof-of-work consensus, where miners solve complex cryptographic puzzles to add new blocks to the blockchain. The network is maintained by a global pool of distributed nodes, ensuring transaction integrity and preventing double-spending. Key factors influencing mining economics include computing power, energy costs, and network difficulty, with miners competing to maximize their share of the total computational power (hashrate) deployed on the bitcoin network. As more miners participate, the network difficulty adjusts dynamically every 2,016 blocks (approximately every two weeks) to maintain a consistent block creation rate.
Bitcoin Reward Halving
Bitcoin’s supply issuance follows a predefined halving schedule, reducing the block reward by 50% approximately every four years. This mechanism enforces a controlled supply of bitcoin, contributing to its scarcity and long-term value proposition. The total bitcoin supply is capped at 21 million coins, and halvings will continue until this limit is reached.
The most recent halving occurred on April 19, 2024, reducing the block reward from 6.25 to 3.125 bitcoin per block. While the halving decreases the direct mining subsidy, transaction fees remain an additional source of miner revenue. This built-in supply constraint influences mining economics and often plays a role in bitcoin’s long-term price dynamics.
Business Strategy
Our strategy is centered on leveraging our owned and scalable digital infrastructure to drive revenue and profitability through both bitcoin mining and HPC hosting. As a vertically integrated operator, we own and control our infrastructure, allowing us to optimize efficiency, reduce costs, and maintain a highly competitive cost structure.
While bitcoin mining remains a core focus, we are strategically transitioning an increasing portion of the Lake Mariner Facility to support HPC hosting and colocation. This shift allows us to capitalize on the growing demand for AI, machine learning, and cloud computing workloads while further optimizing our power utilization and digital infrastructure.
29
Table of Contents
A key milestone in this transition occurred on December 22, 2024, when we signed a multi-year data center lease agreement with Core42, securing 72.5 MW of HPC hosting capacity at the Lake Mariner Facility for GPU compute workloads. This agreement includes an option to expand by an additional 135 MW through March 31, 2025, enabling total deployments to Core42 of up to 72.5 MW in 2025 and 135 MW in 2026. This development accelerates our HPC hosting expansion, positioning us at the intersection of energy and digital compute infrastructure. To support this expansion, we have expanded our digital infrastructure at the site, featuring advanced liquid cooling systems and Tier 3 redundancy. This infrastructure will be optimized for high-density compute workloads, reinforcing our ability to attract hyperscale and enterprise customers.
By prioritizing cost-efficient power utilization, sustainability, and scalable infrastructure, our strategy positions TeraWulf to maximize value creation while adapting to the evolving landscape of digital asset mining and AI-driven computing. Looking ahead, we remain focused on expanding our infrastructure, optimizing operations, and strengthening our competitive advantage in both bitcoin mining and HPC hosting.
Our Facilities
During the year ended December 31, 2024, we operated bitcoin mining activities at two data centers: the Lake Mariner Facility and the Nautilus Cryptomine Facility in central Pennsylvania. In October 2024, we sold our entire equity interest in Nautilus, allowing us to consolidate operations and reinvest in future infrastructure growth.
Lake Mariner Facility
Strategically located in Barker, New York, on the site of a former coal-fired power plant, the Lake Mariner Facility began operations in March 2022, designed to support sustainable bitcoin mining. As of December 31, 2024, the facility was operating 195 MW of bitcoin mining capacity, with an additional 50 MW under construction and expected to come online in the first half of 2025. Additionally, the Company is developing HPC data centers at the Lake Mariner Facility to provide HPC hosting services for Core42, supporting up to 72.5 MW of data center infrastructure dedicated to GPU compute workloads. This capacity is expected to come online throughout 2025. Core42 also has an option, exercisable through March 31, 2025, to secure an additional 135 MW of data center infrastructure at the Lake Mariner Facility.
The Company has a PPA with NYPA, securing 90 MW of high-load factor power to support its bitcoin mining operations. The PPA, executed in February 2022, has a ten-year term from the commencement of NYPA’s power delivery. The Lake Mariner Facility is built for scalable expansion, with the ability to grow up to 500 MW in the near term and potentially 750 MW with targeted transmission upgrades. Its strategic location and access to low-cost, predominantly zero-carbon energy make it a highly attractive site for both bitcoin mining and HPC workloads.
As of December 31, 2024, we owned approximately 62,000 miners, of which approximately 58,800 are operational at the Lake Mariner Facility with the remainder undergoing maintenance, awaiting disposal or on standby to replace miners under repair. These miners were comprised as follows:
| Vendor and Model | Number of miners | |
|---|---|---|
| Bitmain S19 XP | 18,500 | |
| Bitmain S19j XP | 18,100 | |
| Bitmain S19k Pro | 4,200 | |
| Bitmain S21 | 8,300 | |
| Bitmain S21 Pro | 12,900 | |
| 62,000 |
As of December 31, 2024, our fleet of miners ranged in age from 0.1 to 2.6 years and have an average age of approximately 0.7 years. We do not have scheduled downtime for our miners; however, while we periodically perform unscheduled maintenance on our miners, such downtime has not been significant historically. When performing unscheduled maintenance, depending on the length of estimated repair time, we may replace a miner with a substitute miner to limit overall downtime. As of December 31, 2024, our fleet of miners at the Lake Mariner Facility had a range of energy efficiency from 15 to 23 joules per terahash (“j/th”) and has an average energy efficiency of 19.8 j/th.
30
Table of Contents
Nautilus Cryptomine Facility
The Nautilus Cryptomine Facility, located in Berwick, Pennsylvania, was a joint venture between TeraWulf and Talen Member. The Nautilus Cryptomine Facility was a 200 MW bitcoin mining operation, situated adjacent to the 2.5-gigawatt nuclear-powered Susquehanna Station and was the first bitcoin mining site powered entirely by behind-the-meter, zero-carbon nuclear energy, operating under a fixed-rate power contract of 2.0 cents per kilowatt-hour for a five-year term, with options for two three-year renewals.
Under the terms of the joint venture agreement, TeraWulf held a 25% equity interest in Nautilus, while Talen Member held a 75% equity interest, with ownership subject to adjustments based on capital contributions. TeraWulf began mining bitcoin at the Nautilus Cryptomine Facility in the first quarter of 2023, with an allotted 50 MW of operational capacity prior to divesting its interest in Nautilus in October 2024. While holding a 25% equity stake, TeraWulf’s share of mined bitcoin was determined by relative hashrate contributions. The Company had contributed approximately 1.9 EH/s of the facility’s total 5.2 EH/s capacity, representing approximately 35.7% of the total hashrate attributed to the Company. At the time of TeraWulf’s ownership, the Nautilus Cryptomine Facility deployed approximately 48,000 miners, of which 15,800 miners were attributed to TeraWulf’s contributions to utilize its 50 MW allotment.
In October 2024, TeraWulf sold its entire equity interest in Nautilus, allowing the Company to reallocate capital toward expanding its digital infrastructure at the Lake Mariner Facility and advancing its HPC hosting strategy. As part of the transaction, Nautilus distributed to TeraWulf all of its right, title, and interest in its miners, as well as certain other related equipment. Following the sale, TeraWulf deployed 12,300 S19 XP miners and sold or otherwise disposed of 35,700 miners as of December 31, 2024.
Bitcoin Mining - Combined Facilities
As outlined above, several factors influence our ability to mine bitcoin profitably, including bitcoin’s USD value, mining difficulty, global hashrate, power costs, fleet energy efficiency, and overall data center efficiency. Among these, energy efficiency is a critical driver of profitability, as power costs represent the most significant direct expense in bitcoin mining. We believe we operate a highly efficient mining fleet, optimized to maximize output while minimizing energy consumption. To assess operational performance and effectiveness, the Company tracks key metrics, which we believe are also valuable to investors for evaluating our progress and benchmarking against industry peers.
The table below presents our miner efficiency and computing power as compared to the global computing power as of December 31, 2024 and 2023:
| December 31, 2024 | December 31, 2023(1) | ||||
|---|---|---|---|---|---|
| Global hashrate (EH/s)(2) | 704.0 | 558.4 | |||
| Miner efficiency (w/th)(3) | 19.0 | 27.6 | |||
| TeraWulf combined average operating hashrate (EH/s)(4) | 9.7 | 5.0 | |||
| TeraWulf % of Global hashrate | 1.4 | % | 0.9 | % |
(1) Results as of December 31, 2023 reflect hashrate of mining operations at the Lake Mariner Facility and TeraWulf’s net share of hashrate produced at the Nautilus Cryptomine Facility.
(2) Total global hashrate obtained from YCHARTS (https://ycharts.com/indicators/bitcoin_network_hash_rate)
(3) Joules of energy required to produce each terahash of processing power
(4) While nameplate inventory at the Lake Mariner Facility was 9.7 EH/s as of December 31, 2024 and was 5.5 EH/s for TeraWulf’s two facilities as of December 31, 2023, inclusive of gross total hosted miners, actual monthly hashrate performance depends on a variety of factors, including (but not limited to) performance tuning to increase efficiency and maximize margin, scheduled outages (scopes to improve reliability or performance), unscheduled outages, curtailment due to participation in various cash generating demand response programs, derate of ASICS due to adverse weather and ASIC maintenance and repair.
As of December 31, 2024, our operating hashrate represented approximately 1.4% of the total global hashrate, aligning with our share of global blockchain rewards. As of that date, this translated to approximately 6 bitcoin mined per day. To maintain profitability, we focus on optimizing operational efficiency and cost management, ensuring that our mining rewards consistently cover direct operating expenses.
31
Table of Contents
The table below presents the average cost of mining each bitcoin, including bitcoin mined at the Lake Mariner Facility and the Company’s net share of bitcoin mined at the Nautilus Cryptomine Facility, for the years ended December 31, 2024 and 2023 and the total energy cost per kWh utilized within the facilities.
| Year Ended December 31, | |||||||
|---|---|---|---|---|---|---|---|
| Cost of mining - Analysis of costs to mine one bitcoin | 2024 | 2023 | |||||
| Cost of mining - Lake Mariner Facility and net share of the Nautilus Cryptomine Facility | |||||||
| Cost of energy per bitcoin mined | $ | 25,227 | $ | 8,676 | |||
| Other direct costs of mining - non energy utilities per bitcoin mined | $ | 41 | $ | 29 | |||
| Cost to mine one bitcoin(1) | $ | 25,268 | $ | 8,705 | |||
| Value of each bitcoin mined(2) | $ | 62,889 | $ | 29,645 | |||
| Cost to mine one bitcoin as % of value of bitcoin mined | 40.2 | % | 29.4 | % | |||
| Statistics | |||||||
| Lake Mariner Facility and net share of the Nautilus Cryptomine Facility | |||||||
| Total bitcoin mined(3) | 2,728 | 3,343 | |||||
| Total value of bitcoin mined(2) ($ in thousands) | $ | 171,547 | $ | 99,105 | |||
| Total MWhs utilized | 1,601,061 | 910,744 | |||||
| Total energy expense, net of expected demand response proceeds(4) ($ in thousands) | $ | 68,815 | $ | 29,006 | |||
| Cost per kWh | $ | 0.043 | $ | 0.032 | |||
| Energy expense, net as % of value of bitcoin mined | 40.1 | % | 29.3 | % | |||
| Other direct costs of mining ($ in thousands) | $ | 111 | $ | 97 |
(1) “Cost to mine one bitcoin” is a cash cost metric and does not include depreciation. Although the Company recognizes depreciation with respect to its mining assets, it does not consider depreciation in determining whether it is economical to operate its mining equipment. As a result, the Company does not consider the sunk costs or depreciation of past capital investments in its historical or forecasted breakeven analysis. If depreciation of our miner fleet were factored into the above cost of mining analysis, it would add $22,086 and $9,892 per bitcoin mined for the years ended December 31, 2024 and 2023, respectively, bringing the total “cost to mine one bitcoin” to $47,354 and $18,598 for the years ended December 31, 2024 and 2023, respectively.
(2) Computed as the weighted-average opening price of bitcoin on each respective day the mined bitcoin is earned. Excludes bitcoin earned from profit sharing associated with a bitcoin miner hosting agreement that expired in February 2024 at the Lake Mariner Facility.
(3) Excludes bitcoin earned from profit sharing associated with a bitcoin miner hosting agreement that expired in February 2024 at the Lake Mariner Facility of 6 and 64 bitcoin for the years ended December 31, 2024 and 2023, respectively, and includes TeraWulf’s net share of bitcoin mined at the Nautilus Cryptomine Facility, based on the hashrate share attributed to the Company.
(4) Excludes energy expenses associated with a bitcoin miner hosting agreement that expired in February 2024 at the Lake Mariner Facility and includes TeraWulf’s net share of energy expense at the Nautilus Cryptomine Facility, based on aggregate nameplate power consumption of deployed miners attributed to TeraWulf’s contribution to Nautilus.
Power costs are the most significant expense in our bitcoin mining operations, accounting for 40.1% and 29.4% of the total value of bitcoin mined for the years ended ended December 31, 2024 and 2023, respectively. The increase in power costs as a percentage of bitcoin mined in 2024 compared to 2023 was primarily driven by a near doubling of network difficulty and the bitcoin halving event in April 2024, which reduced block rewards. These impacts were partially offset by growth in our average operating hashrate and an increase in the average market value of each bitcoin mined.
Energy prices are highly volatile, influenced by global events that can drive nationwide fluctuations in power costs. At the Lake Mariner Facility, power costs are subject to variable market rates, which can change hourly based on wholesale electricity pricing. While this introduces some unpredictability, it also provides us with the flexibility to actively manage our energy consumption, optimizing for profitability and efficiency. Energy prices are also highly sensitive to weather conditions, such as winter storms and polar vortices, which can increase regional power demand and drive up costs. During such events, we may curtail operations to avoid consuming power at peak rates, or we may be curtailed under demand response programs in which we participate. For the years ended December 31, 2024, and 2023, the average aggregate realized power prices at the Lake Mariner Facility and Nautilus Cryptomine Facility were $0.043 and $0.032 per kilowatt hour, respectively.
Our management team continuously monitors market conditions to determine when and for how long to curtail operations. If curtailment is not mandated under demand response programs, we make real-time decisions to curtail mining whenever power prices exceed the value of the fixed bitcoin reward. As a result, curtailment increases when bitcoin’s value declines or energy prices rise, and decreases when bitcoin’s value appreciates or energy costs fall. These decisions are actively managed on an hour-by-hour basis to optimize profitability.
32
Table of Contents
During the years ended December 31, 2024 and 2023, we curtailed operations at the Lake Mariner Facility in response to weather events, energy price spikes, and participation in demand response programs. The Company records expected payments to be received for demand response programs as a reduction in cost of revenue, which amounted to $8.6 million and $3.5 million for the years ended December 31, 2024 and 2023, respectively.
The Company has purchased all miners with cash, without relying on limited recourse equipment financing for miner acquisitions. To support operations, invest in our joint venture, and purchase miners and other fixed assets, we have raised capital through both equity issuances and corporate-level debt. Costs related to these capital raises are not included in this analysis.
Miner acquisition costs, or capital expenditures, are not factored into the cost of mining analysis, as they do not impact the marginal cost of producing one bitcoin. Instead, these costs are recorded as property, plant, and equipment in the consolidated balance sheets. Depreciation of property, plant, and equipment is calculated using the straight-line method, with estimated useful lives of four years for miners and five years for computer equipment.
During the year ended December 31, 2024, the Company recorded an accelerated depreciation expense of $5.1 million related to certain miners whose estimated useful lives were shortened due to planned replacement by April 2024. While our standard depreciation period for miners is four years, historically low power costs may allow for a longer actual useful life in certain cases. However, if depreciation were included in the cost of mining analysis, it would add $22,086 and $9,892 per bitcoin mined for the years ended December 31, 2024 and 2023, respectively.
Estimating asset useful lives requires management judgment, particularly given the rapid evolution of next-generation mining rigs in industrial-scale bitcoin mining. Depreciation schedules may be adjusted if events, regulatory changes, or shifts in operating conditions indicate a need for revision. Management continuously evaluates factors such as future energy market conditions, operating costs, maintenance practices, and capital investment needs to ensure depreciation assumptions remain reasonable. When an asset’s estimated useful life is adjusted—either shortened or extended—depreciation provisions are updated accordingly, which could have a material impact on future financial results.
Recent Developments
In October 2024, the Company’s board of directors approved a share repurchase program authorizing the Company to repurchase up to $200.0 million of the Company’s outstanding shares of Common Stock through December 31, 2025. Subsequent to December 31, 2024 and through February 28, 2025, the Company repurchased 5,900,000 shares of its Common Stock for $33.3 million.
In December 2024, the Company entered into certain long-term data center lease agreements with Core42, a G42 company specializing in sovereign cloud, AI infrastructure, and digital services, to lease specified data center infrastructure comprising 72.5 MW of HPC hosting capacity at the Lake Mariner Facility to the customer to support the customer’s HPC operations (the “HPC Leases”). As of the date of this Annual Report, none of the HPC Leases had commenced and all are expected to commence at various dates in 2025, each having an initial term of ten years and granting the customer two five-year renewal options. Additionally, the HPC Leases provide Core 42 an option to expand near-term HPC hosting capacity by an additional 135 MW gross, which is equivalent to 108 MW of critical IT load, by March 31, 2025.
The HPC Leases provide for certain prepaid rent amounts (“Prepaid Rent”) representing the first 12 months base rent under each lease for a total of $90.0 million and shall be applied towards each month’s base rent for 24 months commencing on the respective commencement date of each lease until the Prepaid Rent is exhausted. As of the date of this Annual Report, the Company has received all $90.0 million of Prepaid Rent.
The Business Combination
On December 13, 2021, TeraWulf completed its business combination (the “Merger”) with IKONICS Corporation (“IKONICS”), through which the Company effectively acquired IKONICS and became a publicly traded entity on Nasdaq, which was the primary objective of the business combination.
As part of the Merger consideration, IKONICS shareholders received contractual contingent value rights (“CVR”) under a Contingent Value Rights Agreement (the “CVR Agreement”). Each IKONICS shareholder as of immediately prior to the Merger received one non-transferable CVR for each share of IKONICS common stock held at that time. The CVR holders were entitled to receive 95% of the Net Proceeds (as defined in the CVR Agreement) from any sale, transfer, disposition, spin-off, or licensing of IKONICS’ pre-merger business assets.
33
Table of Contents
During the year ended December 31, 2023, the Company fulfilled its CVR obligations, making $11.0 million in payments related to proceeds from the sale of net assets held for sale. As of December 31, 2023, the Company had completed all required distributions to CVR holders, and the CVR Agreement was deemed terminated.
Results of Operations - Comparative Results for the Years Ended December 31, 2024 and 2023
The Company generates revenue in the form of bitcoin by providing hash computation services to a mining pool operator to mine bitcoin and validate transactions on the global bitcoin network using miners owned by the Company. The earned bitcoin are routinely sold for U.S. dollars. The Company also earned revenue by providing bitcoin miner hosting services to third parties. While the Company may choose to mine other digital currencies, it has no plans to do so currently.
The Company’s business strategy centers on growing revenue and profitability by enhancing the capacity and efficiency of our bitcoin mining fleet while expanding our data center infrastructure to support HPC hosting activities. We plan to strategically develop the infrastructure necessary for profitability of bitcoin mining while pursuing adjacent high-value HPC hosting opportunities that leverage our power utilization and digital infrastructure. We are confident that our expertise in power infrastructure and digital asset mining can be favorably applied to the design, development, and operation of large-scale data centers. These data centers are optimized for high-value applications such as cloud computing, machine learning, and artificial intelligence. We will actively seek opportunities to expand into these areas using our knowledge, expertise, and existing infrastructure wherever favorable market opportunities arise.
Revenue
The following table presents revenue (in thousands):
| Year Ended December 31, | ||||||
|---|---|---|---|---|---|---|
| 2024 | 2023 | |||||
| Revenue | $ | 140,051 | $ | 69,229 |
Revenue for the years ended December 31, 2024 and 2023 was $140.1 million and $69.2 million, respectively, an increase of $70.9 million. The increase was primarily attributed to an increase in the average price of bitcoin during the year ended December 31, 2024 of $65,824 as compared to $28,788 during the same period in the prior year and an increase in mining capacity at the Lake Mariner Facility to approximately 195 MW as of December 31, 2024 as compared to 110 MW as of December 31, 2023, partially offset by decreases in the total bitcoin mined due to impacts of the halving in April 2024 and the increase in network hashrate, resulting in total bitcoin mined of 2,177 bitcoin during the year ended December 31, 2024 as compared to 2,168 bitcoin during the same period in the prior year.
During the years ended December 31, 2024 and 2023 revenue from bitcoin miner hosting was $0.8 million and $7.5 million, respectively, a decrease due to the expiration of the Company’s bitcoin miner hosting contract with a customer in February 2024.
Costs and Expenses
The following table presents cost of revenue (exclusive of deprecation) (in thousands):
| Year Ended December 31, | ||||||
|---|---|---|---|---|---|---|
| 2024 | 2023 | |||||
| Cost of revenue (exclusive of depreciation) | $ | 62,608 | $ | 27,315 |
Cost of revenue (exclusive of depreciation) for the years ended December 31, 2024 and 2023 was $62.6 million and $27.3 million, respectively, an increase of approximately $35.3 million. Cost of revenues is primarily comprised of power expense and the increase was primarily due to the increase in mining capacity due to infrastructure constructed and placed in service between December 31, 2023 and December 31, 2024 at the Lake Mariner Facility and, to a lesser extent, an increase in realized power prices during the year ended December 31, 2024 as compared to the same period in the prior year. The Company records proceeds related to participation in demand response programs as a reduction in cost of revenue in the period corresponding to the underlying demand response program period; the amount of aggregate proceeds received or expected to be received were $8.6 million and $3.5 million for the years ended December 31, 2024 and 2023, respectively. The Company is actively expanding its enrollment in such available programs in New York State.
34
Table of Contents
The following table presents operating expenses (in thousands):
| Year Ended December 31, | ||||||
|---|---|---|---|---|---|---|
| 2024 | 2023 | |||||
| Operating expenses | $ | 3,387 | $ | 2,116 | ||
| Operating expenses - related party | 4,262 | 2,773 | ||||
| $ | 7,649 | $ | 4,889 |
Operating expenses (including related party expenses) for the years ended December 31, 2024 and 2023 were approximately $7.6 million and $4.9 million, respectively, a net increase of $2.7 million. Operating expenses increased primarily due to higher engineering expenses of $0.4 million and property insurance of $0.7 million. Operating expense - related party increased primarily due to $0.4 million in rent expense and $1.1 million due to increased staffing at the Lake Mariner Facility. These increases related to infrastructure constructed and placed in service between December 31, 2023 and 2024.
The following table presents selling, general and administrative expenses (in thousands):
| Year Ended December 31, | ||||||
|---|---|---|---|---|---|---|
| 2024 | 2022 | |||||
| Selling, general and administrative expenses | $ | 57,883 | $ | 23,693 | ||
| Selling, general and administrative expenses - related party | 12,695 | 13,325 | ||||
| $ | 70,578 | $ | 37,018 |
Selling, general and administrative expenses (including related party expenses) for the years ended December 31, 2024 and 2023 were $70.6 million and $37.0 million, respectively, a net increase of $33.6 million. Selling, general and administrative expenses increased primarily due to increased expense during the year ended December 31, 2024 as compared to the same period in the prior year of (i) stock-based compensation of $25.2 million, (ii) employee compensation and benefits of $5.7 million, (iii) travel expenses of $0.6 million, (iv) legal and other professional fees of $1.4 million, (v) charity, sponsorships and investor relations of $1.1 million and (vi) other public company costs of $1.1 million, partially offset by decreases in insurance expense of $0.9 million. Selling, general and administrative expenses – related party decreased a net $1.3 million in fees paid under the Services Agreement with Beowulf E&D primarily due to performance milestone expense incurred during the year ended December 31, 2023 that were not incurred during the year ended December 31, 2024, offset by an increase in the base fee as well as increased travel expense of $0.6 million.
Depreciation for the years ended December 31, 2024 and 2023 was $59.8 million and $28.4 million, respectively. The increase was primarily due to the increase in mining capacity due to infrastructure constructed and placed in service between December 31, 2023 and December 31, 2024 at the Lake Mariner Facility. Additionally, during the year ended December 31, 2024, the Company recorded accelerated depreciation expense of $5.1 million related to certain miners of which the Company shortened their estimated useful lives based on anticipated replacement by April 30, 2024.
Gain on fair value of digital currency, net during the year ended December 31, 2024 was $2.2 million as a result of the Company adopting Financial Accounting Standards Board (“FASB”) Accounting Standards Update (“ASU”) No. 2023-08, Intangible – Goodwill and Other – Crypto Assets (Subtopic 350-60): Accounting for and Disclosure of Crypto Assets (“ASU 2023-08”), on January 1, 2024 which requires entities with certain crypto assets to subsequently measure such assets at fair value, with changes in fair value recorded in net income in each reporting period. Prior to the adoption of ASU 2023-08, the Company recorded impairment of digital currency of $3.0 million during the year ended December 31, 2023 representing the decline in bitcoin prices during the Company’s holding period of its bitcoin, which was not reversed during its holding period, and realized gain on sale of digital currency of $3.2 million during the year ended December 31, 2023 upon subsequent liquidation of bitcoin held. The Company elected to early adopt ASU 2023-08 effective January 1, 2024, resulting in a cumulative-effect change of $37,000 to increase the balance of digital currency with a corresponding decrease in the opening balance of accumulated deficit in the consolidated balance sheet as of January 1, 2024.
During the years ended December 31, 2024 and December 31, 2023, the Company recorded a loss on disposal of property, plant and equipment of $17.8 million and $1.2 million, respectively, related to disposals of miners and write-off of deposits on miners.
35
Table of Contents
Interest expense
Interest expense for the years ended December 31, 2024 and 2023 was $19.8 million and $34.8 million, respectively, a decrease of $15.0 million. Interest expense through July 2024 related primarily to the borrowings under the Loan, Guaranty and Security Agreement (the “LGSA”) with Wilmington Trust (the “Term Loans”), which had an original maturity date of December 1, 2024 and was fully repaid in July 2024 ahead of maturity. In October 2024, the Company completed a private offering of convertible senior notes due 2030 (the “2030 Convertible Notes”) which accrue 2.75% interest annually. The decrease in interest expense during the year ended December 31, 2024 as compared to the prior year is primarily due to early repayments of the Term Loans principal balance resulting in a decrease of amortization of debt issuance costs and debt discount of $8.1 million. Additionally, interest expense related to the stated interest rate decreased $9.4 million for the same reason, partially offset by $2.6 million of interest accrued during the year ended December 31, 2024 under the 2030 Convertible Notes and payable in May 2025.
Loss on extinguishment of debt
Loss on extinguishment of debt was $6.3 million for the year ended December 31, 2024 related to voluntary prepayments of the Term Loans in February and July 2024. The Company incurred prepayment fees of $1.3 million in connection with the voluntarily prepayments and derecognized unamortized debt discount of $5.0 million associated with the principal repaid. The Company made no prepayments on the principal balance of the Term Loans during the year ended December 31, 2023.
Income tax benefit
Income tax benefit was $0 for the years ended December 31, 2024 and 2023. Based upon the level of historical U.S. losses and future projections over the period in which the net deferred tax assets are deductible, at this time, management believes it is more likely than not that the Company will not realize the benefits of the remaining deductible temporary differences, and as a result the Company has recorded a full valuation allowance against its gross deferred tax assets as of December 31, 2024 and 2023.
Equity in net loss of investee, net of tax
Equity in net income (loss) of investee, net of tax for the years ended December 31, 2024 and 2023 was $3.4 million and $(9.3) million, respectively, which represents TeraWulf’s proportional share of income or loss of Nautilus, which commenced operations in February 2023. The amount includes an impairment loss of $13.6 million for the year ended December 31, 2023 related to the distribution of miners from Nautilus to the Company whereby the miners were marked to fair value from book value on the date distributed. The impairment loss was the result of decreasing prices for miners between initial purchase and distribution.
Additionally the Company recorded a gain on sale of equity interest in investee of $22.6 million in the consolidated statement of operations for the year ended December 31, 2024 as a result of the sale of its entire 25% equity interest in Nautilus to the Talen Member in October 2024.
Non-GAAP Measure
To provide investors with additional information in connection with our results as determined in accordance with generally accepted accounting principals in the United States (“U.S. GAAP”), we disclose Adjusted EBITDA as a non-GAAP measure. This measure is not a financial measure calculated in accordance with U.S. GAAP, and it should not be considered as a substitute for net loss, operating loss, or any other measure calculated in accordance with U.S. GAAP, and may not be comparable to similarly titled measures reported by other companies.
We define Adjusted EBITDA as net loss adjusted for (i) impacts of interest, taxes, depreciation and amortization; (ii) stock-based compensation expense, amortization of right-of-use asset and related party expense to be settled with respect to common stock, all of which are non-cash items that the Company believes are not reflective of its general business performance, and for which the accounting requires management judgment, and the resulting expenses could vary significantly in comparison to other companies; (iii) one-time, non-recurring transaction-based compensation expense related to the 2030 Convertible Notes (iv) equity in net income (loss) of investee, net of tax, related to Nautilus and the gain on sale of interest in Nautilus; (v) other income which is related to interest income or income for which management believes is not reflective of the Company’s ongoing operating activities; (vi) loss on extinguishment of debt and net losses on disposals of property, plant and equipment, net, which are not reflective of the Company’s general business performance and (vii) loss from discontinued operations, net of tax, which is not applicable to the Company’s future
36
Table of Contents
business activities. The Company’s Adjusted EBITDA also includes the impact of distributions from investee received in bitcoin related to a return on the Nautilus investment, which management believes, in conjunction with excluding the impact of equity in net income (loss) of investee, net of tax, is reflective of assets available for the Company’s use in its ongoing operations as a result of its investment in Nautilus.
Management believes that providing this non-GAAP financial measure allows for meaningful comparisons between the Company's core business operating results and those of other companies, and provides the Company with an important tool for financial and operational decision making and for evaluating its own core business operating results over different periods of time. In addition to management's internal use of non-GAAP Adjusted EBITDA, management believes that Adjusted EBITDA is also useful to investors and analysts in comparing the Company’s performance across reporting periods on a consistent basis. Management believes the foregoing to be the case even though some of the excluded items involve cash outlays and some of them recur on a regular basis (although management does not believe any of such items are normal operating expenses necessary to generate the Company’s bitcoin related revenues). For example, the Company expects that share-based compensation expense, which is excluded from Adjusted EBITDA, will continue to be a significant recurring expense over the coming years and is an important part of the compensation provided to certain employees, officers, directors and consultants. Additionally, management does not consider any of the excluded items to be expenses necessary to generate the Company’s bitcoin related revenue.
The Company’s Adjusted EBITDA measure may not be directly comparable to similar measures provided by other companies in the Company’s industry, as other companies in the Company’s industry may calculate non-GAAP financial results differently. The Company's Adjusted EBITDA is not a measurement of financial performance under U.S. GAAP and should not be considered as an alternative to net loss or any other measure of performance derived in accordance with U.S. GAAP. Although management utilizes internally and presents Adjusted EBITDA, the Company only utilizes that measure supplementally and does not consider it to be a substitute for, or superior to, the information provided by U.S. GAAP financial results. Accordingly, Adjusted EBITDA is not meant to be considered in isolation of, and should be read in conjunction with, the information contained in the Company’s consolidated financial statements, which have been prepared in accordance with U.S. GAAP.
The following table is a reconciliation of the Company’s Adjusted EBITDA to its most directly comparable U.S. GAAP measure (i.e., net loss) for the periods indicated (in thousands):
| Year Ended December 31, | ||||||
|---|---|---|---|---|---|---|
| 2024 | 2023 | |||||
| Net loss | $ | (72,418) | $ | (73,421) | ||
| Adjustments to reconcile net loss to non-GAAP Adjusted EBITDA: | ||||||
| Loss from discontinued operations, net of tax | — | 129 | ||||
| Gain on sale of equity interest in investee | (22,602) | — | ||||
| Equity in net (income) loss of investee, net of tax, related to Nautilus | (3,363) | 9,290 | ||||
| Distributions from investee, related to Nautilus | 22,776 | 21,949 | ||||
| Income tax benefit | — | — | ||||
| Other income | (3,927) | (231) | ||||
| Loss on extinguishment of debt | 6,300 | — | ||||
| Interest expense | 19,794 | 34,812 | ||||
| Loss on disposals of property, plant, and equipment, net | 17,824 | 1,209 | ||||
| Depreciation | 59,808 | 28,350 | ||||
| Amortization of right-of-use asset | 1,373 | 1,001 | ||||
| Stock-based compensation expense | 30,927 | 5,859 | ||||
| Transaction-based compensation expense | 3,885 | — | ||||
| Related party expense to be settled with respect to common stock | — | 2,917 | ||||
| Non-GAAP adjusted EBITDA | $ | 60,377 | $ | 31,864 |
37
Table of Contents
Liquidity and Capital Resources
As of December 31, 2024, the Company had balances of cash and cash equivalents of $274.1 million, working capital of $229.6 million, total stockholders’ equity of $244.4 million and an accumulated deficit of $332.3 million. The Company incurred a net loss of $72.4 million for the year ended December 31, 2024. The Company began mining bitcoin in March 2022 and had 9.7 EH/s of operating capacity as of December 31, 2024. To date, the Company has relied primarily on proceeds from the sale of bitcoin, both self-mined and distributed from the joint venture which owned the Nautilus Cryptomine Facility, and its issuances of debt and equity to fund its principal operations.
The principal uses of cash are for the operation and buildout of data center facilities, debt service, and general corporate activities and, to a lesser extent in 2023, investments in the Nautilus joint venture related to mining facility buildout and general corporate activities. Cash flow information is as follows (in thousands):
| Year Ended December 31, | ||||||
|---|---|---|---|---|---|---|
| 2024 | 2023 | |||||
| Cash provided by (used in): | ||||||
| Operating activities: | ||||||
| Continuing operations | $ | (24,422) | $ | 4,160 | ||
| Discontinued operations | — | 103 | ||||
| Total operating activities | (24,422) | 4,263 | ||||
| Investing activities | (91,159) | (78,013) | ||||
| Financing activities | 335,207 | 119,866 | ||||
| Net change in cash and cash equivalents and restricted cash | $ | 219,626 | $ | 46,116 |
Operating activities
Cash (used in) provided by operating activities for continuing operations was $(24.4) million and $4.2 million for the years ended December 31, 2024 and 2023, respectively, reflecting a decrease of $28.6 million. During the year ended December 31, 2024, the Company completed significant expansion of its bitcoin mining operations resulting in an increase in mining capacity at the Lake Mariner Facility to approximately 195 MW as of December 31, 2024 as compared to 110 MW as of December 31, 2023 which resulted in stable bitcoin earned during the period despite the impacts of the halving in April 2024. In addition, the average price of bitcoin increased during the year ended December 31, 2024 to $65,824 as compared to $28,788 during the same period in the prior year, resulting in an increase in revenue of $70.9 million. Power prices increased during the year ended December 31, 2024 as compared to prior year and cost of revenue (exclusive of depreciation) increased approximately $35.3 million for the year ended December 31, 2024 as compared to the prior year primarily due to the increase in mining capacity and the halving in April 2024. Additionally, prior to the repayment of the Term Loans in July 2024, the Company converted its bitcoin holdings nearly immediately to cash and the related proceeds from sales of digital currency were included within cash flows from operating activities in the consolidated statements of cash flows. Subsequently, proceeds from sales of digital currency of $67.4 million are included within cash flows from investing activities in the consolidated statements of cash flows for the year ended December 31, 2024 as the Company no longer converts bitcoin into cash on a nearly immediate basis.
Investing activities
Cash used in investing activities was $91.2 million and $78.0 million for the years ended December 31, 2024 and 2023, respectively. The Company invested $267.9 million and $75.2 million in the buildout of its facilities at the Lake Mariner Facility for the years ended December 31, 2024 and 2023, respectively, which included $69.2 million during the year ended December 31, 2024 related to infrastructure intended to support expansion into HPC leasing operations in 2025. Additionally, during the year ended December 31, 2023, the Company invested $2.8 million in its joint venture. During the year ended December 31, 2024, the Company received proceeds from the sale of its equity interest in the joint venture of $86.1 million, proceeds from the sale of property, plant and equipment of $23.3 million, and proceeds from sales of digital currency not converted nearly immediately into cash of $67.4 million.
Financing activities
Cash provided by financing activities was $335.2 million and $119.9 million for the years ended December 31, 2024 and 2023, respectively. During the year ended December 31, 2024, the Company received proceeds from (i) issuance
38
Table of Contents
of convertible notes, net of issuance costs paid, of $487.1 million, (ii) issuances of Common Stock, net of issuance costs, of $188.7 million and (iii) warrant exercises of $4.8 million. The cash provided by financing activities during the year ended December 31, 2024 was partially offset by principal payments on long-term debt of $139.4 million, repurchases of treasury stock of $118.2 million, purchases of capped call instruments of $60.0 million and payments related to tax withholdings related to net share settlements of stock-based compensation awards of $23.7 million. During the year ended December 31, 2023, the Company received proceeds from (i) issuances of Common Stock, net of issuance costs, of $135.9 million (ii) proceeds from warrant exercises of $2.5 million, and (iii) issuance of convertible promissory notes of $1.3 million. The cash provided by financing activities during the year ended December 31, 2023 was partially offset by payments of contingent value rights liability related to the proceeds from sales of net assets held for sale of RM 101 of $11.0 million, principal payments on long-term debt of $6.6 million, and payments related to tax withholdings related to net share settlements of stock-based compensation awards of $2.0 million.
Financial Condition
The Company incurred a net loss of $72.4 million and reported cash used in operating activities of $24.4 million for the year ended December 31, 2024. As of December 31, 2024, the Company had balances of cash and cash equivalents of $274.1 million, working capital of $229.6 million, total stockholders’ equity of $244.4 million and an accumulated deficit of $332.3 million. The Company had 9.7 EH/s of operating capacity at the Lake Mariner Facility as of December 31, 2024. To date, the Company has relied primarily on proceeds from sales of bitcoin, both self-mined and distributed from the joint venture which owned the Nautilus Cryptomine Facility, and its issuances of debt and equity to fund its principal operations. Subsequent to December 31, 2024, the Company received $90.0 million of Prepaid Rent under its HPC Leases which shall be applied towards each month’s base rent for 24 months commencing on the respective commencement date of each lease until the Prepaid Rent is exhausted.
Critical Accounting Estimates
The above discussion and analysis of the Company’s financial condition and results of operations are based upon its consolidated financial statements, which have been prepared in accordance with U.S. GAAP. The preparation of the Company’s consolidated financial statements requires management to make estimates and assumptions about future events that affect the amounts reported in the financial statements and accompanying notes. Future events and their effects cannot be determined with absolute certainty. Therefore, the determination of estimates requires the exercise of judgment. Actual results inevitably will differ from those estimates, and such differences may be material to the financial statements.
See Note 2 of the Notes to Consolidated Financial Statements included in Item 8 of this Annual Report for a summary of the Company’s significant accounting policies.
Digital currency
Digital currency is comprised of bitcoin earned as noncash consideration in exchange for providing hash computation services to a mining pool as well as consideration for bitcoin miner hosting services. From time to time, the Company also receives bitcoin as distributions-in-kind from its joint venture.
Bitcoin are accounted for as intangible assets with indefinite useful life and is included in current assets in the consolidated balance sheets due to the Company’s ability to sell it in a highly liquid marketplace and because the Company reasonably expects to liquidate its bitcoin to support operations within the next twelve months. The Company elected to early adopt ASU 2023-08 effective January 1, 2024, which requires digital currency to be valued at fair value each reporting period in accordance with ASC 820 with changes in fair value recorded in net income. Gains and losses from the remeasurement of digital currency are included within gain on fair value of digital currency, net in the consolidated statements of operations. The Company sells bitcoin and gains and losses from such transactions, measured as the difference between the cash proceeds and the cost basis of bitcoin as determined on a first-in-first-out basis, are also included within gain on fair value of digital currency, net in the consolidated statements of operations.
Prior to the adoption of ASU 2023-08, bitcoin was assessed for impairment annually, or more frequently if events or changes in circumstances indicate it is more likely than not that the asset is impaired. The Company elected to bypass the optional qualitative impairment assessment and to track its bitcoin activity daily for impairment assessment purposes. The Company performed an analysis each day to identify whether events or changes in circumstances, principally decreases in the quoted price of bitcoin on the active trading platform, indicated that it was more likely than not that its bitcoin were impaired. For impairment testing purposes, the lowest intraday trading price of bitcoin was identified at the single bitcoin level (one bitcoin). The excess, if any, of the carrying amount of bitcoin and the lowest daily trading price of
39
Table of Contents
bitcoin represented a recognized impairment loss. To the extent an impairment loss was recognized, the loss established the new cost basis of the asset. Subsequent reversal of previously recorded impairment losses was prohibited.
Bitcoin earned through mining activities is recorded as an adjustment in the consolidated statements of cash flows, reconciling net loss to cash flows from operating activities. Bitcoin received as distributions-in-kind from equity investees is disclosed in supplemental noncash investing activities.
Prior to the repayment of the Term Loans in July 2024 (see Note 9), bitcoin sales proceeds were included in cash flows from operating activities, as bitcoin was converted into cash immediately during that period. Following repayment of the Term Loans, bitcoin sales proceeds are now classified under cash flows from investing activities, as the Company no longer converts bitcoin into cash immediately upon mining.
Long-lived Assets
Property, plant and equipment are recorded at cost, net of accumulated depreciation. Judgment is necessary in estimating the Company’s various assets’ useful lives. This includes evaluating the Company’s own usage experience with its currently owned assets, the quality of materials used in construction-related projects and, for its miners, the rate of technological advancement and market-related factors such as the price of bitcoin and the bitcoin network hashrate, which impact the value of the miners. Depreciation is computed using the straight-line method over the estimated useful lives of the assets (generally 5 years for computer equipment and 4 years for miners). Leasehold improvements and electrical equipment are depreciated over the shorter of their estimated useful lives or the lease term. Changes in depreciation and amortization, generally accelerated depreciation, are determined and recorded when estimates of the remaining useful lives or residual values of long-term assets change.
The Company reviews its long-lived assets, including property, plant and equipment, for impairment whenever events or changes in circumstances indicate that the carrying amount of an asset, or asset group, may not be recoverable. Recoverability of assets to be held and used is measured by a comparison of the carrying amount of an asset to undiscounted cash flows expected to be generated by the asset. Significant judgment is used when estimating future cash flows, particularly the price of bitcoin and the network hashrate. Any impairment loss recorded is measured as the amount by which the carrying value of the assets exceeds the fair value of the assets. Should our estimates of useful lives, undiscounted cash flows, or asset fair values change, additional and potentially material impairments may be required, which could have a material impact on our reported financial results.
Stock-based compensation
The Company measures stock-based compensation cost related to share-based payment awards at the grant date of the award, based on the estimated fair value of the award. For restricted stock units (“RSUs”) with time-based vesting, the fair value is determined by the Company’s Common Stock price on the date of the grant. For RSUs with vesting based on market conditions (“PSUs”), the effect of the market condition is considered in the determination of fair value on the grant date using a Monte Carlo simulation model. Stock-based compensation expense for PSUs is recorded over the derived service period unless the market condition is satisfied in advance of the derived service period, in which case a cumulative catch-up is recognized as of the date of achievement. Stock-based compensation for PSUs is recorded regardless of whether the market conditions are met unless the service conditions are not met. The Company accounts for forfeitures as they occur. The Company uses significant judgment in determining the likelihood of meeting milestones and market conditions. Inputs into valuation models such as Monte Carlo simulations include both the Company’s and guideline public company historical and expected annual volatility and, depending on the inputs selected, the Company could calculate significantly different estimated grant date fair values, materially impacting the valuation of our stock-based awards and the stock-based compensation expense we recognize in future periods.
Income Taxes
The Company accounts for income taxes pursuant to ASC 740, Income Taxes (“ASC 740”), which requires, among other things, an asset and liability approach to calculating deferred income taxes. The asset and liability approach requires the recognition of deferred tax assets and liabilities for the expected future tax consequences of temporary differences between the carrying amounts and the tax bases of assets and liabilities. A valuation allowance is provided to offset any net deferred tax assets for which management believes it is more likely than not that the net deferred tax asset will not be realized. The Company follows the provision of ASC 740 related to accounting for uncertain income tax positions. When tax returns are filed, it is more likely than not that some positions taken would be sustained upon examination by the taxing authorities, while others are subject to uncertainty about the merits of the position taken or the amount of the position that would be ultimately sustained. In accordance with the guidance of ASC 740, the benefit of a tax
40
Table of Contents
position is recognized in the financial statements in the period during which, based on all available evidence, management believes it is more likely that not that the position will be sustained upon examination, including the resolution of appeals or litigation processes, if any. Tax positions taken are not offset or aggregated with other positions. The tax benefits recognized in the consolidated financial statements from such positions are then measured based on the largest benefit that has a greater than 50% likelihood of being realized upon settlement with the applicable taxing authority. The portion of the benefits associated with the tax positions taken that exceeds the amount measured as described above should be reflected as a liability for uncertain tax benefits in the Company’s balance sheets along with any associated interest and penalties that would be payable to the taxing authorities upon examination. The most critical estimate for income taxes is the determination of whether to record a valuation allowance for any net deferred tax asset, including net loss carryforwards, whereby management must estimate whether it is more likely than not that the deferred tax asset would be realized.
FY 2023 10-K MD&A
SEC filing source: 0001083301-24-000072.
ITEM 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations
The following Management’s Discussion and Analysis of Financial Condition and Results of Operations should be read in conjunction with the other Items included in this Annual Report and with the accompanying consolidated financial statements and notes thereto included elsewhere in this report. All figures presented below represent results from continuing operations, unless otherwise specified. Capitalized terms used but not otherwise defined herein shall have the meanings ascribed to such terms in the Consolidated Financial Statements. Unless the context otherwise requires, references in this Annual Report to the “Company,” “TeraWulf,” “we,” “us” or “our” refers to TeraWulf Inc. and its consolidated subsidiaries. Certain statements contained in this Management’s Discussion and Analysis of Financial Condition and Results of Operations may be deemed forward-looking statements. See “Forward-Looking Statements.”
28
Table of Contents
Overview
We are a leading digital asset technology firm that specializes in digital infrastructure and sustainable energy development. Our primary focus is supporting environmentally conscious bitcoin mining operations by developing and operating state-of-the-art facilities within the United States. Our bitcoin mining facilities are powered by clean, affordable, and reliable energy sources, underscoring our commitment to sustainable practices within the cryptocurrency mining industry.
Revenue Structure
Our primary source of revenue stems from the mining of bitcoin conducted at our sustainable mining facility sites. Additionally, we occasionally generate revenue through the provision of miner hosting services to third-party entities. We exclusively engage in bitcoin mining for our own purposes and do not facilitate bitcoin transactions for external parties.
Our industrial-scale bitcoin mining operations are strategically designed to optimize efficiency. This involves continuously expanding our hash rate, which represents the computational power dedicated to supporting the bitcoin blockchain. By doing so, we enhance our chances of successfully solving cryptographic hashes, thereby generating new blocks on the bitcoin blockchain—a process commonly known as “solving a block.” Typically, a miner’s likelihood of solving a block and earning the block reward is directly linked to the proportion of the bitcoin blockchain's total network hash rate that its hash rate represents.
Block rewards, which are fixed, undergo periodic reductions through halving events. The most recent halving occurred in May 2020, reducing the block reward from 12.5 to 6.25 bitcoin. Another halving, which is expected in April 2024, will further reduce the block reward to 3.125 bitcoin.
In addition to block rewards, bitcoin miners also earn transaction fees for confirming transactions. By validating unconfirmed transactions and incorporating them into new blocks within the blockchain, miners collect these fees. While miners are not obliged to confirm specific transactions, economic incentives drive them to validate legitimate transactions to earn fees. Historically, miners have accepted relatively low transaction fees, but these fees can vary, making future fee predictions challenging.
Presently, we liquidate the bitcoin mined as part of our routine treasury management processes to acquire U.S. dollars for operational, capital, or other corporate expenses. Our bitcoin holdings are securely stored in a cold storage wallet managed by our custodian, NYDIG Trust Company LLC, a duly chartered New York limited liability trust company (“NYDIG”).
For our bitcoin mining operations, we utilize a third-party mining pool operated by Foundry Digital LLC (“Foundry”). At the close of each day, the bitcoin we have earned is transferred by Foundry to our custodial wallet address at NYDIG. We abstain from engaging in the direct sale of our bitcoin on any exchange. Instead, we rely on NYDIG to handle the sale of our mined bitcoin in accordance with our execution agreement with NYDIG, as detailed further in the “Risk Factors” section herein. Our bitcoin sales occur on a daily, weekly, and monthly basis.
Bitcoin and Blockchain
Bitcoin, introduced in 2008, fundamentally transformed the landscape of digital currency by providing a decentralized mechanism for exchanging and preserving value. It operates on a consensus-based network, utilizing a public ledger termed as the “blockchain” to meticulously record every bitcoin transaction. TeraWulf’s fully integrated bitcoin mining facilities capitalize on zero-carbon energy sources, primarily sourced from baseload nuclear and hydroelectric power.
Bitcoin mining involves validating transactions through a proof-of-work consensus method, where miners solve complex mathematical problems to add transactions to the blockchain. TeraWulf invests in computation networks (mining rigs) equipped with application-specific integrated circuit (“ASIC”) chips and secures power to validate transactions and maintain the bitcoin ledger. Factors such as computing capacity, electricity costs, and location play pivotal roles in mining operations.
Our Facilities
TeraWulf currently conducts its bitcoin mining operations at two established data centers: the Lake Mariner facility in upstate New York (the “Lake Mariner Facility”) and the jointly owned Nautilus facility located in central
29
Table of Contents
Pennsylvania (the “Nautilus Cryptomine Facility”). As of December 31, 2023, 95% of TeraWulf’s mining operations were fueled by zero-carbon energy, reflecting our dedication to sustainability. The Company’s ongoing objective is to achieve complete reliance on zero-carbon energy sources.
As of December 31, 2023, these two industrial scale projects had a combined operating capacity of 5.5 EH/s with approximately 48,900 miners deployed, comprised of 33,100 operational miners at the Lake Mariner Facility (including 4,800 hosted miners) and 15,800 self-miners at the Nautilus Cryptomine Facility. As of the date of this Annual Report, the Company has a total operational capacity of 210 megawatts (“MW”) and is currently constructing an additional 35 MW at its Lake Mariner Facility, which is expected to be operational in mid-2024.
Lake Mariner Facility
Located at a site adjacent to the now decommissioned coal-fired power plant in Barker, New York, the Lake Mariner Facility began sustainably mining bitcoin in March 2022. As of December 31, 2023, the Lake Mariner Facility was operating approximately 115 megawatt (“MW”) of bitcoin mining capacity and as of the date of this Annual Report, the Company has expanded its Lake Mariner Facility infrastructure to 160 MW of bitcoin mining capacity at the site. The Company has an agreement in place with the Power Authority of the State of New York (“NYPA”) for 90 MW of high load factor power to support its bitcoin mining operations (the “PPA”). The PPA was executed on February 12, 2022 and has a term of ten years from the date of commencement of NYPA’s power delivery. The Lake Mariner Facility is situated on an expansive site on the shores of Lake Ontario and has the ability to scale up to 500 MW of capacity.
As of December 31, 2023, we owned approximately 30,100 miners, exclusive of the 4,800 hosted miners, of which approximately 28,300 are operational at the Lake Mariner Facility with the remainder undergoing maintenance or on standby to replace miners under repair. These miners were comprised as follows:
| Vendor and Model | Number of miners | |
|---|---|---|
| Bitmain S19 Pro | 6,700 | |
| Bitmain S19 XP | 6,300 | |
| Bitmain S19j Pro | 11,800 | |
| MinerVA M7 | 4,100 | |
| Whatsminer M30S+ | 1,200 | |
| 30,100 |
As of December 31, 2023, our fleet of miners ranged in age from 0.4 to 1.6 years and have an average age of approximately 0.8 years. We do not have scheduled downtime for our miners; however, while we periodically perform unscheduled maintenance on our miners, such downtime has not been significant historically. When performing unscheduled maintenance, depending on the length of estimated repair time, we may replace a miner with a substitute miner to limit overall downtime. Our fleet of miners at the Lake Mariner Facility had a range of energy efficiency from 22.0 to 39.0 joules per terahash (“j/th”) and has an average energy efficiency of 28.8 j/th.
Nautilus Cryptomine Facility
Located in Berwick, Pennsylvania, Nautilus Cryptomine LLC (“Nautilus”) is a joint venture between TeraWulf and a subsidiary of Talen Energy Corporation (“Talen”). Nautilus currently owns a 200 MW bitcoin mining facility located adjacent to the 2.5 gigawatt nuclear-powered Susquehanna Station. The Nautilus Cryptomine Facility represents the first bitcoin mining facility site that is powered by 100% “behind the meter” zero-carbon nuclear energy, which is contracted at a fixed rate of 2.0 cents per kilowatt-hour for a term of five years with two successive three-year renewal options. Under the Nautilus joint venture agreement, the Company holds a 25% equity interest in Nautilus and Talen holds a 75% equity interest, each subject to adjustment based on relative capital contributions. TeraWulf began mining bitcoin at the Nautilus Cryptomine Facility in the first quarter of 2023 and, as of December 31, 2023, had 50 MW of operational bitcoin mining capacity at the Nautilus Cryptomine Facility. On February 28, 2024, the Company exercised its option to increase its energy requirement at the Nautilus Cryptomine Facility by an incremental 50 MW (for a total of 100 MW attributable to TeraWulf).
As of December 31, 2023, approximately 48,000 miners have been deployed at the Nautilus Cryptomine Facility of which 46,000 are operational with the remainder undergoing maintenance or on standby to replace miners under repair.
30
Table of Contents
Approximately 15,800 of the deployed miners are attributed to TeraWulf's contributions to Nautilus in order to utilize TeraWulf's allotted 50 MW of bitcoin mining capacity. These miners are comprised as follows:
| Vendor and Model | Number of miners | |
|---|---|---|
| Bitmain S19 Pro | 6,300 | |
| Bitmain S19 XP | 7,100 | |
| Bitmain S19j Pro | 2,400 | |
| 15,800 |
As of December 31, 2023, these miners ranged in age from 0.7 to 0.8 years and have an average age of approximately 0.8 years. Nautilus does not have scheduled downtime for miners; however, while Nautilus periodically performs unscheduled maintenance on miners, such downtime has not been significant historically. When performing unscheduled maintenance, depending on the length of estimated repair time, Nautilus may replace a miner with a substitute miner to limit overall downtime. These miners have a range of energy efficiency from 22.0 to 30.0 j/th and an average energy efficiency of 25.5 j/th. While the Company holds a 25% equity interest in Nautilus, the distributions of mined bitcoin are determined by each of TeraWulf’s and Talen’s respective hashrate contributions. Accordingly, the Company has contributed approximately 1.9 EH/s of a total 5.2 EH/s of miners which results in an approximate 35.7% of the hashrate share attributed to the Company.
Combined Facilities
As described above, there are a variety of factors that influence our ability to mine bitcoin profitably, including bitcoin’s value in USD, mining difficulty global hashrate, power prices, fleet energy efficiency, data center energy efficiency and other factors. The energy efficiency of a mining fleet drives profitability, because the most significant direct expense for bitcoin mining is power. We believe we operate a highly efficient fleet of miners. The Company uses the following metrics as indicators of operational progress and effectiveness and believes they are useful to investors for the same purposes and to provide comparisons to peer companies.
The table below presents our miner efficiency and computing power as compared to the global computing power as of December 31, 2023.
| Combined facilities(1) | As of December 31, 2023 | ||
|---|---|---|---|
| Global hashrate (EH/s)(2) | 558.4 | ||
| Miner efficiency (w/th)(3) | 27.6 | ||
| TeraWulf combined average operating hashrate (EH/s)(4) | 5.0 | ||
| TeraWulf % of Global hashrate | 0.9 | % |
(1) Results reflect hashrate of mining operations at the Lake Mariner Facility and TeraWulf’s net share of hashrate produced at the Nautilus Cryptomine Facility.
(2) Total global hashrate obtained from YCHARTS (https://ycharts.com/indicators/bitcoin_network_hash_rate)
(3) Joules of energy required to produce each terahash of processing power
(4) While nameplate inventory for TeraWulf’s two facilities is 5.5 EH/s, inclusive of gross total hosted miners, actual monthly hashrate performance depends on a variety of factors, including (but not limited to) performance tuning to increase efficiency and maximize margin, scheduled outages (scopes to improve reliability or performance), unscheduled outages, curtailment due to participation in various cash generating demand response programs, derate of ASICS due to adverse weather and ASIC maintenance and repair.
As of December 31, 2023, our operating hashrate was approximately 0.9% of the total global hashrate, and we received approximately the same percentage of the global blockchain rewards, which as of that date, equaled approximately 10 to 11 bitcoin per day. Ultimately, in order to mine profitably, we work to ensure that these mining rewards cover our direct operating costs.
31
Table of Contents
The table below presents the average cost of mining each bitcoin, including bitcoin mined at the Lake Mariner Facility and the Company’s net share of bitcoin mined at the Nautilus Cryptomine Facility, for the year ended December 31, 2023 and the total energy cost per kWh utilized within the facilities.
| Cost of mining - Analysis of costs to mine one bitcoin | Year Ended December 31, 2023 | ||
|---|---|---|---|
| Cost of mining - Lake Mariner Facility and net share of the Nautilus Cryptomine Facility | |||
| Cost of energy per bitcoin mined | $ | 8,676 | |
| Other direct costs of mining - non energy utilities per bitcoin mined | $ | 29 | |
| Cost to mine one bitcoin | $ | 8,705 | |
| Value of each bitcoin mined(1) | $ | 29,645 | |
| Cost to mine one bitcoin as % of value of bitcoin mined | 29.4 | % | |
| Statistics | |||
| Lake Mariner Facility and net share of the Nautilus Cryptomine Facility | |||
| Total bitcoin mined(2) | 3,343 | ||
| Total value of bitcoin mined(1) ($ in thousands) | $ | 99,105 | |
| Total kWhs utilized | 910,743,637 | ||
| Total energy expense, net of expected demand response proceeds(3) ($ in thousands) | $ | 29,006 | |
| Cost per kWh | $ | 0.032 | |
| Energy expense, net as % of value of bitcoin mined | 29.3 | % | |
| Other direct costs of mining ($ in thousands) | $ | 97 |
1 Computed as the weighted-average opening price of bitcoin on each respective day the mined bitcoin is earned. Excludes bitcoin earned from profit sharing associated with a hosting agreement that expired in February 2024 at the Lake Mariner Facility.
2 Excludes bitcoin earned from profit sharing associated with a hosting agreement that expired in February 2024 at the Lake Mariner Facility of 51 bitcoin for the year ended December 31, 2023, and includes TeraWulf’s net share of bitcoin mined at the Nautilus Cryptomine Facility, based on the hashrate share attributed to the Company.
3 Excludes energy expenses associated with a hosting agreement that expired in February 2024 at the Lake Mariner Facility and includes TeraWulf’s net share of energy expense at the Nautilus Cryptomine Facility, based on aggregate nameplate power consumption of deployed miners attributed to TeraWulf’s contribution to Nautilus.
Power prices are the most significant cost driver for our bitcoin mining operations, and energy expense represented 29.3% as expressed as a percentage of value of bitcoin mined during the year ended December 31, 2023.
Energy prices can be highly volatile and global events (including the war in Ukraine and the resulting natural gas shortage) have caused power prices to increase nationwide over the past year. Our wholly-owned Lake Mariner Facility in New York is subject to variable prices and market rate fluctuations with respect to wholesale power costs. Such prices are governed by market power prices and said prices can change hour to hour. While this renders energy prices less predictable, it also gives us greater ability and flexibility to actively manage the energy we consume with an eye towards increasing profitability and energy efficiency. Energy prices are also highly sensitive to weather events, such as winter storms and polar vortices, which increase the demand for power regionally. When such events occur, we may curtail our operations to avoid using power at increased rates or we may be curtailed under demand response programs in which we participate. The average aggregate power prices incurred at the Lake Mariner Facility and the Nautilus Cryptomine Facility during the year ended December 31, 2023 was $0.032 per kilowatt hour.
The management team makes real-time determinations on the need and timing during which we should curtail. If not otherwise curtailed under demand response programs, we curtail when power prices exceed the value we would receive for the corresponding fixed bitcoin reward. This means if bitcoin’s value decreases or energy prices increase, our curtailment will increase; likewise, when bitcoin’s value increases and energy prices decrease, our curtailment will decrease. The management team manages this decision on an hour-by-hour basis.
During the year ended December 31, 2023, the Company curtailed operations at the Lake Mariner Facility due to weather events, energy price spikes, and demand response program participation. The Company records expected payments to be received for demand response programs as a reduction in cost of revenue, which amounted to $3.5 million for the year ended December 31, 2023.
32
Table of Contents
The Company has purchased all miners with cash and has not used limited recourse equipment financing to complete its miner purchases. The Company has raised capital through both the issuance of equity and corporate level debt. These funds have been utilized to support operations, invest in our joint ventures, purchase miners and other fixed assets. Costs related to such issuances are not included in this analysis. Additionally, miner acquisition costs, or capital expenditures, are not factored into the above cost of mining analysis as capital expenditures do not impact the marginal cost of production of one bitcoin. Miner acquisition costs, or capital expenditures, are recorded at cost in property, plant and equipment in the consolidated balance sheets. Depreciation of property, plant and equipment is computed using the straight-line method over the estimated useful lives of the equipment: generally 4 years for miners and 5 years for computer equipment. While we currently depreciate our miners over a 4-year period, given our historical low cost of power ($0.032 per kilowatt-hour for the year ended December 31, 2023), it is possible the average actual useful life of our miners may exceed the depreciation period in certain circumstances. Nevertheless, if depreciation of our miner fleet were factored into the above cost of mining analysis, it would add $11,187 per bitcoin mined in the year ended December 31, 2023.
The estimation of asset useful lives requires management judgement, including consideration of historical operating data, which is limited in the industrial-scale bitcoin mining space given the advent of next-generation mining rigs primarily used by the Company’s bitcoin mining operations. Depreciation periods can be adjusted periodically if an event, regulatory action, or change in retirement patterns indicates an update is necessary. Additionally, management considers expected future energy market prices and conditions, operating costs, maintenance practices and capital investment requirements in determining the estimated useful lives of our equipment and reassesses the reasonableness of estimated useful lives whenever events or changes in circumstances warrant. When a determination has been made that an asset will be retired or extended before or after the end of its current estimated useful life, depreciation provisions will be accelerated or extended to reflect the shortened or lengthened estimated useful life, which could have a material unfavorable or favorable impact on future results of operations.
The Business Combination
TeraWulf completed its business combination with IKONICS Corporation (“IKONICS) on December 13, 2021 (the “Closing Date”) pursuant to which, among other things, TeraCub Inc. (“TeraCub,” formerly known as TeraWulf Inc.) would effectively acquire IKONICS and become a publicly traded company on the Nasdaq, which was the primary purpose of the business combination. Under the terms of the Merger Agreement, each share of IKONICS common stock issued and outstanding immediately prior to the Closing Date was automatically converted into and exchanged for (i) one validly issued, fully paid and nonassessable share of Common Stock of TeraWulf, (ii) one contingent value right (“CVR”) pursuant to a Contingent Value Rights Agreement between TeraWulf and IKONICS (the “CVR Agreement”), and (iii) the right to receive $5.00 in cash, without interest. TeraCub common stock issued and outstanding immediately prior to the Closing Date was automatically converted into the right to receive a number of validly issued, fully paid and nonassessable shares of TeraWulf such that the TeraCub common stockholders prior to conversion would effectively control 98% of the total outstanding shares of TeraWulf immediately subsequent to the Closing Date.
Pursuant to the CVR Agreement, each shareholder of IKONICS as of immediately prior to the Closing Date, received one CVR for each outstanding share of common stock of IKONICS then held. The holders of the CVRs are entitled to receive 95% of the Net Proceeds (as defined in the CVR Agreement), if any, from the sale, transfer, disposition, spin-off, or license of all or any part of the pre-merger business of IKONICS completed within 18 months following the date of the merger, subject to a reserve of up to 10% of the Gross Proceeds (as defined in the CVR Agreement) from such transaction and such other amount to be retained to satisfy Retained Liabilities, as defined. The CVRs do not confer to their holders any voting or equity or ownership interest in IKONICS or TeraWulf and are not transferable, except in limited circumstances, and are not listed on any quotation system or traded on any securities exchange. The CVR Agreement will terminate after all payment obligations to the holders thereof have been satisfied. Holders of CVRs will not be eligible to receive payment for dispositions, if any, of any part of the pre-merger business of IKONICS after the eighteen-month anniversary of the Closing Date. As of December 31, 2022, the CVR liability included in the Company’s consolidated balance sheet was $10.9 million. During the year ended December 31, 2022, the Company completed sales of all IKONICS’ net assets held for sale for net proceeds of $13.2 million, of which $7.0 million remained in escrow under provisions of an asset purchase agreement as of December 31, 2022. Subsequent to the asset sales, IKONICS’ name was changed to RM 101 Inc. (“RM 101”) and the entity has no remaining operations or employees.
In February 2023, all escrowed funds were released to the Company and during the year ended December 31, 2023, the Company made various CVR payments, including (i) a CVR payment of $3.9 million in February 2023 related to the quarterly calculation for the fourth quarter of 2022, (ii) a CVR payment of $5.7 million in May 2023 related to the quarterly calculation for the first quarter of 2023, and (iii) the final CVR payment of $1.4 million in November 2023. In accordance with the CVR Agreement, as of December 31, 2023, all IKONICS’ net assets previously held for sale had been
33
Table of Contents
sold and the Company has made all of the aggregate distributions of $11.0 million of proceeds to the CVR Holders such that the CVR Agreement was deemed terminated as of December 31, 2023.
Upon the consummation of the business combination, RM 101 common stock ceased trading on the Nasdaq and TeraWulf Common Stock began trading on the Nasdaq on December 14, 2021 under the ticker symbol “WULF.”
Results of Operations
The Company generates revenue in the form of bitcoin by providing hash computation services to a mining pool operator to mine bitcoin and validate transactions on the global Bitcoin Network using application-specific integrated circuit computers owned by the Company. The earned bitcoin are routinely sold for U.S. dollars. The Company also earns revenue by providing miner hosting services to third parties. In 2023, the Company established WULF Compute as its internal innovation center, with a specific focus on the research, development, and deployment of its expansive and scalable digital infrastructure. Subsequent to a successful pilot phase involving a compact graphics processing unit (“GPU”) system designed to bolster generative AI and large language model applications, the Company made an initial commitment by allocating a 2 MW power block at the Lake Mariner Facility located in upstate New York (the “Lake Mariner Facility”). This allocation is intended to support a broader high-performance computing (“HPC”) initiative, strategically aimed at diversifying the Company’s revenue streams. While the Company may choose to mine other digital currencies or pursue other data center services in the future, it has no plans to do so currently. The Company's plan of operation for the next twelve months is to continue to increase the mining capacity at its operating mining facilities and to complete the construction of the fourth building at its Lake Mariner Facility.
Revenue and Cost of Revenue
The following table presents revenue and cost of revenue (exclusive of depreciation) (in thousands):
| Year Ended December 31, | ||||||
|---|---|---|---|---|---|---|
| 2023 | 2022 | |||||
| Revenue | $ | 69,229 | $ | 15,033 | ||
| Cost of revenue (exclusive of depreciation) | $ | 27,315 | $ | 11,083 |
Revenue for the years ended December 31, 2023 and 2022 was $69.2 million and $15.0 million, respectively, an increase of $54.2 million. The increase was due primarily to the increase in mining and hosting capacity due to infrastructure constructed and placed in service in the latter half of the year ended December 31, 2022 and during the year ended December 31, 2023. The Company began mining bitcoin at the Lake Mariner Facility in March 2022 and as of December 31, 2023, the Company had energized two buildings and additional infrastructure comprising 115 MW of capacity. During the years ended December 31, 2023 and 2022, revenue from mining was $61.7 million and $10.5 million, respectively, and revenue from hosting was $7.5 million and $4.6 million, respectively.
Cost of revenue (exclusive of depreciation) for the years ended December 31, 2023 and 2022 was $27.3 million and $11.1 million, respectively, an increase of approximately $16.2 million. The increase was primarily due to the increase in mining and hosting capacity due to infrastructure constructed and placed in service between December 31, 2022 and December 31, 2023 at the Lake Mariner Facility. Cost of revenues is comprised primarily of power expense and, to a lesser degree, the cost of services provided under our miner hosting agreements. The Company records proceeds related to participation in demand response programs as a reduction in cost of revenue in the period corresponding to the underlying demand response program period; the amount of aggregate proceeds received or expected to be received were $3.5 million and $0.1 million for the years ended December 31, 2023 and 2022, respectively. The Company is actively expanding its enrollment in such available programs in New York.
34
Table of Contents
Costs and Expenses
The following table presents operating expenses (in thousands):
| Year Ended December 31, | ||||||
|---|---|---|---|---|---|---|
| 2023 | 2022 | |||||
| Operating expenses | $ | 2,116 | $ | 2,038 | ||
| Operating expenses - related party | 2,773 | 1,248 | ||||
| $ | 4,889 | $ | 3,286 |
Operating expenses (including related party expenses) for the years ended December 31, 2023 and 2022 were approximately $4.9 million and $3.3 million, respectively, a net increase of $1.6 million. During the year ended December 31, 2023, operating expenses increased slightly due to increases in repair costs and property insurance offset by lower equipment lease expense as compared to the prior year, while operating expenses – related party, which is paid to a related party which provides services to its Lake Mariner Facility, increased due to increased staffing at the Lake Mariner Facility related to infrastructure constructed and placed in service between December 31, 2022 and 2023 and additionally, to a lesser degree, by an increase in ground lease expense.
The following table presents selling, general and administrative expenses (in thousands):
| Year Ended December 31, | ||||||
|---|---|---|---|---|---|---|
| 2023 | 2022 | |||||
| Selling, general and administrative expenses | $ | 23,693 | $ | 22,770 | ||
| Selling, general and administrative expenses - related party | 13,325 | 13,280 | ||||
| $ | 37,018 | $ | 36,050 |
Selling, general and administrative expenses (including related party expenses) for the years ended December 31, 2023 and 2022 were $37.0 million and $36.1 million, respectively, a net increase of $1.0 million. Selling, general and administrative expenses are comprised primarily of professional fees, legal fees, employee compensation and benefits, stock-based compensation to employees and consultants, insurance and general corporate expenses. The increases during the year ended December 31, 2023 as compared to the prior year were primarily due to increased expenses of (i) stock-based compensation of $4.3 million, (ii) employee compensation and benefits of $3.3 million, and (iii) related party expense to be settled with respect to common stock of $0.8 million. These increases were partially offset by decreases in legal fees of $3.7 million, insurance expense of $1.9 million, and professional fees of $1.7 million. As previously disclosed, the Company has undertaken cost reduction initiatives targeted at reducing its overall selling, general and administrative expenses that are expected to benefit its operating profitability going forward.
Depreciation for the years ended December 31, 2023 and 2022 was $28.4 million and $6.7 million, respectively. The increase was primarily due to the increase in mining capacity due to infrastructure constructed and placed in service between December 31, 2022 and December 31, 2023 at the Lake Mariner Facility.
Impairment of digital currency for the years ended December 31, 2023 and 2022 was $3.0 million and $1.5 million, respectively. Impairment of digital currency represents the decline in bitcoin prices during the Company’s holding period of its bitcoin. Bitcoin impairment is not reversed during its holding period but instead a gain, if any, is recognized upon its liquidation. Realized gain on sale of digital currency, representing such gains on bitcoin liquidation, for the years ended December 31, 2023 and 2022 was $3.2 million and $0.6 million, respectively. In each case, the increase was due to increased bitcoin both earned and sold due to the increase in mining capacity between December 31, 2022 and December 31, 2023.
During the year ended December 31, 2023, the Company recorded a loss on disposal of property, plant and equipment of $1.2 million related to disposals of miners and write-off of deposits on miners. No loss on disposal of property, plant, and equipment was recorded during the year ended December 31, 2022.
During the year ended December 31, 2022, the Company recorded a loss on nonmonetary miner exchange of $0.8 million related to an exchange agreement with Nautilus. No loss on nonmonetary miner exchange was recorded during the year ended December 31, 2023.
35
Table of Contents
Interest expense for the years ended December 31, 2023 and 2022 was $34.8 million and $24.7 million, respectively, an increase of $10.1 million. Interest expense relates primarily to the Company’s term loan financing in the principal amount of $139.4 million as of December 31, 2023 and $146.0 million as of December 31, 2022. The increase in interest expense during the year ended December 31, 2023 as compared to the prior year is primarily due to an increase of approximately $10.2 million of amortization of debt discount related to the term loan financing and an increase in related to the stated interest rate, which remained unchanged, on the term loan financing. The Company’s term loan financing has a maturity date of December 1, 2024.
During the year ended December 31, 2022, the Company recorded a loss on extinguishment of debt of $2.1 million related to an October 2022 amendment to a convertible promissory note (the “Promissory Note”) which was considered an extinguishment of debt under GAAP due the change in fair value of the embedded conversion feature of $1.6 million and the excess of the fair value of the amended Promissory Note of $9.4 million over the carrying value of the Promissory Note immediately prior to the modification.
Income tax benefit for the years ended December 31, 2023 and 2022 was $0 and $0.3 million, respectively. The decrease was do to, during the year ended December 31, 2022, the Company sold the net assets held for sale of IKONICS, resulting in reversal of existing net deferred tax liabilities and a related tax benefit of $0.3 million recorded in income tax benefit in the consolidated statement of operations. Based upon the level of historical U.S. losses and future projections over the period in which the net deferred tax assets are deductible, at this time, management believes it is more likely than not that the Company will not realize the benefits of the remaining deductible temporary differences, and as a result the Company has recorded a full valuation allowance against its gross deferred tax assets as of December 31, 2023 and 2022.
Equity in net loss of investee, net of tax
Equity in net loss of investee, net of tax for the years ended December 31, 2023 and 2022 was $9.3 million and $15.7 million, respectively. The amounts include an impairment loss of $13.6 million and $11.5 million for the years ended December 31, 2023 and 2022, respectively, related to the distribution of miners from Nautilus to the Company whereby the miners were marked to fair value from book value on the date distributed. The impairment loss was the result of decreasing prices for miners between initial purchase and distribution. In each case, the remaining amounts represent TeraWulf’s proportional share of income or losses of Nautilus, which commenced principal operations in February 2023.
Loss from discontinued operations, net of tax
All items included in loss from continuing operations in the consolidated statements of operations for the years ended December 31, 2023 and 2022 relate to its wholly-owned operations of its sole business segment, digital currency mining, due to the Company presenting the RM 101 business as discontinued operations for the years ended December 31, 2023 and 2022.
Loss from discontinued operations, net of tax for the years ended December 31, 2023 and 2022 was $0.1 million and $4.9 million, respectively. The decrease was due to, for the year ended December 31, 2022, the loss from discontinued operations reporting being comprised primarily of an impairment loss on discontinued operations of $4.5 million to write down the related carrying amounts of IKONICS’ net assets to their fair values less estimated cost to sell, offset by a remeasurement gain of $1.1 million on the CVRs, which represents the contingent consideration purchase price component of the RM 101 acquisition. For the year ended December 31, 2023, all assets of IKONICS had been sold prior to the start of the period and RM 101 had no operations or employees.
Non-GAAP Measure
To provide investors with additional information in connection with our results as determined in accordance with generally accepted accounting principals in the United States (“GAAP”), we disclose Adjusted EBITDA as a non-GAAP measure. This measure is not a financial measure calculated in accordance with GAAP, and it should not be considered as a substitute for net income, operating income, or any other measure calculated in accordance with GAAP, and may not be comparable to similarly titled measures reported by other companies.
We define Adjusted EBITDA as income (loss) from continuing operations adjusted for (i) impacts of interest, taxes, depreciation and amortization; (ii) preferred stock dividends, stock-based compensation expense and related party expense to be settled with respect to common stock, all of which are non-cash items that the Company believes are not reflective of its general business performance, and for which the accounting requires management judgment, and the resulting expenses could vary significantly in comparison to other companies; (iii) equity in net loss of investee, net of tax, related to Nautilus; (iv) costs related to non-routine regulatory activities, which costs management does not believe are
36
Table of Contents
reflective of the Company’s ongoing operating activities; (v) other income which is related to interest income or income for which management believes is not reflective of the Company’s ongoing operating activities; and (vi) gains and losses related to discontinued operations that are not be applicable to the Company’s future business activities. The Company’s Adjusted EBITDA also includes the impact of distributions from investee received in bitcoin related to a return on the Nautilus investment, which management believes, in conjunction with excluding the impact of equity in net loss of investee, net of tax, is reflective of assets available for the Company’s use in its ongoing operations as a result of its investment in Nautilus.
Management believes that providing this non-GAAP financial measure allows for meaningful comparisons between the Company's core business operating results and those of other companies, and provides the Company with an important tool for financial and operational decision making and for evaluating its own core business operating results over different periods of time. In addition to management's internal use of non-GAAP Adjusted EBITDA, management believes that Adjusted EBITDA is also useful to investors and analysts in comparing the Company’s performance across reporting periods on a consistent basis. Management believes the foregoing to be the case even though some of the excluded items involve cash outlays and some of them recur on a regular basis (although management does not believe any of such items are normal operating expenses necessary to generate the Company’s bitcoin related revenues). For example, the Company expects that share-based compensation expense, which is excluded from Adjusted EBITDA, will continue to be a significant recurring expense over the coming years and is an important part of the compensation provided to certain employees, officers, directors and consultants. Additionally, management does not consider any of the excluded items to be expenses necessary to generate the Company’s bitcoin related revenue.
The Company’s Adjusted EBITDA measure may not be directly comparable to similar measures provided by other companies in the Company’s industry, as other companies in the Company’s industry may calculate non-GAAP financial results differently. The Company's Adjusted EBITDA is not a measurement of financial performance under GAAP and should not be considered as an alternative to operating (loss) income or any other measure of performance derived in accordance with GAAP. Although management utilizes internally and presents Adjusted EBITDA, the Company only utilizes that measure supplementally and does not consider it to be a substitute for, or superior to, the information provided by GAAP financial results. Accordingly, Adjusted EBITDA is not meant to be considered in isolation of, and should be read in conjunction with, the information contained in the Company’s consolidated financial statements, which have been prepared in accordance with GAAP.
The following table is a reconciliation of the Company’s Adjusted EBITDA to its most directly comparable GAAP measure (i.e., net loss attributable to common stockholders) for the periods indicated (in thousands):
| Year Ended December 31, | ||||||
|---|---|---|---|---|---|---|
| 2023 | 2022 | |||||
| Net loss attributable to common stockholders | $ | (74,495) | $ | (91,574) | ||
| Adjustments to reconcile net loss attributable to common stockholders to non-GAAP adjusted EBITDA: | ||||||
| Preferred stock dividends | 1,074 | 783 | ||||
| Loss from discontinued operations, net of tax | 129 | 4,857 | ||||
| Equity in net (income) loss of investee, net of tax, related to Nautilus | 9,290 | 15,712 | ||||
| Distributions from investee, related to Nautilus | 21,949 | — | ||||
| Income tax expense (benefit) | — | (256) | ||||
| Interest expense | 34,812 | 24,679 | ||||
| Depreciation | 28,350 | 6,667 | ||||
| Amortization of right-of-use asset | 1,001 | 303 | ||||
| Stock-based compensation expense | 5,859 | 1,568 | ||||
| Related party expense to be settled with respect to common stock | 2,917 | 2,083 | ||||
| Costs related to non-routine regulatory activities | — | 996 | ||||
| Other income | (231) | — | ||||
| Non-GAAP adjusted EBITDA | $ | 30,655 | $ | (34,182) |
37
Table of Contents
Liquidity and Capital Resources
As of December 31, 2023, the Company had balances of cash and cash equivalents of $54.4 million, a working capital deficiency of $92.1 million, total stockholders’ equity of $222.5 million and an accumulated deficit of $259.9 million. The Company incurred a net loss attributable to common stockholders of $74.5 million for the year ended December 31, 2023. The Company began mining bitcoin in March 2022 and had 5.5 EH/s of operating capacity across the Lake Mariner Facility and the Nautilus Cryptomine Facility as of December 31, 2023, which increased to 7.9 EH/s upon energization of the third building at the Lake Mariner Facility during the first quarter of 2024. To date, the Company has relied primarily on proceeds from its issuances of debt and equity and sale of bitcoin, both self-mined and distributed from the joint venture which owns the Nautilus Cryptomine Facility (see Note 11), to fund its principal operations. TeraWulf expects to fund its business operations and incremental infrastructure buildout primarily through positive cash flows from operations, including sales of bitcoin, both self-mined and distributed from the joint venture which owns the Nautilus Cryptomine Facility (see Note 11), cash on the balance sheet and the issuance of equity securities.
The principal uses of cash are for the operation and buildout of mining facilities, debt service, and general corporate activities and, to a lesser extent, investments in the Nautilus joint venture related to mining facility buildout and general corporate activities. Cash flow information is as follows (in thousands):
| Year Ended December 31, | ||||||
|---|---|---|---|---|---|---|
| 2023 | 2022 | |||||
| Cash provided by (used in): | ||||||
| Operating activities: | ||||||
| Continuing operations | $ | 4,160 | $ | (32,262) | ||
| Discontinued operations | 103 | (1,804) | ||||
| Total operating activities | 4,263 | (34,066) | ||||
| Investing activities | (78,013) | (94,047) | ||||
| Financing activities | 119,866 | 89,981 | ||||
| Net change in cash and cash equivalents and restricted cash | $ | 46,116 | $ | (38,132) |
Cash provided by (used in) operating activities for continuing operations was $4.2 million and $(32.3) million for the years ended December 31, 2023 and 2022, respectively. For the year ended December 31, 2023, cash provided by operations resulted from a net loss of $73.4 million less (a) $4.3 million noncash expenses, net of $63.9 million increase in digital currency from mining, (b) proceeds from sale of bitcoin of $83.9 million, and (c) changes in certain asset and liability balances. The noncash expenses were primarily comprised of (i) $19.5 million related to amortization of debt issuance cost, commitment fees and accretion of debt discount, (ii) $2.9 million of related party expense to be settled with respect to common stock, (iii) $5.9 million related to stock-based compensation, (iv) $28.4 million of depreciation, (v) $1.0 million of amortization of right-of-use asset, (vi) $0.1 million related to realized gain on sale of digital currency net of impairment of digital currency, and (vii) $9.3 million related to the Company’s equity in net loss of investee, net of tax. The changes in certain assets and liabilities were primarily comprised of a net decrease in current liabilities (which includes accounts payable, other accrued liabilities and other amounts due to related parties) of $10.3 million. For the year ended December 31, 2022, cash used in operations results from a net loss of $90.8 million less (a) $35.6 million noncash expenses, net of $10.8 million increase in digital currency from mining, (b) proceeds from sale of bitcoin of $9.7 million, and (c) changes in certain asset and liability balances. The noncash expenses were primarily comprised of (i) $11.7 million related to amortization of debt issuance cost and accretion of debt discount, (ii) $2.1 million of related party expense to be settled with respect to common stock, (iii) $1.6 million related to stock-based compensation, (iv) $6.7 million of depreciation, (v) $0.3 million of amortization of right-of-use asset, (vi) $0.9 million related to impairment of digital currency net of realized gain on sale of digital currency, (vii) $15.7 million related to the Company’s equity in net loss, net of tax of Nautilus, (viii) $4.9 million of loss from discontinued operations, net of tax related to RM 101’s business, the assets of which were substantially sold as of December 31, 2022, (ix) $0.8 million loss on nonmonetary miner exchange, and (x) $2.1 million of loss on extinguishment of debt. The changes in certain assets and liabilities were primarily comprised of a net increase in liabilities (which primarily includes accounts payable, other accrued liabilities, other amounts due to related parties) of $17.0 million, a net increase in current assets (which primarily includes prepaid expenses, amounts due from related parties and other current assets) of $2.8 million, an increase in other assets of $1.0 million.
38
Table of Contents
Cash used in investing activities was $78.0 million and 94.0 million for the years ended December 31, 2023 and 2022, respectively. During the years ended December 31, 2023 and 2022, the Company (i) invested $75.2 million and $61.1 million, respectively, in the buildout of mining facilities and (ii) invested $2.8 million and $46.2 million, respectively, in Nautilus related primarily to the joint venture’s miner deposits and mining facility buildout (including reimbursable payments made on behalf of the joint venture of joint venture partner offset by reimbursement from joint venture or joint venture partner of less than $0.1 million net cash used). Additionally, during the year ended December 31, 2022 the Company received net proceeds from the sale of IKONICS’ net assets held for sale of $13.3 million. See “Contractual Obligations and Other Commitments” for additional discussion on miner and Nautilus commitments.
Cash provided by financing activities was $119.9 million and $90.0 million for the years ended December 31, 2023 and 2022, respectively. During the years ended December 31, 2023 and 2022, the Company received proceeds from issuance of (i) Common Stock, net of issuance costs, of $135.9 million and $47.3 million, respectively, (ii) warrants of $2.5 million and 5.7 million, respectively, and (iii) convertible promissory notes of $1.3 million and $14.7 million. During the year ended December 31, 2022, the Company also received (i) $22.5 million of proceeds from issuance of long-term debt, net of issuance costs, (ii) $3.4 million proceeds from issuance of promissory notes to stockholders, (iii) $9.6 million of proceeds from issuance of preferred stock and (iv) $2.1 million related to proceeds from insurance premium and property, plant and equipment financing (net of principal payments made). During the years ended December 31, 2023 and 2022, the Company reported cash outflows from operations of (i) $6.6 million and $0, respectively, related to principal payments on long-term debt (ii) $2.0 million and $0, respectively, related to payments of tax withholding related to net share settlements of stock-based compensation awards, (ii) $0 and $15.3 million, respectively, related to principal payments on convertible promissory notes, and (iii) $11.0 million and $0, respectively, related to payment of CVR liability related to proceeds from sale of IKONICS’ net assets held for sale.
Contractual Obligations and Other Commitments
As of December 31, 2023, the Company had one outstanding miner purchase agreement, with Bitmain Technologies Delaware Limited (“Bitmain Delaware”) (the “July 2023 Bitmain Agreement”). The July 2023 Bitmain Agreement provides that the Company will receive 15,100 S19j XP miners from Bitmain Delaware, with an option to receive an additional 3,400 miners, pursuant to certain payment timing conditions, for delivery in the fourth quarter of 2023 for a total purchase price of $75.4 million. The Company is entitled to apply coupons equivalent to 30% of the total purchase price, resulting in an estimated effective purchase price of $53.4 million for 18,500 miners. In September 2023, the Company entered into a binding letter of intent with Bitmain Development PTE. Ltd. (“Bitmain PTE”), for the purchase of at least 1,200 PH of Antminer S21 miners, pursuant to which the Company paid a security deposit of $1.2 million. During the year ended December 31, 2023, the Company elected not to purchase the applicable quantity of Antminer S21 miners, as allowed under the letter of intent, and the $1.2 million security deposit was credited to the Company's account with Bitmain PTE and applied to the July 2023 Bitmain Agreement. As of December 31, 2023, the Company had made payments of $36.2 million, including purchase of coupons, representing 67% of the effective purchase price. Subsequent to December 31, 2023, the Company made the remaining $17.7 million payments to Bitmain Delaware and received all miners contracted under the July 2023 Bitmain Agreement.
The Company is counterparty to the amended and restated Joint Venture agreement dated August 27, 2022 (“A&R Nautilus Agreement”). Under this A&R Nautilus Agreement, the Company has invested $125.2 million on a net basis and has right-sized its equity ownership interest to 25.0% of the joint venture. The Company does not expect any additional material capital contributions to be required for existing infrastructure and operations.
Financial Condition
As of December 31, 2023, the Company had balances of cash and cash equivalents of $54.4 million, a working capital deficiency of $92.1 million, total stockholders’ equity of $222.5 million and an accumulated deficit of $259.9 million. As of December 31, 2023, the working capital deficiency included the then outstanding $139.4 million principal balance of the Company’s Term Loans (See Note 9) which matures on December 1, 2024. To date, the Company has relied primarily on proceeds from its issuances of debt and equity and sale of bitcoin, both self-mined and distributed from the joint venture which owns the Nautilus Cryptomine Facility (see Note 11), to fund its principal operations.
During the year ended December 31, 2023, the Company accomplished several notable steps to achieve positive cash flows from operations and in the aggregate, namely: (1) the Company amended its long-term debt agreement (see Note 9) to, among other changes, remove the fixed principal amortization through April 7, 2024 and, subsequent to December 31, 2023, through maturity on December 1, 2024 (see Note 18), (2) the Company received net proceeds of $135.9 million through the issuance of shares of our common stock, par value $0.001 per share (the “Common Stock”), $2.5 million from warrant issuances in conjunction with equity offerings (see Note 15), and $1.3 million from issuance of a
39
Table of Contents
convertible promissory note (see Note 10), (3) the Company commenced mining activities at the Nautilus Cryptomine Facility, deems that it has funded all known and expected capital commitments at that facility, and received bitcoin distributions of $21.9 million from the joint venture which owns the Nautilus Cryptomine Facility, (4) for the existing operations at the Lake Mariner Facility in buildings one and two and at the Nautilus Cryptomine Facility, the Company received substantially all contracted miners from the miner suppliers and has no remaining outstanding financial commitments under the miner purchase agreements (see Notes 11 and 12), and (5) the construction activities at the Lake Mariner Facility for buildings one, two and three and at the Nautilus Cryptomine Facility are substantially complete as of December 31, 2023, although the Company intends to continue to expand its infrastructure. Additionally, if a business need requires its use, the Company has an active at-the-market sales agreement for sale of shares of Common Stock having an aggregate offering price of up to $200.0 million (the “ATM Sales Agreement”), which had a remaining capacity of $81.2 million and $29.8 million as of December 31, 2023 and March 19, 2024, respectively. The issuance of Common Stock under this agreement would be made pursuant to the Company’s effective registration statement on Form S-3 (Registration statement No. 333-262226).
As of December 31, 2023, the Company is required to pay amounts under its long-term debt agreement subject to an excess cash flow sweep, as defined, on a quarterly basis which automatically extends to the maturity of the Term Loans of December 1, 2024, in the event the Company repays at least $40.0 million of the principal balance of the Term Loans by April 1, 2024 (see Note 9). In February 2024, the Company achieved aggregate repayment of $40.0 million of the principal balance of the Term Loans, thereby automatically extending the excess cash flow sweep to December 1, 2024 (see Note 18). As of March 19, 2024, the outstanding principal balance of the Term Loans was $106.0 million. The Company has determined, based on its expected range of forecasted bitcoin prices, network hashrate, and power prices, that it is probable that it will generate positive cash flows from operations and be able to realize its assets and discharge its liabilities and commitments in the normal course of business, including the Term Loans through maturity without the use of proceeds from equity offerings. Therefore, the Company determined there is not substantial doubt about the Company’s ability to continue as a going concern through at least the next twelve months. The Consolidated Financial Statements do not include any adjustments that might result from TeraWulf’s possible inability to continue as a going concern.
Critical Accounting Policies and Estimates
The above discussion and analysis of the Company’s financial condition and results of operations are based upon its consolidated financial statements, which have been prepared in accordance with accounting principles generally accepted in the United States of America. The preparation of the Company’s consolidated financial statements requires the application of accounting policies and the use of estimates. The accounting policies most important to the preparation of the consolidated financial statements and estimates that require management’s most difficult, subjective or complex judgments are described below.
See Note 2 of the Notes to Consolidated Financial Statements included in Item 8 of this Annual Report on Form 10-K for a summary of the Company’s significant accounting policies.
Revenue Recognition
The Company recognizes revenue under Financial Accounting Standards Board (“FASB”) Accounting Standards Codification (“ASC”) 606, Revenue from Contracts with Customers (“ASC 606”). The core principle of the revenue standard is that a company should recognize revenue to depict the transfer of promised goods or services to customers in an amount that reflects the consideration to which the Company expects to be entitled in exchange for those goods or services.
Mining Pool
The Company has entered into an arrangement with a cryptocurrency mining pool (the Foundry USA Pool) to perform hash computations (i.e. hashrate) for the mining pool in exchange for consideration. Providing hash computation services to a mining pool is an output of the Company’s ordinary activities. The provision of such hash computation services is the sole performance obligation. The mining pool arrangement is terminable at any time without substantial penalty by Foundry USA Pool and may be terminated without substantial penalty by the Company upon providing one Contract Day’s, as defined, prior written notice. The Company’s enforceable right to compensation only begins when and continues while the Company provides hash computation services to its customer, the mining pool operator. Accordingly, the contract term with Foundry USA Pool is deemed to be less than 24 hours and to continuously renew throughout the day. Additionally, the Company concluded that the mining pool operator’s (i.e., the customer’s) renewal right is not a material right because the renewal rights do not include any discounts; that is, the terms, conditions, and compensation amounts are at the then-current market rates.
40
Table of Contents
There is no significant financing component in these transactions.
The mining pool applies the Full Pay Per Share (“FPPS”) payout model. Under the FPPS model, in exchange for providing hash computation services to the pool, the Company is entitled to pay-per-share base amount and transaction fee reward compensation, calculated on a daily basis, at an amount that approximates the total bitcoin that could have been mined and transaction fees that could have been awarded using the Company’s hash computation services, based upon the then current blockchain difficulty. Under this model, the Company is entitled to compensation, payable in bitcoin, regardless of whether the pool operator successfully records a block to the bitcoin blockchain.
The transaction consideration the Company receives, if any, is noncash consideration and is all variable. Because digital currency is considered noncash consideration, fair value of the digital currency award received would generally be determined using the quoted price of the related digital currency in the Company’s principal market at the time of contract inception. The Company has adopted an accounting policy to aggregate individual contracts with individual terms less than 24 hours within each intraday period and apply a consistent valuation point, the start of day Coordinated Universal Time (00:00:00 UTC), to value the related noncash consideration. Revenue is recognized when it is probable that a significant reversal in the amount of cumulative revenue recognized will not occur, which is the same day that control of the contracted service transfers to the mining pool and is the same day as the contract inception. After every 24-hour contract term, the mining pool transfers the digital currency consideration to the Company’s designated digital currency wallets.
Consideration payable to the customer in the form of a pool operator fee, which is incurred only to the extent that the Company has generated FPPS consideration, is deducted from the bitcoin the Company receives and is recorded as contra-revenue, as it does not represent a payment for a distinct good or service.
Data Center Hosting
The Company’s current hosting contracts are service contracts with a single performance obligation. The service the Company provides primarily includes hosting the customers’ miners in a physically secure data center with electrical power, internet connectivity, ambient air cooling and available maintenance resources. Hosting revenue is recognized over time as the customer simultaneously receives and consumes the benefits of the Company’s performance. The Company recognizes hosting revenue to the extent that a significant reversal of such revenue will not occur. Data center hosting customers are invoiced and payments are due on a monthly basis. While the majority of consideration is paid in cash, certain consideration is payable in digital currency. Because digital currency is considered noncash consideration, fair value of the digital currency award received is determined using the quoted price of the related digital currency in the Company’s principal market at the time of contract inception. The Company has one data center hosting contract with a customer, which expired in January 2024, for which the quoted price of bitcoin in the Company’s principal market at the time of contract inception was approximately $38,000. The Company recorded miner hosting revenue of $7.5 million and $4.6 million during the years ended December 31, 2023 and 2022, respectively.
Digital currency, net
Digital currency, net is comprised of bitcoin earned as noncash consideration in exchange for providing hash computation services to a mining pool as well as in exchange for data center hosting services which are accounted for in connection with the Company’s revenue recognition policy disclosed above. From time to time, the Company also receives bitcoin as distributions-in-kind from its joint venture. Digital currency is included in current assets in the consolidated balance sheets due to the Company’s ability to sell it in a highly liquid marketplace and because the Company reasonably expects to liquidate its digital currency to support operations within the next twelve months. The Company sells its digital currency on a first-in-first-out basis.
Digital currency is accounted for as intangible assets with indefinite useful lives. An intangible asset with an indefinite useful life is not amortized but assessed for impairment annually, or more frequently if events or changes in circumstances indicate it is more likely than not that the asset is impaired. Impairment exists when the carrying amount exceeds its fair value. In testing for impairment, the Company has the option to first perform a qualitative assessment to determine whether it is more likely than not that an impairment exists. If it is determined that it is not more likely than not that an impairment exists, a quantitative impairment test is not necessary. If the Company concludes otherwise, it is required to perform a quantitative impairment test.
The Company has elected to bypass the optional qualitative impairment assessment and to track its bitcoin activity daily for impairment assessment purposes. The Company determines the fair value of its bitcoin on a nonrecurring basis in accordance with ASC 820, Fair Value Measurement, based on quoted prices on the active trading platform that the Company normally transacts and has determined is its principal market for bitcoin (Level 1 inputs), based on all
41
Table of Contents
information that is reasonably available. The Company performs an analysis each day to identify whether events or changes in circumstances, principally decreases in the quoted price of bitcoin on the active trading platform, indicate that it is more likely than not that its bitcoin are impaired. For impairment testing purposes, the lowest intraday trading price of bitcoin is identified at the single bitcoin level (one bitcoin). The excess, if any, of the carrying amount of bitcoin and the lowest daily trading price of bitcoin represents a recognized impairment loss. To the extent an impairment loss is recognized, the loss establishes the new cost basis of the asset. Subsequent reversal of previously recorded impairment losses is prohibited. The Company recognized impairment of digital currency of $3.0 million and $1.5 million during the years ended December 31, 2023 and 2022, respectively.
Digital currency awarded to the Company through its mining activities are included as an adjustment to reconcile net loss to cash used in operating activities on the consolidated statements of cash flows. Proceeds from sales of digital currency are included within cash flows from operating activities on the consolidated statements of cash flows and any realized gains or losses from such sales are included in costs and operating expenses on the consolidated statements of operations. The receipt of digital currency as distributions-in-kind from equity investees are included within supplemental disclosure of noncash investing activities.
Variable Interest Entities
Variable interest entities (“VIE”) are legal entities in which equity investors do not have (i) sufficient equity at risk for the legal entity to finance its activities without additional subordinated financial support, or (ii) as a group, the power, through voting or similar rights, to direct the activities of the legal entity that most significantly impact the entity’s economic performance, or (iii) the obligation to absorb the expected losses of the legal entity or the right to receive expected residual returns of the legal entity. The Company would consolidate any VIE in which it has a controlling financial interest through being deemed to be the primary beneficiary of the VIE. The primary beneficiary of a VIE has both of the following characteristics: (1) the power to direct the activities of the VIE that most significantly impact its economic performance; and (2) the obligation to absorb losses of the VIE that could potentially be significant to the VIE or the right to receive benefits from the VIE that could be significant to the VIE. If both characteristics are met, the Company considers itself to be the primary beneficiary and therefore will consolidate that VIE into its consolidated financial statements.
The Company determines whether it is the primary beneficiary of a VIE upon initial involvement with a VIE and reassesses whether it is the primary beneficiary of a VIE on an ongoing basis. The determination of whether an entity is a VIE and whether the Company is the primary beneficiary of a VIE is based upon facts and circumstances for the VIE and requires significant judgments such as whether the entity is a VIE, whether the Company’s interest in a VIE is a variable interest, the determination of the activities that most significantly impact the economic performance of the entity, whether the Company controls those activities, and whether the Company has the obligation to absorb losses of the VIE or the right to receive benefits from the VIE that could be significant to the VIE.
In 2021, the Company entered into a joint venture, Nautilus Cryptomine LLC (“Nautilus”), with an unrelated co-venturer to develop, construct and operate up to 300 MW of zero-carbon bitcoin mining in Pennsylvania (the “Joint Venture”). Due to the initial nature of the Joint Venture and the continued commitment for additional financing, the Company determined Nautilus is a VIE. While the Company has the ability to exercise significant influence over Nautilus, the Company has determined that it does not have the power to direct the activities that most significantly impact the economic performance of Nautilus. Initially, the power to direct the activities of Nautilus that most significantly impact Nautilus’ economic performance were shared equally by both parties within the Joint Venture due to the requirement for both equity holders to approve many of the key operating decisions and when not equally shared, were predominantly under the control of the co-venturer, including through the co-venturer’s majority representation on the board of managers. As such, the Company has determined that it is not the primary beneficiary of Nautilus and, therefore, has accounted for this entity under the equity method of accounting. Risks associated with the Company’s involvement with Nautilus include a commitment to potentially fund additional equity investments. See Note 11 for additional information, including a decrease in the Company’s ownership interest in Nautilus during the year ended December 31, 2022.
Impairment of Long-lived Assets
The Company reviews its long-lived assets, including property, plant and equipment, for impairment whenever events or changes in circumstances indicate that the carrying amount of an asset, or asset group, may not be recoverable. Recoverability of assets to be held and used is measured by a comparison of the carrying amount of an asset to undiscounted future cash flows expected to be generated by the asset. Any impairment loss recorded is measured as the amount by which the carrying value of the assets exceeds the fair value of the assets. During the years ended December 31, 2023 and 2022, the Company recorded no impairment charges for long-lived assets.
42
Table of Contents
Issuance of Debt with Common Stock or Warrants; Debt Modification
On December 1, 2021, the Company entered into the LGSA, which consists of an original term loan facility of $123.5 million (the “Original Term Loan”). In connection with the Original Term Loan, the Company issued to the holders of the Original Term Loan 839,398 shares of Common Stock, which is a quantity of Common Stock representing 1.5% of the outstanding shares of the publicly registered shares of TeraWulf subsequent to the closing of the Original Term Loan. The allocation of proceeds between the debt instrument and any other components included in the debt issuance, including Common Stock, is generally based on the relative fair value allocation method. In applying the relative fair value allocation method, the determination of the fair value of the Common Stock issued and the fair value of the Original Term Loan independent of the Common Stock issued requires significant judgment. As a measure of sensitivity, a 10% change in the estimated fair value of the Original Term Loan component would result in a $1.9 million change in the fair value allocated to each of the Original Term Loan and equity components.
In July 2022, the Company entered into the First Amendment to the LGSA, which included an additional borrowing of $15.0 million and the issuance of warrants to purchase 5,787,732 shares of Common Stock at $0.01 per share. The accounting for debt modifications is complex and requires significant judgment. Potential accounting outcomes include troubled debt restructuring accounting, extinguishment accounting or modification accounting, each with different implications for the consolidated financial statements. The Company has determined that modification accounting is applicable. Additionally, debt modification accounting requires the determination of the fair value of the warrants issued, which requires significant judgment. As a measure of sensitivity, a 10% change in the estimated fair value of the warrants would result in a $0.3 million change in the recorded value of the borrowing under the First Amendment.
In October 2022, the Company entered into the Third Amendment to the LGSA, which included an additional borrowing of $7.5 million and the issuance of warrants to purchase 2,667,678 shares of Common Stock at $0.01 per share. The accounting for debt modifications is complex and requires significant judgment. Potential accounting outcomes include troubled debt restructuring accounting, extinguishment accounting or modification accounting, each with different implications for the consolidated financial statements. The Company has determined that modification accounting is applicable. Additionally, debt modification accounting requires the determination of the fair value of the warrants issued, which requires significant judgment. As a measure of sensitivity, a 10% change in the estimated fair value of the warrants would result in a $0.2 million change in the recorded value of the borrowing under the Third Amendment.
In March 2023, the Company entered into the Fifth Amendment to the LGSA, which included the issuance of warrants to purchase 27,759,265 shares of Common Stock at $0.01 per share and 13,879,630 shares of Common Stock at $1.00 per share. The accounting for debt modifications is complex and requires significant judgment. Potential accounting outcomes include troubled debt restructuring accounting, extinguishment accounting or modification accounting, each with different implications for the consolidated financial statements. The Company has determined that modification accounting is applicable. Additionally, debt modification accounting requires the determination of the fair value of the warrants issued, which requires significant judgment. As a measure of sensitivity, a 10% change in the estimated fair value of the warrants would result in a $1.6 million change in the recorded value of the borrowing under the Fifth Amendment.
Convertible Instruments
The Company accounts for its issuance of convertible debt and convertible equity instruments in accordance with applicable U.S. GAAP. In connection with that accounting, the Company assesses the various terms and features of the agreement in accordance with ASC 480, Distinguishing Liabilities from Equity (“ASC 480”), and ASC 815, Derivatives and Hedging Activities (“ASC 815”). ASC 480 requires liability accounting for certain financial instruments, including shares that embody an unconditional obligation to transfer a variable number of shares, provided that the monetary value of the obligation is based solely or predominantly on one of the following three characteristics: (1) a fixed monetary amount known at inception, (2) variations in something other than the fair value of the issuer’s equity shares or (3) variations in the fair value of the issuer’s equity shares, but the monetary value to the counterparty moves in the opposite direction as the value of the issuer’s shares. In accordance with ASC 815, the Company assesses the various terms and features of the agreement to determine whether or not they contain embedded derivative instruments that are required under ASC 815 to be accounted for separately from the host contract and recorded on the balance sheet at fair value. The fair value of derivative liabilities, if any, is required to be revalued at each reporting date, with corresponding changes in fair value recorded in the current period’s operating results. The Company did not have any liabilities required to be revalued in accordance with ASC 480 or ASC 815 as of December 31, 2023.
43
Table of Contents
Income Taxes
The Company accounts for income taxes pursuant to the provision of ASC 740, Accounting for Income Taxes (“ASC 740”), which requires, among other things, an asset and liability approach to calculating deferred income taxes. The asset and liability approach requires the recognition of deferred tax assets and liabilities for the expected future tax consequences of temporary differences between the carrying amounts and the tax bases of assets and liabilities. A valuation allowance is provided to offset any net deferred tax assets for which management believes it is more likely than not that the net deferred tax asset will not be realized. The Company follows the provision of ASC 740 related to accounting for uncertain income tax positions. When tax returns are filed, it is more likely than not that some positions taken would be sustained upon examination by the taxing authorities, while others are subject to uncertainty about the merits of the position taken or the amount of the position that would be ultimately sustained. In accordance with the guidance of ASC 740, the benefit of a tax position is recognized in the financial statements in the period during which, based on all available evidence, management believes it is more likely than not that the position will be sustained upon examination, including the resolution of appeals or litigation processes, if any. Tax positions taken are not offset or aggregated with other positions. The tax benefits recognized in the consolidated financial statements from such positions are then measured based on the largest benefit that has a greater than 50% likelihood of being realized upon settlement with the applicable taxing authority. The portion of the benefits associated with the tax positions taken that exceeds the amount measured as described above should be reflected as a liability for uncertain tax benefits in the accompanying balance sheets along with any associated interest and penalties that would be payable to the taxing authorities upon examination. The most critical estimate for income taxes is the determination of whether to record a valuation allowance for any net deferred tax asset, including net loss carryforwards, whereby management must estimate whether it is more likely than not that the deferred tax asset would be realized.
FY 2022 10-K MD&A
SEC filing source: 0001558370-23-005301.
ITEM 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations
The following Management’s Discussion and Analysis of Financial Condition and Results of Operations should be read in conjunction with a review of the other Items included in this Annual Report and with the accompanying consolidated financial statements and notes thereto included elsewhere in this report. All figures presented below represent results from continuing operations, unless otherwise specified. Certain statements contained in this Management’s Discussion and Analysis of Financial Condition and Results of Operations may be deemed forward-looking statements. See “Forward-Looking Statements.”
General
TeraWulf is a vertically-integrated owner and operator of environmentally clean bitcoin mining facilities in the United States. Founded and led by an experienced group of energy & power entrepreneurs, the Company is actively operating and constructing, consistent with its sustainable energy mandate, two bitcoin mining facilities, the Lake Mariner Facility and the Nautilus Cryptomine Facility, in the States of New York and Pennsylvania, respectively. TeraWulf will own and operate its bitcoin mining facility sites and expects to consume over 91% zero-carbon energy, with a target of achieving 100%. In connection with the planned buildout, TeraWulf entered into a power purchase agreement at the Nautilus Cryptomine Facility and will receive power at approximately 2.0 cents/kWh. Moreover, the Lake Mariner Facility is located a mere 40 miles from the Robert Moses Niagara Power Plant, an approximate 2,600MW hydroelectric generating facility, the largest generating facility in New York State, and one of the largest in the country, with 24/7 access to low-cost carbon-free electricity. With the Nautilus Cryptomine Facility power purchase agreement, and the strategic location of the Lake Mariner Facility addition, TeraWulf expects to achieve an average long-term cost of electricity of approximately 3.5 cents/kWh, competitively positioning the Company to be a leading, low-cost and zero-carbon bitcoin mining operator in the United States.
41
Table of Contents
Lake Mariner Facility
Located at a site adjacent to the decommissioned coal-fired Somerset Generating Station in Barker, New York, the Lake Mariner Facility has secured an initial 90 MW of energy to support its bitcoin mining capacity through an agreement with NYPA with the potential to expand into an additional 410 MW of energy supply. TeraWulf began mining bitcoin at the Lake Mariner Facility in March 2022 with 10 MW of mining capacity located on the turbine deck of the former coal-fired power plant and energized its first dedicated mining building (“Building 1”), housing approximately 50 MW of mining capacity, during the third quarter of 2022. During the third quarter of 2022, and in conjunction with Nautilus JV amendment discussed below, the Company expanded its self-mining capacity in Building 1 by transferring miners previously purchased for use at the Nautilus facility in order to accelerate revenue growth. Construction is largely complete at the Company’s second dedicated mining building (“Building 2”), which is also scheduled to house approximately 50MW of mining capacity and is targeted for completion in the second quarter of 2023.
Nautilus Cryptomine Facility
The Nautilus Cryptomine Facility is a joint venture between TeraWulf and Talen. The Nautilus Cryptomine Facility, located in Salem Township, Luzerne County, Pennsylvania, is adjacent to the 2.5 GW nuclear-powered Susquehanna Station, 2.3 GW of which are owned and operated by Talen. The Nautilus Cryptomine Facility has secured as its power supply zero-carbon nuclear energy received directly from a substation connected to the Susquehanna Station’s electrical generators over a five-year term with two successive three-year renewal options. The Nautilus Cryptomine Facility is located “behind the meter” and not connected to the electrical distribution grid, therefore avoiding transmission and distribution charges typically paid by other large power consumers. At the time of this Annual Report, the Nautilus Cryptomine Facility has access to up to 300 MW of bitcoin mining capacity from the Susquehanna Station and is expected to be the first bitcoin mining facility site that is powered by 100% “behind the meter” zero-carbon nuclear energy. TeraWulf began installation of miners at the Nautilus Cryptomine Facility in the fourth quarter of 2022, and began mining bitcoin in the first quarter of 2023. In August 2022, the Company and Talen amended their joint venture agreement thereby reducing TeraWulf’s stake in the facility to 25% and right-sizing TeraWulf’s miners and infrastructure to enable maximum utilization of 50 MW of power at approximately 2.0 cents/kWh for five years.
TeraWulf expects to generate revenues primarily by sustainably mining bitcoin at its bitcoin mining facility sites. Incremental revenues may be generated through the hedging and sale of mined bitcoin and the commercial optimization of TeraWulf’s power supply. The Company will also leverage its available digital infrastructure to provide miner hosting services to third parties whereby the Company targets holding an option to purchase the hosted miners in the future.
We believe TeraWulf is an important and low-cost player in the bitcoin network due to our vertical integration, ramp of large-scale operations, market-leading zero-carbon power supply arrangements and a seasoned, dedicated senior management team.
Recent Developments
February 2023 Equity Offering
On February 6, 2023, TeraWulf completed an underwritten public offering of 36,764,706 shares of common stock (the “Equity Offering”) at a public offering price of $0.68 per share, with JonesTrading Institutional Services LLC (“JonesTrading”) acting as sole book-running manager (the “Underwriter”) for the Equity Offering. The Company granted the Underwriter a 30-day over-allotment option to purchase up to an additional 5,514,705 shares of its common stock. On February 8, 2023, the Underwriter exercised its over-allotment option and purchased an additional 3,000,000 shares of common stock from the Company at the public offering price of $0.68 per share (the “February 8, 2023 Overallotment Exercise”). On February 28, 2023, the Underwriter further exercised its over-allotment option and purchased an additional 1,000,000 shares of Common Stock from the Company at the public offering price of $0.68 per share (the “February 28, 2023 Overallotment Exercise” and together with the February 8, 2023 Overallotment Exercise, the “Overallotment Exercise”). The Overallotment Exercise resulted in additional net proceeds to the Company of approximately $2.56 million, or approximately $26.56 million in aggregate net proceeds from the Offering, after deducting underwriting discounts and commissions and estimated offering expenses.
Special Meeting of Shareholders
On February 13, 2023, the Company filed a definitive proxy statement to hold a special meeting (the “Special Meeting”) of its shareholders to amend the Company’s charter to (i) increase the maximum number of authorized shares of common stock, with the par value of $0.001 per share, from 200,000,000 to 400,000,000 and the maximum number of authorized shares of preferred stock,
42
Table of Contents
with the par value of $0.001 per share, from 25,000,000 to 100,000,000 (collectively, the “Share Increase Amendment”) and (ii) remove the restriction on stockholder action by written consent (the “Written Consent Amendment” and, together with the Share Increase Amendment, the “Charter Amendments”). The Company’s shareholders of record as of the close of business on January 27, 2023 were entitled to vote their shares at the Special Meeting. On February 23, 2023, the Charter Amendments were approved by the Company’s shareholders at the Special Meeting.
Voting and Support Agreement
As an inducement for the Exchanging Shareholder (as defined below) to enter into the Exchange Agreement (as defined below), the Company entered into a Voting and Support Agreement, dated January 30, 2023, with certain of the Company’s shareholders (the “Voting and Support Agreement”). Pursuant to the Voting and Support Agreement, such shareholders voted in support of the Charter Amendments at the Special Meeting.
The Voting and Support Agreement contains customary representations, warranties, covenants and termination rights.
Exchange Agreement
For the purpose of increasing the number of shares available for issuance under the charter prior to the receipt of shareholder approval of the Charter Amendments, on January 30, 2023, the Company entered into an exchange agreement (the “Exchange Agreement”) with an entity controlled by Paul Prager (the “Exchanging Shareholder”). Pursuant to the Exchange Agreement, the Exchanging Shareholder exchanged a total of 12,000,000 shares of common stock for 12,000,000 new warrants issued by the Company (the “New Exchange Warrants”) in a private exchange exempt from registration under Section 4(a)(2) and/or Regulation D under the Securities Act. The New Exchange Warrants became immediately exercisable at a strike price of $0.00001 per share on February 24, 2023 and will expire on December 31, 2023. The terms and conditions of the New Exchange Warrants are governed by a certain Warrant Agreement between the Company and the Exchanging Shareholder. The Exchanging Shareholder is entitled to customary registration rights with respect to the shares of common stock issuable upon exercise of the New Exchange Warrants.
The Exchange Agreement contains customary representations, warranties, covenants and termination rights.
Entry into Binding Term Sheet for Fifth Amendment to LGSA & Entry into Fifth Amendment to LGSA
On January 27, 2023, the Company entered into a binding term sheet with its lenders (the “Term Sheet”) pursuant to which the parties agreed to make certain amendments to the LGSA via a fifth amendment (the “Fifth Amendment”). The Term Sheet provided for the elimination of mandatory amortization of the term loan through April 8, 2024, subject to certain conditions, including the completion of one or more equity capital raises with aggregate net proceeds of at least $33.5 million by March 15, 2023 (such aggregate capital raise, the “Qualified Equity Capital Raise”). The Company satisfied the Qualified Equity Capital Raise condition on March 9, 2023. The Term Sheet also provided for an excess cash flow sweep in place of scheduled principal payments, which will automatically extend to the maturity of the term loan on December 1, 2024 in the event the Company repays at least $40 million of the term loan by April 1, 2024. The modifications to the term loan’s amortization schedule are also contingent on the Company complying with certain corporate governance provisions, and that no default or event of default has occurred or is occurring under the term loan.
On March 1, 2023 (the “Fifth Amendment Effective Date”), the conditions precedent to the effectiveness of the Fifth Amendment were satisfied and the Company entered into the Fifth Amendment. Also, on March 1, 2023, in connection with the execution of the Fifth Amendment, the Company entered into a Warrant Agreement (the “Fifth Amendment Warrant Agreement”) to issue the following warrants to the lenders: (i) 26,666,669 warrants to purchase an aggregate number of shares of the Company’s common stock equal to 10.0% of the fully diluted equity of the Company as of the Fifth Amendment Effective Date with an exercise price of $0.01 per share of the Company’s common stock (the “Lender Penny Warrants”) and (ii) 13,333,333 warrants to purchase an aggregate number of shares of the Company’s common stock equal to 5.0% of the fully diluted equity of the Company as of the Fifth Amendment Effective Date with an exercise price of $1.00 per share of the Company’s common stock (the “Lender Dollar Warrants”). Both the Lender Penny Warrants and the Lender Dollar Warrants are subject to anti-dilution protection for any additional capital raising transaction by the Company of up to $5.0 million following the completion of the Qualified Equity Capital Raise. The Lender Penny Warrants are exercisable during the period beginning on April 1, 2024 and ending at 5:00 p.m., New York City time, on December 31, 2025, and the Lender Dollar Warrants are exercisable during the period beginning on April 1, 2024 and ending at 5:00 p.m., New York City time, on December 31, 2026. Also, on March 1, 2023, the Company entered into a registration rights agreement in respect of the Lender Penny Warrants and the Lender Dollar Warrants which provides the lenders with customary shelf and
43
Table of Contents
piggyback registration rights. The Lender Penny Warrants and the Lender Dollar Warrants were issued in a private placement transaction exempt from registration under Section 4(a)(2) and/or Regulation D under the Securities Act.
Additional 2023 Private Placements Warrants
On January 30, 2023, the Company entered into (a) subscription agreements (the “Warrant Subscription Agreements”) with certain accredited investors (the “Warrant Investors”) pursuant to which such Warrant Investors purchased from the Company warrants, each exercisable to purchase one share of the Company’s common stock, at an exercise price of $0.00001 per share of Common Stock (the “Warrants”), in private placement transactions exempt from registration under Section 4(a)(2) and/or Regulation D of the Securities Act for an aggregate purchase price of $2.5 million, based on a price per share of common stock of $1.05 for a total of 2,380,952 shares of Common Stock and (b) warrant agreements (the “Warrant Agreements”) with such Warrant Investors. The Warrant Agreements govern the terms and conditions of the Warrants, which became exercisable beginning on February 24, 2023 and expire on December 31, 2023.
Pursuant to the Warrant Subscription Agreements, the Company agreed to provide customary registration rights to the Warrant Investors with respect to the common stock issuable upon conversion of the Warrants. The Warrant Subscription Agreements contain customary representations, warranties, covenants and termination rights.
February Private Placement
On February 1, 2023, the Company entered into additional subscription agreements (the “February Subscription Agreements”) with certain accredited investors, investors (the “February Common Stock Investors”) purchased from the Company shares of the Company’s common stock, at a purchase price of $0.68 per share of common stock, in private placement transactions exempt from registration under Section 4(a)(2) and/or Regulation D under the Securities Act for an aggregate purchase price of $0.94 million (the “February Private Placement”). The February Private Placement closed on February 2, 2023.
Pursuant to the February Subscription Agreements, the Company agreed to provide customary registration rights to the Common Stock Investors. The February Subscription Agreements contain customary representations, warranties, covenants and termination rights.
Convertible Promissory Notes
Amendment to Existing Convertible Promissory Notes
On January 30, 2023, the Company entered into amendments to its previously disclosed convertible promissory notes (the “Existing Convertible Promissory Notes”), originally issued to certain accredited investors on November 25, 2022 and further amended on December 12, 2022, in privately negotiated transactions as part of a private placement exempt from registration under Section 4(a)(2) and/or Regulation D under the Securities Act in an aggregate principal amount of approximately $3.4 million. The Existing Convertible Promissory Notes converted into shares of common stock on February 28, 2023 at a price of $0.40.
Entry into New Convertible Promissory Note
On January 30, 2023, the Company entered into a new convertible promissory note (the “New Convertible Promissory Note”) to an accredited investor in a privately negotiated transaction as part of a private placement exempt from registration under Section 4(a)(2) and/or Regulation D under the Securities Act in an aggregate principal amount of $1.25 million. The New Convertible Promissory Note has a maturity date of April 1, 2025 and accrues annual interest at a rate of 4%. The New Convertible Promissory Note converted into shares of common stock on February 28, 2023 at a price of $0.40.
Registered Direct Offering, December Private Placement and January Private Placement
On December 12, 2022, the Company entered into (a) subscription agreements (the “December Subscription Agreements”) with certain accredited investors (the “December Investors”) pursuant to which the Company issued (i) to the December Investors, 16,850,000 shares of common stock (the “Registered Common Stock”) as part of a registered direct offering (the “Registered Direct Offering”), at a purchase price of $.40 per share of Registered Common Stock, for an aggregate purchase price of $6.74 million before deducting any fees and other expenses and (ii) to certain of the December Investors, the December Private Placement Warrants exercisable at an exercise price equal to $0.40 per share of common stock for December Private Placement Warrant Shares in a private
44
Table of Contents
placement transaction exempt from registration under Section 4(a)(2) and/or Regulation D under the Securities Act and (b) a warrant agreement (the “December Private Placement Warrant Agreement) with such December Investors. The December Private Placement Warrant Agreement governs the terms and conditions of the December Private Placement Warrants. The December Private Placement Warrants became exercisable on January 16, 2023 and expired on January 31, 2023.
In connection with the signing of the December Private Placement Warrant Agreement, the Company and certain of the December Investors entered into a Registration Rights Agreement, dated as of December 12, 2022, pursuant to which the Company agreed to provide customary registration rights to such December Investors with respect to the December Private Placement Warrant Shares.
On January 30, 2023, the Company entered into additional subscription agreements with the December Investors pursuant to which such December Investors purchased from the Company shares of the Company’s common stock, at a purchase price of $0.40 per share of common stock (the “January Common Shares”), in private placement transactions exempt from registration under Section 4(a)(2) and/or Regulation D under the Securities Act for an aggregate purchase price of $1.75 million (the “January Private Placement”). The January Private Placement effectively replaced 50% of the unexercised December Private Placement Warrants at the same purchase price of $0.40 per share of common stock. The January Private Placement closed on March 9, 2023.
October 2022 Private Placement
On October 6, 2022, the Company entered into (a) subscription agreements (the “October Subscription Agreements”) with certain accredited investors (the “October Investors”) pursuant to which such October Investors purchased from the Company units (the “October Units”) consisting of: (i) 7,481,747 shares of common stock (the “October Shares”) and (2) warrants (the “October Private Placement Warrants”) exercisable for 7,481,747 shares of common stock (such shares, the “October Private Placement Warrant Shares”) in a private placement transaction exempt from registration under Section 4(a)(2) and/or Regulation D under the Securities Act and (b) a warrant agreement (the “October Private Placement Warrant Agreement) with the October Investors. The October Private Placement Warrant Agreement governs the terms and conditions of the October Private Placement Warrants. Upon closing of the private placement transaction on October 6, 2022, the October Units separated into the October Shares and the October Private Placement Warrants. On January 30, 2023, certain of the October Investors agreed to amend the terms of their warrants such that their warrants would become exercisable only after February 23, 2023, the date of approval of the Charter Amendments described elsewhere in this 2022 Form 10-K.
In connection with the signing of the October Subscription Agreements, the Company and the October Investors entered into a Registration Rights Agreement, dated as of October 6, 2022, pursuant to which the Company agreed to provide customary registration rights to the October Investors.
Other Developments
Amendment and Restatement of Lender Warrant Agreement
On October 7, 2022, the Company entered into an amendment and restatement of that certain warrant agreement, dated July 1, 2022, by and among the Company and the holders party thereto (such amended agreement, the “Amended and Restated Warrant Agreement”) pursuant to which the Company issued to its lenders under the LGSA warrants exercisable for 2,667,678 shares of common stock in a private placement transaction exempt from registration under Section 4(a)(2) and/or Regulation D. The Amended and Restated Warrant Agreement provided for the immediate exercisability of the lender warrants.
Loss of Controlled Company Status
After giving effect to the issuance of the Registered Common Stock in the December 2022 Registered Direct Offering, Paul Prager, founder and Chief Executive Officer of the Company, no longer controlled a majority of the Company’s outstanding shares, and certain proxies granted in favor of Stammtisch Investments LLC, an entity owned and controlled by Mr. Prager, terminated in accordance with their terms. As a result, the Company is no longer considered a “controlled company” under applicable Nasdaq rules. The Company is currently in compliance with the applicable Nasdaq corporate governance requirements during the permitted phase-in periods, and expects to be fully in compliance by the requisite deadlines.
45
Table of Contents
Amendment No. 1 to Administrative and Infrastructure Services Agreement
On March 29, 2023, TeraWulf and Beowulf E&D entered into Amendment No. 1 to the administrative and infrastructure services agreement, pursuant to which TeraWulf agreed to pay Beowulf E&D, effective as of January 1, 2023, a reduced annual base fee equal to $8.46 million payable in monthly installments, until all obligations under the Company’s LGSA are either indefeasibly repaid in full or refinanced.
Amendment to Talen Joint Venture
On March 23, 2023, TeraWulf (Thales) entered into a second amended and restated limited liability company agreement (the “Second A&R Talen Joint Venture Agreement”) with Cumulus Coin. Under the Second A&R Talen Joint Venture Agreement, TeraWulf (Thales) will hold a 25% equity interest in Nautilus and Cumulus Coin will hold a 75% equity interest in Nautilus, each subject to adjustment based on relative capital contributions. Bitcoin distributions will be made every two weeks in accordance with each member’s respective hash rate contributions after deducting each member’s share of power and operational costs and cash reserves, as established by the board of managers, to fund, among other things, one month of estimated power costs and two months of budgeted expenditures.
Under the Second A&R Talen Joint Venture Agreement, each member will be entitled to make contributions to Nautilus of certain miners up to a maximum determined in accordance with each member’s ownership percentage, by delivering or causing to be delivered and installed or deemed installed on behalf of Nautilus at the Nautilus Cryptomine facility or at Nautilus’ storage facility, such miners. Pursuant to the Second A&R Talen Joint Venture Agreement, certain MinerVa miners that TeraWulf (Thales) contributed to Nautilus will be removed and provided to TeraWulf (Thales), which TeraWulf (Thales) has the right to replace in its discretion. Likewise, Cumulus Coin may elect to remove certain MinerVa miners that Cumulus Coin contributed to Nautilus, which Cumulus Coin has the right to replace in its discretion.
Nautilus will be governed by a board of managers comprised of one manager appointed by TeraWulf (Thales) and four managers appointed by Cumulus Coin. Under the Second A&R Talen Joint Venture Agreement, the board of managers generally acts upon a majority vote at a duly called meeting at which the manager appointed by TeraWulf (Thales) is present, except that, for certain specified matters (“Special Consent Matters”), the board of managers acts upon a unanimous vote, subject to deadlock procedures. Any member owning less than 20% of Nautilus has no right to vote on Special Consent Matters. Generally, neither TeraWulf (Thales) nor Cumulus Coin may directly transfer any of its interests in Nautilus to any third parties without the majority consent of the board of managers, except that TeraWulf (Thales) is entitled to transfer its interests in Nautilus if certain conditions are met.
Pursuant to the terms of the Second A&R Talen Joint Venture Agreement, the Nautilus Cryptomine facility will initially require 200 MW of electric capacity, and the Cumulus Coin may elect to expand the energy requirement by up to 100 MW, funded solely by the Cumulus Coin, prior to May 13, 2024, for a total capacity of 300 MW. Upon such election, Nautilus will call additional capital for expansion and enter into an additional energy supply agreement with Cumulus Coin or its affiliate for the additional capacity, subject to any regulatory approvals and third-party consents.
On August 26, 2022, Nautilus and Beowulf E&D entered into an amended and restated facility operations agreement with an early termination right for Nautilus, pursuant to which Beowulf E&D provides, or arranges for the provision to Nautilus of, certain infrastructure, construction, operations and maintenance and administrative services necessary to build out and operate the Nautilus Cryptomine facility and support Nautilus’s ongoing business at the Nautilus Cryptomine facility. Nautilus terminated the amended and restated facility operations agreement effective December 26, 2022. On December 26, 2022, Nautilus and Talen Energy Supply LLC entered into a replacement facility operations agreement pursuant to which Talen Energy Supply LLC provides, or arranges for the provision to Nautilus of, certain infrastructure, construction, operations and maintenance and administrative services necessary to build out and operate the Nautilus Cryptomine facility and support Nautilus’s ongoing business at the Nautilus Cryptomine Facility. Also on December 26, 2022, Beowulf E&D and Nautilus entered into a transition services agreement to facilitate the prompt transition of the services provided by Beowulf E&D to Nautilus under the amended and restated facility operations agreement to Talen Energy Supply LLC. Pursuant to the transition services agreement, Beowulf E&D shall provide such transition services to Nautilus until June 30, 2023 in exchange for payment by Nautilus of $339,200 and reimbursement of out of pocket expenses.
The Business Combination
TeraWulf completed its business combination with IKONICS on December 13, 2021 (the “Closing Date”) pursuant to which, among other things, TeraCub Inc. (“TeraCub,” formerly known as TeraWulf Inc.) would effectively acquire IKONICS and become a publicly traded company on the Nasdaq, which was the primary purpose of the business combination. For financial accounting
46
Table of Contents
purposes, the business combination was treated as a reverse merger whereby the accounting acquirer was TeraCub due to TeraCub’s historic shareholders having the majority voting control in the Company, the board of directors members being associated with TeraCub and the senior management of TeraCub becoming the senior management of TeraWulf. Pursuant to business combination accounting, the Company applied the acquisition method, which requires the assets acquired and liabilities assumed be recorded at fair value, with limited exceptions. The Company’s consolidated financial statements include the operating results of IKONICS beginning on the Closing Date.
Under the terms of the Merger Agreement, each share of IKONICS common stock issued and outstanding immediately prior to the Closing Date was automatically converted into and exchanged for (i) one validly issued, fully paid and nonassessable share of Common Stock of TeraWulf, (ii) one CVR pursuant to the CVR Agreement, and (iii) the right to receive $5.00 in cash, without interest. TeraCub common stock issued and outstanding immediately prior to the Closing Date was automatically converted into the right to receive a number of validly issued, fully paid and nonassessable shares of TeraWulf such that the TeraCub common stockholders prior to conversion would effectively control 98% of the total outstanding shares of TeraWulf immediately subsequent to the Closing Date.
Pursuant to the CVR Agreement, each shareholder of IKONICS as of immediately prior to the Closing Date, received one CVR for each outstanding share of common stock of IKONICS then held. The holders of the CVRs are entitled to receive 95% of the Net Proceeds (as defined in the CVR Agreement), if any, from the sale, transfer, disposition, spin-off, or license of all or any part of the pre-merger business of IKONICS completed within 18 months following the date of the merger, subject to a reserve of up to 10% of the Gross Proceeds (as defined in the CVR Agreement) from such transaction and such other amount to be retained to satisfy Retained Liabilities, as defined. The CVRs do not confer to their holders any voting or equity or ownership interest in IKONICS or TeraWulf and are not transferable, except in limited circumstances, and are not listed on any quotation system or traded on any securities exchange. The CVR Agreement will terminate after all payment obligations to the holders thereof have been satisfied. Holders of CVRs will not be eligible to receive payment for dispositions, if any, of any part of the pre-merger business of IKONICS after the eighteen-month anniversary of the Closing Date. The fair value of the aggregate consideration paid for IKONICS was $66.3 million, which includes (i) cash consideration of $13.7 million ($10.3 million net of cash acquired), (ii) equity consideration of $40.6 million and (iii) contingent consideration (related to the CVRs) of $12.0 million. As of December 31, 2022, the CVR liability included in the Company’s consolidated balance sheet is $10.9 million. During the year ended December 31, 2022, the Company completed sales of all IKONICS net assets held for sale for net proceeds of $13.3 million, of which $7.0 million remained in escrow under provisions of an asset purchase agreement as of December 3, 2022. In February 2023, all escrowed funds were released to the Company. Subsequent to the asset sales, IKONICS’ name was changed to RM 101 Inc. (“RM 101”) and the entity has no remaining operations or employees.
Upon the consummation of the business combination, RM 101 common stock ceased trading on the Nasdaq and TeraWulf Common Stock began trading on the Nasdaq on December 14, 2021 under the ticker symbol “WULF.”
COVID-19
The Company’s results of operations could be adversely affected by general conditions in the economy and in the global financial markets, including conditions that are outside of the Company's control, such as the outbreak and global spread of the novel coronavirus disease (“COVID-19”). The COVID-19 pandemic that was declared on March 11, 2020 has caused significant economic dislocation in the United States and globally as governments across the world, including the United States, introduced measures aimed at preventing the spread of COVID-19. The spread of COVID-19 and the imposition of related public health measures resulted in increased volatility and uncertainty in the cryptocurrency space.
The Company may experience disruptions to its business operations resulting from COVID-19-related supply interruptions (including miner delivery interruptions), quarantines, self-isolations, or other movement and restrictions on the ability of its employees or its counterparties to perform their jobs and provide services. The Company may also experience COVID-19-related delays in construction and obtaining necessary equipment in a timely fashion. To date, the Company has experienced certain, but minimal, delays due to COVID-19 among its employees, suppliers and contractors.
Change in Fiscal Year
Upon the closing of its business combination with IKONICS on December 13, 2021, the Company assumed the fiscal year end of December 31. Previously, the Company’s fiscal year ended on March 31. The historical financial statements for the period
47
Table of Contents
from February 8, 2021 (date of inception) and for the nine-month period ended December 31, 2021 have been recast to conform with the Company’s adopted fiscal year.
Restatement of Previously Issued Financial Statements
As part of the Company’s financial statement close process and preparation of its Annual Report on Form 10-K (the “2022 Form 10-K”), the Company identified errors in its historical interim unaudited consolidated financial statements. The misstatements relate solely to incorrectly calculating the impact of noncash activity on purchase and deposits on plant and equipment, resulting in an understatement of net cash used in investing activities and a corresponding overstatement of net cash used in operating activities as originally included in the respective interim unaudited consolidated statements of cash flows. The Company determined that its interim unaudited consolidated financial statements for the quarterly periods ended March 31, 2022, June 30, 2022 and September 30, 2022 (the “Relevant Periods”) were materially misstated and needed to be restated. The restatements are set forth in detail in Note 18 to the Consolidated Financial Statements.
Results of Operations
Since the Company’s inception on February 8, 2021, the Company’s primary activities have been focused on capital acquisition, merger negotiation and consummation, joint venture negotiation and participation, miner procurement, electricity procurement, construction commencement and management, commencement of mining operations, ongoing mining operations, public company readiness and general corporate activities. The Company’s plan of operation for the next twelve months is to continue to increase the mining capacity at its operating mining facilities and complete the construction of its other bitcoin mining facilities, both wholly owned and owned through the Nautilus Joint Venture.
Continuing Operations
All items included in loss from continuing operations in the consolidated statements of operations for the year ended December 31, 2022 and the period February 8, 2021 (date of inception) to December 31, 2021 relate to its wholly-owned operations of its sole business segment, digital currency mining, due to the Company presenting the RM 101 business as discontinued operations for the year ended December 31, 2022 the period February 8, 2021 (date of inception) to December 31,2021.
Revenue and Cost of Revenue
Revenue increased to $15.0 million during the year ended December 31, 2022, respectively, as compared to $0 during the period February 8, 2021 (date of inception) to December 31, 2021 due primarily to the commencement of mining activities at the Lake Mariner Facility in March 2022, the accelerated ramp of mining operations during the year ended December 31, 2022 and the commencement of miner hosting arrangements at the Lake Mariner Facility in May 2022. During the year ended December 31, 2022, revenue from mining was $10.5 million and revenue from hosting was $4.5 million.
Cost of revenue increased to $11.1 million during the year ended December 31, 2022, respectively, as compared to $0 during the period February 8, 2021 (date of inception) to December 31, 2021 due primarily to the commencement of mining activities at the Lake Mariner Facility in March 2022, the accelerated ramp of mining operations during the year ended December 31, 2022 and the commencement of miner hosting arrangements at the Lake Mariner Facility in May 2022. Cost of revenues is comprised primarily of power expense and, to a lesser degree, the cost of services provided under our miner hosting agreements. While the cost of power has moderated subsequent to December 31, 2022, certain periods in calendar year 2022 experienced elevated power prices in the New York power market, the primary power market for the Lake Mariner Facility. The Company records payments received for demand response programs as a reduction in cost of revenue; the amount of aggregate payments received were not significant during the year ended December 31, 2022. The Company is expanding its enrollment in such available programs.
48
Table of Contents
Costs and Expenses
The following table presents operating expenses (in thousands):
| | | | | | | |
|---|---|---|---|---|---|---|
| | | | | | | Period February 8, 2021 (date of |
| | | | Year Ended | | | inception) to |
| | | December 31, | | | December 31, | |
| | | 2022 | | 2021 | ||
| Operating expenses | $ | 2,038 | $ | 104 | ||
| Operating expenses - related party | | | 1,248 | | | 960 |
| | | $ | 3,286 | | $ | 1,064 |
Operating expenses (including related party expenses) were $3.3 million and $1.1 million for the year ended December 31, 2022 and the period February 8, 2021 (date of inception) to December 31, 2021, respectively, which represents an increase of $2.2 million. Operating expenses are comprised primarily of lease expense, operations labor and various site maintenance costs. The increase is attributable primarily to the commencement of mining activities at the Lake Mariner Facility in March 2022 and the commencement of miner hosting arrangements at the Lake Mariner Facility in May 2022. This increase is tempered by the period February 8, 2021 (date of inception) to December 31, 2021 including certain development expenses, including services and third-party costs for transmission consulting, engineering consulting, transmission impact study, electricity procurement and site development.
The following table presents selling, general and administrative expenses (in thousands):
| | | | | | | |
|---|---|---|---|---|---|---|
| | | | Year Ended | | | Period February 8, 2021 (date of inception) to |
| | | | December 31, | | | December 31, |
| | | 2022 | | 2021 | ||
| Selling, general and administrative expenses | $ | 22,770 | $ | 23,759 | ||
| Selling, general and administrative expenses - related party | | | 13,280 | | | 18,576 |
| | | $ | 36,050 | | $ | 42,335 |
Selling, general and administrative expenses (including related party expenses) were $36.1 million and $42.3 million for the year ended December 31, 2022 and the period February 8, 2021 (date of inception) to December 31, 2021, respectively, which represents a decrease of $6.3 million. The decrease is primarily a result of the period February 8, 2021 (date of inception) to December 31, 2021 including $27.7 million of incremental expense related to the RM 101 business combination, consisting of $15.2 million of financial and legal advisor fees and other merger-related costs and a one-time $12.5 million performance expense to be settled in shares of Common Stock included in selling, general and administrative expenses – related party. The decrease is somewhat offset by the year ended December 31, 2022 having increased costs, including insurance, professional fees and payroll, as it was a public company with a growing business throughout the year. Selling, general and administrative expenses are comprised primarily of professional fees, legal fees, employee compensation and benefits, insurance and general corporate expenses. Professional fees for the year ended December 31, 2022 include fixed and passthrough expenses under the administrative and infrastructure services agreement amounting to $13.3 million, inclusive of $2.1 million of expense to be settled in shares of Common Stock. Professional fees for the period February 8, 2021 (date of inception) to December 31, 2021 include fixed and passthrough expenses under the administrative and infrastructure services agreement amounting to $18.6 million, inclusive of the aforementioned $12.5 million of share-based expense. The Company has undertaken cost reduction initiatives targeted at reducing its overall operating expense that is expected to benefit its operating profitability going forward.
Depreciation for the year ended December 31, 2022 was $6.7 million and for the period February 8, 2021 (date of inception) to December 31, 2021 was $0. The increase is due primarily to the Lake Mariner Facility commencing operations in March 2022 and ramping operations through the balance of the year ended December 31, 2022.
Impairment of digital currency for the year ended December 31, 2022 was $1.5 million and for the period February 8, 2021 (date of inception) to December 31, 2021 was $0. Impairment of digital currency represents the decline in bitcoin prices during the Company’s holding period of its bitcoin. Bitcoin impairment is not reversed during its holding period but instead a gain, if any, is
49
Table of Contents
recognized upon its liquidation. Realized gain on sale of digital currency, representing such gains on bitcoin liquidation, for the year ended December 31, 2022 was $0.6 million and for the period February 8, 2021 (date of inception) to December 31, 2021 was $0.
Interest expense for the year ended December 31, 2022 was $24.7 million and for the period February 8, 2021 (date of inception) to December 31, 2021 was $2.3 million, an increase of $22.4 million. Interest expense relates primarily to the Company’s term loan financing in the principal amount of $146.0 million, which was closed on December 1, 2021 with a principal balance of $123.5 million and was amended in July and October 2022 to include an additional aggregate $22.5 million drawn under a delayed draw term loan facility (together, the “Term Loan”). The Term Loan bears an interest rate of 11.5%, which interest payments are due quarterly in arrears. For the year ended December 31, 2022 and for the period February 8, 2021 (date of inception) to December 31, 2021, interest expense also includes $9.3 million and $1.0 million, respectively, of amortization of debt issuance costs and debt discount related to debt issuance costs, an upfront fee, and the fair value of equity and common stock warrants issued to the Term Loan investors in conjunction with the Term Loan. During the year ended December 31, 2022 and for the period February 8, 2021 (date of inception) to December 31, 2021, the Company capitalized $5.3 million and $0.1 million, respectively, of interest costs to property, plant and equipment, net and $4.6 million and $0.1 million, respectively, of interest to equity in net assts of investee in the consolidated balance sheet as of December 31, 2022 and 2021. For the year ended December 31, 2022, the Company incurred $3.1 million in interest expense related to amortization of a commitment fee for the delayed draw term loan facility comprised primarily of the fair value of common stock warrants issued to the Term Loan lenders. The delayed draw term loan facility expired on December 31, 2022. Additionally, on June 2, 2022, the Company entered into a convertible promissory note (the “Promissory Note”) with a principal balance of $15.0 million. The Promissory Note bore an interest rate of 4.0%. Interest payments were due monthly in conjunction with scheduled principal payments. The Promissory Note could have been repaid with the issuance of Common Stock or with cash and, if repaid in cash, together with a cash payment premium of between 4% and 12%. Of the $24.7 million of interest expense reported in the statement of operations for the year ended December 31, 2022, approximately $1.5 million of the interest relates to the Promissory Note, including $0.4 million of expense related to amortization of debt issuance costs and debt discount related to an upfront fee. The Promissory Note was repaid as of December 31, 2022.
Loss on extinguishment of debt was $2.1 million $0 for the year ended December 31, 2022 and the period February 8, 2021 (date of inception) to December 31, 2021, respectively. The loss on extinguishment of debt for the year ended December 31, 2022 relates to an October 2022 amendment to the Promissory Note which is considered an extinguishment of debt under U.S. GAAP due the change in fair value of the embedded conversion feature. This extinguishment loss was primarily related to the change in the fair value of the embedded conversion feature of $1.6 million and the excess of the fair value of the amended Promissory Note of $9.4 million over the carrying value of the Promissory Note immediately prior to the modification.
Income tax benefit was $0.3 million $0.6 million for the year ended December 31, 2022 and the period February 8, 2021 (date of inception) to December 31, 2021, respectively. Based upon the level of historical U.S. losses and future projections over the period in which the net deferred tax assets are deductible, at this time, management believes it is more likely than not that the Company will not realize the benefits of the remaining deductible temporary differences, and as a result the Company has recorded a valuation allowance of $29.5 million for the total, net deferred tax assets as of December 31, 2022.
Equity in net loss of investee, net of tax
Equity in net loss of investee, net of tax was $15.7 million for the year ended December 31, 2022 and was $1.5 million for the period February 8, 2021 (date of inception) to December 31, 2021. For the year ended December 31, 2022, the amount includes an impairment loss of $11.4 million on the distribution of miners from Nautilus to the Company whereby the miners were marked to fair value from book value on the date distributed. The impairment loss was the result of decreasing prices for miners between initial purchase and distribution. In each case, the remaining amounts represent TeraWulf’s proportional share of losses of Nautilus, which had not commenced principal operations as of December 31, 2022.
Loss from discontinued operations, net of tax
Loss from discontinued operations, net of tax was $4.9 million for the year ended December 31, 2022 and was $49.1 million, for the period February 8, 2021 (date of inception) to December 31, 2021. In conjunction with the RM 101 business classification as held for sale upon acquisition on December 13, 2021, the Company has reported the RM 101 business as discontinued operations in the consolidated financial statements. For the year ended December 31, 2022, the total loss from discontinued operations reported is comprised primarily of an impairment loss on discontinued operations of $4.5 million to write down the related carrying amounts of IKONICS to their fair values less estimated cost to sell, offset by a remeasurement gain of $1.1 million on the CVRs, which represents the contingent consideration purchase price component of the RM 101 acquisition. For the period February 8, 2021 (date of inception)
50
Table of Contents
to December 31, 2021, the loss from discontinued operations, net of tax is comprised primarily of a loss on discontinued operations of $48.9 million to write down the related carrying amount so RM 101 to their fair values less estimated costs to sell. All RM 101 net assets held for sale have been sold as of December 31, 2022.
Liquidity and Capital Resources
As of December 31, 2022, the Company had balances of cash and cash equivalents and restricted cash of $8.3 million, a working capital deficiency of $111.9 million, total stockholders’ equity of $117.8 million and an accumulated deficit of $186.5 million. The Company incurred a net loss attributable to common stockholders of $91.6 million for the year ended December 31, 2022, including a net impairment charge (net of a contingent consideration remeasurement gain) of $4.9 million included in loss from discontinued operations, net of tax related to the acquired RM 101 business. The Company has commenced mining activities at the Lake Mariner Facility, however not yet to the scale required to support its principal operations. The Company has relied primarily on proceeds from its issuances of debt and equity and sale of bitcoin mined to fund its principal operations. The principal uses of cash are for deposits on miners, the buildout of mining facilities, debt service, general corporate activities and investments in Nautilus joint venture related to the miner deposits, mining facility buildout and general corporate activities. Cash flow information is as follows (in thousands):
| | | | | | | | |
|---|---|---|---|---|---|---|---|
| | | | | | | | |
| | | | Year Ended | | | Period February 8, 2021 (date of inception) to | |
| | | | December 31, | | | December 31, | |
| | | 2022 | | 2021 | |||
| Cash provided by (used in): | | | | | | ||
| Operating activities: | | | | | | ||
| Continuing operations | | $ | (32,262) | | $ | (21,141) | |
| Discontinued operations | | (1,804) | | (2,958) | | ||
| Total operating activities | | (34,066) | | (24,099) | | ||
| Investing activities | | (94,047) | | (201,413) | | ||
| Financing activities | | 89,981 | | 271,967 | | ||
| Net change in cash and cash equivalents and restricted cash | | $ | (38,132) | | $ | 46,455 | |
Cash used in operating activities for continuing operations was $32.3 million and $21.1 million for the year ended December 31, 2022 and the period February 8, 2021 (date of inception) to December 3, 2021, respectively. For the year ended December 31, 2022, cash used in operations results from a net loss of $90.8 million less non-cash expenses, net of $35.3 million, adjusted for changes in certain asset and liability balances and increased by proceeds from sale of bitcoin of $9.7 million. The non-cash expenses were primarily comprised of (i) $4.9 million of loss from discontinued operations, net of tax related to RM 101’s business, the assets of which were substantially sold as of December 31, 2022, (ii) $15.7 million related to the Company’s equity in net loss, net of tax of Nautilus, (iii) $11.7 million related to amortization of debt issuance cost and accretion of debt discount, (iv) impairment of digital currency and realized gain on sale of digital currency of $0.9 million on a net basis, (v) stock-based compensation of $1.6 million, (vi) depreciation of $6.7 million, (vii) amortization of right-of-use asset of $0.3 million, (viii) a loss on nonmonetary miner exchange of $0.8 million, (ix) loss on extinguishment of debt of $2.1 million and (x) related party expense to be settled with respect to common stock of $2.1 million. The changes in certain assets and liabilities were primarily comprised of a net increase in current liabilities (which primarily includes accounts payable, other accrued liabilities, other amounts due to related parties) of $16.8 million, a net increase in current assets (which primarily includes prepaid expenses, amounts due from related parties and other current assets) of $2.8 million, an increase in other assets of $1.0 million and an increase in other liabilities of $0.2 million.
Cash used in investing activities for continuing operations was $94.0 million and $201.4 for the year ended December 31, 2022 and the period February 8, 2021 (date of inception) to December 31, 2021, respectively. For the year ended December 31, 2022, the Company (i) invested $61.1 million in the buildout of mining facilities, (ii) invested $46.20 million (including reimbursable payments made on behalf of the joint venture of joint venture partner offset by reimbursement from joint venture or joint venture partner of less than $0.1 million net cash used) in Nautilus related primarily to the joint venture’s miner deposits and mining facility buildout and (iii) received net proceeds from the sale of IKONICS’ net assets held for sale of $13.5 million.. See “Contractual Obligations and Other Commitments” for additional discussion on miner and Nautilus commitments.
Cash provided by financing activities for continuing operations was $90.0 million and $272.0 for the year ended December 31, 2022 and the period February 8, 2021 (date of inception) to December 31, 2021, respectively. For the year ended December 31,
51
Table of Contents
2022, the Company received proceeds from the issuance of Common Stock, net of issuance costs, of $47.3, proceeds from the issuance of warrants of $5.7 million, proceeds from the issuance of convertible preferred stock of $9.6 million and net proceeds from the issuance and repayment of convertible promissory notes of $2.8 million. In addition, for the year ended December 31, 2022, the Company received proceeds related to an amendment to its long-term debt of $22.5 million and received proceeds, net of principal payments, of notes payable for insurance premium financing of $2.1 million, net of repayments.
Contractual Obligations and Other Commitments
The Company is counterparty to five miner purchase agreements with Bitmain Technologies Limited. The Company has satisfied all contractual financial commitments under these contracts as of December 31, 2022.
The Company is counterparty to an amended and restated Talen joint venture agreement dated August 27, 2022. Under this joint venture agreement, the Company has invested $116.0 million on a net basis and has right-sized its equity ownership interest to 25% of the joint venture. The Company does not expect any additional material capital contributions to be required.
Financial Condition
There is limited historical financial information about the Company upon which to base an evaluation of its performance. The Company has commenced mining activities, however not yet to the scale required to support its principal operations. The Company has relied primarily on proceeds from its issuances of debt and equity and sale of bitcoin mined to fund its principal operations. Until TeraWulf is able to generate positive cash flows from operations, TeraWulf expects to fund its business operations and infrastructure buildout through the issuance of debt or equity securities, the sale of mined bitcoin or through the provision miner hosting services.
Prior to December 31, 2022, the Company’s fundraising activities resulted in net cash provided by financing activities of $90.0 million and $272.0 million for the year ended December 31, 2022 and the period February 8, 2021 (date of inception) to December 31, 2021, respectively. Financing activities during the year ended December 31 2022 include the following:
ATM Offering. On February 11, 2022, in order to facilitate additional capital acquisition, the Company entered into an At Market Issuance Sales Agreement (the “Sales Agreement”) with B. Riley Securities, Inc. and D.A. Davidson & Co. (each, individually, an “Agent” and, collectively, the “Agents”), pursuant to which the Company may offer and sell, from time to time, through or to the agents, acting as agent or principal, shares of the Company’s Common Stock, par value $0.001 per share, having an aggregate offering price of up to $200.0 million (the “Shares”). The Company is not obligated to sell any Shares under the Sales Agreement. In April 2022, the Company entered into a replacement sales agreement (the “April ATM Sales Agreement”) with Cantor Fitzgerald & Co., B. Riley Securities, Inc. and D.A. Davidson & Co. (together the “April ATM Agents”), pursuant to which the Company may offer and sell, from time to time, through or to the April ATM Agents, shares of the Company’s Common Stock, par value $0.001 per share, having an aggregate offering price of up to $200.0 million. The April ATM Sales Agreement replaced the Sales Agreement. The Company is not obligated to sell any shares under the April ATM Sales Agreement. Subject to the terms and conditions of the April ATM Sales Agreement, the Agents will use commercially reasonable efforts, consistent with its normal trading and sales practices, to sell Shares from time to time based upon the Company’s instructions, including any price, time or size limits or other customary parameters or conditions specified by the Company. The Company will pay the Agents a commission equal to 3.0% of the gross sales price from each sale of Shares and provide the Agents with customary indemnification and contribution rights. The April ATM Sales Agreement may be terminated by the Agents or the Company at any time upon five (5) days’ notice to the other party. The issuance and sale of the April Shares by the Company under the April ATM Sales Agreement are made pursuant to the prospectus and prospectus supplement forming a part of the Company’s shelf registration statement on Form S-3 (Registration Statement No. 333-262226), which was declared effective on February 4, 2022 (“the 2022 Registration Statement”), including a final prospectus supplement dated April 26, 2022. The 2022 Registration Statement provides that the Company may offer and sell from time to time shares of its Common Stock, shares of its preferred stock, debt securities, depositary shares, warrants, rights, purchase contracts or units, or any combination thereof, in one or more offerings in amounts, at prices and on terms that it determines at the time of the offering, with an aggregate initial offering price of up to $500.0 million (or its equivalent in foreign currencies, currency units or composite currencies). As of March 30, 2023, the Company sold 2,910,909 shares of Common Stock for net proceeds of approximately $9.7 million under the ATM Offering.
Common Stock and Common Stock Warrants. At various times through the year ended December 31, 2022, the Company concluded private placements and offerings pursuant to underwriting agreements, to offer Common Stock or units consisting of Common Stock and Common Stock warrants to investors, including members of Company management. Certain Common Stock warrants were also exercised. In the aggregate for these transactions, the Company issues 33,938,500 shares of Common Stock for net proceeds of $53.0 million.
52
Table of Contents
Convertible Preferred Stock. In March 2022, TeraWulf entered into Series A Convertible Preferred Stock Subscription Agreements (the “Subscription Agreements”) with certain accredited and institutional investors (collectively, the “Holders”). Pursuant to the Subscription Agreements, the Company sold 9,566 shares (of 10,000 shares authorized) of Series A Convertible Preferred Stock, par value $0.001 per share (the “Convertible Preferred Stock”) to the Purchasers for an aggregate purchase price of $9.6 million. The Subscription Agreements contain customary representations, warranties, covenants and agreements of the Company. The offer and sale of the Convertible Preferred Stock were made pursuant to the prospectus and prospectus supplement forming a part of the 2022 Registration Statement. Holders of the Convertible Preferred Stock will accumulate cumulative dividends at an annual rate of 10.0% on the stated amount per share plus the amount of any accrued and unpaid dividends on such share, accumulating on a daily basis and payable quarterly on March 31st, June 30th, September 30th and December 31st, respectively, in each year and commencing June 30, 2022. Commencing June 30, 2022, unpaid dividends will be accreted to, and increase, the liquidation preference of the Convertible Preferred Stock. The initial liquidation preference is $1,000 per share. The Conversion Price is determined by dividing $1,000 by the Conversion Rate, as defined, which is initially 100 shares of Common Stock per $1,000 liquidation preference of Convertible Preferred Stock. Cumulative dividends of $0.8 million were accumulated and accreted to liquidation preference as of December 31, 2022. As of December 31, 2022, the aggregate liquidation preference of the Convertible Preferred Stock was approximately $10.3 million.
Long-term Debt Amendments. In July 2022, the Company entered into an amendment to is Loan, Guaranty and Security Agreement (the “LGSA”). This amendment provides for an additional $50.0 million term loan facility (the “New Term Facility”). The New Term Facility has a maturity date of December 1, 2024, consistent with the existing term loans under the LGSA. The interest rate with respect to the New Term Facility is consistent with the existing term loans under the LGSA, but is subject to increase upon the occurrence of certain conditions. Pursuant to the New Term Facility, funds can be drawn in three tranches. The $15.0 million first tranche was drawn at closing in July 2022, and the subsequent tranches of up to $35 million may be drawn at Company’s option, subject to certain conditions, including the raising of matching junior capital, as defined. The amortization with respect to the first tranche of the New Term Facility is consistent with existing term loans under the LGSA. The loans under the subsequent tranches of the New Term Facility are repayable in quarterly installments on (i) April 5, 2024 and July 8, 2024, equal to 12.50% of the original principal amount advanced under such tranches under the LGSA and (ii) October 7, 2024, equal to 37.5% of the original principal amount advanced under such tranches of the LGSA. The New Term Facility required the Company to extend the initial term of the Ground Lease from five years to eight years. In connection with the New Term Facility, the Company issued warrants to the lenders under the New Term Facility to purchase 5,787,732 shares of Common Stock at $0.01 per share, an aggregate number of shares of the Company’s Common Stock equal to 5.0% of the fully diluted equity of the Company. If the Company draws subsequent tranches, it is required to issue warrants to the lenders to purchase shares of the Company’s Common Stock equal to dilution of 3.75% and 4.25% of the then fully diluted equity of the Company, respectively. A certain portion of the Warrants issued under the Warrant Agreement were subject to cancellation, upon the occurrence of certain conditions.; however, the time period for potential warrant cancellation has expired and no warrants were cancelled. In October 2022, the Company entered into a third amendment (the “Third Amendment”) to the LGSA. The Third Amendment divides the initial funding of up to $15,000,000 of the delayed draw term loan commitment under the LGSA into two tranches of up to $7,500,000 each. The first tranche of $7,500,000 was borrowed upon the effectiveness of the Third Amendment on October 7, 2022. In connection with the Third Amendment described above, the Company entered into an amendment and restatement of the warrant agreement related to the New Term Facility. The amended and restated warrant agreement provides that holders party thereto are entitled to additional warrants to purchase an aggregate number of shares of Common Stock equal to an incremental 3.75%, to be divided into two separate increments of 1.875% each, of the fully diluted equity of the Company, determined on the date of the funding of the two separate sub-tranches of $7,500,000 each pursuant to the Third Amendment. On October 7, 2022. the Company issued warrants to purchase 2,667,678 shares of Common Stock at $0.01 per share.
Convertible Promissory Notes. In November 2022, the Company issued convertible promissory notes (the “Convertible Notes”) in an aggregate principal amount of approximately $3.4 million to certain accredited investors, including to members of Company management in the amount of $1.7 million. The Convertible Notes were issued in privately negotiated transactions as part of a private placement exempt from registration under the Securities Act of 1933, as amended. The Convertible Notes, which contain usual and customary antidilution provisions, have a maturity date of April 1, 2025 and accrue annual interest at a rate of 4%, which increases to 15% upon the occurrence of an event of default, as defined. The Convertible Notes are automatically convertible into shares of equity securities of the Company upon the closing of a Qualified Financing, as defined in the Convertible Notes as the issuance and sale of equity securities with an aggregate gross sales price of not less than $5.0 million, with certain sales of equity securities excluded, at a conversion price equal to the price per share paid by the investors purchasing such equity securities in such Qualified Financing. On December 12, 2022, the Company entered into a private placement which met the definition of a Qualified Financing and contemporaneously amended the Convertible Notes to (a) change the conversion date to March 1, 2023 and (b) allow for the conversion price to be reduced if an additional Qualified Financing were to occur prior to the conversion date at a price lower than the then existing Convertible Note conversion price. As of December 31, 2022, the conversion price was $0.40 per share of Common Stock.
53
Table of Contents
SEPA. On June 2, 2022, in order to facilitate additional capital acquisition, the Company entered into the Standby Equity Purchase Agreement (“SEPA”) with YA II PN, Ltd. (“Yorkville”). Pursuant to the SEPA, the Company shall have the right, but not the obligation, to sell to Yorkville up to $50.0 million of its shares of Common Stock, at the Company’s request any time during the commitment period commencing on June 2, 2022 and terminating on the earliest of (i) the first day of the month following the 36-month anniversary of the SEPA and (ii) the date on which Yorkville shall have made payment of any advances requested pursuant to the SEPA for shares of the Common Stock equal to the commitment amount of $50.0 million. In addition to the Company’s right to request Advances, subject to certain conditions precedent, the Company had the option to, but was not obligated to, effect a pre-advance loan with a principal amount of $15.0 million through the issuance and sale to Yorkville of a convertible promissory note (the “Promissory Note”). The Company elected to issue and sell the Promissory Note to Yorkville on June 2, 2022. As of December 31, 2022, the Company sold 91,405 shares of Common Stock for net proceeds of $250,000. The Company fully repaid the Promissory Note, substantially in cash, and the SEPA has been cancelled as of December 31, 2022.
The Company has invested $61.1 million and $109.1 million in the buildout of mining facilities for the year ended December 31, 2022 and the period February 8, 2021 (date of inception) to December 31, 2021, respectively, and $46.2 million and $82.1 million in the Nautilus joint venture for the year ended December 31, 2022 and the period February 8, 2021 (date of inception) to December 31, 2021, respectively. The Lake Mariner facility commenced operations in March 2022 and the Nautilus Cryptomine Facility commenced operations in February 2023. These facilities are expected to reach an aggregate 160 MW of net bitcoin mining capacity with a capacity to support 50,000 miners and over 5.5 EH/s of computational power by early in the second quarter of 2023.
Subsequent to December 31, 2022, the Company accomplished several notable steps toward achieving near term positive cash flows from operations, namely: (1) the Company amended its long-term debt agreement to, among other changes, remove the fixed principal amortization through April 7, 2024 and, potentially, beyond, (2) through the issuance of Common Stock, Common Stock warrants and convertible promissory notes, the Company received net proceeds of $34.3 million, which along with cash flow from operations, is expected to be sufficient to satisfy the Company’s final capital expenditure requirements, other obligations and operating expenses in the months prior to achieving a free cash flow positive enterprise (3) mining activities have commenced at the Nautilus Facility and the Company deems that it has funded all known and expected capital commitments, (4) the Company received materially all contracted miners from the miner suppliers and has no remaining outstanding financial commitments under the miner purchase agreements, (5) the received miners are sufficient to fully utilize mining capacity both in service and under construction at the Lake Mariner Facility and the Nautilus Cryptomine Facility and (6) the remaining construction activities at the Lake Mariner Facility and the Nautilus Cryptomine Facility are currently ongoing and expected to be complete in the second quarter of 2023. The Company has determined that it is probable that these actions will allow the Company to generate positive cash flows from operations and be able to realize its assets and discharge its liabilities and commitments in the normal course of business and, therefore, there is no longer substantial doubt about the Company’s ability to continue as a going concern through at least the next twelve months. The consolidated financial statements do not include any adjustments that might result from TeraWulf’s possible inability to continue as a going concern.
However, the ability to raise funds , if required, through the sale of equity, debt financings, or the sale of bitcoin to expand and maintain our operations is subject to many risks and uncertainties and, even if we were successful, future equity issuances or convertible debt or preferred stock offerings could result in dilution to our existing stockholders and any future debt or debt securities may contain covenants that limit our operations or ability to enter into certain transactions. Our ability to realize revenue through bitcoin mining and successfully convert bitcoin into cash or fund overhead with bitcoin is subject to a number of risks, including regulatory, financial and business risks, many of which are beyond our control. Additionally, bitcoin has experienced significant historical volatility in its market price and, as such, future prices cannot be predicted. See the discussion of risks affecting the Company’s business under Part I, Item 1A. “Risk Factors” of this Annual Report.
Critical Accounting Policies and Estimates
The above discussion and analysis of the Company’s financial condition and results of operations are based upon its consolidated financial statements, which have been prepared in accordance with accounting principles generally accepted in the United States of America. The preparation of the Company’s consolidated financial statements requires the application of accounting policies and the use of estimates. The accounting policies most important to the preparation of the consolidated financial statements and estimates that require management’s most difficult, subjective or complex judgments are described below.
See Note 2 of the Notes to Consolidated Financial Statements included in Item 8 of this Annual Report on Form 10-K for a summary of the Company’s significant accounting policies.
54
Table of Contents
Variable Interest Entities
Variable interest entities (“VIE”) are legal entities in which equity investors do not have (i) sufficient equity at risk for the legal entity to finance its activities without additional subordinated financial support, or (ii) as a group, the power, through voting or similar rights, to direct the activities of the legal entity that most significantly impact the entity’s economic performance, or (iii) the obligation to absorb the expected losses of the legal entity or the right to receive expected residual returns of the legal entity. The Company would consolidate any VIE in which it has a controlling financial interest through being deemed to be the primary beneficiary of the VIE. The primary beneficiary of a VIE has both of the following characteristics: (1) the power to direct the activities of the VIE that most significantly impact its economic performance; and (2) the obligation to absorb losses of the VIE that could potentially be significant to the VIE or the right to receive benefits from the VIE that could be significant to the VIE. If both characteristics are met, the Company considers itself to be the primary beneficiary and therefore will consolidate that VIE into its consolidated financial statements.
The Company determines whether it is the primary beneficiary of a VIE upon initial involvement with a VIE and reassesses whether it is the primary beneficiary of a VIE on an ongoing basis. The determination of whether an entity is a VIE and whether the Company is the primary beneficiary of a VIE is based upon facts and circumstances for the VIE and requires significant judgments such as whether the entity is a VIE, whether the Company’s interest in a VIE is a variable interest, the determination of the activities that most significantly impact the economic performance of the entity, whether the Company controls those activities, and whether the Company has the obligation to absorb losses of the VIE or the right to receive benefits from the VIE that could be significant to the VIE.
In 2021, the Company entered into a joint venture, Nautilus Cryptomine LLC (“Nautilus”), with an unrelated co-venturer to develop, construct and operate a bitcoin mining facility in Pennsylvania. Due to the initial nature of the joint venture and the continued commitment for additional financing, the Company determined Nautilus is a VIE. While the Company has the ability to exercise significant influence over Nautilus, the Company has determined that it does not have the power to direct the activities that most significantly impact the economic performance of Nautilus. Initially, the power to direct the activities of Nautilus that most significantly impact Nautilus’ economic performance were shared equally by both parties within the joint venture due to the requirement for both equity holders to approve many of the key operating decisions and when not equally shared, were predominantly under the control of the co-venturer, including through the co-venturer’s majority representation on the board of managers. As such, the Company has determined that it is not the primary beneficiary of Nautilus and, therefore, has accounted for this entity under the equity method of accounting. Risks associated with the Company’s involvement with Nautilus include a commitment to potentially fund additional equity investments. During the year ended December 31, 0222, the Company reduced its ownership interest in Nautilus to 25.2%.
Mining Pool
The Company has entered into an arrangement with a cryptocurrency mining pool (the Foundry USA Pool) to provide computing power to the mining pool in exchange for consideration. The arrangement is terminable at any time without substantial penalty by either party and the contract term is deemed to be 24 hours. The Company’s enforceable right to compensation only begins when and continues while the Company provides computing power to its customer, the mining pool operator. The mining pool applies the Full Pay Per Share (“FPPS”) model. Under the FPPS model, in exchange for providing computing power to the pool, the Company is entitled to pay-per-share base amount and transaction fee reward compensation, calculated on a daily basis, at an amount that approximates the total bitcoin that could have been mined and transaction fees that could have been awarded using the Company’s computing power, based upon the then current blockchain difficulty. Under this model, the Company is entitled to compensation regardless of whether the pool operator successfully records a block to the bitcoin blockchain.
Providing computing power to a mining pool for cryptocurrency transaction verification services is an output of the Company’s ordinary activities. The provision of such computing power is the sole performance obligation. The transaction consideration the Company receives, if any, is non-cash consideration and is all variable. Because cryptocurrency is considered non-cash consideration, fair value of the cryptocurrency award received is determined using the quoted price of the related cryptocurrency in the Company’s principal market at the time of contract inception, which is deemed daily. Revenue is recognized when it is probable that a significant reversal in the amount of cumulative revenue recognized will not occur. After every 24-hour contract term, the mining pool transfers the cryptocurrency consideration to our designated cryptocurrency wallet.
There is no significant financing component in these transactions. There may be, however, consideration payable to the customer in the form of a pool operator fee; this fee, if any, is deducted from the proceeds the Company receives and is recorded as contra-revenue, as it does not represent a payment for a distinct good or service.
55
Table of Contents
Data Center Hosting
The Company’s current hosting contracts are service contracts with a single performance obligation. The service the Company provides primarily includes hosting the customers’ miners in a physically secure data center with electrical power, internet connectivity, ambient air cooling and available maintenance resources. Hosting revenue is recognized over time as the customer simultaneously receives and consumes the benefits of the Company’s performance. The Company recognizes hosting revenue to the extent that a significant reversal of such revenue will not occur. Data center hosting customers are invoiced and payments are due on a monthly basis. While the majority of consideration is paid in cash, certain consideration is payable in cryptocurrency. Because cryptocurrency is considered non-cash consideration, fair value of the cryptocurrency award received is determined using the quoted price of the related cryptocurrency in the Company’s principal market at the time of contract inception. The Company has one data center hosting contract with a customer, which expires in December 2023, for which the quoted price of bitcoin in the Company’s principal market at the time of contract inception was approximately $38,000. The Company recorded miner hosting revenue of $4.6 million and $0 during the year ended December 31, 2022 and the period February 8, 2021 (date of inception) to December 31, 2021, respectively.
Cryptocurrencies
Cryptocurrencies, including bitcoin, are included in current assets in the consolidated balance sheets due to the Company’s ability to sell it in a highly liquid marketplace and its intent to liquidate its cryptocurrencies to support operations when needed. Cryptocurrencies earned by the Company through the provision of computing power to a mining pool and hosting activities are accounted for in connection with the Company’s revenue recognition policy disclosed above.
Cryptocurrencies are accounted for as intangible assets with indefinite useful lives. An intangible asset with an indefinite useful life is not amortized but assessed for impairment on a continuous basis through the entirety of its holding period. Impairment exists when the carrying amount exceeds its fair value, which is measured using the quoted price of the cryptocurrency at the time its fair value is being measured, which is based on the intraday low quoted price of the cryptocurrency reported in the Company’s principal market. To the extent an impairment loss is recognized, the loss establishes the new cost basis of the asset. Subsequent reversal of impairment losses is not permitted.
Sales of cryptocurrencies by the Company and cryptocurrencies awarded to the Company, including as compensation for data center hosting services, are included within cash flows from operating activities on the consolidated statements of cash flows. The Company will account for its gains or losses in accordance with the first in first out (“FIFO”) method of accounting.
Issuance of Debt with Common Stock or Warrants; Debt Modification
On December 1, 2021, TeraCub entered into a the LGSA, which consists of a $123.5 million term loan facility. In connection with the LGSA, the Company issued to the holders of the Term Loan 839,398 shares of Common Stock, which is a quantity of Common Stock representing 1.5% of the outstanding shares of the publicly registered shares of TeraWulf subsequent to the Closing. The allocation of proceeds between the debt instrument and any other components included in the debt issuance, including Common Stock, is generally based on the relative fair value allocation method. In applying the relative fair value allocation method, the determination of the fair value of the Common Stock issued and the fair value of the Term Loan independent of the Common Stock issued requires significant judgment. As a measure of sensitivity, a 10% change in the estimated fair value of the Term Loan component would result in a $1.9 million change in the fair value allocated to each of the Term Loan and equity components.
In July 2022, the Company entered into the First Amendment to the LGSA, which included an additional borrowing of $15.0 million and the issuance of warrants to purchase 3,472,640 shares of Common Stock at $0.01 per share. The accounting for debt modifications is complex and requires significant judgment. Potential accounting outcomes include troubled debt restructuring accounting, extinguishment accounting or modification accounting, each with different implications for the consolidated financial statements. The Company has determined that modification accounting is applicable. Additionally, debt modification accounting requires the determination of the fair value of the warrants issued, which requires significant judgment. As a measure of sensitivity, a 10% change in the estimated fair value of the warrants would result in a $0.3 million change in the recorded value of the borrowing under the First Amendment.
In October 2022, the Company entered into the Third Amendment to the LGSA, which included an additional borrowing of $7.5 million and the issuance of warrants to purchase 2,667,678 shares of Common Stock at $0.01 per share. The accounting for debt modifications is complex and requires significant judgment. Potential accounting outcomes include troubled debt restructuring
56
Table of Contents
accounting, extinguishment accounting or modification accounting, each with different implications for the consolidated financial statements. The Company has determined that modification accounting is applicable. Additionally, debt modification accounting requires the determination of the fair value of the warrants issued, which requires significant judgment. As a measure of sensitivity, a 10% change in the estimated fair value of the warrants would result in a $0.2 million change in the recorded value of the borrowing under the Third Amendment.
Convertible Instruments
The Company accounts for its issuance of convertible debt and convertible equity instruments in accordance with applicable U.S. GAAP. In connection with that accounting, the Company assesses the various terms and features of the agreement in accordance with Financial Accounting Standards Board (“FASB”) Accounting Standards Codification (“ASC”) No. 480 “Distinguishing Liabilities from Equity” (“ASC 480”) and ASC 815 “Derivatives and Hedging Activities” (“ASC 815”). ASC 480 requires liability accounting for certain financial instruments, including shares that embody an unconditional obligation to transfer a variable number of shares, provided that the monetary value of the obligation is based solely or predominantly on one of the following three characteristics: (1) a fixed monetary amount known at inception, (2) variations in something other than the fair value of the issuer’s equity shares or (3) variations in the fair value of the issuer’s equity shares, but the monetary value to the counterparty moves in the opposite direction as the value of the issuer’s shares. In accordance with ASC 815, the Company assesses the various terms and features of the agreement to determine whether or not they contain embedded derivative instruments that are required under ASC 815 to be accounted for separately from the host contract and recorded on the balance sheet at fair value. The fair value of derivative liabilities, if any, is required to be revalued at each reporting date, with corresponding changes in fair value recorded in current period operating results.
Income Taxes
The Company accounts for income taxes pursuant to the provision of Accounting Standards Codification (“ASC”) 740-10, “Accounting for Income Taxes” which requires, among other things, an asset and liability approach to calculating deferred income taxes. The asset and liability approach requires the recognition of deferred tax assets and liabilities for the expected future tax consequences of temporary differences between the carrying amounts and the tax bases of assets and liabilities. A valuation allowance is provided to offset any net deferred tax assets for which management believes it is more likely than not that the net deferred tax asset will not be realized. The Company follows the provision of the ASC 740-10 related to Accounting for Uncertain Income Tax Positions. When tax returns are filed, it is more likely than not that some positions taken would be sustained upon examination by the taxing authorities, while others are subject to uncertainty about the merits of the position taken or the amount of the position that would be ultimately sustained. In accordance with the guidance of ASC 740-10, the benefit of a tax position is recognized in the financial statements in the period during which, based on all available evidence, management believes it is more likely that not that the position will be sustained upon examination, including the resolution of appeals or litigation processes, if any. Tax positions taken are not offset or aggregated with other positions. The tax benefits recognized in the consolidated financial statements from such positions are then measured based on the largest benefit that has a greater than 50% likelihood of being realized upon settlement with the applicable taxing authority. The portion of the benefits associated with the tax positions taken that exceeds the amount measured as described above should be reflected as a liability for uncertain tax benefits in the Company’s balance sheets along with any associated interest and penalties that would be payable to the taxing authorities upon examination. The most critical estimate for income taxes is the determination of whether to record a valuation allowance for any net deferred tax asset, including net loss carryforwards, whereby management must estimate whether it is more likely than not that the deferred tax asset would be realized.
FY 2021 10-K MD&A
SEC filing source: 0001104659-22-041168.
ITEM 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations
The following Management’s Discussion and Analysis of Financial Condition and Results of Operations should be read in conjunction with a review of the other Items included in this Annual Report and with the accompanying consolidated financial statements and notes thereto included elsewhere in this report. All figures presented below represent results from continuing operations, unless otherwise specified. Certain statements contained in this Management’s Discussion and Analysis of Financial Condition and Results of Operations may be deemed to forward-looking statements. See “Forward-Looking Statements.”
General
TeraWulf is a digital asset technology company with a core business of sustainable bitcoin mining. TeraWulf will develop, own and operate its bitcoin mining facility sites in the United States and expects to consume over 90% zero-carbon energy, with a target of 100% by 2028.
TeraWulf is actively developing, consistent with its sustainable energy mandate, two bitcoin mining facility sites in the States of New York and Pennsylvania, the Lake Mariner Facility and the Nautilus Cryptomine Facility, respectively, and has secured competitive equipment supply agreements for each.
Lake Mariner Facility — Located at a site adjacent to the decommissioned coal-fired Somerset Generating Station in Barker, New York, the Lake Mariner Facility has secured an initial 90 MW of energy to support its bitcoin mining capacity through an agreement with the NYPA with the potential to expand into an additional 410 MW of energy supply. TeraWulf began mining bitcoin at the Lake Mariner Facility in March 2022.
34
Table of Contents
Nautilus Cryptomine Facility — The Nautilus Cryptomine Facility is a joint venture between TeraWulf and Talen. The Nautilus Cryptomine Facility, located in Salem Township, Luzerne County, Pennsylvania, is located adjacent to the 2.5 GW nuclear-powered Susquehanna Station, 2.3 GW of which are owned and operated by Talen.. The Nautilus Cryptomine Facility has secured as its power supply zero-carbon nuclear energy received directly from a substation connected to the Susquehanna Station’s electrical generators over a five-year term with two successive three-year renewal options. The Nautilus Cryptomine Facility is located “behind the meter” and not connected to the electrical distribution grid, therefore avoiding transmission and distribution charges typically paid by other large power consumers. At the time of this Annual Report, the Nautilus Cryptomine Facility has access to up to 300 MW of bitcoin mining capacity from the Susquehanna Station and is expected to be the first bitcoin mining facility site that is powered by 100% “behind the meter” zero-carbon nuclear energy. TeraWulf plans to begin installation of ASICs at the Nautilus Cryptomine Facility by mid-year 2022. TeraWulf expects to generate revenues primarily by sustainably mining bitcoin at its bitcoin mining facility sites. Incremental revenues may be generated through the hedging and sale of mined bitcoin and the commercial optimization of TeraWulf’s power supply.
The Business Combination
TeraWulf completed its business combination with IKONICS on the Closing Date pursuant to which, among other things, TeraCub would effectively acquire IKONICS and become a publicly traded company on the Nasdaq, which was the primary purpose of the business combination. For financial accounting purposes, the business combination was treated as a reverse merger whereby the accounting acquirer was TeraCub due to TeraCub’s historic shareholders having the majority voting control in the Company, the board of directors members being associated with TeraCub and the senior management of TeraCub becoming the senior management of TeraWulf. Pursuant to business combination accounting, the Company applied the acquisition method, which requires the assets acquired and liabilities assumed be recorded at fair value, with limited exceptions. The Company’s consolidated financial statements include the operating results of IKONICS beginning on the Closing Date.
Under the terms of the Merger Agreement, each share of IKONICS common stock issued and outstanding immediately prior to the Closing Date was automatically converted into and exchanged for (i) one validly issued, fully paid and nonassessable share of common stock of TeraWulf, (ii) one CVR and (iii) the right to receive $5.00 in cash, without interest. TeraCub common stock issued and outstanding immediately prior to the Closing Date was automatically converted into the right to receive a number of validly issued, fully paid and nonassessable shares of TeraWulf such that the TeraCub common stockholders prior to conversion would effectively control 98% of the total outstanding shares of TeraWulf immediately subsequent to the Closing Date.
Pursuant to the CVR Agreement, each shareholder of IKONICS as of immediately prior to the Closing Date, received one CVR for each outstanding share of common stock of IKONICS then held. The holders of the CVRs are entitled to receive 95% of the Net Proceeds (as defined in the CVR Agreement), if any, from the sale, transfer, disposition, spin-off, or license of all or any part of the pre-merger business of IKONICS completed within 18 months following the date of the merger, subject to a reserve of up to 10% of the Gross Proceeds (as defined in the CVR Agreement) from such transaction. The CVRs do not confer to their holders any voting or equity or ownership interest in IKONICS or TeraWulf and are not transferable, except in limited circumstances, and are not listed on any quotation system or traded on any securities exchange. The CVR Agreement will terminate after all payment obligations to the holders thereof have been satisfied. Holders of CVRs will not be eligible to receive payment for dispositions, if any, of any part of the pre-merger business of IKONICS after the eighteen-month anniversary of the Closing Date. The fair value of the aggregate consideration paid for IKONICS was $66.3 million, which includes (i) cash consideration of $13.7 million ($10.3 million net of cash acquired), (ii) equity consideration of $40.6 million and contingent consideration (related to the CVRs) of $12.0 million.
Upon the consummation of the business combination, IKONICS common stock ceased trading on the Nasdaq and TeraWulf common stock began trading on the Nasdaq on December 14, 2021 under the ticker symbol “WULF.”
35
Table of Contents
COVID-19
The Company’s results of operations could be adversely affected by general conditions in the economy and in the global financial markets, including conditions that are outside of the Company's control, such as the outbreak and global spread of the novel coronavirus disease (“COVID-19”). The COVID-19 pandemic that was declared on March 11, 2020 has caused significant economic dislocation in the United States and globally as governments across the world, including the United States, introduced measures aimed at preventing the spread of COVID-19. The spread of COVID-19 and the imposition of related public health measures have resulted in, and are expected to continue to result in, increased volatility and uncertainty in the cryptocurrency space. Any severe or prolonged economic downturn, as a result of the COVID-19 pandemic or otherwise, could result in a variety of risks to the business and management cannot anticipate all the ways in which the current economic climate and financial market conditions could adversely impact its business.
The Company may experience disruptions to its business operations resulting from supply interruptions (including miner delivery interruptions), quarantines, self-isolations, or other movement and restrictions on the ability of its employees or its counterparties to perform their jobs and provide services. The Company may also experience delays in construction and obtaining necessary equipment in a timely fashion. To date, the Company has experienced certain, but minimal, delays due to COVID-19 complications among its employees, suppliers and contractors. If the Company is unable to effectively set up and service its miners, its ability to mine bitcoin will be adversely affected. The future impact of the COVID-19 pandemic is still highly uncertain and there is no assurance that the COVID-19 pandemic or any other pandemic, or other unfavorable global economic, business or political conditions, will not materially and adversely affect the Company's business, prospects, financial condition, and operating results.
Change in Fiscal Year
Upon the closing of its business combination with IKONICS, the Company assumed the fiscal year end of December 31. Accordingly, its consolidated financial statements are as of December 31, 2021 and for the nine-month period ended December 31, 2021. Previously, the Company’s fiscal year ended on March 31.
Results of Operations
Since the Company’s inception on February 8, 2021, the Company’s primary activities have been focused on capital acquisition, merger negotiation and consummation, joint venture negotiation and participation, miner procurement, electricity procurement, construction commencement and management, public company readiness and general corporate purposes. The Company’s plan of operation for the next twelve months is to continue to develop its initial bitcoin mining facilities, both wholly owned and owned through Nautilus.
Continuing Operations
All items included in loss from continuing operations in the consolidated statements of operations for the nine months ended December 31, 2021 and the period February 8, 2021 (date of inception) to March 31, 2021 relate to its wholly-owned operations of its sole business segment, digital currency mining, due to the Company classifying the newly acquired IKONICS business as held for sale and discontinued operations as of and for the nine months ended December 31, 2021.
Selling, general and administrative expenses during the nine months ended December 31, 2021 and the period February 8, 2021 (date of inception) to March 31, 2021 totaled $41.5 million (including $18.0 million related party expenses) and $0.8 million (including $0.6 million related party expenses), respectively. The increase of $40.7 million is a result of the difference in the nine-month period ended December 31, 2021 as compared to the less than two-month period ended March 31, 2021, among other factors, including merger-related costs and scaling of the Company’s operations during nine months ended December 31, 2021. In connection with the business combination with IKONICS, the Company incurred $27.7 million of incremental expense during the nine months ended December 31, 2021, consisting of $15.2 million of financial and legal advisor fees and other merger-related costs and the $12.5 million performance incentive expense under the Beowulf E&D administrative and infrastructure services agreement to be settled with respect to shares of the Company’s common stock. The balance of selling, general and administrative expenses is comprised primarily of professional fees, employee compensation and benefits, insurance and general corporate expenses. Professional fees include fixed and passthrough expenses under the administrative and infrastructure services agreement amounting to $5.4 million for the nine months ended December 31, 2021.
36
Table of Contents
Interest expense for the nine months ended December 31, 2021 and the period February 8, 2021 (date of inception) to March 31, 2021 totaled $2.3 million and $0, respectively. Interest expense incurred relates primarily to the Company’s term loan financing in the principal amount of $123.5 million, which was closed on December 1, 2021 (the “Term Loan”). The Term Loans bear an interest rate of 11.5%, which interest payments are due quarterly in arrears. Of the $2.3 million of interest expense reported in the statement of operations for the nine months ended December, 2021, approximately $1.0 million of the interest expense relates to amortization of debt issuance costs and debt discount related to debt issuance costs, an upfront fee, and the fair value of equity issued to the Term Loan investors in conjunction with the Term Loan.
Equity in net loss of investee, net of tax
Equity in net loss of investee, net of tax for the nine months ended December 31, 2021 and the period February 8, 2021 (date of inception) to March 31, 2021 totaled $1.5 million and $0, respectively. The $1.5 million for the nine months ended December 31, 2021 reflects TeraWulf’s 50% share of losses of Nautilus, which had not commenced principal operations as of December 31, 2021.
Loss from discontinued operations, net of tax
Loss from discontinued operations, net of tax for the nine months ended December 31, 2021 and the period February 8, 2021 (date of inception) to March 31, 2021 totaled $49.1 million and $0, respectively. In conjunction with the IKONICS’ business classification as held for sale upon acquisition, the Company has reported the IKONICS business as discontinued operations in the consolidated financial statements. The total loss from discontinued operations reported is comprised primarily of a loss on discontinued operations of $48.9 million to write down the related carrying amounts of IKONICS to their fair values less estimated cost to sell.
Liquidity and Capital Resources
As of December 31, 2021, the Company had cash and cash equivalents of $43.4 million, working capital, including current assets and current liabilities held for sale, of $22.2 million, total stockholders’ equity of $123.2 million and an accumulated deficit of $95.7 million. The Company incurred a net loss of $94.0 million for the nine months ended December 31, 2021, including an impairment charge of $48.9 million included in loss from discontinued operations, net of tax related to the acquired IKONICS business. As a new business enterprise that has not commenced its principal revenue generating operations, the Company’s primary sources of liquidity have been the issuance of debt and equity securities. The principal uses of cash are for deposits on miners, the buildout of mining facilities, general corporate purposes and investments in Nautilus joint venture related to the miner deposits, mining facility buildout and general corporate purposes. Cash flow information is as follows (in thousands):
| | | | | | | |
|---|---|---|---|---|---|---|
| | | | Period February 8, | |||
| | | | | | 2021 (date of | |
| | | Nine Months Ended | | inception) to | ||
| | | December 31, 2021 | March 31, 2021 | |||
| Cash provided by (used in) | | | | | ||
| Operating activities: | | | | | ||
| Continuing operations | | $ | (21,141) | | $ | — |
| Discontinued operations | | (2,958) | | — | ||
| Total operating activities | | (24,099) | | — | ||
| Investing activities | | (177,713) | | (23,700) | ||
| Financing activities | | 241,967 | | 30,000 | ||
| | | 40,155 | | 6,300 |
37
Table of Contents
Cash used in operating activities for continuing operations was $21.1 million and $0 for the nine months ended December 31, 2021 and the period February 8, 2021 (date of inception) to March 31, 2021, respectively. The cash used in operations results from a net loss of $94.0 million less non-cash expenses, net of $63.5 million and adjusted for changes in certain asset and liability balances. The non-cash expenses were primarily comprised of (i) $49.1 million of loss from discontinued operations, net of tax related to IKONICS business, which is classified as held for sale at December 31, 2021, (ii) $12.5 million related to a performance incentive expense under the administrative and infrastructure services agreement to be settled with respect to shares of the Company’s common stock, (iii) $1.5 million related to the Company’s equity in net loss, net of tax of Nautilus and (iv) $1.0 million related to amortization of debt issuance cost and accretion of debt discount offset by $0.6 million related to deferred income tax benefit. The changes in certain assets and liabilities were primarily comprised of a net increase in current liabilities (which includes accounts payable, accrued construction liabilities, other accrued liabilities and other amounts due to related parties) of $11.6 million offset by an increase in current assets (which includes prepaid expenses, amounts due from related parties and other current assets) of $2.2 million.
Cash used in investing activities for continuing operations was $177.7 million and $23.7 for the nine months ended December 31, 2021 and the period February 8, 2021 (date of inception) to March 31, 2021, respectively. Deposits on miners comprised $70.6 million and $23.7 million (subsequently contributed to Nautilus) for the nine months ended December 31, 2021 and the period February 8, 2021 (date of inception) to March 31, 2021, respectively. For the nine months ended December 31, 2021, the Company additionally invested (i) $14.8 million in the buildout of mining facilities, (ii) $82.1 million (investments in joint venture of $93.9 million net of reimbursement from joint venture partner of $11.8 million) in Nautilus related primarily to the joint venture’s miner deposits and mining facility buildout and (iii) $10.3 million, net of cash acquired in the business acquisition of IKONICS. The Company has significant future obligations related to miner deposits and also has commitments under the Talen Joint Venture Agreement . See “—Contractual Obligations and Other Commitments.”
Cash provided by financing activities for continuing operations was $242.0 million and $30.0 for the nine months ended December 31, 2021 and the period February 8, 2021 (date of inception) to March 31, 2021, respectively. Proceeds from the issuance of common stock provided, net of issuance costs, $74.4 million and $30.0 million for the nine months ended December 31, 2021 and the period February 8, 2021 (date of inception) to March 31, 2021, respectively. For the nine months ended December 31, 2021, the Company issued shares of Series A Preferred stock for proceeds, net of issuance costs, of $49.3 million and Term Loan debt proceeds, net of issuance costs, of $118.3 million. The Series A Preferred stock converted into shares of common stock immediately prior to the Closing Date. The Term Loan debt offering included providing shares of common stock with an aggregate fair value, net of allocated issuance costs, of $24.6 million to the Term Loan investors.
Contractual Obligations and Other Commitments
The Company has purchase obligations under miner purchase agreements and commitments under the Talen Joint Venture Agreement as of December 31, 2021, as follows (in thousands):
| | | | | | | | | | | | | | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| | | | | | | | | | | | Remaining | ||
| | | | | Contractual | | | | Contractual | |||||
| Counterparty | | Agreement Description | Agreement Date | Amount | Paid | Amount | |||||||
| Bitmain Technologies Limited | | Miner Purchase Agreement (1) | | December 7, 2021 | | $ | 32,550 | | $ | 11,393 | | $ | 21,157 |
| Bitmain Technologies Limited | Miner Purchase Agreement (1) | | December 15, 2021 | | $ | 169,050 | | $ | 59,168 | | $ | 109,882 | |
| Nautilus Cryptomine LLC | Joint Venture Agreement (2) | | May 13, 2021 | | $ | 156,000 | | $ | 105,818 | | $ | 50,182 |
| Column 1 | Column 2 |
|---|---|
| (1) | Pursuant to the December Bitmain Agreements, the Company has the option to purchase or decline to purchase any batch of miners comprising a monthly shipment upon Bitmain’s notification of the actual price under the agreements one month prior to shipment, so long as it has been determined that the Company is in compliance with the terms of the agreements. In the event the Company declines to purchase any monthly scheduled batch, the remaining balance prepaid for such batch is to be refunded to the Company pursuant to the terms of the agreements. As of December 31, 2021, the potential refund amount would be up to $70.5 million based on payments then made. For the agreements in the aggregate, the portion of the remaining contractual amounts the Company would not be obligated to pay in the event the Company declines to purchase any monthly scheduled batch is up to $60.5 million. |
| Column 1 | Column 2 |
|---|---|
| (2) | The contractual commitment amount represents the contractually required capital contributions of the Company which are required for the initial phase of the Nautilus Cryptomine Facility buildout. The joint venture members may seek alternate financing for the Nautilus Cryptomine Facility, which could reduce the amount of investments each member would be required to provide. The members may mutually agree on changes to the Nautilus Cryptomine Facility, which could increase or decrease the amount of contributions each joint venture member is required to provide. |
38
Table of Contents
On December 7, 2021, the Company entered into the December 7 Bitmain Agreement. The First Bitmain Purchase Agreement includes liquidated damage provisions that may be applied if payments are not made within sixty days of a payment due date, if not otherwise mutually extended. The Company is responsible for all logistics costs related to transportation for the delivery of miners. Pursuant to the First Bitmain Purchase Agreement, the Company paid an initial deposit of approximately $11.4 million during the nine months ended December 31, 2021. The balance of payments due under the First Bitmain Purchase Agreement, an amount of $21.2 million, are scheduled to be paid in unequal monthly installments through November 2022.
On December 15, 2021, the Company entered into the December 15 Bitmain Agreement. The Second Bitmain Purchase Agreement includes liquidated damage provisions that may be applied if payments are not made within sixty days of a payment due date, if not otherwise mutually extended. The Company is responsible for all logistics costs related to transportation for the delivery of miners. Pursuant to the Second Bitmain Purchase Agreement, the Company paid an initial deposit of approximately $59.2 million during the nine months ended December 31, 2021. The balance of payments due under the Second Bitmain Purchase Agreement, an amount of $109.9 million, are scheduled to be paid in unequal monthly installments through November 2022.
Pursuant to the terms of the Talen Joint Venture Agreement, TeraWulf would contribute $156.0 million both in cash and in-kind and Talen would contribute $156.0 million both in cash and in-kind to Nautilus by March 2022, unless otherwise determined in accordance with the Talen Joint Venture Agreement. The aforementioned contributions were based on an initial development budget formed on assumptions and inputs available at the time the joint venture was formed, and are subject to change. These contributions are now expected to be contributed by the third quarter of 2022, as agreed to by the members.
Financial Condition; Need for Additional Capital
There is limited historical financial information about the Company upon which to base an evaluation of its performance. The Company has commenced mining activities, however not yet to scale, and therefore has not generated material revenues from its mining business. The Company has relied on proceeds from its issuances of debt and equity to fund its principal operations. In accordance with its plan to develop its bitcoin mining facilities, during the nine months ended December 31, 2021, the Company paid approximately $70.6 million as deposits on miners, and has significant future obligations related to these miner purchase agreements. Also during the nine months ended December 31, 2021, the Company invested $82.1 million, net in its joint venture and has additional commitments under its joint venture agreement. The Company will need additional capital in order to meet these obligations in accordance with the existing contractual terms and to fund the planned development of its bitcoin mining facilities. Until TeraWulf is able to generate positive cash flows from operations, TeraWulf expects to fund its business operations and infrastructure buildout through the issuance of debt or equity securities. Subsequent to December 31, 2021 and as discussed below, the Company entered into an At Market Issuance Sales Agreement for sale of shares of Common Stock having an aggregate offering price of up to $200.0 million (the “ATM Offering”). However, there can be no assurance that the ATM Offering or any other financing will be successfully consummated on acceptable terms and volume, if at all, which may impact the timing or scale of TeraWulf’s planned development. In the event TeraWulf is unable to raise additional capital, TeraWulf may seek alternative arrangements or potential partnerships in order to fund its planned development. In the opinion of management, while it expects to be successful in its fundraising efforts, these factors, which include elements of capital acquisition outside the control of the Company, raise substantial doubt about TeraWulf’s ability to continue as a going concern through at least the next twelve months. The financial statements do not include any adjustments that might result from TeraWulf’s possible inability to continue as a going concern.
39
Table of Contents
ATM Offering. On February 11, 2022, in order to facilitate additional capital acquisition, the Company entered into an At Market Issuance Sales Agreement (the “Sales Agreement”) with B. Riley Securities, Inc. and D.A. Davidson & Co. (each, individually, an “Agent” and, collectively, the “Agents”), pursuant to which the Company may offer and sell, from time to time, through or to the agents, acting as agent or principal, shares of the Company’s common stock, par value $0.001 per share, having an aggregate offering price of up to $200.0 million (the “Shares”). The Company is not obligated to sell any Shares under the Sales Agreement. As of March 28, 2021, the Company sold 521,390 shares of common stock for net proceeds of approximately $4.3 million under the ATM offering. Subject to the terms and conditions of the Sales Agreement, the Agents will use commercially reasonable efforts, consistent with its normal trading and sales practices, to sell Shares from time to time based upon the Company’s instructions, including any price, time or size limits or other customary parameters or conditions specified by the Company. The Company will pay the Agents a commission equal to 3.0% of the gross sales price from each sale of Shares and provide the Agents with customary indemnification and contribution rights. The Sales Agreement may be terminated by the Agents or the Company at any time upon five (5) days’ notice to the other party. The issuance and sale of any Shares by the Company under the Sales Agreement are made pursuant to the Company’s effective registration statement on Form S-3 (Registration Statement No. 333-262226) (as amended, the “Registration Statement”), filed with the SEC on January 31, 2022, and declared effective by the SEC on February 4, 2022. The Registration Statement provides that the Company may offer and sell from time to time shares of its common stock, shares of its preferred stock, debt securities, depositary shares, warrants, rights, purchase contracts or units, or any combination thereof, in one or more offerings in amounts, at prices and on terms that it determines at the time of the offering, with an aggregate initial offering price of up to $500.0 million (or its equivalent in foreign currencies, currency units or composite currencies). The ATM Offering is described in the Company’s prospectus supplement dated February 11, 2022, as filed with the SEC on February 11, 2022, which is a supplement to the prospectus dated February 4, 2022.
Critical Accounting Policies and Estimates
The above discussion and analysis of the Company’s financial condition and results of operations are based upon its consolidated financial statements, which have been prepared in accordance with accounting principles generally accepted in the United States of America. The preparation of the Company’s consolidated financial statements requires the application of accounting policies and the use of estimates. The accounting policies most important to the preparation of the consolidated financial statements and estimates that require management’s most difficult, subjective or complex judgments are described below.
Variable Interest Entities
Variable interest entities (“VIE”) are legal entities in which equity investors do not have (i) sufficient equity at risk for the legal entity to finance its activities without additional subordinated financial support or (ii) as a group, the power, through voting or similar rights, to direct the activities of the legal entity that most significantly impact the entity’s economic performance, or (iii) obligation to absorb the expected losses of the legal entity or the right to receive expected residual returns of the legal entity. The Company would consolidate any VIE in which it has a controlling financial interest through being deemed to be the primary beneficiary of the VIE. The primary beneficiary of a VIE has both of the following characteristics: (1) the power to direct the activities of the VIE that most significantly impact its economic performance; and (2) the obligation to absorb losses of the VIE that could potentially be significant to the VIE or the right to receive benefits from the VIE that could be significant to the VIE. If both characteristics are met, the Company considers itself to be the primary beneficiary and therefore will consolidate that VIE into its consolidated financial statements.
The Company determines whether it is the primary beneficiary of a VIE upon initial involvement with a VIE and reassesses whether it is the primary beneficiary of a VIE on an ongoing basis. The determination of whether an entity is a VIE and whether the Company is the primary beneficiary of a VIE is based upon facts and circumstances for the VIE and requires significant judgments such as whether the entity is a VIE, whether the Company’s interest in a VIE is a variable interest, the determination of the activities that most significantly impact the economic performance of the entity, whether the Company controls those activities, and whether the Company has the obligation to absorb losses of the VIE or the right to receive benefits from the VIE that could be significant to the VIE.
40
Table of Contents
The Company evaluated its investment in Nautilus under the VIE guidance, which requires management to exercise significant judgment. Due to the initial nature of the joint venture and the continued commitment for additional financing, the Company determined Nautilus is a VIE. While the Company has the ability to exercise significant influence over Nautilus, the Company has determined that it does not have the power to direct the activities that most significantly impact the economic performance of Nautilus. The power to direct the activities of Nautilus that most significantly impact Nautilus’ economic performance are shared equally by both parties within the joint venture due to the requirement for both equity holders to approve many of the key operating decisions and when not equally shared, are predominantly under the control of the co-venturer, including through the co-venturer’s majority representation on the board of managers. As such, the Company has determined that it is not the primary beneficiary of Nautilus and, therefore, has accounted for this entity under the equity method of accounting. Risks associated with the Company’s involvement with Nautilus include a commitment to fund additional equity investments.
Issuance of Debt with Common Stock
On December 1, 2021, TeraCub entered into a Loan, Guaranty and Security Agreement with Wilmington Trust, National Association as administrative agent (the “LGSA”). The LGSA consists of a $123.5 million term loan facility. In connection with the LGSA, the Company issued to the holders of the Term Loan 839,398 shares of common stock, which is a quantity of common stock representing 1.5% of the outstanding shares of the publicly registered shares of TeraWulf subsequent to the Closing. The allocation of proceeds between the debt instrument and any other components included in the debt issuance, including common stock, is generally based on the relative fair value allocation method. In applying the relative fair value allocation method, the determination of the fair value of the common stock issued and the fair value of the Term Loan independent of the common stock issued requires significant judgment. As a measure of sensitivity, a 10% change in the estimated fair value of the Term Loan component would result in a $1.9 million change in the fair value allocated to each of the Term Loan and equity components.
Income Taxes
The Company accounts for income taxes pursuant to the provision of Accounting Standards Codification (“ASC”) 740-10, “Accounting for Income Taxes” which requires, among other things, an asset and liability approach to calculating deferred income taxes. The asset and liability approach requires the recognition of deferred tax assets and liabilities for the expected future tax consequences of temporary differences between the carrying amounts and the tax bases of assets and liabilities. A valuation allowance is provided to offset any net deferred tax assets for which management believes it is more likely than not that the net deferred tax asset will not be realized. The Company follows the provision of the ASC 740-10 related to Accounting for Uncertain Income Tax Positions. When tax returns are filed, it is more likely than not that some positions taken would be sustained upon examination by the taxing authorities, while others are subject to uncertainty about the merits of the position taken or the amount of the position that would be ultimately sustained. In accordance with the guidance of ASC 740-10, the benefit of a tax position is recognized in the financial statements in the period during which, based on all available evidence, management believes it is more likely that not that the position will be sustained upon examination, including the resolution of appeals or litigation processes, if any. Tax positions taken are not offset or aggregated with other positions. The tax benefits recognized in the consolidated financial statements from such positions are then measured based on the largest benefit that has a greater than 50% likelihood of being realized upon settlement with the applicable taxing authority. The portion of the benefits associated with the tax positions taken that exceeds the amount measured as described above should be reflected as a liability for uncertain tax benefits in the Company’s balance sheets along with any associated interest and penalties that would be payable to the taxing authorities upon examination. The most critical estimate for income taxes is the determination of whether to record a valuation allowance for any net deferred tax asset, including net loss carryforwards, whereby management must estimate whether it is more likely than not that the deferred tax asset would be realized.
Business Combinations
The Company includes the results of operations of the businesses that it acquires as of the acquisition date. The Company allocates the purchase price of the acquisitions to the assets acquired and liabilities assumed based on their estimated fair values. The excess of the purchase price over the fair values of identifiable assets and liabilities is recorded as goodwill. Contingent consideration is included within the purchase price and is recognized at its fair value on the acquisition date. A liability resulting from contingent consideration is remeasured to fair value as of each reporting date until the contingency is resolved, and subsequent changes in fair value are recognized in earnings. Contingent consideration is recorded in current liabilities in the Company’s consolidated balance sheets.
41
Table of Contents
While the Company uses its best estimates and assumptions to accurately apply preliminary values to assets acquired and liabilities assumed at the acquisition date as well as contingent consideration, where applicable, these estimates are inherently uncertain and subject to refinement. As a result, during the measurement period, which may be up to one year from the acquisition date, the Company records adjustments to the assets acquired and liabilities assumed with the corresponding offset to goodwill. Upon the conclusion of the measurement period or final determination of the values of the assets acquired or liabilities assumed, whichever comes first, any subsequent adjustments are recorded in the consolidated statements of operations. Accounting for business combinations requires management to make significant estimates and assumptions, especially at the acquisition date, including estimates for intangible assets, contractual obligations assumed, pre-acquisition contingencies, and contingent consideration, where applicable. Although the Company believes the assumptions and estimates it has made have been reasonable and appropriate, they are based in part on historical experience and information obtained from management of the acquired companies and are inherently uncertain. Critical estimates in valuing certain of the intangible assets acquired include; future expected cash flows, estimated market royalty rates, customer attrition rates, cost of developed technology and discount rates. Unanticipated events and circumstances may occur that may affect the accuracy or validity of such assumptions, estimates, or actual results. As a measure of sensitivity, at December 31, 2021 a change in estimated net fair value of acquired assets and assumed liabilities of IKONICS of 10% would result in a change of $1.8 million to the impairment on held-for-sale classification included in loss from discontinued operations, net in the consolidated statement of operations for the nine months ended December 31, 2021.
Acquisition-related expenses are recognized separately from the business combination and are expensed as incurred.
Held for Sale and Discontinued Operations Classification
The Company classifies a business as held for sale in the period in which management commits to a plan to sell the business, the business is available for immediate sale in its present condition, an active program to complete the plan to sell the business is initiated, the sale of the business within one year is probable and the business is being marketed at a reasonable price in relation to its fair value. As a measure of sensitivity, the classification of the IKONICS business as held-for-sale resulted in a $48.9 million impairment charge included in loss from discontinued operations, net in the consolidated statement of operations for the nine months ended December 31, 2021. If held-for-sale classification accounting had not been applied, the acquired goodwill would have been evaluated for impairment with an alternate potential impairment charge applied.