Risk Factors
Read NFE's verbatim Item 1A Risk Factors from its latest 10-K: Risk Factors.
Selected Fundamentals
| Metric | Value | Unit | FY | Filed |
|---|---|---|---|---|
| Revenue | 1,504,037,000 | USD | 2025 | 2026-04-13 |
| Net income | -1,831,953,000 | USD | 2025 | 2026-04-13 |
| Assets | 10,555,623,000 | USD | 2025 | 2026-04-13 |
Financials
Annual standardized facts from SEC companyfacts as of latest extracted filing date 2026-04-13. Source: https://data.sec.gov/api/xbrl/companyfacts/CIK0001749723.json. Derived margins, ratios, and free cash flow are computed from the extracted annual SEC facts.
| Metric | 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 |
|---|---|---|---|---|---|---|---|---|---|
| Revenue | 97,262,000 | 112,301,000 | 189,125,000 | 451,650,000 | 1,322,810,000 | 2,368,272,000 | 2,390,605,000 | 2,358,944,000 | 1,504,037,000 |
| Net income | -31,671,000 | -78,182,000 | -204,319,000 | -263,965,000 | 92,711,000 | 184,786,000 | 548,224,000 | -244,537,000 | -1,831,953,000 |
| Operating income | -24,990,000 | -58,488,000 | -187,275,000 | -155,358,000 | 238,878,000 | 737,380,000 | 935,651,000 | 528,479,000 | -1,120,414,000 |
| Diluted EPS | -1.62 | -1.71 | 0.47 | 0.93 | 2.65 | -1.26 | -6.63 | ||
| Operating cash flow | -54,892,000 | -93,227,000 | -234,261,000 | -125,566,000 | 84,770,000 | 355,111,000 | 818,579,000 | 602,206,000 | -583,382,000 |
| Capital expenditures | 28,727,000 | 181,151,000 | 377,051,000 | 156,995,000 | 669,348,000 | 1,174,008,000 | 2,919,768,000 | 2,130,641,000 | 650,811,000 |
| Dividends paid | 0.00 | 0.00 | 33,742,000 | 88,756,000 | 99,050,000 | 723,962,000 | 65,310,000 | 3,472,000 | |
| Assets | 699,402,000 | 1,123,814,000 | 1,908,091,000 | 6,876,492,000 | 7,705,082,000 | 10,513,437,000 | 12,923,225,000 | 10,555,623,000 | |
| Liabilities | 416,755,000 | 736,490,000 | 1,533,005,000 | 4,882,438,000 | 6,263,223,000 | 8,735,661,000 | 10,831,954,000 | 10,245,992,000 | |
| Stockholders' equity | 84,805,000 | 366,959,000 | 1,791,575,000 | 1,289,820,000 | 1,640,001,000 | 1,878,041,000 | 182,647,000 | ||
| Cash and cash equivalents | 78,301,000 | 27,098,000 | 601,522,000 | 187,509,000 | 675,492,000 | 155,414,000 | 492,881,000 | 226,453,000 | |
| Free cash flow | -83,619,000 | -274,378,000 | -611,312,000 | -282,561,000 | -584,578,000 | -818,897,000 | -2,101,189,000 | -1,528,435,000 | -1,234,193,000 |
Ratios
| Metric | 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 |
|---|---|---|---|---|---|---|---|---|---|
| Net margin | -32.56% | -69.62% | -108.03% | -58.44% | 7.01% | 7.80% | 22.93% | -10.37% | -121.80% |
| Operating margin | -25.69% | -52.08% | -99.02% | -34.40% | 18.06% | 31.14% | 39.14% | 22.40% | -74.49% |
| Return on equity | -240.93% | -71.93% | 5.17% | 14.33% | 33.43% | -13.02% | |||
| Return on assets | -11.18% | -18.18% | -13.83% | 1.35% | 2.40% | 5.21% | -1.89% | -17.36% | |
| Liabilities / equity | 8.68 | 4.18 | 2.73 | 4.86 | 5.33 | 5.77 | 56.10 | ||
| Current ratio | 0.38 | 2.06 | 3.99 | 1.04 | 0.98 | 0.58 | 0.92 | 0.15 |
Industry Peer Context
Net margin peer context
Operating margin peer context
ROE peer context
ROA peer context
Financial Bridges
Free cash flow = operating cash flow - capital expenditures
Figure provenance: SEC companyfacts FY 2025. Operating cash flow: accession 0001749723-26-000032; concept NetCashProvidedByUsedInOperatingActivities; source concepts us-gaap:NetCashProvidedByUsedInOperatingActivities | Capital expenditures: accession 0001749723-26-000032; concept PaymentsToAcquirePropertyPlantAndEquipment; source concepts us-gaap:PaymentsToAcquirePropertyPlantAndEquipment | Free cash flow: accession 0001749723-26-000032; concept NetCashProvidedByUsedInOperatingActivities - PaymentsToAcquirePropertyPlantAndEquipment; source concepts us-gaap:NetCashProvidedByUsedInOperatingActivities; us-gaap:PaymentsToAcquirePropertyPlantAndEquipment
Financial Charts
Figure provenance: SEC companyfacts. Latest point: FY 2025 ended 2025-12-31; accession 0001749723-26-000032; filed 2026-04-13. Concept: Revenues. Source concepts: us-gaap:Revenues.
Figure provenance: SEC companyfacts. Latest point: FY 2025 ended 2025-12-31; accession 0001749723-26-000032; filed 2026-04-13. Concept: ProfitLoss. Source concepts: us-gaap:ProfitLoss.
Figure provenance: SEC companyfacts. Latest point: FY 2025 ended 2025-12-31; accession 0001749723-26-000032; filed 2026-04-13. Concept: OperatingIncomeLoss. Source concepts: us-gaap:OperatingIncomeLoss.
Figure provenance: SEC companyfacts. Latest point: FY 2025 ended 2025-12-31; accession 0001749723-26-000032; filed 2026-04-13. Concept: EarningsPerShareDiluted. Source concepts: us-gaap:EarningsPerShareDiluted.
Figure provenance: SEC companyfacts. Latest point: FY 2025 ended 2025-12-31; accession 0001749723-26-000032; filed 2026-04-13. Concept: NetCashProvidedByUsedInOperatingActivities. Source concepts: us-gaap:NetCashProvidedByUsedInOperatingActivities.
Figure provenance: SEC companyfacts. Latest point: FY 2025 ended 2025-12-31; accession 0001749723-26-000032; filed 2026-04-13. Concept: PaymentsToAcquirePropertyPlantAndEquipment. Source concepts: us-gaap:PaymentsToAcquirePropertyPlantAndEquipment.
Figure provenance: SEC companyfacts. Latest point: FY 2025 ended 2025-12-31; accession 0001749723-26-000032; filed 2026-04-13. Concept: PaymentsOfDividends. Source concepts: us-gaap:PaymentsOfDividends.
Figure provenance: SEC companyfacts. Latest point: FY 2025 ended 2025-12-31; accession 0001749723-26-000032; filed 2026-04-13. Concept: Assets. Source concepts: us-gaap:Assets.
Figure provenance: SEC companyfacts. Latest point: FY 2025 ended 2025-12-31; accession 0001749723-26-000032; filed 2026-04-13. Concept: Liabilities. Source concepts: us-gaap:Liabilities.
Figure provenance: SEC companyfacts. Latest point: FY 2025 ended 2025-12-31; accession 0001749723-26-000032; filed 2026-04-13. Concept: StockholdersEquity. Source concepts: us-gaap:StockholdersEquity.
Figure provenance: SEC companyfacts. Latest point: FY 2025 ended 2025-12-31; accession 0001749723-26-000032; filed 2026-04-13. Concept: CashAndCashEquivalentsAtCarryingValue. Source concepts: us-gaap:CashAndCashEquivalentsAtCarryingValue.
Figure provenance: SEC companyfacts. Latest point: FY 2025 ended 2025-12-31; accession 0001749723-26-000032; filed 2026-04-13. Concept: NetCashProvidedByUsedInOperatingActivities - PaymentsToAcquirePropertyPlantAndEquipment. Source concepts: us-gaap:NetCashProvidedByUsedInOperatingActivities; us-gaap:PaymentsToAcquirePropertyPlantAndEquipment.
Quarterly
Quarterly standardized facts from SEC companyfacts as of latest extracted filing date 2026-05-14. Source: https://data.sec.gov/api/xbrl/companyfacts/CIK0001749723.json.
| Quarter | End Date | Revenue | Net Income | Diluted EPS | Method |
|---|---|---|---|---|---|
| 2022-Q2 | 2022-06-30 | -0.81 | reported discrete quarter | ||
| 2022-Q3 | 2022-09-30 | 0.29 | reported discrete quarter | ||
| 2023-Q1 | 2023-03-31 | 0.71 | reported discrete quarter | ||
| 2023-Q2 | 2023-03-31 | 151,566,000 | reported discrete quarter | ||
| 2023-Q2 | 2023-06-30 | 561,345,000 | 0.58 | reported discrete quarter | |
| 2023-Q3 | 2023-06-30 | 120,100,000 | reported discrete quarter | ||
| 2023-Q3 | 2023-09-30 | 514,462,000 | 0.30 | reported discrete quarter | |
| 2023-Q4 | 2023-12-31 | 758,358,000 | 214,872,000 | derived Q4 = FY annual - nine-month YTD | |
| 2024-Q1 | 2024-03-31 | 690,321,000 | 56,670,000 | 0.26 | reported discrete quarter |
| 2024-Q2 | 2024-03-31 | 56,670,000 | reported discrete quarter | ||
| 2024-Q2 | 2024-06-30 | 428,006,000 | -0.44 | reported discrete quarter | |
| 2024-Q3 | 2024-06-30 | -86,860,000 | reported discrete quarter | ||
| 2024-Q3 | 2024-09-30 | 567,535,000 | 0.03 | reported discrete quarter | |
| 2024-Q4 | 2024-12-31 | 678,998,000 | -223,510,000 | derived Q4 = FY annual - nine-month YTD | |
| 2025-Q1 | 2025-03-31 | 470,536,000 | -197,373,000 | -0.73 | reported discrete quarter |
| 2025-Q2 | 2025-03-31 | -197,373,000 | reported discrete quarter | ||
| 2025-Q2 | 2025-06-30 | 301,692,000 | -2.02 | reported discrete quarter | |
| 2025-Q3 | 2025-06-30 | -556,827,000 | reported discrete quarter | ||
| 2025-Q3 | 2025-09-30 | 327,367,000 | -1.07 | reported discrete quarter | |
| 2025-Q4 | 2025-12-31 | 404,442,000 | -784,397,000 | derived Q4 = FY annual - nine-month YTD | |
| 2026-Q1 | 2026-03-31 | 226,953,000 | -400,604,000 | -1.40 | reported discrete quarter |
Quarterly Charts
Figure provenance: SEC companyfacts. Latest point: FY 2026 ended 2026-03-31; accession 0001749723-26-000062; filed 2026-05-14. Concept: Revenues. Source concepts: us-gaap:Revenues.
Figure provenance: SEC companyfacts. Latest point: FY 2026 ended 2026-03-31; accession 0001749723-26-000062; filed 2026-05-14. Concept: ProfitLoss. Source concepts: us-gaap:ProfitLoss.
Figure provenance: SEC companyfacts. Latest point: FY 2026 ended 2026-03-31; accession 0001749723-26-000062; filed 2026-05-14. Concept: EarningsPerShareDiluted. Source concepts: us-gaap:EarningsPerShareDiluted.
Macro Cross-References
- CPIAUCSL - Consumer Price Index for All Urban Consumers: All Items in U.S. City Average
- UNRATE - Unemployment Rate
- FEDFUNDS - Federal Funds Effective Rate
- CES0500000003 - Average Hourly Earnings of All Employees, Total Private
- DFEDTARU - Federal Funds Target Range - Upper Limit
- DFEDTARL - Federal Funds Target Range - Lower Limit
- DGS3MO - Market Yield on U.S. Treasury Securities at 3-Month Constant Maturity
- DGS2 - Market Yield on U.S. Treasury Securities at 2-Year Constant Maturity
- DGS10 - Market Yield on U.S. Treasury Securities at 10-Year Constant Maturity
- DGS30 - Market Yield on U.S. Treasury Securities at 30-Year Constant Maturity
- T10Y2Y - 10-Year Treasury Constant Maturity Minus 2-Year Treasury Constant Maturity
- CPILFESL - Consumer Price Index for All Urban Consumers: All Items Less Food and Energy
- CPIUFDSL - Consumer Price Index for All Urban Consumers: Food
- CPIENGSL - Consumer Price Index for All Urban Consumers: Energy
- CUSR0000SAH1 - Consumer Price Index for All Urban Consumers: Shelter
- PCEPI - Personal Consumption Expenditures: Chain-type Price Index
- PCEPILFE - Personal Consumption Expenditures Excluding Food and Energy: Chain-type Price Index
- PPIACO - Producer Price Index by Commodity: All Commodities
- T10YIE - 10-Year Breakeven Inflation Rate
- U6RATE - Total Unemployed, Plus All Marginally Attached Workers Plus Total Employed Part Time for Economic Reasons
- PAYEMS - All Employees, Total Nonfarm
- CIVPART - Labor Force Participation Rate
- EMRATIO - Employment-Population Ratio
- UNEMPLOY - Unemployed
- CE16OV - Employment Level
- ICSA - Initial Claims
- JTSJOL - Job Openings: Total Nonfarm
- JTSQUR - Quits: Total Nonfarm
- GDPC1 - Real Gross Domestic Product
- A191RL1Q225SBEA - Real Gross Domestic Product: Percent Change from Preceding Period
- INDPRO - Industrial Production: Total Index
- TCU - Capacity Utilization: Total Index
- HOUST - New Privately-Owned Housing Units Started: Total Units
- PERMIT - New Privately-Owned Housing Units Authorized in Permit-Issuing Places: Total Units
- RSAFS - Advance Retail Sales: Retail Trade
- PCE - Personal Consumption Expenditures
- DSPIC96 - Real Disposable Personal Income
- PSAVERT - Personal Saving Rate
- M2SL - M2
- BOPGSTB - U.S. International Trade in Goods and Services: Balance
- MSPUS - Median Sales Price of Houses Sold for the United States
- HSN1F - New One Family Houses Sold: United States
- RHORUSQ156N - Homeownership Rate in the United States
- TTLCONS - Total Construction Spending: Total Construction in the United States
- RRVRUSQ156N - Rental Vacancy Rate in the United States
- TOTALSL - Total Consumer Credit Owned and Securitized
- REVOLSL - Revolving Consumer Credit Owned and Securitized
- DRCCLACBS - Delinquency Rate on Credit Card Loans, All Commercial Banks
- GDP - Gross Domestic Product
- GPDI - Gross Private Domestic Investment
- GCE - Government Consumption Expenditures and Gross Investment
- PCEC - Personal Consumption Expenditures
- NETEXP - Net Exports of Goods and Services
- GFDEBTN - Federal Debt: Total Public Debt
- GFDEGDQ188S - Federal Debt: Total Public Debt as Percent of Gross Domestic Product
- FYFSD - Federal Surplus or Deficit
- FGRECPT - Federal Government Current Receipts
- FGEXPND - Federal Government: Current Expenditures
- MANEMP - All Employees, Manufacturing
- USCONS - All Employees, Construction
- USTRADE - All Employees, Retail Trade
- USFIRE - All Employees, Financial Activities
- USGOVT - All Employees, Government
- AWHAETP - Average Weekly Hours of All Employees, Total Private
- DGORDER - Manufacturers' New Orders: Durable Goods
- NEWORDER - Manufacturers' New Orders: Nondefense Capital Goods Excluding Aircraft
- BUSINV - Total Business Inventories
- EXPGS - Exports of Goods and Services
- IMPGS - Imports of Goods and Services
- IR - Import Price Index (End Use): All Commodities
- PPIFIS - Producer Price Index by Commodity: Final Demand
Latest quarter (10-Q)
Latest 10-Q source: 0001749723-26-000062.
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations.
Certain information contained in the following discussion and analysis, including information with respect to our plans, strategy, projections and expected timeline for our business and related financing, includes forward-looking statements. Forward-looking statements are estimates based upon current information and involve a number of risks and uncertainties. Actual events or results may differ materially from the results anticipated in these forward-looking statements as a result of a variety of factors.
You should read “Part 1, Item 1A. Risk Factors” and “Cautionary Statement on Forward-Looking Statements” elsewhere in this Quarterly Report on Form 10-Q (“Quarterly Report”) and under similar headings in the Annual Report on Form 10-K for the year ended December 31, 2025 (our “Annual Report”) for a discussion of important factors that could cause actual results to differ materially from the results described in or implied by the forward-looking statements contained in the following discussion and analysis.
The following information should be read in conjunction with our unaudited condensed consolidated financial statements and accompanying notes included elsewhere in this Quarterly Report. Our financial statements have been prepared in accordance with generally accepted accounting principles in the United States of America (“GAAP”). This information is intended to provide investors with an understanding of our past performance and our current financial condition and is not necessarily indicative of our future performance. Please refer to “—Factors Impacting Comparability of Our Financial Results” for further discussion. Unless otherwise indicated, dollar amounts are presented in millions.
Unless the context otherwise requires, references to “Company,” “NFE,” “we,” “our,” “us” or like terms refer to New Fortress Energy Inc. and its subsidiaries.
Overview
Liquidity and going concern
As part of preparing the financial statements included in this Quarterly Report, we have evaluated whether conditions exist that give rise to substantial doubt as to our ability to continue as a going concern. Due to the events of default under our debt agreements detailed below, management has concluded that there is substantial doubt as to our ability to continue as a going concern. On March 17, 2026, we entered into the RSA with certain lenders and noteholders under each of these facilities, and upon completion of the transactions contemplated in this agreement, we expect to have a new capital structure and the current debt facilities in default will no longer be outstanding. Existing and potential events of default include missed interest payments under the New 2029 Notes, Term Loan B Credit Agreement, Term Loan A Credit Agreement, 2026 Notes, 2029 Notes and Revolving Credit Agreement and other Specified Defaults (as defined in the RSA), as described in the RSA, which are subject to forbearance in accordance with the RSA.
Restructuring Support Agreement and Restructuring Transaction
In response to the Company’s ongoing liquidity challenges, and the events of default under the Company’s indentures and credit agreement, on March 17, 2026, the Company entered into a RSA with the Supporting Creditors, including a majority of the holders of the New 2029 Notes, a majority of the lenders under the Term Loan B Credit Agreement and a majority of the lenders under the Revolving Facility. The RSA provides a framework for a comprehensive restructuring transaction designed to address the Company’s capital structure and restore financial stability. Under the terms of the RSA, the holders of the New 2029 Notes, holders of debt under the R-2 Revolving Credit Facility and the holders of the debt under the Term Loan A Credit Agreement, as applicable, will receive 100% of the common equity interests of NFE Brazil Holdings, the parent company of NFE’s Brazil business expected to be separated in connection with the restructuring. In addition, the Supporting Creditors will receive one or a combination of the following: senior secured term loans, non-recourse term loans secured by the Company’s Fast LNG assets, shares of a new class of NFE’s preferred stock as well as shares of NFE’s Class A common stock, and shares of FLNG 2 preferred stock. Certain lenders have also agreed to provide the Company with incremental funding in exchange for additional term loans or additional letter of credit facility capacity to support ongoing operations and liquidity needs.
33
Table of Contents
In connection with the Restructuring Transaction, NFE expects to divest its Brazil business, including the Barcarena Facility, Barcarena Power Plant, Santa Catarina Facility, and PortoCem Power Plant. The effectuation of the restructuring will result in a significant reduction of the Company’s outstanding debt and annual interest expense, as the debt facilities currently in default will no longer be outstanding. The Company’s future business will be focused on operational efficiency of its remaining facilities and the cost-effective completion of in-process development projects, with the objective of returning to profitability and generating shareholder value. However, the consummation of the Restructuring Transaction is subject to a number of conditions and approvals, some of which are outside the Company’s control, and there can be no assurance that the transactions will be completed as contemplated. If the restructuring is not successfully implemented, the Company would be required or compelled to pursue alternative in-court restructuring initiatives to preserve value, which would have a material adverse impact on stakeholders and likely result in no recovery to stockholders.
For further discussion of the RSA, the Restructuring Plans and the Restructuring Transaction, see Note 2 of our condensed consolidated financial statements.
Business overview
We are a global energy infrastructure company founded to help address energy poverty and accelerate the world’s transition to reliable, affordable and clean energy. We own and operate natural gas and liquefied natural gas (“LNG”) infrastructure, and an integrated fleet of ships and logistics assets to rapidly deliver turnkey energy solutions to global markets. Collectively, our assets and operations reinforce global energy security, enable economic growth, enhance environmental stewardship and transform local industries and communities around the world.
Our chief operating decision maker makes resource allocation decisions and assesses performance on the basis of two operating segments, Terminals and Infrastructure and Ships.
Our Terminals and Infrastructure segment includes the entire production and delivery chain from natural gas procurement and liquefaction to logistics, shipping, facilities and conversion or development of natural gas-fired power generation. Our first floating liquefaction unit, which we refer to as “FLNG 1”, began producing LNG in July 2024, and we source a significant portion of our LNG needs from this facility. Currently, demand for LNG above FLNG 1’s capacity is acquired from third-party suppliers in open market purchases. Starting in 2027, we expect to meet this demand under long-term supply contracts, which are based on an index such as Henry Hub plus a fixed fee component. The Terminals and Infrastructure segment includes all terminal operations in Puerto Rico, Mexico and Brazil, as well as vessels utilized in our terminal or logistics operations. We centrally manage our LNG supply and the deployment of our vessels utilized in our terminal, logistics or sub-charter operations, which allows us to optimally manage our LNG supply and fleet.
Our Ships segment currently includes one vessel which is currently chartered under a long-term arrangement to a third party and is part of the Energos Formation Transaction (defined below). Vessels that have been in our Ships segment transitioned to the Terminals and Infrastructure segment once we began to utilize the vessels in our own operations.
Our Current Operations – Terminals and Infrastructure
Our management team has successfully employed our strategy to secure long-term contracts with significant customers, including, the Puerto Rico Electric Power Authority (“PREPA”), and Comisión Federal de Electricidad (“CFE”), Mexico’s power utility, each of which is described in more detail below. Our assets built to service these significant customers have been designed with capacity to service other customers.
San Juan Facility
Our San Juan Facility became fully operational in the third quarter of 2020. It is designed as a landed micro-fuel handling facility located in the Port of San Juan, Puerto Rico. The San Juan Facility has multiple truck loading bays to provide LNG to on-island industrial users. The San Juan Facility is near the PREPA San Juan Power Plant and serves as our supply hub for the PREPA San Juan Power Plant and industrial end-user customers in Puerto Rico.
In December 2025, we were awarded a new 7-year gas supply agreement with PREPA to deliver up to 75 TBtu of natural gas annually from our San Juan Facility. The new contract establishes security of supply in San Juan for power plants currently running on natural gas and also provides for incremental natural gas volumes to be delivered, allowing for
34
Table of Contents
the conversion of additional gas-ready plants currently burning diesel. We do not expect to have to incur significant capital expenditures to be able to supply these additional locations.
We continue to provide operation and maintenance services for PREPA’s thermal generation assets through our wholly-owned subsidiary, Genera PR LLC ("Genera"), with the goal of reducing costs and improving reliability of power generation in Puerto Rico. The service period under the contract commenced on July 1, 2023, and we receive an annual management fee for the services provided.
La Paz Facility
In 2021, we began commercial operations at the Port of Pichilingue in Baja California Sur, Mexico (the “La Paz Facility”). The La Paz Facility also supplies our gas-fired power units located adjacent to the La Paz Facility (the “La Paz Power Plant”) and could have a maximum capacity of up to 135 MW of power. We placed the La Paz Power Plant into service in the third quarter of 2023.
In the third quarter of 2024, we executed an amendment to the gas sales agreement to multiple CFE power generation facilities in Baja California Sur on a take-or-pay basis that extended the term to ten years from November 3, 2024, and amended the annual minimum volumes.
Santa Catarina Facility
We placed our Santa Catarina Facility in service in the fourth quarter of 2024. The Santa Catarina Facility is located on the southern coast of Brazil. We have developed and constructed a 33-kilometer, 20-inch pipeline that connects the Santa Catarina Facility to the existing inland Transportadora Brasileira Gasoduto Bolivia-Brasil S.A. (“TBG”) pipeline via an interconnection point in the municipality of Garuva. The Santa Catarina Facility and associated pipeline are expected to have a total addressable market of 15 million cubic meters per day of natural gas. In March 2026, the Company entered into a term sheet to lease its Santa Catarina Facility to a third party that is expected to commence in August 2026.
In August 2024, we acquired 100% of the outstanding equity interest of Usina Termeletrica de Lins S.A. (“Lins”), which owns key rights and permits to develop a natural gas-fired power plant for up to 2.05 GW located in the State of São Paulo, within the city limits of Lins. The Santa Catarina Facility will supply natural gas to the Lins power project, and is expected to commence operations in 2031.
Upon effectuation of the Restructuring Transaction, we expect to no longer own BrazilCo, including the Santa Catarina Faci
[Excerpt truncated for page length; source filing is linked above.]
Latest 10-K MD&A
Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations.
Certain information contained in the following discussion and analysis, including information with respect to our plans, strategy, projections and expected timeline for our business and related financing, includes forward-looking statements. Forward-looking statements are estimates based upon current information and involve a number of risks and uncertainties. Actual events or results may differ materially from the results anticipated in these forward-looking statements as a result of a variety of factors.
You should read “Part 1, Item 1A. Risk Factors” and “Cautionary Statement on Forward-Looking Statements” elsewhere in this Annual Report on Form 10-K (“Annual Report”) for a discussion of important factors that could cause actual results to differ materially from the results described in or implied by the forward-looking statements contained in the following discussion and analysis.
The comparison of the years ended December 31, 2024 and 2023 can be found in our Annual Report on Form 10-K for the year ended December 31, 2024 located within “Part II, Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations.”
The accompanying Management’s Discussion and Analysis of Financial Condition and Results of Operations gives effect to the restatement of our previously issued audited consolidated financial statements for the years ended December 31, 2024 and December 31, 2023 and our previously issued unaudited consolidated financial statements for each of the interim periods ended March 31, 2024, June 30, 2024, September 30, 2024, March 31, 2025, June 30, 2025, and September 30, 2025. Please refer to “—Recent Developments—Restatement of Previously Issued Financial Statements” and Note 1 and Note 33 of our notes to the consolidated financial statements included in this Annual Report for further discussion.
The following information should be read in conjunction with our audited consolidated financial statements and accompanying notes included elsewhere in this Annual Report. Our financial statements have been prepared in accordance with generally accepted accounting principles in the United States of America (“GAAP”). This information is intended to provide investors with an understanding of our past performance and our current financial condition and is not necessarily indicative of our future performance. Please refer to “—Factors Impacting Comparability of Our Financial Results” for further discussion. Unless otherwise indicated, dollar amounts are presented in millions.
Unless the context otherwise requires, references to “Company,” “NFE,” “we,” “our,” “us” or like terms refer to New Fortress Energy Inc. and its subsidiaries.
Overview
Liquidity and going concern
As part of preparing the financial statements included in this Annual Report, we have evaluated whether conditions exist that give rise to substantial doubt as to our ability to continue as a going concern. Due to the events of default under our debt agreements detailed below, management has concluded that there is substantial doubt as to our ability to continue as a going concern. On March 17, 2026, we entered into the RSA with certain lenders and noteholders under each of these facilities, and upon completion of the transactions contemplated in this agreement, we expect to have a new capital structure and the current debt facilities in default will no longer be outstanding. Existing and potential events of default include missed interest payments under the New 2029 Notes, Term Loan B Credit Agreement, Term Loan A Credit Agreement and Revolving Credit Agreement and other Specified Defaults (as defined in the RSA), as described in the RSA, which are subject to forbearance in accordance with the RSA. Additionally, the Company did not make interest and
67
Table of Contents
principal payments due in the fiscal quarter ended March 31, 2026 on the 2026 Notes and the 2029 Notes, which will result in events of default under each series of notes if not cured within 30 days.
Restructuring Support Agreement and Restructuring Transaction
In response to the Company’s ongoing liquidity challenges, and the events of default under the Company’s indentures and credit agreement, on March 17, 2026, the Company entered into a RSA with the Supporting Creditors, including a majority of the holders of the New 2029 Notes, a majority of the lenders under the Term Loan B Credit Agreement and a majority of the lenders under the Revolving Facility. The RSA provides a framework for a comprehensive restructuring transaction designed to address the Company’s capital structure and restore financial stability. Under the terms of the RSA, the holders of the New 2029 Notes will receive 100% of the common equity interests of BrazilCo, the parent company of NFE’s Brazil business, in exchange for the retirement of all New 2029 Notes. In addition, the Supporting Creditors will receive one or a combination of the following: senior secured term loans, non-recourse term loans secured by the Company’s Fast LNG assets, shares of a new class of NFE’s preferred stock as well as shares of NFE’s Class A common stock, and shares of FLNG 2 preferred stock. Certain lenders have also agreed to provide the Company with incremental funding in exchange for additional term loans or additional letter of credit facility capacity to support ongoing operations and liquidity needs.
Upon completion of the Restructuring Transaction, NFE expects to divest its Brazil business, including the Barcarena Facility, Barcarena Power Plant, Santa Catarina Facility, and PortoCem Power Plant. The effectuation of the restructuring will result in a significant reduction of the Company’s outstanding debt and annual interest expense, as the debt facilities currently in default will no longer be outstanding. The Company’s future business will be focused on operational efficiency of its remaining facilities and the cost-effective completion of in-process development projects, with the objective of returning to profitability and generating shareholder value. However, the consummation of the Restructuring Transaction is subject to a number of conditions and approvals, some of which are outside the Company’s control, and there can be no assurance that the transactions will be completed as contemplated. If the restructuring is not successfully implemented, the Company may be required to pursue alternative restructuring initiatives, including possible in-court proceedings, which could have a material adverse impact on stakeholders.
For further discussion of the RSA, the Restructuring Plans and the Restructuring Transaction, see “Items 1 and 2. Business and Properties—Planned Debt Restructuring.”
Business overview
We are a global energy infrastructure company founded to help address energy poverty and accelerate the world’s transition to reliable, affordable and clean energy. We own and operate natural gas and liquefied natural gas (“LNG”) infrastructure, and an integrated fleet of ships and logistics assets to rapidly deliver turnkey energy solutions to global markets. Collectively, our assets and operations reinforce global energy security, enable economic growth, enhance environmental stewardship and transform local industries and communities around the world.
Our chief operating decision maker makes resource allocation decisions and assesses performance on the basis of two operating segments, Terminals and Infrastructure and Ships.
Our Terminals and Infrastructure segment includes the entire production and delivery chain from natural gas procurement and liquefaction to logistics, shipping, facilities and conversion or development of natural gas-fired power generation. Our first floating liquefaction unit, which we refer to as “FLNG 1”, began producing LNG in July 2024, and we source a significant portion of our LNG needs from this facility. Currently, demand for LNG above FLNG 1’s capacity is acquired from third party suppliers in open market purchases. Starting in 2027, we expect to meet this demand under long-term supply contracts, which are based on an index such as Henry Hub plus a fixed fee component. The Terminals and Infrastructure segment includes all terminal operations in Puerto Rico, Mexico and Brazil, as well as vessels utilized in our terminal or logistics operations. We centrally manage our LNG supply and the deployment of our vessels utilized in our terminal, logistics or sub-charter operations, which allows us to optimally manage our LNG supply and fleet.
Our Ships segment currently includes one vessel which is currently chartered under a long-term arrangement to a third party and is part of the Energos Formation Transaction (defined below). Vessels that have been in our Ships segment transitioned to the Terminals and Infrastructure segment once we began to utilize the vessels in our own operations.
On May 14, 2025, we completed the sale of our Jamaica business, including operations at the LNG import terminal in Montego Bay, the offshore floating storage and regasification terminal in Old Harbour and the 150 MW Combined Heat
68
Table of Contents
and Power Plant in Clarendon, along with the associated infrastructure (the “Jamaica Business”). We received cash proceeds of approximately $961.9 million, with an additional $58.0 million of proceeds held in escrow to be returned to us based on the terms of the sale agreement. The proceeds were partially used to repay all outstanding South Power Bonds of $227.2 million and certain transaction costs.
Our Current Operations – Terminals and Infrastructure
Our management team has successfully employed our strategy to secure long-term contracts with significant customers, including, the Puerto Rico Electric Power Authority (“PREPA”), and Comisión Federal de Electricidad (“CFE”), Mexico’s power utility, each of which is described in more detail below. Our assets built to service these significant customers have been designed with capacity to service other customers.
San Juan Facility
Our San Juan Facility became fully operational in the third quarter of 2020. It is designed as a landed micro-fuel handling facility located in the Port of San Juan, Puerto Rico. The San Juan Facility has multiple truck loading bays to provide LNG to on-island industrial users. The San Juan Facility is near the PREPA San Juan Power Plant and serves as our supply hub for the PREPA San Juan Power Plant and industrial end-user customers in Puerto Rico.
In 2023, we entered into agreements for the installation and operation of approximately 350 MW of additional power to be generated at the Palo Seco Power Plant and San Juan Power Plant in Puerto Rico as well as the supply of natural gas. Our customer was contracted by the U.S. Army Corps of Engineers to support the island’s grid stabilization project with additional power capacity to enable maintenance and repair work on Puerto Rico’s power system and grid. We commissioned 350 MW of duel-fuel power generation using our gas supply in less than 180 days. In March 2024, our contract to provide emergency power services to support the grid stabilization project was terminated, and we completed a series of transactions that included the sale of turbines and related equipment deployed to support the grid stabilization project to PREPA. In December 2025, we entered into a settlement agreement, pursuant to which the Company will receive a total of $142.0 million as equitable adjustment related to the early termination of our contract to provide emergency power services. We expect to receive the balance in the first half of 2026.
In December 2025, we were awarded a new 7-year gas supply agreement with PREPA to deliver up to 75 TBtu of natural gas annually from our San Juan Facility. The new contract establishes security of supply in San Juan for power plants currently running on natural gas and also provides for incremental natural gas volumes to be delivered, allowing for the conversion of additional gas-ready plants currently burning diesel. We do not expect to have to incur significant capital expenditures to be able to supply these additional locations.
In 2023, our wholly-owned subsidiary, Genera PR LLC (“Genera”), was awarded a 10-year contract for the operation and maintenance of PREPA’s thermal generation assets with the goal of reducing costs and improving reliability of power generation in Puerto Rico. The service period under the contract commenced on July 1, 2023, and we receive an annual management fee for the services provided.
La Paz Facility
In 2021, we began commercial operations at the Port of Pichilingue in Baja California Sur, Mexico (the “La Paz Facility”). The La Paz Facility also supplies our gas-fired power units located adjacent to the La Paz Facility (the “La Paz Power Plant”) and could have a maximum capacity of up to 135 MW of power. We placed the La Paz Power Plant into service in the third quarter of 2023.
In the third quarter of 2024, we executed an amendment to the gas sales agreement to multiple CFE power generation facilities in Baja California Sur on a take-or-pay basis that extended the term to ten years from November 3, 2024, and amended the annual minimum volumes.
Santa Catarina Facility
We placed our Santa Catarina Facility in service in the fourth quarter of 2024. The Santa Catarina Facility is located on the southern coast of Brazil. We have developed and constructed a 33-kilometer, 20-inch pipeline that connects the Santa Catarina Facility to the existing inland Transportadora Brasileira Gasoduto Bolivia-Brasil S.A. (“TBG”) pipeline via an interconnection point in the municipality of Garuva. The Santa Catarina Facility and associated pipeline are expected to
69
Table of Contents
have a total addressable market of 15 million cubic meters per day of natural gas. In March 2026, the Company entered into a term sheet to lease its Santa Catarina Facility to a third party that is expected to commence in August 2026.
In August 2024, we acquired 100% of the outstanding equity interest of Usina Termeletrica de Lins S.A. (“Lins”), which owns key rights and permits to develop a natural gas-fired power plant for up to 2.05GW located in the State of São Paulo, within the city limits of Lins. The Santa Catarina Facility will supply natural gas to the Lins power project, and is expected to commence operations in 2031.
Upon effectuation of the Restructuring Transaction, we expect to no longer own BrazilCo, including the Santa Catarina Facility.
FLNG 1
Our first Fast LNG unit (“FLNG 1”) has been deployed off the coast of Altamira, Tamaulipas, Mexico. The 1.4 million ton per annum (“MTPA”) FLNG unit utilizes CFE’s firm pipeline transportation capacity on the Sur de Texas-Tuxpan Pipeline to receive feedgas volumes. This first FLNG unit has been fully commissioned, and we are in the process of increasing available liquefaction capacity through optimization projects.
Our LNG Supply and Cargo Sales
NFE provides reliable, affordable and clean energy supplies to customers around the world, and we currently satisfy customer demand with production from FLNG 1, which we expect to generate up to 70 TBtus annually. We have binding contracts for LNG volumes from two separate U.S. LNG facilities, each with a 20-year term, which are expected to commence in 2027 and 2029. Additional LNG needed to supply expansion of our operations in Puerto Rico and/or our Nicaragua Power Plant will be provided by open market purchases until the commencement of these LNG supply contracts.
Geopolitical events have substantially impacted and may continue to impact the natural gas and LNG markets, which have experienced significant volatility in recent years. Our pricing in contracts with customers is largely based on the Henry Hub index price plus a fixed fee component. Pricing for feed gas purchased for own Fast LNG production is based on Henry Hub, which allows us to mitigate exposure to variability in LNG prices. Our long-term supply contracts also contain pricing based on Henry Hub, however, until the commencement of these long-term supply contracts, a portion of our LNG needs will be purchased on the open market which exposures us to volatility in LNG pricing.
Our Current Operations – Ships
Our shipping assets include Floating Storage and Regasification Units (“FSRUs”), Floating Storage Units (“FSUs”) and LNG carriers (“LNGCs”). Our shipping assets are included in both of our operating segments. Certain vessels are currently chartered to third parties under long-term arrangements and are included in the Energos Formation Transaction (defined below); such vessels are included in our Ships segment. At the expiration of third party charters of these vessels, we plan to utilize these vessels for our own operational purposes. Vessels we operate at our terminal operations or that we decide to sub-charter are included in our Terminals and Infrastructure segment.
In August 2022, we completed a transaction (the “Energos Formation Transaction”) with an affiliate of Apollo Global Management, Inc., pursuant to which we transferred ownership of eleven vessels to Energos in exchange for approximately $1.85 billion in cash and a 20% equity interest in Energos. Ten of the vessels were subject to current or future charters with NFE and one vessel (the Nanook) was not subject to a future NFE charter. The in-place and future charters to NFE of ten vessels prevent the recognition of the sale of those vessels to Energos, and the proceeds associated with these vessels have been treated as a failed sale leaseback. As a result, these ten vessels continue to be recognized on our Consolidated Balance Sheet as Property, plant and equipment, and the proceeds are recognized as debt. Consistent with this treatment as a failed sale leaseback, (i) the third party charter revenues continue to be recognized by us as Vessel charter revenue; (ii) the costs of operating the vessels is included in Vessel operating expenses for the remaining terms of the third-party charters and (iii) such revenues are included as part of debt service for the sale leaseback financing debt and are included in additional financing costs within Interest expense, net. In February 2024, we sold substantially all of our stake in Energos.
In November 2025, we completed a transaction with Energos, pursuant to which the Company early terminated the long-term charter agreements with Energos for Energos Eskimo, Energos Winter, Energos Igloo and Energos Freeze and novated associated sub-charter agreements for these vessels to Energos, in exchange for cash consideration of $150.0
70
Table of Contents
million. This transaction resulted in the sale of these vessels that were previously accounted for as a failed sale leaseback. Upon closing of the transaction, the Company derecognized these vessels with a net book value of $667.0 million from Property, plant and equipment, derecognized debt of $734.2 million, and recognized a gain of $217.1 million. The Company will also no longer recognize charter revenues and vessel operating expenses associated with these vessels.
Our Development Projects
Our projects currently under development include our development of a second modular liquefaction facility to provide a source of low-cost supply of LNG to customers around the world through our Fast LNG technologies; our LNG terminal (“Barcarena Facility”) and power plants located in Pará, Brazil; our LNG terminal facility and power plant in Puerto Sandino, Nicaragua (“Puerto Sandino Facility”); and our LNG terminal and power plant in Ireland (“Ireland Facility”). Subsequent to the Restructuring Transaction, we will focus on operational efficiency of our current facilities and cost-effective completion of in-process development projects.
The design, development, construction and operation of our projects are highly regulated activities and subject to various approvals and permits. The process to obtain required permits, approvals and authorizations is complex, time-consuming, challenging and varies in each jurisdiction in which we operate. We obtain required permits, approvals and authorizations in due course in connection with each milestone for our projects.
We describe each of our current development projects below.
Fast LNG
Following the completion of the Restructuring Transaction, we do not plan to incur significant capital expenditures to develop our second 1.4 MTPA Fast LNG unit (“FLNG 2”). We are in active discussions with third parties to co-develop FLNG 2, which is expected to take approximately 24 months to complete from the time our partner is engaged. Estimated cost to complete is uncertain and is dependent upon final design and engineering, but we currently expect the remaining cost to be between $750.0 million and $1,500.0 million.
Barcarena Facility
The Barcarena Facility consists of an FSRU and associated infrastructure, including mooring and offshore and onshore pipelines. The Barcarena Facility is capable of delivering almost 600,000 MMBtu from LNG per day and storing up to 160,000 cubic meters of LNG. We have entered into a 15-year gas supply agreement with a subsidiary of Norsk Hydro ASA for the supply of natural gas to the Alunorte Alumina Refinery in Pará, Brazil, through our Barcarena Facility. We have substantially completed our Barcarena Facility and are in process of final commissioning.
The Barcarena Facility will also supply our new 630 MW combined cycle natural gas-fired power plant located in Pará, Brazil (the “Barcarena Power Plant”). The power plant is fully contracted under multiple 25-year power purchase agreements to supply electricity to the national electricity grid. We expect to place the Barcarena Power Plant into service in the first half of 2026.
In March 2024, we closed the acquisition of PortoCem Geração de Energia S.A. (“PortoCem”), a wholly-owned subsidiary of Ceiba Fundo de Investimento em Participações Multiestratégia- Investimento no Exterior (“Ceiba Energy”). PortoCem is the owner of a 15-year 1.6 GW capacity reserve contract in Brazil. We have transferred the 1.6 GW capacity reserve contract to a site owned by NFE that is adjacent to the Barcarena Facility, where NFE is building the 1.6 GW simple cycle, natural gas-fired power plant (“PortoCem Power Plant”) to supply the capacity reserve contract using gas from the Barcarena Facility. We expect the PortoCem Power Plant to be completed in 2026.
Upon effectuation of the Restructuring Transaction, we expect to no longer own BrazilCo, including the Barcarena Facility, Barcarena Power Plant and PortoCem Power Plant.
Puerto Sandino Facility
We are developing an offshore liquefied natural gas receiving, transloading and regasification facility in Puerto Sandino, Nicaragua, as well as a pipeline connecting the facility with our Puerto Sandino Power Plant. We have entered into a 25-year PPA with Nicaragua’s electricity distribution companies, and we expect to utilize approximately 57,000 MMBtu from LNG per day to provide natural gas to the Puerto Sandino Power Plant in connection with the 25-year power
71
Table of Contents
purchase agreement. Construction of the power plant is substantially complete, and we expect to complete the construction of the terminal and commission both the terminal and the power plant during 2026. As part of our long-term strategy, we are also evaluating solutions to optimize power generation and delivery to other markets, connected to our power plant through a regional transmission line.
Ireland Facility
We intend to develop and operate an LNG facility and power plant on the Shannon Estuary, near Tarbert, Ireland. In April 2023, we were awarded a capacity contract for the development of a power plant for approximately 353 MW of electricity generation with a duration of ten years as part of the auction process operated by Ireland’s Transmission System Operator.
In the third quarter of 2023, An Bord Pleanála (“ABP”), Ireland’s planning commission, denied our application for the development of an LNG terminal and power plant. We challenged this decision, and in September 2024, the High Court of Ireland ruled that ABP did not have appropriate grounds for the denial of our permit. In March 2025, ABP withdrew their appeal to the September 2024 decision of the High Court of Ireland. ABP is now reconsidering our planning application in accordance with Irish Law.
Further, in March 2025, ABP granted our application to construct a 600 MW power plant and a separate application to construct the 220 kV electricity interconnect. We are able to fuel this power plant via our LNG marine import terminal, if approved, or using gas provided from our permitted pipeline interconnection. The continued development of this project is uncertain and there are multiple risks, including regulatory risks, which could preclude the development of this project; however, management continues to assess all options in respect of future developments for the land held.
Recent Developments
Restructuring Support Agreement and Restructuring Transaction
On March 17, 2026, NFE entered into the RSA with the Supporting Creditors. Under the RSA, the Supporting Creditors agree to support the Restructuring Transaction, which involves a comprehensive restructuring of the Company’s principal funded debt obligations. For further discussion on the RSA, the Restructuring Plans and the Restructuring Transaction, see “Items 1 and 2. Business and Properties—Planned Debt Restructuring.”
Restatement of Previously Issued Financial Statements
As previously reported on the Company’s Current Report on Form 8-K filed on March 17, 2026, during the preparation of the Company’s consolidated financial statements for the year ended December 31, 2025, the Company identified errors in its historical consolidated statements of cash flows and determined that adjustments are required to previously issued audited consolidated financial statements. Accordingly, the Company is restating its previously issued audited consolidated financial statements for the years ended December 31, 2024 and December 31, 2023. During the periods covered by the financial statements, the Company delayed payments to certain vendors on certain significant development projects, which allowed the Company to improve its working capital and liquidity. Payments for capital expenditures significantly outside of a vendor’s customary payment terms should be classified as financing activities, as opposed to investing activities, which is how these payments were presented in the previously issued financial statements. In connection with the restatement, the Company is also correcting unrelated errors identified in prior periods. Additionally, the Company’s unaudited consolidated financial statements as of and for each of the interim periods ended March 31, 2024, June 30, 2024, September 30, 2024, March 31, 2025, June 30, 2025, and September 30, 2025 are being restated to correct the classification of capital expenditures paid outside of customary payment terms, as well as to correct other unrelated errors. Refer to Note 1 and Note 33 of our notes to the consolidated financial statements included in this Annual Report for further discussion.
Other Matters
On June 18, 2020, we received an order from the Federal Energy Regulatory Commission (“FERC”), which asked us to explain why our San Juan Facility is not subject to FERC’s jurisdiction under section 3 of the NGA. Because we do not believe that the San Juan Facility is jurisdictional, we provided our reply to FERC on July 20, 2020 and requested that FERC act expeditiously. On March 19, 2021, FERC issued an order that the San Juan Facility does fall under FERC jurisdiction. FERC directed us to file an application for authorization to operate the San Juan Facility within 180 days of
72
Table of Contents
the order, which was September 15, 2021, but also found that allowing operation of the San Juan Facility to continue during the pendency of an application is in the public interest. FERC also concluded that no enforcement action against us is warranted, presuming we comply with the requirements of the order. Parties to the proceeding, including the Company, sought rehearing of the March 19, 2021 FERC order, and FERC denied all requests for rehearing in an order issued on July 15, 2021; the FERC order was affirmed by the United States Court of Appeals for the District of Columbia Circuit (“D.C. Circuit”) on June 14, 2022. In order to comply with the FERC’s directive, on September 15, 2021, we filed an application for authorization to operate the San Juan Facility, which remains pending.
On July 18, 2023, we filed for an amendment to the March 19, 2021 and July 15, 2021 FERC orders allowing the continued operation of the San Juan Facility during the pendency of the formal application to allow us to construct and interconnect 220 feet of incremental 10-inch pipeline needed to supply natural gas for temporary power generation solicited through the Puerto Rico Power Stabilization Task Force. On July 31, 2023, FERC issued an order stating that it would not take action to prevent the construction and operation of the pipeline and interconnect and on January 30, 2024, FERC reaffirmed the order allowing the construction and operation to continue. On September 19, 2025, the D.C. Circuit denied a petition challenging this FERC order, holding that the order reflected an unreviewable exercise of enforcement discretion rather than a de facto authorization for construction or operation. The deadline to seek a writ of certiorari from that decision has expired.
On September 26, 2024, the United States Coast Guard (“USCG”) filed a Letter of Recommendation (“LOR”) with FERC in which it assessed our Letter of Intent dated April 12, 2024, and our Waterway Suitability Assessment, dated August 26, 2024, in respect of future ship to ship transfers with alternative vessels, and recommended against the allowance of the proposed operations. Further, on September 26, 2024, the USCG issued a Letter of Warning in respect of our ongoing ship to ship transfers of LNG operations within the San Juan port limits. On October 21, 2024, we filed an appeal with the USCG under 33 CFR 160.7. In December 2024 and February 2025, we submitted an updated Letter of Intent and Waterway Suitability Assessments detailing our alternative operational plans to the USCG. In concert with our collaboration with the USCG regarding our new operational plans, we withdrew our appeal on February 14, 2025. On January 12, 2026, the Acting Captain of the Port of San Juan for the USCG issued a LOR in response to NFE’s filings. The LOR determined that the Port of San Juan waterway is suitable for the transit and docking of larger LNG Carriers.
On October 25, 2024, FERC issued a notice of intent to prepare an Environmental Impact Statement, which included, among other things, two public scoping sessions in Puerto Rico held on November 18, 2024 in accordance with the National Environmental Policy Act.
Factors Impacting Comparability of Our Financial Results
Our historical results of operations and cash flows are not indicative of results of operations and cash flows to be expected in the future, principally for the following reasons:
•Our historical results of operations include our Jamaica Business. In May 2025, we completed the sale of our Jamaica Business, and we no longer include the results of operations of the Montego Bay Facility and Old Harbour Facility in our financial statements.
Our results of operations include the cost of operating FLNG 1. We placed our first Fast LNG project into service in the fourth quarter of 2024. This project represents our largest ever capital project and placing the asset into service from an accounting perspective that has significantly increased the depreciation recognized in the current period; such depreciation also impacts the cost of LNG delivered from the FLNG facility. This also increased interest expense as we are no longer able to capitalize borrowing costs associated this development.
We source a significant portion of our LNG needs from FLNG 1. Currently, demand for LNG above FLNG 1’s capacity is acquired from third party suppliers in open market purchases. Starting in 2027, we expect to meet this demand under long-term supply contracts, which are based on an index such as Henry Hub plus a fixed fee component.
•Our historical financial results include BrazilCo and do not reflect the contemplated effect of the Restructuring Transaction. The Restructuring Transaction contemplates the separation of our Brazil business, the exchange of existing debt for new debt and equity securities (including the issuance of CoreCo Convertible Preferred Stock and new shares of our Class A common stock), and the incurrence of new term loans and preferred equity at various subsidiaries. These changes will materially impact our reported interest expense, outstanding debt, equity
73
Table of Contents
balances, cost of borrowing and earnings per share calculations. In addition, the mandatory conversion of CoreCo Convertible Preferred Stock, potential future equity issuances, and the implementation of new incentive plans may result in further dilution and changes to our financial metrics. As a result, our future financial results will not be directly comparable to our historical results.
•We have reached compromise agreements to reduce expenses which are not reflected in our historical financial results. Over the past several months, we reached compromise agreements with vendors, service providers and other partners to materially reduce our outstanding obligations. These cost savings are expected to further impact the comparability of our financial results to prior periods by lowering our ongoing expense base and improving our overall financial position moving forward.
74
Table of Contents
Results of Operations – Three Months Ended December 31, 2025 compared to Three Months Ended September 30, 2025 (As Restated) and Year Ended December 31, 2025 compared to Year Ended December 31, 2024 (As Restated)
Performance of our two segments, Terminals and Infrastructure and Ships, is evaluated based on Segment Operating Margin. Segment Operating Margin reconciles to Consolidated Segment Operating Margin as reflected below, which is a non-GAAP measure. We reconcile Consolidated Segment Operating Margin to GAAP Gross margin, inclusive of depreciation and amortization. Consolidated Segment Operating Margin is mathematically equivalent to Revenue minus Cost of sales (excluding depreciation and amortization reflected separately) minus Operations and maintenance minus Vessel operating expenses, each as reported in our financial statements. We believe this non-GAAP measure, as we have defined it, offers a useful supplemental measure of the overall performance of our operating assets in evaluating our profitability in a manner that is consistent with metrics used for management’s evaluation of the overall performance of our operating assets.
Consolidated Segment Operating Margin is not a measurement of financial performance under GAAP and should not be considered in isolation or as an alternative to Gross margin, income from operations, net income, cash flow from operating activities or any other measure of performance or liquidity derived in accordance with GAAP. As Consolidated Segment Operating Margin measures our financial performance based on operational factors that management can impact in the short-term, items beyond the control of management in the short term, such as depreciation and amortization are excluded. As a result, this supplemental metric affords management the ability to make decisions and facilitates measuring and achieving optimal financial performance of our current operations. The principal limitation of this non-GAAP measure is that it excludes significant expenses and income that are required by GAAP. A reconciliation is provided for the non-GAAP financial measure to the most directly comparable GAAP measure, Gross margin. Investors are encouraged to review the related GAAP financial measures and the reconciliation of the non-GAAP financial measure to our Gross margin, and not to rely on any single financial measure to evaluate our business.
The tables below present our segment information for the three months ended December 31, 2025 and September 30, 2025, and for the year ended December 31, 2025 and December 31, 2024:
| Three Months Ended December 31, 2025 | |||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| (in thousands of $) | Terminals and Infrastructure | Ships | Total Segment | Consolidationand Other(3) | Consolidated | ||||||||||||||
| Total revenues | $ | 379,067 | $ | 16,677 | $ | 395,744 | $ | — | $ | 395,744 | |||||||||
| Cost of sales(1) | 211,157 | — | 211,157 | — | 211,157 | ||||||||||||||
| Vessel operating expenses(4) | 690 | 3,363 | 4,053 | — | 4,053 | ||||||||||||||
| Operations and maintenance(4) | 48,866 | — | 48,866 | — | 48,866 | ||||||||||||||
| Segment Operating Margin | $ | 118,354 | $ | 13,314 | $ | 131,668 | $ | — | $ | 131,668 |
| Three Months Ended December 31, 2025 | ||
|---|---|---|
| (in thousands of $) | Consolidated | |
| Gross margin (GAAP) | $ | 86,671 |
| Depreciation and amortization | 44,997 | |
| Consolidated Segment Operating Margin (Non-GAAP) | $ | 131,668 |
| Three Months Ended September 30, 2025 (As Restated) | |||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| (in thousands of $) | Terminals and Infrastructure | Ships | Total Segment | Consolidationand Other(3) | Consolidated | ||||||||||||||
| Total revenues | $ | 306,309 | $ | 25,602 | $ | 331,911 | $ | — | $ | 331,911 | |||||||||
| Cost of sales(1) | 196,908 | — | 196,908 | — | 196,908 | ||||||||||||||
| Vessel operating expenses(4) | 1,940 | 5,357 | 7,297 | — | 7,297 | ||||||||||||||
| Operations and maintenance(4) | 57,301 | — | 57,301 | — | 57,301 | ||||||||||||||
| Segment Operating Margin | $ | 50,160 | $ | 20,245 | $ | 70,405 | $ | — | $ | 70,405 |
75
Table of Contents
| Three Months Ended September 30, 2025 (As Restated) | |||
|---|---|---|---|
| (in thousands of $) | Consolidated | ||
| Gross margin (GAAP) | $ | 21,075 | |
| Depreciation and amortization | 49,330 | ||
| Consolidated Segment Operating Margin (Non-GAAP) | $ | 70,405 |
| Year Ended December 31, 2025 | |||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| (in thousands of $) | Terminals and Infrastructure | Ships | Total Segment | Consolidationand Other(2) | Consolidated | ||||||||||||||
| Total revenues | $ | 1,384,693 | $ | 119,344 | $ | 1,504,037 | $ | — | $ | 1,504,037 | |||||||||
| Cost of sales(1) | 918,603 | — | 918,603 | — | 918,603 | ||||||||||||||
| Vessel operating expenses(4) | 4,407 | 22,187 | 26,594 | — | 26,594 | ||||||||||||||
| Operations and maintenance(4) | 218,511 | — | 218,511 | — | 218,511 | ||||||||||||||
| Segment Operating Margin | $ | 243,172 | $ | 97,157 | $ | 340,329 | $ | — | $ | 340,329 |
| Year Ended December 31, 2025 | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| (in thousands of $) | Consolidated | ||||||||||
| Gross margin (GAAP) | $ | 136,821 | |||||||||
| Depreciation and amortization | 203,508 | ||||||||||
| Consolidated Segment Operating Margin (Non-GAAP) | $ | 340,329 |
| Year Ended December 31, 2024 (As Restated) | |||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| (in thousands of $) | Terminals and Infrastructure | Ships | Total Segment | Consolidationand Other(2) | Consolidated | ||||||||||||||
| Total revenues(5) | $ | 2,041,580 | $ | 170,587 | $ | 2,212,167 | $ | 146,777 | $ | 2,358,944 | |||||||||
| Cost of sales(1) | 1,065,181 | — | 1,065,181 | — | 1,065,181 | ||||||||||||||
| Vessel operating expenses(4) | — | 33,372 | 33,372 | — | 33,372 | ||||||||||||||
| Operations and maintenance(4) | 170,763 | — | 170,763 | — | 170,763 | ||||||||||||||
| Deferred earnings from contracted sales(3) | 150,000 | — | 150,000 | (150,000) | — | ||||||||||||||
| Segment Operating Margin | $ | 955,636 | $ | 137,215 | $ | 1,092,851 | $ | (3,223) | $ | 1,089,628 |
| Year Ended December 31, 2024 (As Restated) | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| (in thousands of $) | Consolidated | ||||||||||
| Gross margin (GAAP) | $ | 930,837 | |||||||||
| Depreciation and amortization | 158,791 | ||||||||||
| Consolidated Segment Operating Margin (Non-GAAP) | $ | 1,089,628 |
(1)Cost of sales is presented exclusive of costs included in Depreciation and amortization in the Consolidated Statements of Operations and Comprehensive (Loss) Income.
(2)For the year ended December 31, 2024, Consolidation and Other adjusts for the inclusion of deferred earnings from contracted sales of $150.0 million which were recognized during the third and fourth quarters of 2024.
(3)Deferred earnings from contracted sales represent forward sales transactions that were contracted in the second and third quarters of 2024 and prepayment for these sales was received. Revenue has been recognized in the Consolidated Statements of Operations and Comprehensive (Loss) Income during the third and fourth quarters of 2024.
(4)Operations and maintenance and Vessel operating expenses are directly attributable to revenue-producing activities of our terminals and vessels and are included in the calculation of Gross margin as defined under GAAP.
76
Table of Contents
(5)For the year ended December 31, 2024, Consolidation and Other adjusts for $3.2 million in amortization of intangible assets recognized upon acquisition of certain vessels with in-place leases, which was recorded in Vessel charter revenue; such amortization is excluded from Total Segment Operating Margin reviewed by our CODM.
Terminals and Infrastructure Segment
| Three Months Ended, | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|
| (in thousands of $) | December 31, 2025 | September 30, 2025 (As Restated) | Change | |||||||
| Total revenues | $ | 379,067 | $ | 306,309 | $ | 72,758 | ||||
| Cost of sales (exclusive of depreciation and amortization) | 211,157 | 196,908 | 14,249 | |||||||
| Vessel operating expenses | 690 | 1,940 | (1,250) | |||||||
| Operations and maintenance | 48,866 | 57,301 | (8,435) | |||||||
| Segment Operating Margin | $ | 118,354 | $ | 50,160 | $ | 68,194 |
| Year Ended, | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|
| (in thousands of $) | December 31, 2025 | December 31, 2024 (As Restated) | Change | |||||||
| Total revenues | $ | 1,384,693 | $ | 2,041,580 | $ | (656,887) | ||||
| Cost of sales (exclusive of depreciation and amortization) | 918,603 | 1,065,181 | (146,578) | |||||||
| Vessel operating expenses | 4,407 | — | 4,407 | |||||||
| Operations and maintenance | 218,511 | 170,763 | 47,748 | |||||||
| Deferred earnings from contracted sales | — | 150,000 | (150,000) | |||||||
| Segment Operating Margin | $ | 243,172 | $ | 955,636 | $ | (712,464) |
Total revenue
Total revenue for the Terminals and Infrastructure Segment increased by $72.8 million for the three months ended December 31, 2025 as compared to the three months ended September 30, 2025. The increase was primarily driven by cargo sales, contract settlement, and power trading revenue, offset by lower volumes delivered to our terminals. The average Henry Hub index pricing used to invoice our downstream customers increased by 15% for the three months ended December 31, 2025 as compared to the three months ended September 30, 2025.
•In December 2025, we entered into a settlement agreement with our customer for $142.0 million, related to the early termination of our contract to provide emergency power services in Puerto Rico, and we recognized revenue of $74.8 million.
•We recognized $69.4 million of revenue from cargo sales in the three months ended December 31, 2025. No cargo sales revenue was recognized in the three months ended September 30, 2025.
•We are required to deliver power under power purchase agreements (“PPAs”) from the Barcarena Power Plant starting in the third quarter of 2025. The Barcarena Power Plant is currently being commissioned, and as such, we partnered with a local energy trader to supply the required power. Revenue recognized for the delivery of power under these PPAs in fourth quarter of 2025 increased from $93.9 million during the three months ended September 30, 2025 to $109.7 million during the three months ended December 31, 2025.
•The increases are partially offset by lower volumes delivered to our downstream terminal customers at the San Juan and Mexico facilities, primarily due to repairs and maintenance at our customers’ facilities and lower power generation by these power facilities. Total volumes delivered decreased from 10.7 TBtu in the third quarter of 2025 to 6.4 TBtu in the fourth quarter of 2025 As a result, revenue decreased by $67.8 million at the San Juan and
77
Table of Contents
the Mexico facilities. This decrease includes lower expected capacity payments in Mexico of $18.0 million attributable to lower availability of our La Paz Power Plant during the fourth quarter of 2025.
•The third-party vessel charter revenue decreased by $14.7 million due to the sale of certain vessels to Energos during the fourth quarter of 2025.
Total revenue for the Terminals and Infrastructure Segment decreased by $656.9 million for the year ended December 31, 2025 as compared to the year ended December 31, 2024, and segment revenue was impacted by the following in 2025:
•For the year ended December 31, 2024, we recognized $295.6 million of income from the novation of an LNG supply contract, of which $235.6 million was recognized as segment revenue. Only $6.4 million of novation income was recognized in the year ended December 31, 2025 related to the accretion of expected payments under the novated LNG supply contract.
•For the year ended December 31, 2025, volumes delivered to downstream customers were 45.1 TBtu as compared to 81.3 TBtu for the year ended December 31, 2024. The lower volumes in 2025 were primarily attributable to the termination of the grid stabilization project in the first quarter of 2024 and the sale of our Jamaica Business in May 2025.
◦In Jamaica, we delivered 9.4 TBtu from our Montego Bay Facility and Old Harbour Facility in 2025, compared to 26.5 TBtu during the year ended December 31, 2024, which resulted in a reduction of revenue of $216.4 million in 2025.
◦Revenue from the San Juan Facility in Puerto Rico decreased by $541.7 million in 2025, primarily due to the termination of the grid stabilization project, partially offset by $74.8 million revenue recognized from the settlement contract related to the termination.
◦During 2024, we recognized an incentive fee of $15.7 million as incentive fees under our subsidiary Genera’s operations and maintenance contract with PREPA. No such incentive fees were earned during 2025. In 2025, our revenue decreased by $14.8 million due to lower costs that were passed through to our customer under Genera’s operations and maintenance contract.
◦Lastly, revenue decreased by $14.4 million due to sale of our Miami Facility in 2024.
The decrease in revenue for the year ended December 31, 2025 was partially offset by an increase due to the following:
•Revenue from cargos sales increased by $75.4 million for the year ended December 31, 2025, compared with the year ended December 31, 2024.
•Starting in the third quarter of 2025, we partnered with a local energy trader to supply the power required under power purchase agreements in Brazil while the Barcarena Power Plant is being commissioned. Revenue recognized for the delivery of power under these power purchase agreements during the second half of 2025 was $203.6 million.
•During 2025, we entered into sub-charter agreements for Energos Eskimo, Energos Winter, and Energos Freeze, and recognized additional vessel charter revenues of $29.0 million during the year ended December 31, 2025, which is included in our Terminals and Infrastructure segment.
•The average Henry Hub index pricing used to invoice our downstream customers increased by 51% for the year ended December 31, 2025 as compared to the year ended December 31, 2024.
Cost of sales
Cost of sales includes the procurement of feed gas or LNG, as well as shipping and logistics costs to deliver LNG or natural gas to our facilities. We source LNG and natural gas from third parties and our own liquefaction facilities, including our Fast LNG unit which was placed into service in the fourth quarter of 2024. Costs to convert natural gas to LNG, including labor, depreciation and other direct costs to operate our liquefaction facilities are also included in Cost of sales.
78
Table of Contents
Our subsidiary, Genera, provides operations and maintenance services to PREPA’s thermal generation assets, and cost to provide these services is included in Cost of sales. Under our contract with PREPA, we pass all of these costs onto PREPA, and such billings are recognized as revenue.
Cost of sales increased $14.2 million for the three months ended December 31, 2025 as compared to the three months ended September 30, 2025. The increase was primarily driven by increases in cost of cargo sales of $54.3 million as there were no cargos sales during the three months ended September 30, 2025, which were partially offset by a decrease due to lower volumes delivered. We delivered 40% lower volumes to our customers during the three months ended December 31, 2025 resulting in a decrease in cost of LNG consumed by $44.2 million. Our cost of acquiring and producing LNG decreased to $8.58 per MMBtu for the three months ended December 31, 2025 from $9.40 per MMBtu for the three months ended September 30, 2025.
Cost of sales decreased by $146.6 million for the year ended December 31, 2025 as compared to the year ended December 31, 2024, which was attributable to the following activity:
•We delivered 45% less volume to our downstream terminal customers in the current year compared to 2024, principally due to the sale of our Jamaica Business, which resulted in a $122.7 million decrease in our LNG cost of sales. In addition, cost of LNG delivered at our Puerto Rico operations decreased by $103.4 million in 2025 compared to 2024 due to lower volumes delivered in 2025, primarily as a result of termination of our customer’s grid stabilization project in the first quarter of 2024.
•Vessel costs decreased by $53.6 million, for the year ended December 31, 2025 as compared to the year ended December 31, 2024 due to reduced number of vessels chartered in our fleet. We assigned vessels used in the Jamaica Business to the buyer, and we redelivered certain vessels after their charters ended in the 2025.
•We recognized payroll and other operating costs of $80.3 million to provide services under Genera’s operations and maintenance contract for the year ended December 31, 2025 compared to $100.2 million for the year ended December 31, 2024; these costs are passed onto PREPA.
The decrease in cost of sales for the year ended December 31, 2025 as compared to the year ended December 31, 2024 was offset by the following:
•Although the volumes delivered decreased, our cost of LNG increased to $8.93 per MMBtu for the year ended December 31, 2025 compared to $7.20 per MMBtu for the year ended December 31, 2024. The increase was primarily driven by higher gas prices. The average Henry Hub index pricing increased by 51% for the year ended December 31, 2025 as compared to the year ended December 31, 2024.
•We incurred $89.7 million cost of sales in 2025 related to the delivery of power under power purchase agreements from the Barcarena Power Plant. No such costs were incurred in 2024.
•Cost of cargo sales increased by $47.2 million in 2025 compared to 2024, reflecting less favorable pricing on certain cargo purchases.
•Higher costs incurred due to increased volumes delivered from our La Paz Facility.
The weighted-average cost of our LNG inventory balance to be used in our operations as of December 31, 2025 and December 31, 2024 was $8.35 per MMBtu and $6.90 per MMBtu, respectively.
79
Table of Contents
Vessel operating expenses
Vessel operating expenses relate to direct costs such as crewing, repairs and maintenance, insurance, stores, lube oils, communication expenses, management fees associated with operating vessels.
We incurred $4.4 million of vessel operating expenses for the year ended December 31, 2025. No such costs were incurred in this segment in 2024. Vessel operating expenses were immaterial to our results of operations for the three months ended December 31, 2025 and September 30, 2025.
Operations and maintenance
Operations and maintenance includes costs of operating our facilities, exclusive of costs to convert that are reflected in Cost of sales.
Operations and maintenance decreased by $8.4 million for the three months ended December 31, 2025 as compared to the three months ended September 30, 2025. In November 2025, we completed a transaction with Energos, that resulted in sale of four vessels. Following the transaction, we ceased incurring operating costs for three of the vessels that were part of our Terminals and Infrastructure segment. In addition, our operating expenses decreased due to the expiration of an operating lease, reduction in port fees, and decreased spare parts usage at our terminals.
Operations and maintenance increased by $47.7 million for the year ended December 31, 2025 as compared to the year ended December 31, 2024. The increase is primarily due to Fast LNG unit and the Santa Catarina Facility that were placed in service at the end of 2024. The increase was also driven by higher vessel charter costs as more vessels were deployed in our terminal operations during 2025. These impacts were partially offset by the sale of our Jamaica Business in May 2025.
Deferred earnings from contracted sales
During 2024, we completed forward sales and received prepayments from the buyers of $150.0 million. The prepayments were based on the fair market value of these sales as compared to our supply cost, and our CODM includes these results in this evaluation of Terminals and Infrastructure operations. Revenue for these sales were recognized in our Consolidated Statements of Operations and Comprehensive (Loss) Income in 2024, and as such, these deferred earnings do not impact the total segment operating margin recognized for the year ended December 31, 2024.
Ships Segment
| Three Months Ended, | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|
| (in thousands of $) | December 31, 2025 | September 30, 2025 (As Restated) | Change | |||||||
| Total revenues | $ | 16,677 | $ | 25,602 | $ | (8,925) | ||||
| Vessel operating expenses | 3,363 | 5,357 | (1,994) | |||||||
| Segment Operating Margin | $ | 13,314 | $ | 20,245 | $ | (6,931) |
| Year Ended, | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|
| (in thousands of $) | December 31, 2025 | December 31, 2024 (As Restated) | Change | |||||||
| Total revenues | $ | 119,344 | $ | 170,587 | $ | (51,243) | ||||
| Vessel operating expenses | 22,187 | 33,372 | (11,185) | |||||||
| Segment Operating Margin | $ | 97,157 | $ | 137,215 | $ | (40,058) |
Revenue in the Ships segment is comprised of operating lease revenue under time charters, fees for positioning and repositioning vessels as well as the reimbursement of certain vessel operating costs. As of December 31, 2025, one vessel included in the Energos Formation Transaction was under a third-party charter and is included in this segment.
80
Table of Contents
Total revenue
Total revenue for the Ships segment decreased by $8.9 million from the three months ended September 30, 2025 to the three months ended December 31, 2025. In November 2025, we completed a transaction with Energos, pursuant to which we early terminated the long-term charter agreements with Energos for certain vessels, including Energos Igloo, which was included in the Ships segment at September 30, 2025. This transaction resulted in a sale of Energos Igloo to Energos and a reduction in charter revenue for the three months ended December 31, 2025 compared to the three months ended September 30, 2025.
Total revenue for the Ships segment decreased by $51.2 million for the year ended December 31, 2025 as compared to the year ended December 31, 2024. Subsequent to the Energos Formation Transaction, we continue to be, for accounting purposes, the owner of certain vessels included in the transaction, and as such, we continue to recognize revenue from the charter of these vessels to third parties. We excluded such vessels from the Ships segment and included them in our Terminals and Infrastructure segment as certain third-party charters expired and we began to use the vessels in our own operations during the year ended December 31, 2025.
Vessel operating expenses
Vessel operating expenses include direct costs associated with operating a vessel, such as crewing, repairs and maintenance, insurance, stores, lube oils, communication expenses, and management fees. We also recognize voyage expenses within Vessel operating expenses, which principally consist of fuel consumed before or after the term of time charter or when the vessel is off hire. Under time charters, the majority of voyage expenses are paid by customers. To the extent that these costs are a fixed amount specified in the charter, which is not dependent upon redelivery location, the estimated voyage expenses are recognized over the term of the time charter.
Vessel operating expenses decreased by $2.0 million from the three months ended September 30, 2025 to the three months ended December 31, 2025. Vessel operating expenses decreased by $11.2 million for the year ended December 31, 2025 as compared to the year ended December 31, 2024. The vessel operating expenses were lower during the three months and the year ended December 31, 2025 as all vessels aside from Nusantara Regas Satu were either utilized in our terminal operations following the conclusion of their third party charters, or were sold as part of the vessel sale transaction to Energos, as discussed above.
81
Table of Contents
Other operating results
| Three Months Ended, | Year Ended, | |||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| (in thousands of $) | December 31, 2025 | September 30, 2025 (As Restated) | Change | December 31, 2025 | December 31, 2024 (As Restated) | Change | ||||||||||||||||
| Selling, general and administrative | $ | 112,596 | $ | 86,467 | $ | 26,129 | $ | 307,442 | $ | 293,378 | $ | 14,064 | ||||||||||
| Transaction and integration costs | 54,792 | 19,679 | 35,113 | 161,756 | 12,279 | 149,477 | ||||||||||||||||
| Depreciation and amortization | 44,997 | 49,330 | (4,333) | 203,508 | 158,791 | 44,717 | ||||||||||||||||
| Asset impairment expense | 732,954 | 4,782 | 728,172 | 860,865 | 16,494 | 844,371 | ||||||||||||||||
| (Gain) loss on sale | (199,944) | — | (199,944) | (670,938) | 80,207 | (751,145) | ||||||||||||||||
| Goodwill impairment expense | 15,938 | — | 15,938 | 598,110 | — | 598,110 | ||||||||||||||||
| Total operating expenses | 761,333 | 160,258 | 601,075 | 1,460,743 | 561,149 | 899,594 | ||||||||||||||||
| Operating (loss) income | (629,664) | (89,853) | (539,811) | (1,120,414) | 528,479 | (1,648,893) | ||||||||||||||||
| Interest expense | 192,929 | 198,218 | (5,289) | 777,845 | 316,337 | 461,508 | ||||||||||||||||
| Other (income) expense, net | 5,934 | (30,566) | 36,500 | (147,593) | 116,308 | (263,901) | ||||||||||||||||
| Loss on extinguishment of debt, net | (850) | — | (850) | 19,937 | 270,063 | (250,126) | ||||||||||||||||
| (Loss) income before income taxes | (827,676) | (257,505) | (570,171) | (1,770,603) | (174,229) | (1,596,374) | ||||||||||||||||
| Tax provision | 19,386 | 5,496 | 13,890 | 61,350 | 70,308 | (8,958) | ||||||||||||||||
| Net loss | $ | (847,062) | $ | (263,001) | $ | (584,061) | $ | (1,831,953) | $ | (244,537) | $ | (1,587,416) |
Selling, general and administrative
Selling, general and administrative includes compensation expenses for our corporate employees, employee travel costs, insurance, professional fees for our advisors, and screening costs for projects that are in initial stages and development is not yet probable.
Selling, general and administrative increased by $26.1 million for the three months ended December 31, 2025 as compared to the three months ended September 30, 2025. During the three months ended December 31, 2025, we recorded $45.6 million contingent losses related to certain legal proceedings compared to $18.6 million loss recorded during the three months ended September 30, 2025.
Selling, general and administrative increased by $14.1 million for the year ended December 31, 2025, compared to the year ended December 31, 2024. The increase was primarily due to provision for certain legal matters of $64.2 million with our customers and vendors. In addition, legal and professional fees increased by $8.5 million, mostly attributable to certain litigation and arbitration proceedings. These increases were largely offset by a $35.9 million reduction of share-based compensation expense in 2025 primarily due to the vesting of a large number of restricted share units at the beginning of 2025. Screening costs for development projects decreased by $11.5 million due to lower activity to develop potential projects during 2025. Lastly, our bad debt expense decreased by $14.1 million in 2025, primarily due to a reversal of an allowance for bad debt as a result of a settlement agreement entered with our customer as discussed above.
Transaction and integration costs
We incurred transaction and integration costs of $54.8 million and $19.7 million, respectively, during the three months ended December 31, 2025 and September 30, 2025, which is primarily comprised of professional and consulting fees relating to our debt restructuring process, as well as costs incurred for certain debt amendments.
82
Table of Contents
We incurred $161.8 million of transaction and integration costs during the year ended December 31, 2025. In addition to the professional and consulting fees related to our debt restructuring, we incurred $71.1 million of transaction costs directly attributable to the sale of the Jamaica Business, which included fees associated with novating a vessel charter to the buyer and contingent fees due to our advisors. Remaining transaction and integration costs relate to legal fees and other third party costs incurred in connection with amendments to credit agreements, which were accounted for as modifications.
The transaction and integration costs of $12.3 million during the year ended December 31, 2024 primarily relate to legal fees and other third party costs incurred by the Company in connection with the amendments of credit agreements, which were accounted for as modifications.
Depreciation and amortization
Depreciation and amortization decreased by $4.3 million for the three months ended December 31, 2025 as compared to the three months ended September 30, 2025. The decrease was primarily attributable to the sale of certain vessels to Energos during the fourth quarter of 2025 as discussed above.
Depreciation and amortization increased by $44.7 million for the year ended December 31, 2025 as compared to the year ended December 31, 2024. The increase in depreciation expense resulted from the Fast LNG project and the Santa Catarina Facility being placed into service in December 2024, and was partially offset by a reduction following the sale of certain turbines and equipment to PREPA in the first half of 2024, and the sale of our Jamaica Business in May 2025.
Asset impairment expense
During the three months ended December 31, 2025, as part of the Company’s ongoing discussions with creditors, the Company has determined that it was not probable that it would pursue the development of certain Fast LNG projects and the ZeroParks hydrogen project and recognized impairment charges of $733.0 million to reduce the carrying values of the asset groups to their estimated fair value.
During the three months ended September 30, 2025, we determined that it was not probable that we would pursue development of certain projects and recognized an impairment charge of $4.8 million relating to costs incurred on these development projects.
During the year ended December 31, 2025, we recognized an impairment charge of $860.9 million, principally related to the Fast LNG project and the ZeroParks hydrogen project discussed above, the Lakach deepwater project and the development project in Pennsylvania. During the year ended December 31, 2024, we recognized an impairment expense of $16.5 million related to the sale of our Miami Facility.
Goodwill impairment expense
During the three months ended December 31, 2025, we recognized an impairment of goodwill of $15.9 million in our Ships segment, primarily as a result of a reduction in forecasted cash flows following the sale of certain vessels to Energos. There was no goodwill impairment expense recognized for the three months ended September 30, 2025.
During the year ended December 31, 2025, we recognized an impairment of goodwill of $582.2 million in our Terminals and Infrastructure segment, primarily as a result of (i) the significant increase in the WACC which reflected a higher company specific risk premium, and (ii) a reduction in forecasted cash flows following changes in customer revenue projections and the timing of completion of development projects.
Following the impairments recognized in the Terminals and Infrastructure and Ships segments described above, the remaining goodwill has been fully impaired.
There was no goodwill impairment expense recognized for the year ended December 31, 2024.
(Gain) loss on sale
For the three months ended December 31, 2025, the Company recorded a gain of $199.9 million. In November 2025, we completed a transaction with Energos, pursuant to which the Company early terminated the long-term charter
83
Table of Contents
agreements with Energos for certain vessels and novated associated sub-charter agreements for these vessels to Energos, in exchange for cash consideration of $150.0 million. The Company recognized a gain of $217.1 million from the transaction.
For the year ended December 31, 2025, the Company recorded a gain of $670.9 million. In addition to the vessel sale transaction discussed above, in May 2025, the Company completed the sale of its Jamaica Business, and recognized a gain of $453.8 million from the sale.
During the year ended December 31, 2024, the Company recognized a loss of $80.2 million from the sale of turbines and related equipment to the PREPA.
Interest expense
Interest expense decreased by $5.3 million for the three months ended December 31, 2025 as compared to the three months ended September 30, 2025, primarily due to lower debt resulting from the vessel sale transaction during the fourth quarter of 2025.
Interest expense increased by $461.5 million during the year ended December 31, 2025 as compared to the year ended December 31, 2024, primarily due to higher debt balances outstanding as well as increased borrowing rates. In addition, we also capitalized lower interest expense of $339.6 million for the year ended December 31, 2025 compared to $501.9 million for the year ended December 31, 2024, as the Fast LNG project and Santa Catarina Facility were placed into service at the end of 2024.
Other expense (income), net
Other expense, net and other income, net was $5.9 million and $30.6 million for the three months ended December 31, 2025 and September 30, 2025, respectively. Other income, net and other expense, net was $147.6 million and $116.3 million for the year ended December 31, 2025 and December 31, 2024, respectively.
Other income (expense), net for the third and fourth quarters of 2025, as well as for the years ended 2025 and 2024, primarily reflected remeasurement gains and losses on U.S. dollar denominated debt held by our Brazil subsidiary, driven by fluctuations in the Brazilian Real relative to the U.S. Dollar. The losses were partially offset by interest income, and realized and unrealized gains on foreign currency derivative contracts. The interest income was derived largely from the restricted cash for our development projects in Brazil.
Loss on extinguishment of debt, net
The Company had no material extinguishment of debt for the three months ended December 31, 2025 and September 30, 2025.
During 2025, we reduced the available capacity under our Revolving Facility by $270.0 million and recognized $10.6 million of loss on extinguishment of debt, which represents the write-off of unamortized deferred financing costs. We also recognized $5.9 million of loss on extinguishment of debt related to the repayment of the South Power Bonds in conjunction with closing of the sale of our Jamaica Business. Additionally, we made a partial repayment of the Term Loan A using proceeds from the sale and incurred a partial extinguishment loss of $3.0 million.
During 2024, we repaid all of the 2025 Notes and a portion of the 2026 Notes and 2029 Notes, and recognized as a loss on extinguishment of debt totaling $235.4 million. In Brazil, we repaid the PortoCem Bridge Loan with proceeds from the PortoCem Debenture issuance and recorded a loss on extinguishment of $25.0 million. In addition, during the first quarter of 2024, we recognized prepayment premium and unamortized financing costs of $7.9 million in connection with the prepayment of the Equipment Notes. During the same period, we also recognized a premium over the repurchase price of $1.9 million in connection with the cash tender offer to repurchase $375.0 million of the outstanding 2025 Notes.
Tax provision
We recognized a tax provision of $61.4 million for the year ended December 31, 2025 compared to a tax provision of $70.3 million for the year ended December 31, 2024. For the year ended December 31, 2025, the tax provision was primarily driven by valuation allowance against deferred tax assets related to losses in U.S. operations and losses generated by foreign operations in Brazil and Mexico.
84
Table of Contents
Liquidity and Capital Resources
Cash Flows
The following table summarizes the changes to our cash flows for the year ended December 31, 2025 and 2024, respectively:
| Year Ended December 31, | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|
| (in thousands) | 2025 | 2024 (as Restated) | Change | |||||||
| Cash flows from: | ||||||||||
| Operating activities | $ | (583,382) | $ | 602,206 | $ | (1,185,588) | ||||
| Investing activities | 465,763 | (1,584,054) | 2,049,817 | |||||||
| Financing activities | (543,640) | 1,718,511 | (2,262,151) | |||||||
| Net (decrease) increase in cash, cash equivalents, and restricted cash | $ | (661,259) | $ | 736,663 | $ | (1,397,922) |
Cash (used in) / provided by operating activities
Our cash flow used in operating activities was $583.4 million for the year ended December 31, 2025, which decreased by $1,185.6 million from cash provided by operating activities of $602.2 million for the year ended December 31, 2024. Our net loss for the year ended December 31, 2025, when adjusted for non-cash items, increased by $1.2 billion from the year ended December 31, 2024.
Cash outflows during the year ended December 31, 2025 includes significant interest payments resulting from both higher amounts of outstanding debt and increased interest rates. Cash paid for interest, excluding capitalized interest, during 2025 totaled approximately $352.2 million. Additionally, we have incurred significant professional and consulting fees relating to our capital restructuring process. We have recognized reduced cash flows following the sale of our Jamaica Business. Following the sale of the Jamaica Business, we continue to incur operational and administrative costs that supported all of our operations, including Jamaica. Additionally, our first FLNG unit was placed in service at the end of 2024, and we have incurred increased operational and maintenance costs as we optimize our LNG production process.
Cash provided by / (used in) investing activities
Our cash flow provided by investing activities was $465.8 million for the year ended December 31, 2025, which increased by $2.0 billion from cash used in investing activities of $1.6 billion for the year ended December 31, 2024. Cash inflows from investing activities during the year ended December 31, 2025 were primarily from proceeds of $961.9 million from the sale of the Jamaica Business and $150.0 million from the sale of Energos vessels. Cash inflows were offset by $908.8 million of capital expenditures of which $257.9 million was paid significantly beyond our vendors customary payment terms, and as such, is presented as a financing activity. Capital expenditures were used for continued construction of the PortoCem Power Plant and the Puerto Sandino Facility, and for expansion projects in Puerto Rico.
Cash outflows from investing activities during the year ended December 31, 2024 were primarily used for continued development of our Fast LNG project and the construction of the PortoCem Power Plant and Barcarena Power Plant. Cash outflows were offset by proceeds from the sale of assets including the sale of turbines and related equipment to PREPA, our investment in Energos, the Mazo and the Miami Facility.
Cash (used in) / provided by financing activities
Our cash flow used in financing activities was $543.6 million for the year ended December 31, 2025, which decreased by $2.3 billion from cash provided by financing activities of $1.7 billion for the year ended December 31, 2024. During the year ended December 31, 2025 we had total borrowings of $1.4 billion, a portion of which were used to repay the Barcarena Debentures in full. We also repaid a portion of our Revolving Facility and repaid our short-term borrowings under repurchase agreements, prior to drawing again on these facilities. In conjunction with closing the sale of the Jamaica Business, we repurchased all outstanding South Power Bonds for $227.1 million.
85
Table of Contents
During the year ended December 31, 2024 we had total borrowings of $5.9 billion, with such borrowings primarily used to fund development of the Fast LNG project, Barcarena Power Plant, and PortoCem Power Plant. Such borrowings were also used to repay a portion of the 2025 Notes and various asset level financings in Puerto Rico and Brazil. We also repaid a portion of our Revolving Facility and short-term borrowings under repurchase agreements, prior to again drawing on these facilities.
Contractual Obligations
We are committed to make cash payments in the future pursuant to certain contracts. The following table summarizes certain contractual obligations in place as of December 31, 2025 and includes those contractual obligations of BrazilCo, which will no longer be owed by us upon completion of the Restructuring Transaction:
| (in thousands) | Total | Year 1 | Years 2 to 3 | Years 4 to 5 | More than 5 years | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Long-term debt obligations | $ | 9,661,351 | $ | 7,452,300 | $ | 391,064 | $ | 264,245 | $ | 1,553,742 | ||||||||
| Purchase obligations | 17,954,542 | 211,618 | 769,000 | 1,769,116 | 15,204,808 | |||||||||||||
| Lease obligations | 538,443 | 104,559 | 174,499 | 112,386 | 146,999 | |||||||||||||
| Total | $ | 28,154,336 | $ | 7,768,477 | $ | 1,334,563 | $ | 2,145,747 | $ | 16,905,549 |
Long-term debt obligations
For information on our long-term debt obligations, see “—Liquidity and Capital Resources—Long-Term Debt.” The amounts included in the table above are based on the total debt balance, scheduled maturities or accelerated maturities under the events of default, and interest rates in effect as of December 31, 2025 and includes certain obligations that will not be owed by us upon completion of the Restructuring Transaction.
A portion of our long-term debt obligations will be paid to Energos under charters of vessels included in the Energos Formation Transaction to third parties. The residual value of these vessels also forms a part of the obligation and will be recognized as a bullet payment at the end of the charters. As neither these third party charter payments nor the residual value of these vessels represent cash payments due by NFE, such amounts have been excluded from the table above.
Purchase obligations
We are party to contractual purchase commitments for the purchase, production and transportation of LNG and natural gas, as well as engineering, procurement and construction agreements to develop our terminals and related infrastructure. Our commitments to purchase LNG and natural gas are principally take-or-pay contracts, which require the purchase of minimum quantities of LNG and natural gas, and these commitments are designed to assure sources of supply and are not expected to be in excess of normal requirements. Certain LNG purchase commitments are subject to conditions precedent, and we include these expected commitments in the table above beginning when delivery is expected assuming that all contractual conditions precedent are met. For purchase commitments priced based upon an index such as Henry Hub, the amounts shown in the table above are based on the spot price of that index as of December 31, 2025.
We have construction purchase commitments in connection with our development projects, including our Puerto Sandino Facility, Barcarena Facility, Barcarena Power Plant and PortoCem Power Plant, and any remaining unpaid commitments on our FLNG projects. Commitments included in the table above include commitments under engineering, procurement and construction contracts where a notice to proceed has been issued. Our remaining committed capital expenditures, inclusive of invoiced amounts in Accounts payable, towards these projects is approximately $271 million. We have secured financing commitments to continue to develop our Barcarena Power Plant and PortoCem Power Plant, which represents approximately $97 million of our upcoming committed capital expenditures.
Following the completion of the Restructuring Transaction, we do not plan to incur significant capital expenditures to develop FLNG 2. We are in active discussions with third parties to co-develop FLNG 2, which is expected to take approximately 24 months to complete from the time our partner is engaged. Estimated cost to complete is uncertain and is dependent upon final design and engineering, but we currently expect the remaining cost to be between $750.0 million and $1,500.0 million.
Lease obligations
86
Table of Contents
Future minimum lease payments under non-cancellable lease agreements, inclusive of fixed lease payments for renewal periods we are reasonably certain will be exercised, are included in the above table. Our lease obligations are primarily related to LNG vessel time charters, marine port leases, ISO tank leases, office space, and a land lease.
Long-Term Debt
New 2029 Notes
On November 6, 2024, we entered into an exchange and subscription agreement (the “Exchange and Subscription Agreement”) with certain holders (the “Supporting Holders”) of our outstanding 2026 Notes and 2029 Notes. Pursuant to the Exchange and Subscription Agreement (i) NFE Financing, an indirect subsidiary of NFE, sold to the Supporting Holders approximately $1,210.4 million aggregate principal amount of NFE Financing’s 12.000% Senior Secured Notes due 2029 (the “New 2029 Notes”) (the transactions described in clause (i), the “Subscription Transactions”) and (ii) NFE Financing issued to the Supporting Holders approximately $1,519.7 million aggregate principal amount of New 2029 Notes in a dollar-for-dollar exchange for a portion of our 2026 Notes and 2029 Notes (the transactions described in clause (ii), the “Exchange Transactions” and together with the Subscription Transactions, the “Refinancing Transactions”).
NFE Financing issued $2,730.1 million aggregate principal amount of New 2029 Notes pursuant to the Refinancing Transactions. The Company utilized $886.6 million of these net proceeds from the Subscription Transactions to repay in full the outstanding aggregate principal amount and accrued interest on the 2025 Notes. The remainder of the net proceeds from the New 2029 Notes issued pursuant to the Subscription Transactions were used for general corporate purposes.
Pursuant to the Exchange and Subscription Agreement, upon consummation of the Refinancing Transactions, the Supporting Holders received a commitment fee equal to either (i) 5% of the aggregate principal amount of such Supporting Holder’s New 2029 Notes, payable in shares of Class A common stock of the Company, at a price of $8.63 per share (the “Commitment Fee Shares”), (ii) 2% of the aggregate principal amount of such Supporting Holder’s New 2029 Notes, payable in kind in the form of additional New 2029 Notes (the “Commitment Fee Notes”), or (iii) a combination of the foregoing. The Company issued 15,700,998 Commitment Fee Shares to the Supporting Holders in satisfaction of its commitment fee obligations under the Exchange and Subscription Agreement, and $5.4 million Commitment Fee Notes were issued and included in the total New 2029 Notes issuance.
The New 2029 Notes were issued pursuant to, and are governed by, an indenture (the “New 2029 Notes Indenture”). The New 2029 Notes are senior, secured obligations of NFE Financing, and interest is payable semi-annually in arrears at a rate of 12.000% per annum on May 15 and November 15 of each year, beginning on May 15, 2025. The New 2029 Notes will mature on November 15, 2029, provided that the maturity date shall be accelerated to the date that is 91 days prior to the stated maturity date of any of our other indebtedness, subject to certain exceptions as described in the New 2029 Notes Indenture, if more than $100.0 million aggregate principal amount of such other indebtedness remains outstanding on such date.
NFE Financing may redeem some or all of the New 2029 Notes at redemption prices set forth in the New 2029 Notes Indenture; such redemption prices and any “make-whole” premiums are based on the timing of the redemption. Further, upon the occurrence of certain other events, including change of control and certain distributions from our Brazil business, NFE Financing may be required to make an offer to repurchase all of the New 2029 Notes at prices specified in the New 2029 Notes Indenture.
The New 2029 Notes Indenture contains default provisions that would allow these holders to accelerate the maturity date under the New 2029 Notes following the occurrence of a default by the Company or any of its subsidiaries on indebtedness for borrowed money if the principal amount of such indebtedness is equal to $10.0 million in the case of NFE Financing and $100.0 million in the case of the Company and any of its other subsidiaries unless such defaulted indebtedness has been discharged, the default has been cured or the holders have rescinded or waived the acceleration, notice or action giving rise to the event of default.
NFE Financing did not make the interest payment of $163.8 million due to holders of the New 2029 Notes on November 17, 2025. An event of default under the New 2029 Notes Indenture arose on November 20, 2025, when the contractual grace period for interest payments on such notes expired. Such defaults are subject to forbearance under the RSA pursuant to which the holders have agreed, subject to certain conditions, to refrain from exercising remedies with respect to specified defaults until termination of the RSA or the closing of the Restructuring Transaction. If the Restructuring Transaction is not consummated or the RSA is terminated, the holders thereunder could accelerate the
87
Table of Contents
outstanding indebtedness. Upon completion of the Restructuring Transaction contemplated under the RSA, the New 2029 Notes will no longer be outstanding.
2026 Notes
In April 2021, we issued $1,500.0 million of 6.50% senior secured notes in a private offering pursuant to Rule 144A under the Securities Act (the “2026 Notes”). Interest is payable semi-annually in arrears on March 31 and September 30 of each year; no principal payments are due until maturity on September 30, 2026. We may redeem the 2026 Notes, in whole or in part, at any time prior to maturity, subject to certain make-whole premiums.
The 2026 Notes are guaranteed, jointly and severally, on a senior secured basis by certain domestic and foreign subsidiaries. Subsequent to the Refinancing Transactions, the 2026 Notes are subject to the 2026 Supplemental Indenture.
The Company did not make the interest payment of $10.4 million due to holders of the 2026 Notes on March 15, 2026. An event of default under the indenture governing the 2026 Notes will arise on April 15, 2026, when the contractual grace period for interest payments on such notes expires. Additionally, the Company has not entered into a forbearance agreement with respect to the 2026 Notes, and as a result, the holders of the 2026 Notes are not restricted from exercising remedies in connection with such event of default. Uncured events of default exist under this indenture and the credit agreements, and as such, the outstanding principal balance of the 2026 Notes has been presented as a current liability. Upon completion of the Restructuring Transaction contemplated under the RSA, the 2026 Notes will no longer be outstanding.
2029 Notes
In March 2024, we issued $750.0 million of 8.75% senior secured notes in a private offering pursuant to Rule 144A under the Securities Act (the “2029 Notes”). Interest is payable semi-annually in arrears on March 15 and September 15 of each year; no principal payments are due until maturity on March 15, 2029. We may redeem the 2029 Notes, in whole or in part, at any time prior to maturity, subject to certain make-whole premiums.
The 2029 Notes are guaranteed on a senior secured basis by each domestic subsidiary and foreign subsidiary that is a guarantor under the 2026 Notes. Subsequent to the Refinancing Transactions, the 2029 Notes are subject to the 2029 Supplemental Indenture.
The Company did not make the interest payment of $16.6 million due to holders of the 2029 Notes on March 31, 2026. An event of default under the indenture governing the 2029 Notes will arise on April 30, 2026, when the contractual grace period for interest payments on such notes expires. Additionally, the Company has not entered into a forbearance agreement with respect to the 2029 Notes, and as a result, the holders of the 2029 Notes are not restricted from exercising remedies in connection with such event of default. Uncured events of default exist under this indenture and the credit agreements, and as such, the outstanding principal balance of the 2029 Notes has been presented as a current liability. Upon completion of the Restructuring Transaction contemplated under the RSA, the 2029 Notes will no longer be outstanding.
Revolving Facility
In April 2021, we entered into a credit agreement (the “Revolving Credit Agreement”) for a $200.0 million senior secured revolving credit facility (the “Revolving Facility”). The obligations under the Revolving Facility are guaranteed by certain of the Company’s subsidiaries, including those that own the Company’s offshore FLNG facility at Altamira (“FLNG 1 Project”) and FLNG 2, and are secured by substantially the same collateral securing the obligations under certain intercompany loans entered into in conjunction with the Refinancing Transactions, as well as the assets comprising the FLNG 1 Project and FLNG 2.
The borrowings under the Revolving Facility bear interest at a Secured Overnight Financing Rate (“SOFR”) based rate plus a margin based upon usage of the Revolving Facility. The rates applicable to outstanding borrowings as of
88
Table of Contents
December 31, 2025 and 2024 were 7.51% and 8.22%, respectively. Borrowings under the Revolving Facility may be prepaid, at our option, at any time without premium.
Through May 2024, the Revolving Facility was amended to increase the borrowing capacity to $1,000 million. The amendments did not impact the interest rate or term of the Revolving Facility, and no deferred costs were written off. As of December 31, 2025 and 2024, $660 million and $1,000 million was outstanding under the Revolving Facility, respectively.
In May 2025, we entered into an amendment to the Revolving Credit Agreement to, among other things, (i) provide for a covenant holiday with respect to the consolidated first lien debt ratio and fixed charge coverage ratio contained therein for the fiscal quarter ended June 30, 2025, (ii) permit $270.0 million of proceeds from the sale of the Jamaica Business to be used to prepay and terminate a portion of loans and commitments currently outstanding and otherwise not require the proceeds of the sale of the Jamaica Business to be used to prepay loans and commitments, (iii) provide that the asset sale sweep mandatory prepayment will no longer apply once aggregate commitments are reduced to $550.0 million and (iv) restrict the Company from prepaying the 2026 Notes in excess of $200.0 million other than to avoid springing maturities unless any such prepayment is made using proceeds from refinancing indebtedness or capital contributions.
In May 2025, we repaid $270.0 million of outstanding revolving loans under the Revolving Facility which permanently reduced the borrowing capacity to $730.0 million. Additionally, we have issued letters of credit of $69.5 million in 2025, and including the outstanding letters of credit, we have fully utilized the borrowing capacity of $729.9 million as of December 31, 2025.
In November 2025, we amended our Revolving Credit Agreement to, among other things, (i) add a covenant restricting our ability to modify the New 2029 Notes Forbearance Agreement in a matter adverse to the lenders under the Revolving Credit Agreement without consent, including extensions of the forbearance period, (ii) provide a covenant holiday with respect to the consolidated first lien debt ratio, the fixed charge coverage ratio and minimum liquidity for the fiscal quarters ended September 30, 2025 with respect to the consolidated first lien debt ratio and the fixed charge coverage ratio and December 31, 2025 with respect to minimum liquidity, (iii) add a covenant restricting the ability of the Borrower to amend certain existing debt in a way that would modify the choice of law provisions of such debt, and (iv) add new events of default that would occur if the New 2029 Notes Forbearance Agreement is materially breached or does not remain in effect or if any payment is made on the outstanding principal or interest for the 2026 Notes, the 2029 Notes, the Term Loan A Credit Agreement, the Term Loan B Credit Agreement, certain intercompany agreements and the New 2029 Notes.
In December 2025, we entered into an amendment to the Revolving Credit Agreement to, among other things, provide that if the Company fails to maintain the Term Loan A Forbearance Agreement and the Term Loan B Forbearance Agreement in full force and effect or materially violates its terms, an event of default would occur under the Revolving Credit Agreement. If such events of default occur, the lenders would have the right to accelerate the repayment of the outstanding principal under the Revolving Credit Agreement. If the lenders and issuing banks choose to exercise such rights under those facilities, substantially all of the Company’s outstanding indebtedness could be accelerated, and the Company may be required or compelled to pursue additional restructuring initiatives to preserve value and optionality, including possible out of court restructurings, or in-court relief, which could have a material and adverse impact on stockholders. The amendment also, among other things and subject to certain exceptions described therein, removes certain flexibility the Company had to pay dividends and other distributions, incur indebtedness for borrowed money, consummate asset sales, make intercompany transfer of assets and make investments.
The Company is required to comply with the below covenants under the Revolving Credit Agreement:
•Beginning with the fiscal quarter ended March 31, 2025, for quarters in which the Revolving Facility is greater than 50% drawn, the Consolidated First Lien Debt Ratio must be below the following: (i) 6.50 to 1.00, for the fiscal quarter ended December 31, 2025, (ii) 7.25 to 1.00, for the fiscal quarters ending March 31, 2026 through September 30, 2026, and (iii) 6.75 to 1.00, for the fiscal quarter ending December 31, 2026 and each fiscal quarter
89
Table of Contents
thereafter. The Consolidated First Lien Debt Ratio test was not tested for the Test Periods ending June 30, 2025 and September 30, 2025.
•Beginning with fiscal quarter ended March 31, 2025, the Fixed Charge Coverage Ratio must be less than or equal to (i) 1.00 to 1.00, for the fiscal quarter ended December 31, 2025 and each fiscal quarter thereafter. The Fixed Charge Coverage Ratio test was not tested for the Test Periods ended June 30, 2025 and September 30, 2025.
•The Company is also required to maintain a minimum consolidated liquidity of (i) $50.0 million as of the last day of each month and (ii) $100.0 million as of the last day of any fiscal quarter (other than for the fiscal quarter ended December 31, 2025, which shall not be tested).
The Company was not in compliance with the Consolidated First Lien Debt Ratio and the Fixed Charge Coverage Ratio as of December 31, 2025. Such defaults are subject to forbearance under the RSA pursuant to which the lenders have agreed subject to certain conditions, to refrain from exercising remedies with respect to specified defaults until termination of the
RSA or the closing of the Restructuring Transaction. If the Restructuring Transaction is not consummated or the RSA is
terminated, the lenders thereunder could accelerate the outstanding indebtedness. Upon completion of the Restructuring Transaction contemplated under the RSA, the Revolving Facility will no longer be outstanding.
Letter of Credit Facility
In July 2021, we entered into an uncommitted letter of credit and reimbursement agreement (the “Letter of Credit Agreement”) with a bank for the issuance of letters of credit for an aggregate amount of up to $75.0 million (the “Letter of Credit Facility”). Through December 31, 2023, the Letter of Credit Facility was amended multiple times to increase the availability to $350.0 million. In 2025, the Letter of Credit Facility was amended multiple times to reduce the availability to $195.0 million. As of December 31, 2025, the Company had $195.0 million of letters of credit outstanding under the Letter of Credit Facility.
The obligations under the Letter of Credit Facility are guaranteed by certain of our subsidiaries, including those that own our FLNG 1 Project and FLNG 2. The Letter of Credit Facility is secured by substantially the same collateral as the first lien obligations under the Revolving Facility and Term Loan B Credit Agreement.
In November 2025, we entered into the eleventh amendment to the Letter of Credit Agreement to, among other things, (a) extend the maturity date of the Letter of Credit Facility to March 31, 2026, (b) provide for a covenant holiday with respect to the consolidated first lien debt ratio and fixed charge coverage ratio covenants contained therein for the fiscal quarters ended December 31, 2025, (c) remove the minimum liquidity requirement contained therein with respect to each fiscal quarter, (d) remove certain flexibility we had to pay dividends and other distributions, and (e) restrict our ability to make payments of principal or interest accruing on certain outstanding indebtedness. As of December 31, 2025, the Company had $195.0 million of letters of credit outstanding under the Letter of Credit Facility.
Term Loan B Credit Agreement
On August 3, 2023, we entered into a credit agreement (the “Bridge Term Loan Agreement”) pursuant to which the lenders funded term loans (the “Bridge Term Loans”) in an aggregate principal amount of $400.0 million. The Bridge Term Loans were initially set to mature on August 1, 2024 and were payable in full on the maturity date. The Bridge Term Loans bore interest at a per annum rate equal to Adjusted Term SOFR (as defined in the Bridge Term Loan Agreement) plus 3.50%.
On October 30, 2023, we entered into a credit agreement (the “Term Loan B Credit Agreement”) pursuant to which the lenders funded term loans in an aggregate principal amount of $856.0 million (“Term Loan B”). Borrowings were issued at a discount, and we received proceeds of $787.5 million. The proceeds from the Term Loan B issuance were used to repay the Bridge Term Loans and may be used for working capital and other general corporate purposes. The Term Loan B will mature on the earliest of (i) October 30, 2028 if the 2026 Notes are refinanced in full prior to their maturity and (ii) July 31, 2026, if any of the 2026 Notes remain outstanding as of such date. Quarterly principal payments of approximately $2.1 million are required beginning March 2024.
The obligations under the Term Loan B are guaranteed by certain of our subsidiaries, including those that own our FLNG 1 Project and FLNG 2. The Term Loan B is secured by substantially the same collateral as the first lien obligations under the 2026 Notes, the Revolving Facility, and, in addition, is secured by assets compromising our FLNG 1 Project.
90
Table of Contents
The Term Loan B bears interest at a per annum rate equal to Adjusted Term SOFR (as defined in the Term Loan B Credit Agreement) plus 5.0%. We may prepay the Term Loan B at its option subject to prepayment premiums until October 2025 and customary break funding costs. We are required to prepay the Term Loan B with the net proceeds of certain asset sales, condemnations, and debt and convertible securities issuances, in each case subject to certain exceptions and thresholds. Additionally, commencing with the fiscal quarter ended December 31, 2024, we will be required to prepay the Term Loan B with our Excess Cash Flow (as defined in the Term Loan B Credit Agreement).
In March 2025, we entered into an amendment to the Term Loan B Credit Agreement. Pursuant to the amendment, certain lenders agreed to provide incremental term loans in an aggregate principal amount of up to $425.0 million, which increased the total outstanding principal amount to $1,272.4 million (“Term Loan B”). The incremental term loans were issued at a discount, and we received proceeds, net of discount, of $391.0 million. The incremental term loans are subject to the same maturity date as the term loans under the original agreement. Quarterly principal payments of approximately $3.2 million were required beginning June 2025.
The obligations under the Term Loan B are guaranteed by certain of our subsidiaries, including those that own our FLNG 1 Project and FLNG 2. The Term Loan B is secured by substantially the same collateral as the first lien obligations under the 2026 Notes, the Revolving Facility, and, in addition, is secured by assets compromising the FLNG 1 Project. The Term Loan B Credit Agreement contains usual and customary representations and warranties, and usual and customary affirmative and negative covenants. No financial covenant compliance is required under the Term Loan B.
The Term Loan B bears interest at a per annum rate equal to Adjusted Term SOFR (as defined in the amendment) plus 5.5%. The Company may prepay the Term Loan B at its option subject to prepayment premiums until March 10, 2028 and customary break funding costs. The Company is required to prepay the Term Loan B with the net proceeds of certain asset sales, condemnations, and debt and convertible securities issuances and with the Company’s Excess Cash Flow (as defined in the amendment), in each case subject to certain exceptions and thresholds. The Company must comply with the same covenant requirements as those under the original agreement.
The Term Loan B contains cross acceleration provisions that would allow these lenders to accelerate the maturity date of outstanding principal under the Term Loan B upon an acceleration of outstanding principal balances under other credit agreements and indentures, including the New 2029 Notes Indenture, Revolving Credit Agreement and Term Loan A Credit Agreement. Uncured events of default exist under the Term Loan B Credit Agreement, as well as these other indentures and credit agreements, and as such, the outstanding principal balance of the Term Loan B has been presented as a current liability. Upon completion of the Restructuring Transaction contemplated under the RSA, the Term Loan B will no longer be outstanding.
Term Loan A Credit Agreement
In July 2024, we entered into a credit agreement (“Term Loan A Credit Agreement”) for a senior secured, multiple draw term loan facility in an aggregate principal amount of up to $700.0 million (“Term Loan A”). During 2024, we drew $350.0 million on the Term Loan A.
In March 2025, the Company entered into an amendment to the Term Loan A Credit Agreement. Pursuant to the amendment, the future borrowing commitments are reduced to zero, eliminating the potential for future borrowings under the Term Loan A Credit Agreement. In May 2025, the Company entered into an additional amendment to the Term Loan A Credit Agreement, which, among other things, (i) requires $55.0 million of proceeds from the sale of the Jamaica Business to be used to prepay a portion of loans currently outstanding; (ii) increases the applicable margin to 6.70% for SOFR loans and 5.70% for Base Rate Loans and implement a Term SOFR floor of 4.30% for the initial term loans and a base rate minimum of 5.30%; (iii) requires the Company to make mandatory prepayments with 12.5% of proceeds of a request for equitable adjustment and any other proceeds related to the early termination of contracts associated with the grid stabilization project in Puerto Rico, if and when such proceeds are received. Additionally, this amendment amends certain of the financial covenants, whereby the consolidated first lien debt ratio cannot exceed (i) 6.50 to 1.00, for the fiscal quarter ended December 31, 2025, (ii) 7.25 to 1.00, for the fiscal quarters ending March 31, 2026 and September 30, 2026 and (iii) 6.75 to 1.00, for the fiscal quarter ending December 31, 2026 and each fiscal quarter thereafter. The amendment added a fixed charge coverage ratio covenant and removed the debt to total capitalization covenant. The Company cannot permit
91
Table of Contents
the fixed charge coverage ratio for the Company and its restricted subsidiaries to be less than or equal to 1.00 to 1.00 for the fiscal quarter ended September 30, 2025 and each fiscal quarter thereafter.
The obligations under the Term Loan A Credit Agreement are guaranteed, jointly and severally, on a senior secured basis by each subsidiary that is a guarantor under the 2026 Notes, 2029 Notes, our Revolving Facility, our letter of credit facility (the “Letter of Credit Facility”) and our Term Loan B, other than the guarantors comprising the FLNG 1 Project (who guarantee the Revolving Facility, the Letter of Credit Facility, and the Term Loan B). The obligations under the Term Loan A Credit Agreement are secured by substantially the same collateral as the collateral securing such facilities, with the exception of the collateral comprising the FLNG 1 Project (which secures the Revolving Facility, the Letter of Credit Facility, and the Term Loan B). Additionally, the Term Loan A is guaranteed by the entities, and secured by the assets, comprising FLNG 2. An equal priority intercreditor agreement governs the treatment of the collateral.
The Term Loan A will mature in July 2027 and is payable in full on the maturity date. In the event that our existing 2026 Notes are not refinanced or repaid at least 60 days prior to maturity, amounts outstanding under the Term Loan A will become due and payable on such date. We may prepay the Term Loan A at its option without premium or penalty at any time subject to customary break funding costs. We are required to prepay the Term Loan A with the net proceeds of certain asset sales, condemnations, debt and convertible securities issuances, and extraordinary receipts related to FLNG 2. Additionally, commencing with the first fiscal quarter after the Completion Date, we will be required to prepay the Term Loan A with FLNG 2’s Excess Cash Flow (as defined in the Term Loan A Credit Agreement).
The Term Loan A Credit Agreement contains usual and customary representations, warranties and affirmative and negative covenants for financings of this type, including certain representations and warranties related to FLNG 2. The Term Loan A Credit Agreement includes certain other covenants related solely to FLNG 2, including limitations on capital expenditures, restrictions on additional accounts, and restrictions on amendments or termination of certain material documents related to FLNG 2.
The Term Loan A contains cross acceleration provisions that would allow these lenders to accelerate the maturity date of outstanding principal under the Term Loan A upon an acceleration of outstanding principal balances under other credit agreements and indentures, including the New 2029 Notes Indenture, Revolving Credit Agreement and Term Loan B Credit Agreement. Uncured events of default exist under the Term Loan A Credit Agreement, as well as these other indentures and credit agreements, and as such, the outstanding principal balance of the Term Loan A has been presented as a current liability. Upon completion of the Restructuring Transaction contemplated under the RSA, the Term Loan A will no longer be outstanding.
Short-term Borrowings
We may, from time to time, enter into sales and repurchase agreements with a financial institution, whereby we sell to the financial institution an LNG cargo and concurrently enter into an agreement to repurchase the same LNG cargo immediately with the repurchase price payable at a future date, generally not to exceed 90-days from the date of the sale and repurchase (the “Short-term Borrowings”). As of December 31, 2025, we had $73.2 million due under these arrangements. During 2025, the we executed multiple amendments to this financing arrangement primarily to extend payment terms. Each of these amendments was accounted for as a debt modification. We did not incur material costs and fees associated with the modifications.
Vessel Financing Obligation
In connection with the Energos Formation Transaction, we entered into long-term time charter agreements for certain vessels for periods of up to 20 years. Vessels chartered to us at the time of closing were classified as finance leases. Additionally, our charter of certain other vessels will commence only upon the expiration of the vessel’s existing third-party charters. These forward starting charters prevented the recognition of a sale of the vessels to Energos. As such, we accounted for the Energos Formation Transaction as a failed sale-leaseback and has recorded a financing obligation for consideration received.
We continue to be the owner for accounting purposes of vessels included in the Energos Formation Transaction (except the Nanook), and as such, we recognize revenue and operating expenses related to vessels under charter to third parties. Revenue recognized from these third-party charters form a portion of the debt service for the financing obligation; at inception of the arrangement, the effective interest rate on this financing obligation was approximately 18.10% and includes the cash flows that Energos receives from these third-party charters. Charter payments due in 2025 include $57.8
92
Table of Contents
million that will be treated as a payment of principal, and this amount is included within the current portion of long-term debt.
In November 2025, the Company completed a transaction with Energos, pursuant to which the Company early terminated the long-term charter agreements with Energos for Energos Eskimo, Energos Winter, Energos, Igloo and Energos Freeze and novated associated sub-charter agreements for these vessels to Energos. This transaction
resulted in the sale of these vessels that were previously accounted for as a failed sale leaseback. Upon closing of the
transaction, the Company derecognized these vessels from Property, plant and equipment with a carrying value of $667.0 million, and derecognized debt of $734.2 million.
Tugboat Financing
In December 2023, we sold and leased back four tugboat vessels for 15 years receiving proceeds of $46.7 million. (“Tugboat Financing”). The leasebacks of the tugboat vessels were classified as finance leases, and as such, we accounted for the Tugboat Financing as a failed sale-leaseback and has recorded a financing obligation for consideration received. The effective interest rate on this financing obligation is approximately 16.92%.
Brazil Financing Notes
In February 2025, one of our consolidated subsidiaries entered into an agreement to issue up to $350.0 million aggregate principal amount of 15.0% Senior Secured Notes due 2029 (the “Brazil Financing Notes”) at a purchase price of 97.75% of par. The Brazil Financing Notes mature on August 30, 2029; the principal is due in full on the maturity date. Interest is payable quarterly in arrears beginning on June 30, 2025, and for the first 30 months that the Brazil Financing Notes are outstanding, interest due can be paid in kind and added to the principal amount. A portion of the proceeds from the issuance of the Brazil Financing Notes of $208.7 million was used to repay the Barcarena Debentures in full.
The Brazil Financing Notes contain usual and customary representations and warranties, and usual and customary affirmative and negative covenants. No financial covenant compliance is required under the Brazil Financing Notes.
The repayment of the Barcarena Debentures was evaluated on a creditor-by-creditor basis to determine whether the transaction should be accounted for as a modification or extinguishment of debt. As a result of this evaluation, a portion of the repayment was determined to be an extinguishment of debt and, therefore, the Company recorded a debt extinguishment loss of $0.4 million to write off a pro-rata amount of unamortized issuance costs.
The outstanding principal balance of Brazil Financing Notes has been presented as a current liability as the Company provides a parent company guarantee under the agreement and uncured events of default exist under certain indentures and credit agreements. Upon completion of the Restructuring Transaction contemplated under the RSA, NFE will no longer own BrazilCo, including the Brazil Financing Notes.
PortoCem Debentures
PortoCem Debentures included a non-automatic early maturity provision whereby upon multiple downgrades of the Company’s credit rating, early maturity may be declared if approved by the majority of debenture holders. Our credit ratings were downgraded during 2025, the debenture holders have unanimously permanently waived their ability to declare an early maturity event due to these credit rating downgrades in exchange for two additional bank guarantees, totaling $129.1 million. During 2025, the Company provided the first required $50.0 million bank guarantee, which may be drawn by the debenture holders if there is a breach under the Equity Contribution Agreement; an additional bank guarantee of $79.1 million is required to be provided by May 10, 2026, subject to a 45 day cure period. Based on the Company’s current liquidity, the Company determined that it is not currently probable that the bank guarantee can be provided absent an agreement with its existing creditors or new lenders, and as such the PortoCem Debentures have been classified as a current liability. If the Company fails to provide the bank guarantee of $79.1 million, an automatic early maturity event will occur, and substantially all of the Company’s outstanding indebtedness would be payable on demand. In addition, certain of the creditors that have executed the RSA would have the right to terminate the RSA if the debenture holders declare an automatic early maturity.
Upon completion of the Restructuring Transaction contemplated under the RSA, NFE will no longer own BrazilCo, or be subject to the PortoCem Debentures.
93
Table of Contents
South Power 2029 Bonds
On May 14, 2025, we completed the sale of the Jamaica Business. In conjunction with closing, we repurchased all outstanding South Power Bonds for $227.2 million, including a 1.0% prepayment penalty and accrued interest.
Turbine Financing
In May 2024, we executed a loan agreement with a lender to borrow $148.5 million under a promissory note secured by certain turbines owned by a wholly-owned subsidiary of ours (the “Turbine Financing”). The Turbine Financing bears interest at 10.30%, and the principal is partially repayable in monthly installments over the 36-month term of the loan with the balance due upon maturity in June 2027.
The Turbine Financing contains usual and customary representations and warranties, and usual and customary affirmative and negative covenants. The Turbine Financing does not contain any restrictive financial covenants. We were required to pay a deposit of approximately $6.0 million that will be held by the lender throughout the term of the borrowing recorded in Other non-current assets, net.
EB-5 Loan Agreement
On July 21, 2023, we entered into a loan agreement under the U.S. Citizenship and Immigration Services EB-5 Program (“EB-5 Loan Agreement”) to pay for the development and construction of a new green hydrogen facility in Texas. The maximum aggregate principal amount available under the EB-5 Loan Agreement is $100.0 million, and outstanding borrowings bear interest at a fixed rate of 4.75%. The loan matures in 5 years from the initial advance with an option to extend the maturity by two one-year periods. It is expected that the loan will be secured by NFE’s green hydrogen facility, and NFE has provided a guarantee of the obligations under the EB-5 Loan Agreement. As of December 31, 2025, the availability under the EB-5 Loan Agreement has been fully funded, and there is an aggregate principal amount of $100.0 million outstanding.
The EB-5 Loan Agreement contains usual and customary representations and warranties, and usual and customary affirmative and negative covenants. The EB-5 Loan Agreement does not contain any restrictive financial covenants.
Summary of Critical Accounting Estimates
The preparation of consolidated financial statements in conformity with GAAP requires us to make certain estimates and assumptions that affect the amounts reported in the consolidated financial statements and the accompanying notes. Changes in facts and circumstances or additional information may result in revised estimates, and actual results may differ from these estimates. We evaluate our estimates and related assumptions regularly, and we believe that the accounting policies discussed below are critical to understanding our historical and future performance, as these policies relate to the more significant areas involving management’s judgments and estimates.
Impairment of long-lived assets
We perform a recoverability assessment of long-lived assets whenever events or changes in circumstances indicate that the carrying amount of an asset may not be recoverable. Indicators may include, but are not limited to, an impairment of goodwill, adverse changes in the regulatory environment in a jurisdiction where we operate, unfavorable events impacting the supply chain for LNG to our operations, a decision to discontinue the development of a long-lived asset, early termination of a significant customer contract or the introduction of newer technology. We exercise judgment in determining if any of these events represent an impairment indicator requiring a recoverability assessment.
When performing a recoverability assessment, the Company measures whether the estimated future undiscounted net cash flows expected to be generated by the asset exceeds its carrying value. The undiscounted cash flows consist of cash flows from current contracts, future projected contracts, estimated capital expenditures, and estimated residual or scrap values. The recoverability assessment also considers the probability of development, which may be impacted by the viability of the projects and our liquidity position. In the event that an asset does not meet the recoverability test, the carrying value of the asset will be adjusted to fair value resulting in an impairment charge.
94
Table of Contents
Recent Accounting Standards
For descriptions of recently issued accounting standards, refer to Note 5 of our notes to consolidated financial statements included in this Annual Report.
MD&A history
Prior-year 10-K MD&A spans are extracted from SEC filings with the same bounded parser used for the latest filing. The latest 10-K appears above; prior years are below.
FY 2024 10-K MD&A
SEC filing source: 0001749723-25-000029.
Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations.
Certain information contained in the following discussion and analysis, including information with respect to our plans, strategy, projections and expected timeline for our business and related financing, includes forward-looking statements. Forward-looking statements are estimates based upon current information and involve a number of risks and uncertainties. Actual events or results may differ materially from the results anticipated in these forward-looking statements as a result of a variety of factors.
You should read “Part 1, Item 1A. Risk Factors” and “Cautionary Statement on Forward-Looking Statements” elsewhere in this Annual Report on Form 10-K (“Annual Report”) for a discussion of important factors that could cause actual results to differ materially from the results described in or implied by the forward-looking statements contained in the following discussion and analysis.
The comparison of the years ended December 31, 2023 and 2022 can be found in our Annual Report on Form 10-K for the year ended December 31, 2023 located within “Part II, Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations.”
The following information should be read in conjunction with our audited consolidated financial statements and accompanying notes included elsewhere in this Annual Report. Our financial statements have been prepared in accordance with generally accepted accounting principles in the United States of America (“GAAP”). This information is intended to provide investors with an understanding of our past performance and our current financial condition and is not necessarily indicative of our future performance. Please refer to “—Factors Impacting Comparability of Our Financial Results” for further discussion. Unless otherwise indicated, dollar amounts are presented in millions.
Unless the context otherwise requires, references to “Company,” “NFE,” “we,” “our,” “us” or like terms refer to New Fortress Energy Inc. and its subsidiaries.
Overview
We are a global energy infrastructure company founded to help address energy poverty and accelerate the world’s transition to reliable, affordable and clean energy. We own and operate natural gas and liquefied natural gas ("LNG") infrastructure, and an integrated fleet of ships and logistics assets to rapidly deliver turnkey energy solutions to global markets; additionally, we have expanded our focus to building our modular LNG manufacturing business. Our near-term mission is to provide modern infrastructure solutions to create cleaner, reliable energy while generating a positive economic impact worldwide. Our long-term mission is to become one of the world’s leading companies providing power free from carbon emissions by leveraging our global portfolio of integrated energy infrastructure. We discuss this important goal in more detail in this Annual Report, “Items 1 and 2: Business and Properties” under “Sustainability—Toward a Low Carbon Future.”
Our chief operating decision maker makes resource allocation decisions and assesses performance on the basis of two operating segments, Terminals and Infrastructure and Ships.
Our Terminals and Infrastructure segment includes the entire production and delivery chain from natural gas procurement and liquefaction to logistics, shipping, facilities and conversion or development of natural gas-fired power generation. We currently source LNG from long-term supply agreements with third-party suppliers. Our first floating liquefaction unit, which we refer to as "Fast LNG" or "FLNG", began producing LNG in July 2024, and, once fully commissioned, we plan to source a portion of our LNG needs from this facility. The Terminals and Infrastructure segment includes all terminal operations in Jamaica, Puerto Rico, Mexico and Brazil, as well as vessels utilized in our terminal or logistics operations. We centrally manage our LNG supply and the deployment of our vessels utilized in our terminal or logistics operations, which allows us to optimally manage our LNG supply and fleet.
Our Ships segment includes certain vessels which are currently chartered under long-term arrangements to third parties and are part of the Energos Formation Transaction (defined below). Over time, we expect to utilize these vessels in our own terminal operations as charter agreements for these vessels expire, and these vessels are included in our Terminals and Infrastructure segment.
59
Table of Contents
Our Current Operations – Terminals and Infrastructure
Our management team has successfully employed our strategy to secure long-term contracts with significant customers, including Jamaica Public Service Company Limited (“JPS”), the sole public utility in Jamaica, South Jamaica Power Company Limited (“SJPC”), an affiliate of JPS, Jamalco, a bauxite mining and alumina producer in Jamaica, the Puerto Rico Electric Power Authority (“PREPA”), and Comisión Federal de Electricidad (“CFE”), Mexico’s power utility, each of which is described in more detail below. Our assets built to service these significant customers have been designed with capacity to service other customers.
Montego Bay Facility
The Montego Bay Facility serves as our supply hub for the north side of Jamaica, providing natural gas to JPS to fuel the 145MW Bogue power plant in Montego Bay, Jamaica ("Bogue Power Plant"). Our Montego Bay Facility commenced commercial operations in October 2016 and is capable of processing up to 60,000 MMBtu of LNG per day and features approximately 7,000 cubic meters of onsite storage. The Montego Bay Facility also consists of an ISO loading facility that can transport LNG to numerous on-island industrial users.
Old Harbour Facility
The Old Harbour Facility is an offshore facility consisting of an FSRU that is capable of processing up to 750,000 MMBtus of LNG per day. The Old Harbour Facility commenced commercial operations in June 2019 and supplies natural gas to the 190MW Old Harbour power plant (“Old Harbour Power Plant”) operated by SJPC. The Old Harbour Facility is also supplying natural gas to our dual-fired combined heat and power facility in Clarendon, Jamaica (“CHP Plant”). The CHP Plant supplies electricity to JPS under a long-term agreement. The CHP Plant also provides steam to Jamalco under a long-term take-or-pay agreement. The Old Harbour Facility also supplies gas directly to Jamalco to utilize in their gas-fired boilers.
San Juan Facility
Our San Juan Facility became fully operational in the third quarter of 2020. It is designed as a landed micro-fuel handling facility located in the Port of San Juan, Puerto Rico. The San Juan Facility has multiple truck loading bays to provide LNG to on-island industrial users. The San Juan Facility is near the PREPA San Juan Power Plant and serves as our supply hub for the PREPA San Juan Power Plant, industrial end-user customers in Puerto Rico, and after being awarded a new gas sale agreement in the first quarter of 2024, PREPA's gas-fired power plants throughout the island of Puerto Rico.
In 2023, we entered into agreements for the installation and operation of approximately 350MW of additional power to be generated at the Palo Seco Power Plant and San Juan Power Plant in Puerto Rico as well as the supply of natural gas. Our customer was contracted by the U.S. Army Corps of Engineers to support the island’s grid stabilization project with additional power capacity to enable maintenance and repair work on Puerto Rico’s power system and grid. We commissioned 350MW of duel-fuel power generation using our gas supply in less than 180 days.
In March 2024, our contract to provide emergency power services to support the grid stabilization project was terminated, and we completed a series of transactions that included the sale of turbines and related equipment deployed to support the grid stabilization project to PREPA. We were also awarded a new gas sale agreement with PREPA to supply up to 80 TBtu annually to PREPA's gas-fired power plants, including to the turbines that were sold to PREPA. The contract initially has a one year term that is renewable annually for three additional annual periods.
We are pursuing a $659 million request for equitable adjustment related to the early termination of our contract to provide emergency power services. The actual amount of any such adjustment and the timing of any related payments may be materially different than management’s current estimate. As a result, the Company cannot offer any assurance as to the actual amount that may be recovered pursuant to such request or subsequent claim, if any.
In the first quarter of 2023, our wholly-owned subsidiary, Genera PR LLC ("Genera"), was awarded a 10-Year contract for the operation and maintenance of PREPA’s thermal generation assets with the goal of reducing costs and
60
Table of Contents
improving reliability of power generation in Puerto Rico. We receive an annual management fee and are eligible for performance-based incentive fees. The service period under the contract commenced on July 1, 2023.
La Paz Facility
In the fourth quarter of 2021, we began commercial operations at the Port of Pichilingue in Baja California Sur, Mexico (the “La Paz Facility”). The La Paz Facility also supplies our gas-fired power units located adjacent to the La Paz Facility (the “La Paz Power Plant”) and could have a maximum capacity of up to 135MW of power. We placed the La Paz Power Plant into service in the third quarter of 2023.
In the fourth quarter of 2022, we finalized short-form agreements with CFE to expand and extend our supply of natural gas to multiple CFE power generation facilities in Baja California Sur and to sell the La Paz Power Plant to CFE. In the third quarter of 2024, we executed a 10-year gas sales agreement to supply natural gas to additional CFE facilities on take-or-pay basis.
Santa Catarina Facility
We placed our Santa Catarina Facility in service in the fourth quarter of 2024. The Santa Catarina Facility is located on the southern coast of Brazil and consists of an FSRU with a processing capacity of approximately 500,000 MMBtu from LNG per day and LNG storage capacity of up to 138,000 cubic meters. We have developed and constructed a 33-kilometer, 20-inch pipeline that connects the Santa Catarina Facility to the existing inland Transportadora Brasileira Gasoduto Bolivia-Brasil S.A. (“TBG”) pipeline via an interconnection point in the municipality of Garuva. The Santa Catarina Facility and associated pipeline are expected to have a total addressable market of 15 million cubic meters per day of natural gas.
In August 2024, we acquired 100% of the outstanding equity interest of Usina Termeletrica de Lins S.A. ("Lins"), which owns key rights and permits to develop a natural gas-fired power plant for up to 2.05GW located in the State of Sao Paulo, within the city limits of Lins. We expect to participate in upcoming power auctions in Brazil scheduled for June 2025, and to the extent that we are successful in these auctions, we expect to develop a gas-fired power plant using natural gas from the Santa Catarina Facility.
Miami Facility
Our Miami Facility began operations in April 2016. This facility has liquefaction capacity of approximately 8,300 MMBtu of LNG per day and enables us to produce LNG for sales directly to industrial end-users in southern Florida, including Florida East Coast Railway via our train loading facility, and other customers throughout the Caribbean using ISO containers. On June 30, 2024, the Company entered into a definitive agreement to sell its Miami Facility for $62 million. The transaction closed in the fourth quarter of 2024.
Our LNG Supply and Cargo Sales
NFE provides reliable, affordable and clean energy supplies to customers around the world that we plan to satisfy through the following sources: 1) our current contractual supply commitments; 2) our own FLNG production; and 3) additional LNG supply contracts expected to commence in 2027. Our first FLNG facility began to produce LNG in July 2024, and we expect to generate up to 70 TBtus annually from this facility. When expected production from FLNG is combined with our commitments to purchase and receive physical delivery of LNG volumes, we expect to have sufficient supply for 100% of our committed volumes for each of our downstream terminals inclusive of our Montego Bay Facility, Old Harbour Facility, San Juan Facility, La Paz Facility, Barcarena Facility and Santa Catarina Facility. Additionally, we have binding contracts for LNG volumes from two separate U.S. LNG facilities, each with a 20-year term, which are expected to commence in 2027 and 2029.
Geopolitical events have substantially impacted and may continue to impact the natural gas and LNG markets, which have experienced significant volatility in recent years. The majority of our LNG supply contracts are based on a natural gas-based index, Henry Hub, plus a contractual spread. We limit our exposure to fluctuations in natural gas prices as our pricing in contracts with customers is largely based on the Henry Hub index price plus a fixed fee component. Additionally, with our own Fast LNG production, we plan to further mitigate our exposure to variability in LNG prices, and our long-term strategy is to sell substantially all cargos produced to customers on a long-term, take-or-pay basis through our downstream terminals.
61
Table of Contents
Our Current Operations – Ships
Our shipping assets include Floating Storage and Regasification Units ("FSRUs"), Floating Storage Units ("FSUs") and LNG carriers ("LNGCs"). Our shipping assets are included in both of our operating segments. Certain vessels are currently chartered to third parties under long-term arrangements and are included in the Energos Formation Transaction (defined below); such vessels are included in our Ships segment. At the expiration of third party charters of these vessels, we plan to utilize these vessels for our own operational purposes. Vessels we operate at our terminal operations or that we decide to sub-charter are included in our Terminals and Infrastructure segment.
In August 2022, we completed a transaction (the “Energos Formation Transaction”) with an affiliate of Apollo Global Management, Inc., pursuant to which we transferred ownership of eleven vessels to Energos in exchange for approximately $1.85 billion in cash and a 20% equity interest in Energos. Ten of the vessels were subject to current or future charters with NFE and one vessel (the Nanook) was not subject to a future NFE charter. The in-place and future charters to NFE of ten vessels prevent the recognition of the sale of those vessels to Energos, and the proceeds associated with these vessels have been treated as a failed sale leaseback. As a result, these ten vessels continue to be recognized on our Consolidated Balance Sheet as Property, plant and equipment, and the proceeds are recognized as debt. Consistent with this treatment as a failed sale leaseback, (i) the third party charter revenues continue to be recognized by us as Vessel charter revenue; (ii) the costs of operating the vessels is included in Vessel operating expenses for the remaining terms of the third-party charters and (iii) such revenues are included as part of debt service for the sale leaseback financing debt and are included in additional financing costs within Interest expense, net. In February 2024, we sold substantially all of our stake in Energos.
Our Development Projects
Our projects currently under development include our development of a series of modular liquefaction facilities to provide a source of low-cost supply of LNG to customers around the world through our Fast LNG technologies; our LNG terminal facility and power plant in Puerto Sandino, Nicaragua (“Puerto Sandino Facility”); our LNG terminal (“Ireland Facility”) and power plant in Ireland, our first green hydrogen project ("ZeroPark I") and Klondike Digital Infrastructure, our newly-launched power and data center infrastructure business ("Klondike"). We are also in active discussions to develop projects in multiple regions around the world that may have significant demand for additional power, LNG and natural gas, although there can be no assurance that these discussions will result in additional contracts or that we will be able to achieve our target revenue or results of operations.
The design, development, construction and operation of our projects are highly regulated activities and subject to various approvals and permits. The process to obtain required permits, approvals and authorizations is complex, time-consuming, challenging and varies in each jurisdiction in which we operate. We obtain required permits, approvals and authorizations in due course in connection with each milestone for our projects.
We describe each of our current development projects below.
Fast LNG
We are currently developing multiple modular liquefaction facilities to provide a source of low-cost supply of LNG to customers around the world. We have designed and are constructing liquefaction facilities for our growing customer base that we believe are both faster and more economical to construct than many traditional liquefaction solutions. Our first “Fast LNG,” or “FLNG,” design pairs advancements in modular, midsize liquefaction technology with jack up rigs, semi-submersible rigs or similar marine floating infrastructure to enable a lower cost and faster deployment schedule than other greenfield alternatives. Semi-permanently moored FSUs will provide LNG storage alongside the floating liquefaction infrastructure, which can be deployed anywhere there is abundant and stranded natural gas. As noted below, we are also in discussions with CFE to utilize our FLNG design in an onshore application.
Fast LNG is anchored by key benefits over conventional liquefaction projects. In particular, we believe installing modular equipment in a shipyard will meaningfully expedite timelines. In addition, placing solutions offshore provides greater access to natural gas and optimized marine logistics.
We describe our operational and planned FLNG projects below.
62
Table of Contents
Altamira
Our first Fast LNG unit has been deployed off the coast of Altamira, Tamaulipas, Mexico. The 1.4 million ton per annum (“MTPA”) FLNG unit utilizes CFE’s firm pipeline transportation capacity on the Sur de Texas-Tuxpan Pipeline to receive feedgas volumes. Our first FLNG unit has been installed and connected to the gas pipeline at Altamira, and we are in the process of finalizing commissioning the project. While we experienced delays in commissioning our first FLNG unit, which impacted our results of operations in 2024 and may impact our results in future periods, in July 2024, we began to produce LNG. We have placed this asset into service from an accounting perspective in the fourth quarter of 2024, and we expect to achieve run-rate production in 2025.
We expect to deploy up to two 1.4MTPA additional FLNG units onshore at the existing Altamira LNG import facility. The terminal would source also feedgas from the CFE from the Sur de Texas-Tuxpan Pipeline. The Altamira onshore LNG facility is a world class import facility that will be converted to export LNG similar to other gulf coast regasification terminals. Existing infrastructure at the facility includes two 150,000m3 storage tanks, deepwater marine berth and access to local gas and power networks.
Louisiana
In addition, we are considering a plan to install up to two FLNG units approximately 16 nautical miles off the southeast coast of Grand Isle, Louisiana. We have filed applications with the U.S. Maritime Administration ("MARAD") and the U.S. Coast Guard to obtain our deepwater port license application for this facility. The facility will be capable of exporting up to approximately 145 billion cubic feet of natural gas per year, equivalent to approximately 2.8 MTPA of LNG.
Lakach
We have been in discussions with Petróleos Mexicanos (“Pemex”) to form a long-term strategic partnership to develop the Lakach deepwater natural gas field for Pemex to supply natural gas to Mexico's onshore domestic market and for NFE to produce LNG for export to global markets. Our initial agreements were terminated in the fourth quarter of 2023, however, NFE continues to be in active discussions with Pemex to develop or monetize an offshore project.
Puerto Sandino Facility
We are developing a liquefied natural gas receiving, transloading and regasification facility in Puerto Sandino, Nicaragua, as well as a pipeline connecting the facility with our Puerto Sandino Power Plant. We have entered into a 25-year PPA with Nicaragua’s electricity distribution companies, and we expect to utilize approximately 57,000 MMBtu from LNG per day to provide natural gas to the Puerto Sandino Power Plant in connection with the 25-year power purchase agreement. Construction of the terminal and power plant is substantially complete; however, we will determine timing of final commissioning and commencement under our PPA based on the most optimal use of our LNG supply chain. As part of our long-term strategy, we are also evaluating solutions to optimize power generation and delivery to other markets, connected to our power plant through a regional transmission line.
Barcarena Facility
The Barcarena Facility consists of an FSRU and associated infrastructure, including mooring and offshore and onshore pipelines. The Barcarena Facility is capable of delivering almost 600,000 MMBtu from LNG per day and storing up to 160,000 cubic meters of LNG. We have entered into a 15-year gas supply agreement with a subsidiary of Norsk Hydro ASA for the supply of natural gas to the Alunorte Alumina Refinery in Pará, Brazil, through our Barcarena Facility.
The Barcarena Facility will also supply our new 630MW combined cycle natural gas-fired power plant to be located in Pará, Brazil (the “Barcarena Power Plant”). The power plant is fully contracted under multiple 25-year power purchase agreements to supply electricity to the national electricity grid. We expect to complete the Barcarena Power Plant in 2025.
In March 2024, we closed the acquisition of PortoCem Geração de Energia S.A. ("PortoCem"), a wholly-owned subsidiary of Ceiba Fundo de Investimento em Participações Multiestratégia- Investimento no Exterior ("Ceiba Energy") in exchange for newly issued 4.8% NFE redeemable Series A Convertible Preferred Stock. PortoCem is the owner of a 15-year 1.6GW capacity reserve contract in Brazil. We have transferred the 1.6 GW capacity reserve contract to a site owned by NFE that is adjacent to the Barcarena Facility, where NFE is building the 1.6 GW simple cycle, natural gas-fired power
63
Table of Contents
plant ("PortoCem Power Plant") to supply the capacity reserve contract using gas from the Barcarena Facility. We expect the PortoCem Power Plant to be completed in 2026.
Ireland Facility
We intend to develop and operate an LNG facility and power plant on the Shannon Estuary, near Tarbert, Ireland. In April 2023, we were awarded a capacity contract for the development of a power plant for approximately 353 MW of electricity generation with a duration of ten years as part of the auction process operated by Ireland’s Transmission System Operator. The power plant is required to be operational by October 2026.
In the third quarter of 2023, An Bord Pleanála ("ABP"), Ireland's planning commission, denied our application for the development of an LNG terminal and power plant. We challenged this decision, and in September 2024, the High Court of Ireland ruled that ABP did not have appropriate grounds for the denial of our permit. In November, ABP sought leave to appeal the High Court's decision, the High Court has not yet heard the request to leave appeal. If the leave is not granted, ABP will be directed to reconsider our permit application on accordance with Irish Law. The continued development of this project is uncertain and there are multiple risks, including regulatory risks, that could preclude the development of this project, and the results of these risks could have a material effect on our results of operations.
ZeroParks
In 2020, we formed our Zero division to develop and operate facilities that produce clean hydrogen in an environmentally sustainable manner, and to invest in emerging technologies that enable the production of clean hydrogen to be more efficient and scalable. Our business plan is to build a portfolio of clean hydrogen production sites, each referred to as a ZeroPark, in key regions throughout the United States, utilizing the most efficient and reliable electrolyzer technologies.
Our first clean hydrogen project, known as ZeroPark I, is located in Beaumont, Texas. The ZeroPark I facility is sited within a 10-mile radius of the two largest refineries in the western hemisphere and numerous petrochemical manufacturers, many of which require significant amounts of hydrogen for their businesses. ZeroPark I, as planned, could use up to 200 MW of power, constructed in two distinct phases, each using 100 MW of electrolysis technology. In total, ZeroPark I is expected to produce up to 86,000 kg of clean hydrogen per day, or approximately 31,000 TPA. We have commenced design, engineering and permitting for ZeroPark I. Additionally, we have secured a binding offtake commitment for the clean hydrogen produced at ZeroPark I. Once completed, we expect ZeroPark I to be the largest green hydrogen plant in the United States.
Klondike
We recently launched Klondike, a power and data center development business dedicated to working with hyperscale customers to build and operate data centers. This venture comes in response to a significant need for turnkey digital infrastructure to support the next stage of explosive growth in artificial intelligence.
Klondike will develop independent power sources that utilize and provide behind-the-meter on-site power. This innovative approach is designed to address all major constraints of digital infrastructure development, providing grid stability, significant transmission capacity, power reliability, energy cost savings, and scalability. This approach not only reduces the demand for power from the grid but also contributes power back to it.
Klondike plans to develop a geographically diverse portfolio of data center sites to satisfy the requirements of hyperscale users. Klondike has more than 1,000 acres of developable land across sites in Brazil, Ireland, and the United States that it either owns or leases. These locations have, or will have, large existing power plants or permits in process to build several gigawatts of power, connectivity to fiber networks, access to transmission and water.
Recent Developments
In February 2025, one of our consolidated subsidiaries entered into an agreement to issue up to $350.0 million aggregate principal amount of 15% Senior Secured Notes due 2029 (the “Brazil Financing Notes”) at a purchase price of 97.75% of par. The Brazil Financing Notes bear interest at a rate of 15.0% and mature on August 30, 2029; the principal is due in full on the maturity date. Interest is payable quarterly in arrears beginning on March 30, 2025, and for the first 30 months that
64
Table of Contents
the Brazil Financing Notes are outstanding, interest due can be paid in kind and added to the principal amount. A portion of the proceeds from the issuance of the Brazil Financing Notes was used to repay the Barcarena Debentures in full.
In March 2025, we entered into an amendment to the Term Loan B Agreement. Pursuant to the amendment, certain lenders agreed to provide incremental term loans in an aggregate principal amount of up to $425.0 million. The incremental term loans are subject to the same terms as the initial Term Loan B, including interest rates and maturity date. Net proceeds will be used primarily to fund capital expenditures of our onshore Fast LNG project at Altamira, and for other corporate expenses. In connection with the amendment, all unused term loan commitments under the Term Loan A Credit Agreement were terminated.
On March 6, 2025, we entered into a Backstop Agreement (the "Backstop Agreement") with a lender, pursuant to which we may, at our sole option, issue and sell to this lender (subject to the satisfaction of certain conditions) senior debt securities up to an aggregate principal amount sufficient to generate gross proceeds of $100.0 million with a term of at least three years from the closing date. Proceeds received would be used to satisfy the repayment of the outstanding borrowings under the Revolving Facility (defined below) required by the reduction of commitments by September 30, 2025. The Backstop Agreement would be terminated in the event that we complete the sale of assets or receives proceeds associated with a contract termination fee sufficient to satisfy such required repayment.
Other Matters
On June 18, 2020, we received an order from the Federal Energy Regulatory Commission ("FERC"), which asked us to explain why our San Juan Facility is not subject to FERC’s jurisdiction under section 3 of the NGA. Because we do not believe that the San Juan Facility is jurisdictional, we provided our reply to FERC on July 20, 2020 and requested that FERC act expeditiously. On March 19, 2021, FERC issued an order that the San Juan Facility does fall under FERC jurisdiction. FERC directed us to file an application for authorization to operate the San Juan Facility within 180 days of the order, which was September 15, 2021, but also found that allowing operation of the San Juan Facility to continue during the pendency of an application is in the public interest. FERC also concluded that no enforcement action against us is warranted, presuming we comply with the requirements of the order. Parties to the proceeding, including the Company, sought rehearing of the March 19, 2021 FERC order, and FERC denied all requests for rehearing in an order issued on July 15, 2021; the FERC order was affirmed by the United States Court of Appeals for the District of Columbia Circuit on June 14, 2022. In order to comply with the FERC’s directive, on September 15, 2021, we filed an application for authorization to operate the San Juan Facility, which remains pending.
On July 18, 2023, we filed for an amendment to the March 19, 2021 and July 15, 2021 FERC orders allowing the continued operation of the San Juan Facility during the pendency of the formal application to allow us to construct and interconnect 220 feet of incremental 10-inch pipeline needed to supply natural gas for temporary power generation solicited through the Puerto Rico Power Stabilization Task Force. On July 31, 2023, FERC issued an order stating that it would not take action to prevent the construction and operation of the pipeline and interconnect and on January 30, 2024, FERC reaffirmed the order allowing the construction and operation to continue.
On September 26, 2024, the United States Coast Guard ("USCG") filed a Letter of Recommendation with FERC in which it assessed our Letter of Intent dated April 12, 2024, and our Waterway Suitability Assessment, dated August 26, 2024, in respect of future ship to ship transfers with alternative vessels, and recommended against the allowance of the proposed operations. Further, on September 26, 2024, the USCG issued a Letter of Warning in respect of our ongoing ship to ship transfers of LNG operations within the San Juan port limits. On October 21, 2024, we filed an appeal with the USCG under 33 CFR 160.7. In December 2024 and February 2025, we submitted an updated Letter of Intent and Waterway Suitability Assessments detailing our alternative operational plans to the USCG and are working collaboratively with the USCG to obtain a new Letter of Recommendation to FERC in support of our operations, which we expect to be imminently forthcoming. In concert with our collaboration with the USCG regarding our new operational plans, we withdrew our appeal on February 14, 2025.
On October 25, 2024, FERC issued a notice of intent to prepare an Environmental Impact Statement, which included, among other things, two public scoping sessions in Puerto Rico held on November 18, 2024 in accordance with the National Environmental Policy Act.
65
Table of Contents
Factors Impacting Comparability of Our Financial Results
Our historical results of operations and cash flows are not indicative of results of operations and cash flows to be expected in the future, principally for the following reasons:
•Our future results of operations will include the cost of operating our Fast LNG solution that were not included in our historical financial statements. We placed our first Fast LNG project into service from an accounting perspective in the fourth quarter of 2024. This project represents our largest ever capital project and placing the asset into service from an accounting perspective will significantly increase the depreciation recognized in future periods; such depreciation will also impact the cost of LNG delivered from the FLNG facility. We also expect interest expense to increase as we are no longer able to capitalize borrowing costs associated this development.
While the asset is in service from an accounting perspective, we will continue to commission the asset to achieve run rate production. Such costs that enhance the asset will be capitalized on our Consolidated Balance Sheets.
•Our historical financial results do not reflect our Fast LNG solution that will lower the cost of our LNG supply. We currently purchase the majority of our supply of LNG from third parties, sourcing approximately 93% of our LNG volumes from third parties for the year ended December 31, 2024. We anticipate that the deployment of Fast LNG liquefaction facilities will significantly lower the cost of our LNG supply and reduce our dependence on third-party suppliers. Though the commissioning of our first Fast LNG unit was delayed from the initially anticipated date, which impacted our results of operations in this period and may impact our results in future periods, we began to produce LNG from our first Fast LNG unit in July 2024. We sold the first full cargo from this facility on September 30, 2024, and we anticipate reaching run rate production in 2025..
•Our historical financial results do not include significant projects that have recently been completed or are near completion. Our results of operations for the year ended December 31, 2024 include our Montego Bay Facility, Old Harbour Facility, San Juan Facility, La Paz Power Plant and certain industrial end-users. We placed the Santa Catarina Facility into service in the fourth quarter of 2024. We have also completed construction of our Barcarena Facility and are in the final stages of commissioning. We are also continuing to develop our Barcarena Power Plant, PortoCem Power Plant, Puerto Sandino Facility and Ireland Facility, and our current results do not include revenue and operating results from these projects.
Additionally, we began to deliver power to the Puerto Rican grid as part of the grid stabilization project in the second quarter of 2023. In the first quarter of 2024, our contract was terminated and assets related to the grid stabilization project were sold to PREPA. Under our new island-wide gas sale agreement with PREPA, we continue to supply gas to these power generation assets.
•Our historical financial results include the results from our investments in the common units of Hilli LLC and Energos. On March 15, 2023, we completed a transaction with Golar LNG Limited (“GLNG”) for the sale of our investment in the common units of Hilli LLC (“Hilli Common Units”), disponent owner and operator of the Hilli Episeyo (the “Hilli”) through its subsidiary Golar Hilli Corporation, in exchange for approximately 4.1 million NFE shares and $100 million in cash (the "Hilli Exchange"). As a result of this transaction, we no longer have any ownership interest in the Hilli, and their results are no longer included in NFE's results of operations.
In February 2024, the Company completed the sale of substantially all of its stake in Energos for a total consideration of $136.4 million and retaining an investment in Energos valued at $1.0 million. As a result of this transaction, we no longer include the results of Energos in our results of operations.
66
Table of Contents
Results of Operations – Three Months Ended December 31, 2024 compared to Three Months Ended September 30, 2024 and Year Ended December 31, 2024 compared to Year Ended December 31, 2023
Performance of our two segments, Terminals and Infrastructure and Ships, is evaluated based on Segment Operating Margin. Segment Operating Margin reconciles to Consolidated Segment Operating Margin as reflected below, which is a non-GAAP measure. We reconcile Consolidated Segment Operating Margin to GAAP Gross margin, inclusive of depreciation and amortization. Consolidated Segment Operating Margin is mathematically equivalent to Revenue minus Cost of sales (excluding depreciation and amortization reflected separately) minus Operations and maintenance minus Vessel operating expenses, each as reported in our financial statements. We believe this non-GAAP measure, as we have defined it, offers a useful supplemental measure of the overall performance of our operating assets in evaluating our profitability in a manner that is consistent with metrics used for management’s evaluation of the overall performance of our operating assets.
Consolidated Segment Operating Margin is not a measurement of financial performance under GAAP and should not be considered in isolation or as an alternative to Gross margin, income from operations, net income, cash flow from operating activities or any other measure of performance or liquidity derived in accordance with GAAP. As Consolidated Segment Operating Margin measures our financial performance based on operational factors that management can impact in the short-term, items beyond the control of management in the short term, such as depreciation and amortization are excluded. As a result, this supplemental metric affords management the ability to make decisions and facilitates measuring and achieving optimal financial performance of our current operations. The principal limitation of this non-GAAP measure is that it excludes significant expenses and income that are required by GAAP. A reconciliation is provided for the non-GAAP financial measure to the most directly comparable GAAP measure, Gross margin. Investors are encouraged to review the related GAAP financial measures and the reconciliation of the non-GAAP financial measure to our Gross margin, and not to rely on any single financial measure to evaluate our business.
The tables below present our segment information for the three months ended December 31, 2024 and September 30, 2024, and for the year ended December 31, 2024 and December 31, 2023:
| Three Months Ended December 31, 2024 | |||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| (in thousands of $) | Terminals and Infrastructure | Ships | Total Segment | Consolidationand Other(3) | Consolidated | ||||||||||||||
| Total revenues | $ | 528,908 | $ | 42,363 | $ | 571,271 | $ | 107,727 | $ | 678,998 | |||||||||
| Cost of sales(1)(2) | 288,398 | — | 288,398 | — | 288,398 | ||||||||||||||
| Vessel operating expenses(5) | — | 8,219 | 8,219 | — | 8,219 | ||||||||||||||
| Operations and maintenance(5) | 34,411 | — | 34,411 | — | 34,411 | ||||||||||||||
| Segment Operating Margin | $ | 206,099 | $ | 34,144 | $ | 240,243 | $ | 107,727 | $ | 347,970 |
| Three Months Ended December 31, 2024 | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| (in thousands of $) | Consolidated | ||||||||||
| Gross margin (GAAP) | $ | 309,224 | |||||||||
| Depreciation and amortization | 38,746 | ||||||||||
| Consolidated Segment Operating Margin (Non-GAAP) | $ | 347,970 |
| Three Months Ended September 30, 2024 | |||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| (in thousands of $) | Terminals and Infrastructure | Ships | Total Segment | Consolidationand Other(3) | Consolidated | ||||||||||||||
| Total revenues | $ | 482,200 | $ | 43,062 | $ | 525,262 | $ | 42,273 | $ | 567,535 | |||||||||
| Cost of sales(1)(2) | 325,292 | — | 325,292 | — | 325,292 | ||||||||||||||
| Vessel operating expenses(5) | — | 8,254 | 8,254 | — | 8,254 | ||||||||||||||
| Operations and maintenance(5) | 32,062 | — | 32,062 | — | 32,062 | ||||||||||||||
| Deferred earnings from contracted sales(4) | 60,000 | — | 60,000 | (60,000) | $ | — | |||||||||||||
| Segment Operating Margin | $ | 184,846 | $ | 34,808 | $ | 219,654 | $ | (17,727) | $ | 201,927 |
67
Table of Contents
| Three Months Ended September 30, 2024 | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| (in thousands of $) | Consolidated | ||||||||||
| Gross margin (GAAP) | $ | 166,563 | |||||||||
| Depreciation and amortization | 35,364 | ||||||||||
| Consolidated Segment Operating Margin (Non-GAAP) | $ | 201,927 |
| Year Ended December 31, 2024 | |||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| (in thousands of $) | Terminals and Infrastructure | Ships | Total Segment | Consolidationand Other(3) | Consolidated | ||||||||||||||
| Total revenues | $ | 2,044,273 | $ | 170,587 | $ | 2,214,860 | $ | 150,000 | $ | 2,364,860 | |||||||||
| Cost of sales(1)(2) | 1,064,667 | — | 1,064,667 | — | 1,064,667 | ||||||||||||||
| Vessel operating expenses(5) | — | 33,372 | 33,372 | — | 33,372 | ||||||||||||||
| Operations and maintenance(5) | 174,313 | — | 174,313 | — | 174,313 | ||||||||||||||
| Deferred earnings from contracted sales(4) | 150,000 | — | 150,000 | (150,000) | — | ||||||||||||||
| Segment Operating Margin | $ | 955,293 | $ | 137,215 | $ | 1,092,508 | $ | — | $ | 1,092,508 |
| Year Ended December 31, 2024 | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| (in thousands of $) | Consolidated | ||||||||||
| Gross margin (GAAP) | $ | 930,494 | |||||||||
| Depreciation and amortization | 162,014 | ||||||||||
| Consolidated Segment Operating Margin (Non-GAAP) | $ | 1,092,508 |
| Year Ended December 31, 2023 | |||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| (in thousands of $) | Terminals and Infrastructure | Ships | Total Segment | Consolidationand Other(3) | Consolidated | ||||||||||||||
| Total revenues | $ | 2,141,085 | $ | 293,605 | $ | 2,434,690 | $ | (21,394) | $ | 2,413,296 | |||||||||
| Cost of sales(1)(2) | 764,828 | — | 764,828 | 112,623 | 877,451 | ||||||||||||||
| Vessel operating expenses(5) | — | 51,387 | 51,387 | (5,948) | 45,439 | ||||||||||||||
| Operations and maintenance(5) | 166,785 | — | 166,785 | — | 166,785 | ||||||||||||||
| Segment Operating Margin | $ | 1,209,472 | $ | 242,218 | $ | 1,451,690 | $ | (128,069) | $ | 1,323,621 |
| Year Ended December 31, 2023 | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| (in thousands of $) | Consolidated | ||||||||||
| Gross margin (GAAP) | $ | 1,136,297 | |||||||||
| Depreciation and amortization | 187,324 | ||||||||||
| Consolidated Segment Operating Margin (Non-GAAP) | $ | 1,323,621 |
(1)Cost of sales in our segment measure only includes realized gains and losses on derivative transactions that are an economic hedge of commodity purchases and sales, and a realized gain of $139.1 million for the year ended December 31, 2023 was recognized as a reduction to Cost of sales in the segment measure. We recognized unrealized losses of $106.4 million on the mark-to-market value of derivative transactions for the year ended December 31, 2023, and these losses reconcile Cost of sales in the segment measure to Cost of sales in the Consolidated Statements of Operations and Comprehensive (Loss) Income. No realized gains or losses were recognized for the year ended December 31, 2024.
We have excluded contract acquisition costs that do not meet the criteria for capitalization from the segment measure. Contract acquisition costs of $6.2 million for the year ended December 31, 2023 reconcile Cost of sales in the segment
68
Table of Contents
measure to Cost of sales in the Consolidated Statements of Operations and Comprehensive (Loss) Income. We did not incur such costs in the year ended December 31, 2024.
(2)Cost of sales is presented exclusive of costs included in Depreciation and amortization in the Consolidated Statements of Operations and Comprehensive (Loss) Income.
(3)For the year ended December 31, 2024, Consolidation and Other adjusts for the inclusion of deferred earnings from contracted sales of $150.0 million which were recognized during the third and fourth quarters of 2024.
In 2023, the effective share of revenues, expenses and operating margin attributable to our ownership of the common units of Hilli LLC were included in the segment measure prior to the disposition of this investment. Unrealized mark-to-market gains or losses on derivative instruments and the exclusion of non-capitalizable contract acquisition costs were also removed.
(4)Deferred earnings from contracted sales represent forward sales transactions that were contracted in the second and third quarters of 2024 and prepayment for these sales was received. Revenue has been recognized in the Consolidated Statements of Operations and Comprehensive (Loss) Income during the third and fourth quarters of 2024.
(5)Operations and maintenance and Vessel operating expenses are directly attributable to revenue-producing activities of our terminals and vessels and are included in the calculation of Gross margin as defined under GAAP.
Terminals and Infrastructure Segment
| Three Months Ended, | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|
| (in thousands of $) | December 31, 2024 | September 30, 2024 | Change | |||||||
| Total revenues | $ | 528,908 | $ | 482,200 | $ | 46,708 | ||||
| Cost of sales (exclusive of depreciation and amortization) | 288,398 | 325,292 | (36,894) | |||||||
| Operations and maintenance | 34,411 | 32,062 | 2,349 | |||||||
| Deferred earnings from contracted sales | — | 60,000 | (60,000) | |||||||
| Segment Operating Margin | $ | 206,099 | $ | 184,846 | $ | 21,253 |
| Year Ended, | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|
| (in thousands of $) | December 31, 2024 | December 31, 2023 | Change | |||||||
| Total revenues | $ | 2,044,273 | $ | 2,141,085 | $ | (96,812) | ||||
| Cost of sales (exclusive of depreciation and amortization) | 1,064,667 | 764,828 | 299,839 | |||||||
| Operations and maintenance | 174,313 | 166,785 | 7,528 | |||||||
| Deferred earnings from contracted sales | 150,000 | — | 150,000 | |||||||
| Segment Operating Margin | $ | 955,293 | $ | 1,209,472 | $ | (254,179) |
Total revenue
Total revenue for the Terminals and Infrastructure Segment increased by $46.7 million for the three months ended December 31, 2024 as compared to the three months ended September 30, 2024. The increase was primarily driven by income from the novation of an LNG supply contract during the fourth quarter of 2024 and higher Henry Hub index pricing, offset by lower volumes delivered and cargo sales.
•The Company novated an LNG supply contract to a customer, recognizing $235.6 million within segment revenue in the fourth quarter. NFE recognized $60.0 million of deferred earnings from contracted sales with this customer
69
Table of Contents
in the third quarter of 2024, and this prepayment is included in the reconciliation between segment revenue and consolidated revenue recognized.
•The average Henry Hub index pricing used to invoice our downstream customers increased by 29% for the three months ended December 31, 2024 as compared to the three months ended September 30, 2024.
•Volumes delivered to downstream terminal customers decreased from 20.7 TBtu in the third quarter of 2024 to 18.4 TBtu in the fourth quarter of 2024. The decrease was due to vessel maintenance in our LNG supply chain that briefly deferred deliveries to our customers.
•Revenue recognized from cargo sales decreased during the three months ended December 31, 2024 to $91.9 million from $174.5 million during three months ended September 30, 2024.
•In the second and third quarters of 2024, we recognized an estimate of the incentive fees that we expected to earn under our contract with Genera. In the first quarter of 2025, we modified our agreement with Genera to remove all future incentive payments in exchange for a payment of $110.0 million. The subsequent modification of the agreement required us to evaluate the incentive fees recognized in 2024, and we recognized a reversal of $57.0 million of revenue that was recognized earlier in 2024.
Total revenue for the Terminals and Infrastructure Segment decreased by $96.8 million for the year ended December 31, 2024 as compared to the year ended December 31, 2023, and segment revenue was impacted by the following in 2024:
•For the year ended December 31, 2024, volumes delivered to downstream customers were 81.3 TBtu as compared to 68.3 TBtu for the year ended December 31, 2023. We placed the La Paz Power Plant into service during the third quarter of 2023, and recorded a full year of revenue during 2024 compared to two quarters of revenue during 2023.
•During 2024, we recognized $235.6 million of income within segment revenue from the novation of an LNG supply contract.
•Starting in the third quarter of 2023, Genera, began to provide operations and maintenance services to PREPA's thermal generation assets, and cost to provide these services is included in Cost of sales. Under our contract with PREPA, we pass all of these costs onto PREPA, and such billings are recognized as revenue. The Company provided full year of operations and maintenance services during 2024 compared to six months of services in 2023.
Although we recognized the contract novation income and delivered significantly higher volumes in the current year, our revenue was impacted by lower Henry Hub pricing and lower cargo sale revenue.
•The average Henry Hub index pricing used to invoice our downstream customers decreased by 17% for the year ended December 31, 2024 as compared to the year ended December 31, 2023.
•The Company had $291.0 million in cargo sales for the year ended December 31, 2024. Revenue from cargo sales was $618.5 million for the year ended December 31, 2023, which included $332.0 million of contract settlements.
•In 2023, we began to support the grid stabilization project in Puerto Rico, commissioning power generation assets in the second and third quarters of 2023. Our customer terminated the grid stabilization project in the first quarter of 2024, resulting in lower revenue from the project in 2024. However, we continue to sell volumes into these power plants under a new island-wide gas sale agreement signed with PREPA.
Cost of sales
Cost of sales includes the procurement of feed gas or LNG, as well as shipping and logistics costs to deliver LNG or natural gas to our facilities. Historically, our LNG and natural gas supply has been purchased from third parties or converted in our Miami Facility. Following the sale of our Miami Facility, we continue sourcing LNG from third parties and we expect a portion of our supply to be generated by our first FLNG unit. Costs to convert natural gas to LNG, including labor, depreciation and other direct costs to operate our liquefaction facilities are also included in Cost of sales. Starting in the third quarter of 2023, our subsidiary, Genera, began to provide operations and maintenance services to
70
Table of Contents
PREPA's thermal generation assets, and cost to provide these services is included in Cost of sales. Under our contract with PREPA, we pass all of these costs onto PREPA, and such billings are recognized as revenue.
Cost of sales decreased $36.9 million for the three months ended December 31, 2024 as compared to the three months ended September 30, 2024.
•We delivered 11% lower volumes to our customers in the fourth quarter. Our cost of LNG to supply our downstream customers increased by $8.6 million during the three months ended December 31, 2024, due to higher cost of gas purchased at $8.75 per MMBtu for the three months ended December 31, 2024 compared to $6.65 per MMBtu for the three months ended September 30, 2024.
•The higher cost of LNG to deliver to downstream customers was partially offset by lower cost of selling cargos. We incurred $35.6 million less cost of selling cargos during the fourth quarter of 2024 compared to the third quarter of 2024.
Cost of sales increased by $299.8 million for the year ended December 31, 2024 as compared to the year ended December 31, 2023, which was attributable to the following activity:
•We incurred increased cost of LNG to supply our downstream customers of $64.5 million during the year ended December 31, 2024 due to increased volumes delivered. We delivered 19% more volume to our downstream terminal customers in the current period. Our pricing to purchase LNG for delivery to such customers was slightly lower at $7.20 per MMBtu for the year ended December 31, 2024 compared to $7.23 per MMBtu for the year ended December 31, 2023.
•Vessel costs increased by $67.0 million, for the year ended December 31, 2024 as compared to the year ended December 31, 2023. The increase is primarily driven by additional vessels being used for servicing our terminals during 2024.
•We recognized payroll and other operating costs of $101.4 million to provide services under Genera's operations and maintenance contract for the year ended December 31, 2024 compared to $35.6 million for the year ended December 31, 2023; these costs are passed onto PREPA. Only six months of such costs were incurred during the year ended December 31, 2023 as our contract commenced on July 1, 2023.
•We incurred decreased cost of LNG for cargo sales during the year ended December 31, 2024 by $19.2 million as our LNG cargo sale activity has been marginally lower in 2024.
•In the year ended December 31, 2023, realized gains of $139.1 million from the settlement of commodity swap transactions, entered into as an economic hedge to reduce the market risks associated with commodity prices, were included as reduction of cost of sales in the segment measure. For segment performance measures, unrealized mark to market gains and losses are excluded until settled. No such transactions occurred in 2024.
The weighted-average cost of our LNG inventory balance to be used in our operations as of December 31, 2024 and December 31, 2023 was $6.90 per MMBtu and $7.33 per MMBtu, respectively.
Operations and maintenance
Operations and maintenance includes costs of operating our facilities, exclusive of costs to convert that are reflected in Cost of sales.
Operations and maintenance increased by $2.3 million for the three months ended December 31, 2024 as compared to the three months ended September 30, 2024. We incurred additional operations and maintenance costs for planned maintenance at our terminals and power plants during the three months ended December 31, 2024.
Operations and maintenance increased by $7.5 million for the year ended December 31, 2024 as compared to the year ended December 31, 2023. We incurred full year of operations and maintenance costs at our La Paz Power Plant in 2024, as it was placed into service in September 2023. Additional operations and maintenance cost were also incurred at our La Paz Facility in 2024 to meet higher customer demand. The increase in costs were partially offset by lower lease costs
71
Table of Contents
incurred in 2024. The Company's contract to provide emergency power services to support the grid stabilization project was terminated in the first quarter of 2024 resulting in decreased lease expense compared to 2023.
Deferred earnings from contracted sales
In the second and third quarters of 2024, we completed forward sales receiving prepayments from the buyers of $90.0 million and $60.0 million respectively. The prepayments were based on the fair market value of these sales as compared to our supply cost, and our CODM includes these results in his evaluation of Terminals and Infrastructure operations. Revenue for these sales have been recognized in our Consolidated Statements of Operations and Comprehensive (Loss) Income in the third and fourth quarters of 2024, and as such, these deferred earnings do not impact the total segment operating margin recognized for the year ended December 31, 2024.
Ships Segment
| Three Months Ended, | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|
| (in thousands of $) | December 31, 2024 | September 30, 2024 | Change | |||||||
| Total revenues | $ | 42,363 | $ | 43,062 | $ | (699) | ||||
| Vessel operating expenses | 8,219 | 8,254 | (35) | |||||||
| Segment Operating Margin | $ | 34,144 | $ | 34,808 | $ | (664) |
| Year Ended, | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|
| (in thousands of $) | December 31, 2024 | December 31, 2023 | Change | |||||||
| Total revenues | $ | 170,587 | $ | 293,605 | $ | (123,018) | ||||
| Vessel operating expenses | 33,372 | 51,387 | (18,015) | |||||||
| Segment Operating Margin | $ | 137,215 | $ | 242,218 | $ | (105,003) |
Revenue in the Ships segment is comprised of operating lease revenue under time charters, fees for positioning and repositioning vessels as well as the reimbursement of certain vessel operating costs. As of December 31, 2024, three vessels included in the Energos Formation Transaction were leased to customers under long-term arrangements and are included in this segment.
On March 15, 2023, we completed disposition of our investment in the common units of Hilli LLC, and after this point, the revenue, expenses and operating margin attributable to our 50% ownership of the Hilli are no longer included in our segment results. In the first quarter of 2024, we sold the vessel Mazo, for a total consideration of $22.4 million resulting in a gain of $0.4 million. The gain on sale is included in Loss (gain) on sale of assets, net in the Consolidated Statements of Operations and Comprehensive (Loss) Income.
Total revenue
Total revenue for the Ships segment remained consistent from the three months ended September 30, 2024 to the three months ended December 31, 2024 with a small decrease of $0.7 million.
Total revenue for the Ships segment decreased by $123.0 million for the year ended December 31, 2024 as compared to the year ended December 31, 2023. After the disposition of our investment in the common units of Hilli LLC at the end of the first quarter of 2023, we no longer recognize revenue from the Hilli, decreasing revenue in the Ships segment. Additionally the charters for four vessels concluded in 2023, and one vessel in 2024, lowering vessel revenue for the year ended December 31, 2024. We are now utilizing these vessels in our operations.
Vessel operating expenses
Vessel operating expenses include direct costs associated with operating a vessel, such as crewing, repairs and maintenance, insurance, stores, lube oils, communication expenses, management fees and costs to operate the Hilli prior to the Hilli Exchange discussed above. We also recognize voyage expenses within Vessel operating expenses, which principally consist of fuel consumed before or after the term of time charter or when the vessel is off hire. Under time
72
Table of Contents
charters, the majority of voyage expenses are paid by customers. To the extent that these costs are a fixed amount specified in the charter, which is not dependent upon redelivery location, the estimated voyage expenses are recognized over the term of the time charter.
Vessel operating expenses remained consistent between the three months ended September 30, 2024 and the three months ended December 31, 2024.
Vessel operating expenses decreased by $18.0 million for the year ended December 31, 2024 as compared to the year ended December 31, 2023. The decrease in vessel operating expenses was primarily due to lower costs related to the Hilli after the disposition our investment in the common units of Hilli LLC at the end of the first quarter of 2023. We started using four vessels in 2023 and one vessel in 2024 that were in the Ships segment, in our terminal operations, resulting in lower vessel operating costs.
Other operating results
| Three Months Ended, | Year Ended, | |||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| (in thousands of $) | December 31, 2024 | September 30, 2024 | Change | December 31, 2024 | December 31, 2023 | Change | ||||||||||||||||
| Selling, general and administrative | $ | 61,800 | $ | 82,388 | $ | (20,588) | $ | 285,520 | $ | 205,104 | $ | 80,416 | ||||||||||
| Transaction and integration costs | 5,994 | 3,154 | 2,840 | 12,279 | 6,946 | 5,333 | ||||||||||||||||
| Depreciation and amortization | 38,746 | 35,364 | 3,382 | 162,014 | 187,324 | (25,310) | ||||||||||||||||
| Asset impairment expense | 10,738 | 1,484 | 9,254 | 16,494 | 10,958 | 5,536 | ||||||||||||||||
| Loss (gain) on sale of assets, net | 422 | — | 422 | 77,562 | (29,378) | 106,940 | ||||||||||||||||
| Total operating expenses | 117,700 | 122,390 | (4,690) | 553,869 | 380,954 | 172,915 | ||||||||||||||||
| Operating income | 230,270 | 79,537 | 150,733 | 538,639 | 942,667 | (404,028) | ||||||||||||||||
| Interest expense | 99,527 | 71,107 | 28,420 | 328,377 | 277,842 | 50,535 | ||||||||||||||||
| Other expense (income), net | 52,447 | (5,836) | 58,283 | 113,077 | 10,408 | 102,669 | ||||||||||||||||
| Loss on extinguishment of debt, net | 260,309 | — | 260,309 | 270,063 | — | 270,063 | ||||||||||||||||
| (Loss) income before income from equity method investments and income taxes | (182,013) | 14,266 | (196,279) | (172,878) | 654,417 | (827,295) | ||||||||||||||||
| Income (loss) from equity method investments | — | — | — | — | 9,972 | (9,972) | ||||||||||||||||
| Tax provision (benefit) | 41,497 | 2,953 | 38,544 | 69,509 | 115,513 | (46,004) | ||||||||||||||||
| Net (loss) income | $ | (223,510) | $ | 11,313 | $ | (234,823) | $ | (242,387) | $ | 548,876 | $ | (791,263) |
Selling, general and administrative
Selling, general and administrative includes compensation expenses for our corporate employees, employee travel costs, insurance, professional fees for our advisors, and screening costs for projects that are in initial stages and development is not yet probable.
Selling, general and administrative for the three months ended December 31, 2024 decreased by $20.6 million as compared to the three months ended September 30, 2024. The decrease was primarily driven by significant forfeitures of RSUs due to employee terminations, as well as, reduction in non-capitalizable development costs and payroll costs.
Selling, general and administrative increased by $80.4 million for the year ended December 31, 2024, compared to the year ended December 31, 2023. The increase was primarily due to higher share-based compensation expense and screening costs. During 2024, we granted RSUs to select officers, employees and certain non-employees, and an equity award to
73
Table of Contents
certain employees that will settle in shares of a subsidiary owning the Company's Brazilian operations. The Company recognized $50.4 million of share-based compensation expense for RSUs and other equity awards during the year ended December 31, 2024; no significant cost was recognized in the year ended December 31, 2023. In addition, the bad debt expense increased by $15.9 million for additional allowance and write-off of receivables during 2024. We also incurred higher screening costs for our development projects during 2024, offset by lower travel, payroll costs and professional fees.
Transaction and integration costs
The transaction and integration costs of $6.0 million and $12.3 million during the three months and year ended December 31, 2024, respectively, primarily relate to legal fees and other third party costs incurred by the Company in connection with the amendments of credit agreements.
Depreciation and amortization
Depreciation and amortization increased by $3.4 million for the three months ended December 31, 2024 as compared to the three months ended September 30, 2024. The increase during the fourth quarter of 2024 was mostly attributable to additional depreciation of capitalized vessel-related costs.
Depreciation and amortization decreased by $25.3 million for the year ended December 31, 2024 as compared to the year ended December 31, 2023. During 2024, the Company sold turbines and related equipment to PREPA, resulting in a lower depreciation and amortization expense compared to the year ended December 31, 2023. Amortization of favorable vessel charter contracts also decreased in 2024 due to the expiration of charter contracts. The decrease in depreciation and amortization expense was partly offset by additional depreciation and amortization expense relating to PortoCem Acquisition and the La Paz Power Plant that was put into service during third quarter of 2023.
Asset impairment expense
For the year ended December 31, 2024 the Company recognized an impairment loss of $16.0 million related to the sale of our Miami facility, which includes an allocation of goodwill of $10.4 million. During year ended December 31, 2023, we recognized an impairment expense of $10.9 million for the vessel Mazo.
Loss (gain) on sale of assets, net
The Company had no significant asset sales during the third and fourth quarters of 2024. In 2023, we sold the vessel Golar Spirit and 100% of shares of Pecém and Muricy resulting in a total gain of $29.3 million. During 2024, the Company recognized a loss of $77.6 million from the sale of turbines and related equipment to the PREPA.
Interest expense
Interest expense increased by $28.4 million for the three months ended December 31, 2024 as compared to the three months ended September 30, 2024, primarily due to additional deferred financing costs and higher interest rate under new and refinanced borrowings.
Interest expense increased by $50.5 million for the year ended December 31, 2024, as compared to the year ended December 31, 2023. The increase was primarily due to an increase in total principal outstanding for additional borrowings and amortization of related debt issuance costs, net of capitalized interest cost. The total principal balance on outstanding facilities was $9.0 billion as of December 31, 2024 as compared to total outstanding debt of $6.9 billion as of December 31, 2023.
74
Table of Contents
Other expense (income), net
Other expense, net and other income, net was $52.4 million and $5.8 million for the three months ended December 31, 2024 and September 30, 2024, respectively. Other expense, net was $113.1 million and $10.4 million for the year ended December 31, 2024 and December 31, 2023, respectively.
Other expense, net recognized in the three months ended December 31, 2024 was primarily comprised of foreign currency loss due to remeasurement of USD denominated debt in our Brazil subsidiary. The losses were partly offset by interest income, and realized and unrealized gains on foreign currency derivative contracts.
Other expense, net recognized in the year ended December 31, 2024 was primarily comprised of remeasurement losses from USD denominated foreign currency debt in Brazil, resulting from depreciation of the BRL currency. The losses were partially offset by interest income and realized and unrealized gains on foreign currency derivative contracts.
Loss on extinguishment of debt
During the fourth quarter of 2024, we repaid all of the 2025 Notes and a portion of the 2026 Notes and 2029 Notes, and recognized as a loss on extinguishment of debt totaling $235.4 million. In Brazil, we repaid the PortoCem Bridge Loan with proceeds from the PortoCem Debenture issuance and recorded a loss on extinguishment of $25.0 million.
In addition, during the first quarter of 2024, we recognized prepayment premium and unamortized financing costs of $7.9 million in connection with the prepayment of the Equipment Notes. During the same period, we also recognized a premium over the repurchase price of $1.9 million in connection with the cash tender offer to repurchase $375.0 million of the outstanding 2025 Notes. We did not have any extinguishment transactions in 2023.
Income (loss) from equity method investments
During 2023, we recognized income of $10.0 million from our equity method investment in Energos. In the first quarter of 2024, we sold substantially all of our stake in Energos resulting in no income or loss from equity method investments for the year ended December 31, 2024.
Tax provision
We recognized a tax provision of $69.5 million for the year ended December 31, 2024 compared to a tax provision of $115.5 million year ended December 31, 2023. For the year ended December 31, 2024, the tax provision was primarily driven by U.S. tax on earnings of our Puerto Rican operations and increases in valuation allowances against losses generated by our foreign operations in Brazil and Mexico.
Liquidity and Capital Resources
In the fourth quarter of 2024, we entered into a series of debt and equity transactions to extend the maturities of our corporate debt and to provide additional liquidity. In October, we issued 46,349,942 shares of our Class A common stock, at a purchase price to the public of $8.63 per share, less underwriting discounts and commissions, in a registered public offering, receiving net proceeds of approximately $387 million after underwriters' discounts, commissions and offering expenses. We also completed the Refinancing Transactions under which we issued approximately $2.7 billion of New 2029 Notes, repaid in full our 2025 Notes and repaid a portion of the 2026 Notes and 2029 Notes (each defined below), along with receiving approximately $300 million in proceeds. We also amended the terms of our Revolving Facility to extend the maturity of the majority of the commitments. Collectively these transactions extended the maturity of our corporate debt while providing additional liquidity to fund our development projects, including the completion of our first FLNG project.
We have made significant progress in extending the maturities of our long-term debt, and we continue to explore asset sales, settlement of claims and other strategic transactions (the "Transactions") that seek to optimize the value of our portfolio while providing additional liquidity and cash flow. As part of preparing the financial statements included in this Annual Report, we are required to consider the guidance in ASC 205-40, which requires us to only consider the mitigating effects of our plans only if those plans are fully implemented at the assessment date when assessing whether substantial doubt is raised about our ability to continue as a going concern. Under this guidance, we were required to exclude the effects of the Transactions from our forecast, and as such, we concluded that our current liquidity and forecasted cash flows from operations are not sufficient to support, in full, obligations as they become due. We have approved a plan to alleviate
75
Table of Contents
liquidity risk and concluded that we will have sufficient liquidity to meet its obligations as they become due over the next twelve months from the date that the consolidated financial statements were issued.
Additionally, we expect our current working capital position to improve based on the following: (1) funding received from our Brazil Financing Notes and our upsized Term Loan B; (2) expected cash flows generated from new gas sale agreements and volume growth in Puerto Rico, Mexico and Brazil; (3) sales of our own LNG generated by our first deployed Fast LNG unit; (4) continued proceeds from our asset sale program; and (5) our relationships with certain significant vendors, including vendors constructing our Fast LNG assets, have allowed us to extend our payment terms to better align with the expected completion of our first Fast LNG project. In addition, we have begun to identify strategic partners for one or more of our primary businesses and expect to explore potential strategic partner financing, commercial ventures or assets sales to enhance our liquidity and financial flexibility.
We may also opportunistically elect to generate additional liquidity through future debt or equity issuances and asset sales to fund our developments and transactions. The terms and conditions of our indebtedness include restrictive covenants that limit our ability to operate our business, incur or refinance our debt, engage in certain transactions, and require us to maintain certain financial ratios, among others, any of which may limit our ability to finance future operations and capital needs, react to changes in our business and in the economy generally, and to pursue business opportunities and activities. Following the completion of the Refinancing Transactions, our ability to undertake these activities, including our ability to incur or refinance our debt, is further limited. Furthermore, the restrictions contemplated by certain of the amendments to our Revolving Facility require proceeds of certain asset sales to be used to pay down existing indebtedness. From time to time, we may seek to repay, refinance or restructure all or a portion of our debt or to repurchase our outstanding debt through, as applicable, tender offers, redemptions, exchange offers, open market purchases, privately negotiated transactions or otherwise. Such transactions, if any, will depend on a number of factors, including prevailing market conditions, our liquidity requirements and contractual requirements (including compliance with the terms of our debt agreements), among other factors.
Our remaining committed capital expenditures, inclusive of invoiced amounts in Accounts payable, is approximately $1,159 million and includes remaining expenditures to complete our first Fast LNG project and our onshore liquefaction project at Altamira, as well as committed expenditures necessary to complete the Puerto Sandino Facility, Barcarena and PortoCem Power Plants. This does not include any capital expenditures related to Klondike. We have secured financing commitments to continue to develop our Barcarena Power Plant and PortoCem Power Plant, which represents approximately $433 million of our upcoming committed capital expenditures. In February 2025, we issued the Brazil Financing Notes raising $350.0 million, and in March 2025, we upsized the Term Loan B by an additional $425.0 million. Proceeds received from these financings can be used for general corporate purposes, including towards our development projects.
We expect fully completed Fast LNG units to cost between $1.0 billion and $2.0 billion per unit on average. Unlike engineering, procurement and construction agreements for traditional liquefaction construction, our contracts with vendors to construct the Fast LNG units allow us to closely control the timing of our spending and construction schedules so that we can complete each project in time frames to meet our business needs. For example, expected spending for our second and third Fast LNG units that is not currently contracted is excluded from the estimated committed spending. Each Fast LNG completion is subject to permitting, various contractual terms, project feasibility, our decision to proceed and timing. We carefully manage our contractual commitments, the related funding needs and our various sources of funding including cash on hand, cash flow from operations, and borrowings under existing and future debt facilities. We may also enter into other financing arrangements to generate proceeds to fund our developments.
As of December 31, 2024, we have spent approximately $128.6 million to develop the Pennsylvania Facility. Approximately $22.5 million of construction and development costs have been expensed as we have not issued a final notice to proceed to our engineering, procurement and construction contractors. Cost for land, as well as engineering and equipment that could be deployed to other facilities and associated financing costs of approximately $106.1 million, has been capitalized, and to date, we have repurposed approximately $16.8 million of engineering and equipment to our Fast LNG project. We intend to apply for updated permits for the Pennsylvania Facility with the aim of obtaining these permits to coincide with the commencement of construction activities.
76
Table of Contents
Contractual Obligations
We are committed to make cash payments in the future pursuant to certain contracts. The following table summarizes certain contractual obligations in place as of December 31, 2024:
| (in thousands) | Total | Year 1 | Years 2 to 3 | Years 4 to 5 | More than 5 years | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Long-term debt obligations | $ | 14,109,482 | $ | 1,256,887 | $ | 3,626,265 | $ | 5,682,953 | $ | 3,543,377 | ||||||||
| Purchase obligations | 16,973,053 | 1,476,592 | 1,512,318 | 1,225,575 | 12,758,568 | |||||||||||||
| Lease obligations | 838,524 | 179,485 | 223,566 | 194,263 | 241,210 | |||||||||||||
| Total | $ | 31,921,059 | $ | 2,912,964 | $ | 5,362,149 | $ | 7,102,791 | $ | 16,543,155 |
Long-term debt obligations
For information on our long-term debt obligations, see “—Liquidity and Capital Resources—Long-Term Debt.” The amounts included in the table above are based on the total debt balance, scheduled maturities, and interest rates in effect as of December 31, 2024. The principal on the PortoCem BNDES Debentures (defined below) is subject to adjustment based on inflation; the table above only includes the principal balance due as of December 31, 2024, and does not project future amounts that may be due based on inflation.
A portion of our long-term debt obligations will be paid to Energos under charters of vessels included in the Energos Formation Transaction to third parties. The residual value of these vessels also forms a part of the obligation and will be recognized as a bullet payment at the end of the charters. As neither these third party charter payments nor the residual value of these vessels represent cash payments due by NFE, such amounts have been excluded from the table above.
The New Notes issued pursuant to the New 2029 Notes bear interest at the increased rate of 12.00% per annum compared with the 2025 Notes, the 2026 Notes and the 2029 Notes being refinanced, and results in an increase in long-term debt obligations. The increased debt and interest expense has been included in the table above.
Purchase obligations
We are party to contractual purchase commitments for the purchase, production and transportation of LNG and natural gas, as well as engineering, procurement and construction agreements to develop our terminals and related infrastructure. Our commitments to purchase LNG and natural gas are principally take-or-pay contracts, which require the purchase of minimum quantities of LNG and natural gas, and these commitments are designed to assure sources of supply and are not expected to be in excess of normal requirements. Certain LNG purchase commitments are subject to conditions precedent, and we include these expected commitments in the table above beginning when delivery is expected assuming that all contractual conditions precedent are met. For purchase commitments priced based upon an index such as Henry Hub, the amounts shown in the table above are based on the spot price of that index as of December 31, 2024.
We have construction purchase commitments in connection with our development projects, including our Fast LNG projects, Puerto Sandino Facility, Barcarena Facility, Santa Catarina Facility, Barcarena Power Plant and PortoCem Power Plant. Commitments included in the table above include commitments under engineering, procurement and construction contracts where a notice to proceed has been issued.
Lease obligations
Future minimum lease payments under non-cancellable lease agreements, inclusive of fixed lease payments for renewal periods we are reasonably certain will be exercised, are included in the above table. Our lease obligations are primarily related to LNG vessel time charters, marine port leases, ISO tank leases, office space, and a land lease.
77
Table of Contents
Cash Flows
The following table summarizes the changes to our cash flows for the year ended December 31, 2024 and 2023, respectively:
| Year Ended December 31, | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|
| (in thousands) | 2024 | 2023 | Change | |||||||
| Cash flows from: | ||||||||||
| Operating activities | $ | 586,742 | $ | 824,756 | $ | (238,014) | ||||
| Investing activities | (2,074,647) | (2,904,143) | 829,496 | |||||||
| Financing activities | 2,224,568 | 1,528,950 | 695,618 | |||||||
| Net increase (decrease) in cash, cash equivalents, and restricted cash | $ | 736,663 | $ | (550,437) | $ | 1,287,100 |
Cash provided by operating activities
Our cash flow provided by operating activities was $586.7 million for the year ended December 31, 2024, which decreased by $238.0 million from cash provided by operating activities of $824.8 million for the year ended December 31, 2023. Our results for the year ended December 31, 2024, when adjusted for non-cash items including loss on extinguishment of debt, decreased by $199.3 million from the year ended December 31, 2023. We also settled a commodity swap during the first quarter of 2023, resulting in a significant cash inflow that did not recur during 2024.
Cash used in investing activities
Our cash flow used in investing activities was $2,074.6 million for the year ended December 31, 2024, which decreased by $829.5 million from cash used in investing activities of $2,904.1 million for the year ended December 31, 2023. Cash outflows from investing activities during the year ended December 31, 2024 were used primarily for continued development of our Fast LNG project and the construction of the PortoCem Power Plant and Barcarena Power Plant. Cash outflows were offset by proceeds from the sale of assets including the sale of turbines and related equipment to PREPA, our investment in Energos, the Mazo and the Miami Facility.
Cash outflows for investing activities during the year ended December 31, 2023 were used for continued development of our Fast LNG project and assets to service the grid stabilization project in Puerto Rico. Cash outflows were offset by proceeds of $100.0 million from the sale of our equity method investment in Hilli LLC in the Hilli Exchange, proceeds received from the sale of Pecém and Muricy, as well as proceeds received from the sale of the Spirit and a portion of our investment in equity securities.
Cash provided by financing activities
Our cash flow provided by financing activities was $2,224.6 million for the year ended December 31, 2024, which increased by $695.6 million from cash provided by financing activities of $1,529.0 million for the year ended December 31, 2023. During the year ended December 31, 2024 we had total borrowings of $5,865 million, with such borrowings primarily used to fund continued development of the Fast LNG project, Barcarena Power Plant, and PortoCem Power Plant. Such borrowings were also used to repay a portion of the 2025 Notes and various asset level financings in Puerto Rico and Brazil. We also repaid our Revolving Facility and short-term borrowings under repurchase agreements, prior to again drawing on these facilities.
Our cash flow provided by financing activities during the year ended December 31, 2023 included a dividend payment of $626.3 million that was made in January 2023. We have borrowed under our new Term Loan B Agreement, expanded Revolving Facility, Bridge Term Loans, Equipment Notes, Barcarena Debentures, EB-5 Loan, Tugboat Financing, as well as short-term borrowings under repurchase arrangements for total additional borrowings of $3.0 billion. Such borrowings were primarily used to fund the ongoing development of our Fast LNG project and to support our grid stabilization project in Puerto Rico. Increased borrowings during 2023 were offset by repayments of debt totaling $686.5 million, primarily the repayment of the Bridge Term Loans and short-term borrowings under repurchase arrangements.
78
Table of Contents
Long-Term Debt
2024 Exchange Transactions
On November 6, 2024, we entered into an exchange and subscription agreement (the “Exchange and Subscription Agreement”) with certain holders (the “Supporting Holders”) of our outstanding 2026 Notes and 2029 Notes (each defined below). Pursuant to the Exchange and Subscription Agreement (i) NFE Financing LLC (“NFE Financing”), an indirect subsidiary of NFE, sold to the Supporting Holders approximately $1,210.4 million aggregate principal amount of NFE Financing’s 12.0% Senior Secured Notes due 2029 (the “New 2029 Notes”) (the transactions described in clause (i), the “Subscription Transactions”) and (ii) NFE Financing issued to the Supporting Holders approximately $1,519.7 million aggregate principal amount of New 2029 Notes in a dollar-for-dollar exchange for a portion of our 2026 Notes and 2029 Notes (the transactions described in clause (ii), the “Exchange Transactions” and together with the Subscription Transactions, the “Refinancing Transactions”).
NFE Financing issued $2,730.1 million aggregate principal amount of New 2029 Notes pursuant to the Refinancing Transactions. We utilized $886.6 million of these net proceeds from the Subscription Transactions to repay in full the outstanding aggregate principal amount and accrued interest on the 2025 Notes. The remainder of the net proceeds from the New 2029 Notes issued pursuant to the Subscription Transactions will be used for general corporate purposes.
Pursuant to the Exchange and Subscription Agreement, upon consummation of the Refinancing Transactions, the Supporting Holders received a commitment fee equal to either (i) 5% of the aggregate principal amount of such Supporting Holder’s New 2029 Notes, payable in shares of Class A common stock of the Company, at a price of $8.63 per share (the “Commitment Fee Shares”), (ii) 2% of the aggregate principal amount of such Supporting Holder’s New 2029 Notes, payable in kind in the form of additional New 2029 Notes (the “Commitment Fee Notes”), or (iii) a combination of the foregoing. We have issued 15,700,998 Commitment Fee Shares to the Supporting Holders in satisfaction of its commitment fee obligations under the Exchange and Subscription Agreement, and $5.4 million Commitment Fee Notes were issued and included in the total New 2029 Notes issuance.
The New 2029 Notes were issued pursuant to, and are governed by, an indenture (the “New Notes Indenture”). The New 2029 Notes are senior, secured obligations of NFE Financing, and interest is payable semi-annually in arrears at a rate of 12.0% per annum on May 15 and November 15 of each year, beginning on May 15, 2025. The New Notes will mature on November 15, 2029, provided that the maturity date shall be accelerated to the date that is 91 days prior to the stated maturity date of any of our other indebtedness, subject to certain exceptions as described in the New Notes Indenture, if more than $100.0 million aggregate principal amount of such other indebtedness remains outstanding on such date.
NFE Financing may redeem some or all of the New 2029 Notes at redemption prices set forth in the New Notes Indenture; such redemption prices and any “make-whole” premiums are based on the timing of the redemption. Further, upon the occurrence of certain other events, including change of control and certain distributions from our Brazil business, NFE Financing may be required to make an offer to repurchase all of the New 2029 Notes at prices specified in the New Notes Indenture.
The New 2029 Notes are guaranteed by NFE Financing’s wholly-owned subsidiary, Bradford County Real Estate Partners LLC (the “New Notes Guarantor”) which owns our land in Wyalusing, Pennsylvania. The New 2029 Notes are secured by first-priority liens on: (a) all assets of NFE Financing, including approximately 45% of the equity in the entity that owns our Brazil business, and 100% of the equity in the New Notes Guarantor and (b) all assets of the New Notes Guarantor.
The New Notes Indenture provides for customary events of default which include (subject in certain cases to customary grace and cure periods), among others, acceleration and/or defaults of certain of our other indebtedness. The New Notes Indenture and other credit agreements associated with certain intercompany loans of NFE Financing, limit our ability to, among other things, incur additional indebtedness, incur liens that secure indebtedness, make restricted payments, create dividend restrictions and other payment restrictions, sell or transfer certain assets, in each case subject to certain exceptions and qualifications set forth in the New Notes Indenture and other indentures.
The repayment of all of the 2025 Notes and the exchange of a portion of the 2026 Notes and 2029 Notes was treated as an extinguishment, and $11.4 million of unamortized deferred debt issuance costs was recognized as a loss on extinguishment of debt in the Consolidated Statements of Operations and Comprehensive (Loss) Income. Fees paid to lenders, including the issuance of Commitment Fee Shares and Commitment Fee Notes, of $193.4 million were included in
79
Table of Contents
the loss on extinguishment of debt. We also recognized $30.5 million of loss on extinguishment of debt, which represents the fair value of the New 2029 Notes issued in excess of the carrying amount of debt exchanged or repaid. The New 2029 Notes are recorded at fair value and fees paid to third parties of $32.3 million will be amortized over the term of the New 2029 Notes.
In conjunction with the Refinancing Transactions, the Supporting Holders agreed to consent to certain amendments to the indentures pursuant to which the 2026 Notes (such indenture, the “Existing 2026 Notes Indenture”) and the 2029 Notes (such indenture, the “Existing 2029 Notes Indenture”) were issued. These amendments allow us to subordinate the liens on certain of the collateral securing the obligations under each of the Existing 2026 Notes Indenture and Existing 2029 Notes Indenture to the liens on the same collateral securing certain intercompany loans due to NFE Financing, and to remove all covenants and events of default that may be removed in compliance with terms of such indentures (the “Indenture Amendments”). The adoption of the Indenture Amendments required the consent of holders of at least 66.67% the outstanding principal amount of each of the 2026 Notes and 2029 Notes. We received the required level of consent, and subsequently executed a supplemental indenture to the Existing 2026 Notes Indenture (the “2026 Supplemental Indenture”) and a supplemental indenture to the Existing 2029 Notes Indenture (the “2029 Supplemental Indenture,” and, together with the 2026 Supplemental Indenture, the “Supplemental Indentures”) effecting the Amendments. The Supplemental Indentures became effective on December 5, 2024.
Series I Credit Agreement
On November 22, 2024, NFE Brazil Investments LLC (“Brazil Parent”), as lender, Wilmington Savings Fund Society, FSB, as the administrative agent and as collateral agent, New Fortress Energy Inc. , as borrower, and certain subsidiaries, as guarantors, entered into a senior secured, multiple-draw term loan credit agreement (“Series I Credit Agreement”) in an aggregate principal amount of approximately $970.0 million (the “Series I Term Loan Facility,” and the loans made under the Series I Term Loan Facility, the “Series I Term Loans”). The initial and subsequent funding of the Series I Term Loans are subject to certain customary conditions. The Series I Term Loans bear interest at a rate of 16.5997% (exclusive of 2.00% interest being paid-in-kind) per annum, payable semiannually in arrears on May 15 and November 15 of each year, beginning on May 15, 2025. The cash interest rate on the Series I Term Loans will be reduced by an amount to be determined from and after the closing date of the Refinancing Transactions. On November 22, 2024, NFE borrowed $875.0 million of Series I Term Loans to redeem in full the outstanding aggregate principal amount of the 2025 Notes. On December 6, 2024, NFE borrowed the remaining $95.0 million of the Series I Term Loans, the proceeds of which were used to effectuate the transactions contemplated by the Exchange and Subscription Agreement.
The Series I Term Loans will mature on November 15, 2029 and will be payable in full on the maturity date. The obligations under the Series I Credit Agreement are guaranteed, jointly and severally, on a senior secured basis by each subsidiary that is a guarantor under the 2026 Notes and the 2029 Notes. The obligations under the Series I Credit Agreement are secured by substantially the same collateral as the collateral securing the 2026 Notes and the 2029 Notes. An equal priority intercreditor agreement governs the treatment of the collateral.
The Series I Term Loans may be voluntarily prepaid by NFE, in whole or in part, subject to prepayment premiums, as set forth in the Series I Credit Agreement; such redemption prices and any “make-whole” premiums are based on the timing of the redemption. NFE will be required to prepay the Series I Term Loans upon the occurrence of any change of control (which shall include any change of control as defined in the New Notes Indenture and the Brazil Parent Credit Agreement), and with the net proceeds of certain asset sales, condemnations and debt and convertible securities issuances.
The Series I Credit Agreement contains usual and customary representations and warranties, usual and customary affirmative and negative covenants and events of default.
Brazil Parent Credit Agreement
On November 22, 2024, NFE Financing, as lender, entered into a credit agreement (the “Brazil Parent Credit Agreement”), with Brazil Parent, as the borrower, and Wilmington Savings Fund Society, FSB, as administrative agent and collateral agent.
The Brazil Parent Credit Agreement provides for a senior secured, multiple-draw term loan facility of approximately $970.0 million (the “Brazil Parent Term Loan Facility,” and the term loans made thereunder, the “Brazil Parent Term Loans”), which matures on November 15, 2029. The stated maturity date will be accelerated to a date that is 91 days prior to the stated maturity date of any other indebtedness for borrowed money (including indebtedness deemed issued in a debt
80
Table of Contents
exchange), excluding indebtedness under the amended uncommitted letter of credit and reimbursement agreement, if more than $100.0 million in aggregate principal amount of such indebtedness remains outstanding at such time. The initial and subsequent funding of the Brazil Parent Term Loans are subject to certain customary conditions. The Brazil Parent Term Loans bear interest at a rate of 16.5997% (exclusive of 2.00% interest being paid-in-kind) per annum, payable semiannually in arrears on May 15 and November 15 of each year, beginning on May 15, 2025. The cash interest rate on the Brazil Parent Term Loans will be reduced by an amount to be determined from and after the closing of the Refinancing Transactions. The obligations under the Brazil Parent Credit Agreement are secured by substantially all assets of Brazil Parent (including a pledge of the equity interests held by Brazil Parent in NFE Brazil Holdings). On November 22, 2024, Brazil Parent borrowed $875.0 million of Brazil Parent Term Loans, the proceeds of which were advanced to us pursuant to the Series I Credit Agreement for the redemption in full of the outstanding aggregate principal amount of the 2025 Notes. On December 6, 2024, Brazil Parent borrowed the remaining $95.0 million from the Brazil Parent Term Facility. The proceeds of the Brazil Parent Term Loan were used to fund the Series I Term Loan Facility.
The Brazil Parent Term Loans may be voluntarily prepaid by Brazil Parent, subject to prepayment premiums as set forth in the Brazil Parent Credit Agreement; such redemption prices and any “make-whole” premiums are based on the timing of the redemption. In addition, Brazil Parent will be required to prepay the Brazil Parent Term Loans upon the occurrence of certain events (subject to certain premiums as applicable and set forth in the Brazil Parent Credit Agreement), including any change of control and receipt of net proceeds from any prepayment under the Series I Credit Agreement.
The Brazil Parent Credit Agreement contains usual and customary representations and warranties, usual and customary affirmative and negative covenants and events of default.
Series II Credit Agreement
On December 6, 2024, NFE Financing, as lender, Wilmington Savings Fund Society, FSB, as the administrative agent and as collateral agent, and NFE, as borrower, and certain of our subsidiaries of NFE from time to time party thereto as guarantors, entered into a senior secured term loan credit agreement (“Series II Credit Agreement,” and together with the Series I Credit Agreement and the Brazil Parent Credit Agreement, the “Intercompany Credit Agreements”) in an aggregate principal amount of approximately $1.43 billion (the loan made under the term loan facility, the “Series II Term Loan”). The proceeds will be used by us to consummate the transactions contemplated by the Exchange and Subscription Agreement.
The Series II Term Loan will mature in November 2029 and is payable in full on the maturity date. The obligations under the Series II Credit Agreement will be guaranteed, jointly and severally, on a senior secured basis by each subsidiary that is a guarantor under the 2026 Notes and the 2029 Notes. The obligations under the Series II Credit Agreement will be secured by substantially the same collateral as the collateral securing the 2026 Notes and the 2029 Notes. An equal priority intercreditor agreement will govern the treatment of the collateral.
The Series II Term Loans may be voluntarily prepaid by NFE, in whole or in part, subject to prepayment premiums, as set forth in the Series II Credit Agreement; such redemption prices and any “make-whole” premiums are based on the timing of the redemption. NFE will be required to prepay the Series II Term Loan upon the occurrence of any change of control (which shall include any change of control as defined in the New Notes Indenture and the Brazil Parent Credit Agreement), and with the net proceeds of certain asset sales, condemnations and debt and convertible securities issuances.
The Series II Credit Agreement contains usual and customary representations and warranties, usual and customary affirmative and negative covenants and events of default.
2025 Notes
In September and December 2020, we issued an aggregate amount of $1,250.0 million of 6.75% senior secured notes in private offerings pursuant to Rule 144A under the Securities Act (the “2025 Notes”). Interest was payable semi-annually in arrears on March 15 and September 15 of each year; no principal payments were due until maturity on September 15, 2025.
In connection with the offering of the 2029 Notes (defined below) in March 2024, we completed a cash tender offer to repurchase $375.0 million of the outstanding 2025 Notes, for an aggregate repurchase price of $376.9 million. The tender offer was closed and the partial repurchase of the 2025 Notes was completed in the first quarter of 2024. The premium over
81
Table of Contents
the repurchase price of $1.9 million was recognized as Loss on extinguishment of debt, net in the Consolidated Statements of Operations and Comprehensive (Loss) Income. The remaining outstanding principal under the 2025 Notes was repaid in conjunction with the Refinancing Transactions.
2026 Notes
In April 2021, we issued $1,500.0 million of 6.50% senior secured notes in a private offering pursuant to Rule 144A under the Securities Act (the “2026 Notes”). Interest is payable semi-annually in arrears on March 31 and September 30 of each year; no principal payments are due until maturity on September 30, 2026. We may redeem the 2026 Notes, in whole or in part, at any time prior to maturity, subject to certain make-whole premiums.
The 2026 Notes are guaranteed, jointly and severally, on a senior secured basis by certain domestic and foreign subsidiaries. Subsequent to the Refinancing Transactions, the 2026 Notes are subject to the 2026 Supplemental Indenture.
2029 Notes
In March 2024, we issued $750.0 million of 8.75% senior secured notes in a private offering pursuant to Rule 144A under the Securities Act (the “2029 Notes”). Interest is payable semi-annually in arrears on March 15 and September 15 of each year; no principal payments are due until maturity on March 15, 2029. We may redeem the 2029 Notes, in whole or in part, at any time prior to maturity, subject to certain make-whole premiums.
The 2029 Notes are guaranteed on a senior secured basis by each domestic subsidiary and foreign subsidiary that is a guarantor under the 2026 Notes. Subsequent to the Refinancing Transactions, the 2029 Notes are subject to the 2029 Supplemental Indenture.
Revolving Facility
In April 2021, we entered into a credit agreement (the "Revolving Credit Agreement") for a $200.0 million senior secured revolving credit facility (the "Revolving Facility"). Through December 31, 2023, the Revolving Facility was amended to increase the borrowing capacity to $950.0 million. In May 2024, we entered into an amendment which increased the borrowing capacity by $50.0 million, for a total capacity of $1,000.0 million. The amendments did not impact the interest rate or term of the Revolving Facility, and no deferred costs were written off. As of December 31, 2024 and 2023, $1,000.0 million and $866.6 million was outstanding under the Revolving Facility.
The borrowings under the Revolving Facility bear interest at a Secured Overnight Financing Rate ("SOFR") based rate plus a margin based upon usage of the Revolving Facility. The rates applicable to outstanding borrowings as of December 31, 2024 and 2023 were 8.22% and 8.29%, respectively. Borrowings under the Revolving Facility may be prepaid, at our option, at any time without premium.
Concurrent with the Refinancing Transactions, we entered into an amendment with certain lenders in the Revolving Facility (the "Consenting Lenders") to extend the maturity of their commitments to October 15, 2027. The Consenting Lenders hold $900.0 million of the total revolving commitments. The applicable margin payable on revolving borrowings to the Consenting Lenders increased by 100 basis points. We are required to reduce the commitments with proceeds from certain assets sales and by certain amounts received from the settlement of our claims following the termination of our contract to provide emergency power services in Puerto Rico (Note 5). Notwithstanding these required reductions, we must reduce commitments for Consenting Lenders to $630.0 million by September 30, 2025, and as such, $270.0 million of the outstanding borrowings under the Revolving Facility have been recognized as current. The remainder of the Revolving Facility will mature in April 2026 with the potential for us to extend the maturity date once for a one-year increment.
The obligations under the Revolving Facility are guaranteed by certain of our subsidiaries, including those that own our offshore FLNG facility at Altamira ("FLNG1 Project") and Altamira Onshore Project (defined below), and are secured by substantially the same collateral securing the obligations under certain intercompany loans entered into in conjunction with the Refinancing Transactions, as well as the assets comprising the FLNG1 Project and Altamira Onshore Project. We are required to comply with the below covenants under the Revolving Facility and Letter of Credit Facility (defined below):
•Beginning with the fiscal quarter ended March 31, 2025, for quarters in which the Revolving Facility is greater than 50% drawn, the Debt to EBITDA Ratio must be below the following: (i) 8.75 to 1.00, for the fiscal quarter
82
Table of Contents
ending March 31, 2025, (ii) 7.25 to 1.00, for the fiscal quarter ending June 30, 2025, (iii) 6.75 to 1.00, for the fiscal quarter ending September 30, 2025, (iv) 6.50 to 1.00, for the fiscal quarter ending December 31, 2025, (v) 7.25 to 1.00, for the fiscal quarters ending March 31, 2026 through September 30, 2026, and (vi) 6.75 to 1.00, for the fiscal quarter ending December 31, 2026 and each fiscal quarter thereafter.
•Beginning with fiscal quarter ended March 31, 2025, the Fixed Charge Coverage Ratio must be less than or equal to (i) 0.80 to 1.00, for the fiscal quarter ending March 31, 2025 and (ii) 1.00 to 1.00, for the fiscal quarter ending June 30, 2025 and each fiscal quarter thereafter.
•We are also required to maintain a minimum consolidated liquidity of (i) $50,000 as of the last day of each month, commencing as of October 31, 2024 and (ii) $100,000 as of the last day of any fiscal quarter, commencing as of December 31, 2024. We were in compliance with these covenants as of December 31, 2024.
The Revolving Credit Agreement contains usual and customary representations and warranties, usual and customary affirmative and negative covenants and events of default.
Letter of Credit Facility
In July 2021, we entered into an uncommitted letter of credit and reimbursement agreement (the "Letter of Credit Agreement") with a bank for the issuance of letters of credit for an aggregate amount of up to $75.0 million (the“Letter of Credit Facility”). Through December 31, 2023, the Letter of Credit Facility was amended multiple times to increase the availability to $350.0 million. As of December 31, 2024, the Letter of Credit Facility had a limit of $315,000, and the outstanding letters of credt have an interest rate of 3.35%. We had an unutilized Letter of Credit Facility balance of $69.0 million as at December 31, 2024
Term Loan B Credit Agreement
On August 3, 2023, we entered into a credit agreement (the “Bridge Term Loan Agreement”) pursuant to which the lenders funded term loans (the “Bridge Term Loans”) in an aggregate principal amount of $400.0 million. The Bridge Term Loans were initially set to mature on August 1, 2024 and were payable in full on the maturity date. The Bridge Term Loans bore interest at a per annum rate equal to Adjusted Term SOFR (as defined in the Bridge Term Loan Agreement) plus 3.50%.
On October 30, 2023, we entered into a credit agreement (the “Term Loan B Agreement”) pursuant to which the lenders funded term loans to in an aggregate principal amount of $856.0 million ("Term Loan B"). Borrowings were issued at a discount, and we received proceeds of $787.5 million. The proceeds from the Term Loan B issuance were used to repay the Bridge Term Loans and may be used for working capital and other general corporate purposes. The Term Loan B will mature on the earliest of (i) October 30, 2028 if the 2026 Notes are refinanced in full prior to their maturity and (ii) July 31, 2026, if any of the 2026 Notes remain outstanding as of such date. Quarterly principal payments of approximately $2.1 million are required beginning March 2024.
The obligations under the Term Loan B are guaranteed by certain of our subsidiaries, including those that own our FLNG1 Project and Altamira Onshore Project (defined below). The Term Loan B is secured by substantially the same collateral as the first lien obligations under the 2026 Notes, the Revolving Facility, and, in addition, is secured by assets compromising our FLNG1 Project.
The Term Loan B bears interest at a per annum rate equal to Adjusted Term SOFR (as defined in the Term Loan B Agreement) plus 5.0%. We may prepay the Term Loan B at its option subject to prepayment premiums until October 2025 and customary break funding costs. We are required to prepay the Term Loan B with the net proceeds of certain asset sales, condemnations, and debt and convertible securities issuances, in each case subject to certain exceptions and thresholds. Additionally, commencing with the fiscal quarter ending December 31, 2024, we will be required to prepay the Term Loan B with our Excess Cash Flow (as defined in the Term Loan B Agreement).
The Term Loan B Agreement contains usual and customary representations and warranties, and usual and customary affirmative and negative covenants. No financial covenant compliance is required under the Term Loan B Agreement.
83
Table of Contents
Term Loan A Credit Agreement
In July 2024, we entered into a credit agreement ("Term Loan A Credit Agreement") for a senior secured, multiple draw term loan facility in an aggregate principal amount of up to $700.0 million ("Term Loan A"). Proceeds must be used to pay costs of the construction and development of our onshore FLNG project in Altamira (the “Altamira Onshore Project”). During the year ended December 31, 2024, we drew $350.0 million on the Term Loan A. The remaining commitments for subsequent funding expire on the earliest of June 30, 2026, the date of completion of the Onshore Altamira Project (the “Completion Date”) and the date that the commitments are reduced to zero or terminated.
The obligations under the Term Loan A Credit Agreement are guaranteed, jointly and severally, on a senior secured basis by each subsidiary that is a guarantor under the 2026 Notes, 2029 Notes, our Revolving Facility, our letter of credit facility (the “Letter of Credit Facility”) and our Term Loan B, other than the guarantors comprising the FLNG1 Project (who guarantee the Revolving Facility, the Letter of Credit Facility, and the Term Loan B). The obligations under the Term Loan A Credit Agreement are secured by substantially the same collateral as the collateral securing such facilities, with the exception of the collateral comprising the FLNG1 Project (which secures the Revolving Facility, the Letter of Credit Facility, and the Term Loan B). Additionally, the Term Loan A is guaranteed by the entities, and secured by the assets, comprising the Onshore Altamira Project. An equal priority intercreditor agreement governs the treatment of the collateral.
The Term Loan A will mature in July 2027 and is payable in full on the maturity date. In the event that our existing 2026 Notes are not refinanced or repaid at least 60 days prior to maturity, amounts outstanding under the Term Loan A will become due and payable on such date. We may prepay the Term Loan A at its option without premium or penalty at any time subject to customary break funding costs. We are required to prepay the Term Loan A with the net proceeds of certain asset sales, condemnations, debt and convertible securities issuances, and extraordinary receipts related to the Onshore Altamira Project. Additionally, commencing with the first fiscal quarter after the Completion Date, we will be required to prepay the Term Loan A with the Onshore Altamira Project’s Excess Cash Flow (as defined in the Term Loan A Credit Agreement).
The Term Loan A will bear interest at a per annum rate equal to Term SOFR plus 3.75%, or at a base rate plus 2.75%. The interest rate on the Term Loan A will increase by 0.25% every 180 days beginning on June 30, 2025.
The Term Loan A Credit Agreement contains usual and customary representations, warranties and affirmative and negative covenants for financings of this type, including certain representations and warranties related to the Onshore Altamira Project. The Term Loan A Credit Agreement includes certain other covenants related solely to the Onshore Altamira Project, including limitations on capital expenditures, restrictions on additional accounts, and restrictions on amendments or termination of certain material documents related to the Onshore Altamira Project. We must also comply with certain financial covenants consistent with those under the Revolving Facility, including Debt to EBITDA Ratio and minimum consolidated liquidity.
Short-term Borrowings
We may, from time to time, enter into sales and repurchase agreements with a financial institution, whereby we sell to the financial institution an LNG cargo and concurrently enters into an agreement to repurchase the same LNG cargo immediately with the repurchase price payable at a future date, generally not to exceed 90-days from the date of the sale and repurchase (the “Short-term Borrowings”). As of December 31, 2024, we had $179.9 million due under these arrangements.
Vessel Financing Obligation
In connection with of the Energos Formation Transaction, we entered into long-term time charter agreements for certain vessels for periods of up to 20 years. Vessels chartered to us at the time of closing were classified as finance leases. Additionally, our charter of certain other vessels will commence only upon the expiration of the vessel's existing third-party charters. These forward starting charters prevented the recognition of a sale of the vessels to Energos. As such, we accounted for the Energos Formation Transaction as a failed sale-leaseback and has recorded a financing obligation for consideration received.
We continue to be the owner for accounting purposes of vessels included in the Energos Formation Transaction (except the Nanook), and as such, we recognize revenue and operating expenses related to vessels under charter to third parties. Revenue recognized from these third-party charters form a portion of the debt service for the financing obligation;
84
Table of Contents
at inception of the arrangement, the effective interest rate on this financing obligation was approximately 15.9% and includes the cash flows that Energos receives from these third-party charters. Charter payments due in 2025 include $57.8 million that will be treated as a payment of principal, and this amount is included within the current portion of long-term debt.
Tugboat Financing
In December 2023, we sold and leased back four tugboat vessels for 15 years receiving proceeds of $46.7 million. ("Tugboat Financing"). The leasebacks of the tugboat vessels were classified as finance leases, and as such, we accounted for the Tugboat Financing as a failed sale-leaseback and has recorded a financing obligation for consideration received. The effective interest rate on this financing obligation is approximately 16.92%.
PortoCem Financings
As part of the PortoCem Acquisition, we assumed a term loan in the aggregate principal amount of R$141,445 million ($28.1 million based on the exchange rate in effect on the acquisition date) due December 2024, bearing interest at a rate equal to the one-day interbank deposit rate in Brazil plus 5.0% (the "PortoCem BTG Loan"). Lenders under the PortoCem BTG Loan waived acceleration requirements in the event of a change in control in conjunction with the PortoCem Acquisition, and repayment of the PortoCem BTG Loan was required upon the earlier of PortoCem obtaining additional financing or the original maturity date of December 2024.
In April 2024, PortoCem and a syndicate of banks in Brazil entered into a commitment letter for R$2.9 billion of financing. PortoCem received funding under a short term credit note of R$600 million ("PortoCem Credit Note") from this syndicate that was due in July 2024, and a portion of the proceeds was used to repay the PortoCem BTG Loan.
In May 2024, the PortoCem Credit Note was replaced by a bridge financing agreement that allows PortoCem to borrow up to R$2.9 billion due in October 2025 ("PortoCem Bridge Loan"). PortoCem borrowed R$1.5 billion, and this funding was used to repay the PortoCem Credit Note and to begin the development and construction of a power plant to deliver under the capacity reserve contracts acquired in the PortoCem Acquisition. The PortoCem Bridge Loan bore interest at the one-day interbank deposit futures rate in Brazil plus 4.25%, and no principal payments were required until maturity in October 2025.
In November 2024, PortoCem issued R$4.5 billion ($726.8 million based on exchange rates in effect at December 31, 2024) of debentures to BNDES ("PortoCem Debentures"). Borrowings bear interest at 9.15%. No principal or interest payments are due until September 2027; at that point, PortoCem will begin to make semi-annual payments until maturity in September 2040. Proceeds received were utilized to repay the PortoCem Bridge Loan, and the remaining proceeds are restricted to fund the construction of the PortoCem Power Plant.
The PortoCem Debentures contain usual and customary representations and warranties, and usual and customary affirmative and negative covenants. The PortoCem Debentures do not contain any restrictive financial covenants.
Barcarena Financings
In October 2023, certain of our Brazilian subsidiaries entered into two long-term financing arrangements, fully funding the construction of our power plant located in Pará, Brazil (the "Barcarena Power Plant"). The parent of the owner of the Barcarena Power Plant entered into an agreement for the issuance of up to $200 million of convertible debentures maturing in October 2028 ("Barcarena Debentures") and issued $180 million of the Barcarena Debentures prior to December 31, 2023. The remaining series may be issued upon the achievement of certain conditions precedent. Interest on the Barcarena Debentures is due quarterly, and interest accrues at an annual rate of 12.0%, increasing 1.25% each year after the third anniversary of issuance. We are able to prepay the Barcarena Debentures, subject to certain make whole penalties, and we are required to utilize certain excess cash flows from our Brazilian operations to prepay principal.
The Barcarena Debentures are convertible into shares of one of our indirect Brazilian subsidiaries on the maturity date at the creditors' option, based on the current fair value of this subsidiary's equity at the time of conversion.
The obligations under the Barcarena Debentures are guaranteed by certain indirect Brazilian subsidiaries that own the Barcarena Facility and the Santa Catarina Facility. NFE has also provided a parent company guarantee that will be released once the Barcarena Facility commences commercial operations. Brazilian subsidiaries guaranteeing these obligations are
85
Table of Contents
required to comply with customary affirmative and negative covenants, and the Barcarena Debentures also provides for customary events of default, prepayment and cure provisions.
The owner of the Barcarena Power Plant entered into a credit agreement with BNDES, the Brazilian Development Bank (the "BNDES Credit Agreement"). We are able to borrow up to $355.6 million under the BNDES Credit Agreement, segregated into three tranches based on the use of proceeds ("BNDES Term Loan"). We borrowed $344.7 million under the BNDES Credit Agreement in 2024. Each tranche bears a different rate of interest ranging from 2.61% to 4.41% plus the fixed rate announced by BNDES. No principal payments are required until April 2026 and are due quarterly thereafter until maturity in 2045. Interest payments prior to April 2026 are made through an increase in the outstanding principal amount and are due quarterly thereafter.
The obligations under the BNDES Credit Agreement are guaranteed by certain indirect Brazilian subsidiaries that are constructing the Barcarena Power Plant, and are secured by the Barcarena Power Plant and receivables under the Barcarena Power Plant's PPAs. These Brazilian subsidiaries are required to comply with customary affirmative and negative covenants, and the BNDES Credit Agreement also provides for customary events of default, prepayment and cure provisions.
South Power 2029 Bonds
In January 2022, NFE South Power Holdings Limited (“South Power”), a wholly owned subsidiary of NFE, entered into an agreement for the issuance of up to $285.0 million secured bonds (“South Power 2029 Bonds”). The South Power 2029 Bonds are secured by, amongst other things, our combined heat and power plant in Clarendon, Jamaica (“CHP Plant”), and NFE has provided a guarantee of the obligations under the South Power 2029 Bonds. As of both December 31, 2024 and 2023, South Power had $221.8 million of South Power 2029 Bonds issued and outstanding.
The South Power 2029 Bonds bear interest at an annual fixed rate of 6.50% and shall be repaid in quarterly installments beginning in August 2025 with the final repayment date in May 2029. Interest payments on outstanding principal balances are due quarterly.
South Power is required to comply with certain financial covenants as well as customary affirmative and negative covenants. The South Power 2029 Bonds also provide for customary events of default, prepayment and cure provisions. We were in compliance with all covenants as of December 31, 2024 and 2023.
Turbine Financing
In May 2024, we executed a loan agreement with a lender to borrow $148.5 million under a promissory note secured by certain turbines owned by a wholly-owned subsidiary of ours (the “Turbine Financing”). The Turbine Financing bears interest at 10.30%, and the principal is partially repayable in monthly installments over the 36-month term of the loan with the balance due upon maturity in June 2027.
The Turbine Financing contains usual and customary representations and warranties, and usual and customary affirmative and negative covenants. The Turbine Financing does not contain any restrictive financial covenants. We were required to pay a deposit of approximately $6.0 million that will be held by the lender throughout the term of the borrowing recorded in Other non-current assets, net
EB-5 Loan Agreement
On July 21, 2023, we entered into a loan agreement under the U.S. Citizenship and Immigration Services EB-5 Program (“EB-5 Loan Agreement”) to pay for the development and construction of a new green hydrogen facility in Texas. The maximum aggregate principal amount available under the EB-5 Loan Agreement is $100.0 million, and outstanding borrowings bear interest at a fixed rate of 4.75%. The loan matures in 5 years from the initial advance with an option to extend the maturity by two one-year periods. It is expected that the loan will be secured by NFE's green hydrogen facility, and NFE has provided a guarantee of the obligations under the EB-5 Loan Agreement. In the year ended December 31, 2023, $62.9 million was funded under the EB-5 Loan Agreement, and the remaining availability of $37.1 million was funded during the year ended December 31, 2024.
The EB-5 Loan Agreement contains usual and customary representations and warranties, and usual and customary affirmative and negative covenants. The EB-5 Loan Agreement does not contain any restrictive financial covenants.
86
Table of Contents
Summary of Critical Accounting Estimates
The preparation of consolidated financial statements in conformity with GAAP requires us to make certain estimates and assumptions that affect the amounts reported in the consolidated financial statements and the accompanying notes. Changes in facts and circumstances or additional information may result in revised estimates, and actual results may differ from these estimates. We evaluate our estimates and related assumptions regularly, and we believe that the accounting policies discussed below are critical to understanding our historical and future performance, as these policies relate to the more significant areas involving management’s judgments and estimates.
Impairment of long-lived assets
We perform a recoverability assessment of long-lived assets whenever events or changes in circumstances indicate that the carrying amount of an asset may not be recoverable. Indicators may include, but are not limited to, adverse changes in the regulatory environment in a jurisdiction where we operate, unfavorable events impacting the supply chain for LNG to our operations, a decision to discontinue the development of a long-lived asset, early termination of a significant customer contract, or the introduction of newer technology. We exercise judgment in determining if any of these events represent an impairment indicator requiring a recoverability assessment.
Our business model requires investments in infrastructure often concurrently with our customer’s investments in power generation or other assets to utilize LNG. Our costs to transport and store LNG are based upon our customer’s contractual commitments once their assets are fully operational. We expect revenue under these contracts to exceed construction and operational costs, based on the expected term and revenue of these contracts. Additionally, our infrastructure assets are strategically located to provide critical inputs to our committed customer’s operations and our locations allow us to expand to additional opportunities within existing markets. These projects are subject to risks related to successful completion, including those related to government approvals, site identification, financing, construction permitting and contract compliance.
Geopolitical and other macroeconomic events can substantially impact natural gas and LNG markets, leading to volatility in market pricing. The majority of our LNG supply contracts are based on a natural gas-based index, Henry Hub, plus a contractual spread. We primarily operate under long-term contracts with customers, many of which contain fixed minimum volumes that must be purchased on a “take-or-pay” basis. We limit our exposure to fluctuations in natural gas prices as our pricing in contracts with customers is largely based on the Henry Hub index price plus a contractual spread. Based on the long-term nature of our supply and customer contracts, the nature of the pricing in these contracts and the market value of our underlying assets, changes in the price of natural gas or LNG do not indicate that a recoverability assessment of our assets is necessary. Further, LNG production from our own FLNG facilities will further mitigate our exposure to variability in LNG and natural gas prices.
When performing a recoverability assessment, the Company measures whether the estimated future undiscounted net cash flows expected to be generated by the asset exceeds its carrying value. In the event that an asset does not meet the recoverability test, the carrying value of the asset will be adjusted to fair value resulting in an impairment charge. We develop the assumptions used in the recoverability assessment based on active contracts, current and future expectations of the global demand for LNG and natural gas, as well as information received from third party industry sources.
Recent Accounting Standards
For descriptions of recently issued accounting standards, refer to “Note 3. Adoption of new and revised standards” of our notes to consolidated financial statements included in this Annual Report.
FY 2023 10-K MD&A
SEC filing source: 0001749723-24-000011.
Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations.
Certain information contained in the following discussion and analysis, including information with respect to our plans, strategy, projections and expected timeline for our business and related financing, includes forward-looking statements. Forward-looking statements are estimates based upon current information and involve a number of risks and uncertainties. Actual events or results may differ materially from the results anticipated in these forward-looking statements as a result of a variety of factors.
You should read “Part 1, Item 1A. Risk Factors” and “Cautionary Statement on Forward-Looking Statements” elsewhere in this Annual Report on Form 10-K (“Annual Report”) for a discussion of important factors that could cause actual results to differ materially from the results described in or implied by the forward-looking statements contained in the following discussion and analysis.
The comparison of the years ended December 31, 2022 and 2021 can be found in our Annual Report on Form 10-K for the year ended December 31, 2022 located within “Part II, Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations.”
The following information should be read in conjunction with our audited consolidated financial statements and accompanying notes included elsewhere in this Annual Report. Our financial statements have been prepared in accordance with generally accepted accounting principles in the United States of America (“GAAP”). This information is intended to provide investors with an understanding of our past performance and our current financial condition and is not necessarily indicative of our future performance. Please refer to “—Factors Impacting Comparability of Our Financial Results” for further discussion. Unless otherwise indicated, dollar amounts are presented in millions.
Unless the context otherwise requires, references to “Company,” “NFE,” “we,” “our,” “us” or like terms refer to New Fortress Energy Inc. and its subsidiaries.
Overview
We are a global energy infrastructure company founded to help address energy poverty and accelerate the world’s transition to reliable, affordable, and clean energy. We own and operate natural gas and liquefied natural gas ("LNG") infrastructure and an integrated fleet of ships and logistics assets to rapidly deliver turnkey energy solutions to global markets; additionally, we have expanded our focus to building our modular LNG manufacturing business. Our near-term mission is to provide modern infrastructure solutions to create cleaner, reliable energy while generating a positive economic impact worldwide. Our long-term mission is to become one of the world’s leading companies providing power free from carbon emissions by leveraging our global portfolio of integrated energy infrastructure. We discuss this important goal in more detail in this Annual Report, “Items 1 and 2: Business and Properties” under “Sustainability—Toward a Low Carbon Future.”
Our chief operating decision maker makes resource allocation decisions and assesses performance on the basis of two operating segments, Terminals and Infrastructure and Ships.
Our Terminals and Infrastructure segment includes the entire production and delivery chain from natural gas procurement and liquefaction to logistics, shipping, facilities and conversion or development of natural gas-fired power generation. We currently source LNG from long-term supply agreements with third-party suppliers and from our own liquefaction facility in Miami, Florida. Upon the completion of commissioning in 2024, we expect to begin to source a portion of our LNG from our modular liquefaction facilities, which we refer to as "Fast LNG" or "FLNG." The Terminals and Infrastructure segment includes all terminal operations in Jamaica, Puerto Rico, Mexico and Brazil, as well as vessels utilized in our terminal or logistics operations. We centrally manage our LNG supply and the deployment of our vessels utilized in our terminal or logistics operations, which allows us to optimally manage our LNG supply and fleet.
Our Ships segment includes all vessels which are leased to customers under long-term arrangements. The Company’s investment in Energos (defined below) is also included in the Ships segment. Over time, we expect to utilize these vessels in our own terminal operations as charter agreements for these vessels expire.
57
Table of Contents
Our Current Operations – Terminals and Infrastructure
Our management team has successfully employed our strategy to secure long-term contracts with significant customers, including Jamaica Public Service Company Limited (“JPS”), the sole public utility in Jamaica, South Jamaica Power Company Limited (“SJPC”), an affiliate of JPS, Jamalco, a bauxite mining and alumina producer in Jamaica, the Puerto Rico Electric Power Authority (“PREPA”), and Comisión Federal de Electricidad (“CFE”), Mexico’s power utility, each of which is described in more detail below. Our assets built to service these significant customers have been designed with capacity to service other customers.
Montego Bay Facility
The Montego Bay Facility serves as our supply hub for the north side of Jamaica, providing natural gas to JPS to fuel the 145MW Bogue power plant in Montego Bay, Jamaica ("Bogue Power Plant"). Our Montego Bay Facility commenced commercial operations in October 2016 and is capable of processing up to 60,000 MMBtu of LNG per day and features approximately 7,000 cubic meters of onsite storage. The Montego Bay Facility also consists of an ISO loading facility that can transport LNG to numerous on-island industrial users.
Old Harbour Facility
The Old Harbour Facility is an offshore facility consisting of an FSRU that is capable of processing up to 750,000 MMBtus from LNG per day. The Old Harbour Facility commenced commercial operations in June 2019 and supplies natural gas to the 190MW Old Harbour power plant (“Old Harbour Power Plant”) operated by SJPC. The Old Harbour Facility is also supplying natural gas to our dual-fired combined heat and power facility in Clarendon, Jamaica (“CHP Plant”). The CHP Plant supplies electricity to JPS under a long-term agreement. The CHP Plant also provides steam to Jamalco under a long-term take-or-pay agreement. The Old Harbour Facility also supplies gas directly to Jamalco to utilize in their gas-fired boilers.
San Juan Facility
Our San Juan Facility became fully operational in the third quarter of 2020. It is designed as a landed micro-fuel handling facility located in the Port of San Juan, Puerto Rico. The San Juan Facility has multiple truck loading bays to provide LNG to on-island industrial users. The San Juan Facility is near the PREPA San Juan Power Plant and serves as our supply hub for the PREPA San Juan Power Plant and other industrial end-user customers in Puerto Rico.
In the first and second quarters of 2023, we entered into agreements with Weston Solutions, Inc. ("Weston") for the installation and operation of approximately 350MW of additional power to be generated at the Palo Seco Power Plant and San Juan Power Plant in Puerto Rico as well as the supply of natural gas and ADO. Weston has been contracted by the U.S. Army Corps of Engineers to support the island’s grid stabilization project with additional power capacity to enable maintenance and repair work on Puerto Rico’s power system and grid. We commissioned 150MW of duel-fuel power generation using our gas supply in the second quarter of 2023, and the remaining 200MW was commissioned in September 2023.
In the first quarter of 2023, our wholly-owned subsidiary, Genera PR LLC ("Genera"), was awarded a 10-year contract for the operation and maintenance of PREPA’s thermal generation assets with the goal of reducing costs and improving reliability of power generation in Puerto Rico. We receive an annual management fee and are eligible for performance-based incentive fees, beginning after the service period under the contract commenced on July 1, 2023.
La Paz Facility
In the fourth quarter of 2021, we began commercial operations at the Port of Pichilingue in Baja California Sur, Mexico (the “La Paz Facility”). The La Paz Facility also supplies our gas-fired power units located adjacent to the La Paz Facility (the “La Paz Power Plant”) and could have a maximum capacity of up to 135MW of power. We placed the La Paz Power Plant into service in the third quarter of 2023.
In the fourth quarter of 2022, we finalized short-form agreements with CFE to expand and extend our supply of natural gas to multiple CFE power generation facilities in Baja California Sur and to sell the La Paz Power Plant to CFE. We executed the final long-form gas sales agreement in the second quarter of 2023, which is subject to certain conditions precedent including the execution of the final agreement to sell the La Paz Power Plant.
58
Table of Contents
Miami Facility
Our Miami Facility began operations in April 2016. This facility has liquefaction capacity of approximately 8,300 MMBtu from LNG per day and enables us to produce LNG for sales directly to industrial end-users in southern Florida, including Florida East Coast Railway via our train loading facility, and other customers throughout the Caribbean using ISO containers.
Our LNG Supply and Cargo Sales
NFE provides reliable, affordable and clean energy supplies to customers around the world that we plan to satisfy through the following sources: 1) our current contractual supply commitments; 2) additional LNG supply contracts expected to commence in 2027; 3) our Miami Facility; and 4) supply from our own Fast LNG production. We have secured commitments to purchase and receive physical delivery of LNG volumes for 100% of our expected committed volumes for each of our downstream terminals inclusive of our Montego Bay Facility, Old Harbour Facility, San Juan Facility, La Paz Facility, Puerto Sandino Facility, Barcarena Facility and Santa Catarina Facility. Additionally, we have binding contracts for LNG volumes from two separate U.S. LNG facilities, each with a 20-year term, which are expected to commence in 2027. Finally, we plan to commence production from our first Fast LNG facility upon the completion of commissioning in 2024. We plan to expand that capacity when additional Fast LNG units come online over the next two years.
Natural gas and LNG markets have experienced unprecedented price volatility in recent years. The majority of our LNG supply contracts are based on a natural gas-based index, Henry Hub, plus a contractual spread. We limit our exposure to fluctuations in natural gas prices as our pricing in contracts with customers is largely based on the Henry Hub index price plus a fixed fee component. Additionally, with our own Fast LNG production, we plan to further mitigate our exposure to variability in LNG prices. In 2022 and 2023, our revenue and results of operations have benefited from selling cargos into the global LNG market. As FLNG facilities commence production, our long-term strategy is to sell substantially all cargos produced to customers on a long-term, take-or-pay basis through our downstream terminals.
Our Current Operations – Ships
Our Ships segment includes Floating Storage and Regasification Units ("FSRUs"), Floating Storage Units ("FSUs") and LNG carriers ("LNGCs"), which are leased to customers under long-term arrangements. At the expiration of third party charters of vessels owned by Energos Infrastructure (“Energos”), an entity formed in 2022 and described in more detail below, we have chartered these vessels for our own operational purposes. The results of operations of vessels utilized in our terminal operations are reflected in the Terminals and Infrastructure segment.
In August 2022, we completed a transaction (the “Energos Formation Transaction”) with an affiliate of Apollo Global Management, Inc., pursuant to which we transferred ownership of 11 vessels to Energos in exchange for approximately $1.85 billion in cash and a 20% equity interest in Energos. Ten of the vessels were subject to current or future charters with NFE and one vessel (the Nanook) was not subject to a future NFE charter. The in-place and future charters to NFE of ten vessels prevent the recognition of the sale of those vessels to Energos, and the proceeds associated with these vessels have been treated as a failed sale leaseback. As a result, these ten vessels continue to be recognized on our Consolidated Balance Sheets as Property, plant and equipment, and the proceeds are recognized as debt. Consistent with this treatment as a failed sale leaseback, (i) the third party charter revenues continue to be recognized by us as Vessel charter revenue; (ii) the costs of operating the vessels is included in Vessel operating expenses for the remaining terms of the third-party charters and (iii) such revenues are included as part of debt service for the sale leaseback financing debt and are included in additional financing costs within Interest expense, net. In February 2024, we sold substantially all of our stake in Energos.
Our Development Projects
Our projects currently under development include our development of a series of modular liquefaction facilities to provide a source of low-cost supply of LNG to customers around the world through our Fast LNG technologies; our LNG terminal facility and power plant in Puerto Sandino, Nicaragua (“Puerto Sandino Facility”); our LNG terminal (“Barcarena Facility”) and power plant (“Barcarena Power Plant”) located in Pará, Brazil; our LNG terminal located on the southern coast of Brazil ("Santa Catarina Terminal"); our LNG terminal (“Ireland Facility”) and power plant in Ireland; and our first green hydrogen project ("ZeroPark I"). We are also in active discussions to develop projects in multiple regions around the world that may have significant demand for additional power, LNG and natural gas, although there can be no assurance
59
Table of Contents
that these discussions will result in additional contracts or that we will be able to achieve our target revenue or results of operations.
The design, development, construction and operation of our projects are highly regulated activities and subject to various approvals and permits. The process to obtain required permits, approvals and authorizations is complex, time-consuming, challenging and varies in each jurisdiction in which we operate. We obtain required permits, approvals and authorizations in due course in connection with each milestone for our projects.
We describe each of our current development projects below.
Fast LNG
We are currently developing multiple modular liquefaction facilities to provide a source of low-cost supply of LNG to customers around the world. We have designed and are constructing liquefaction facilities for our growing customer base that we believe are both faster and more economical to construct than many traditional liquefaction solutions. Our initial “Fast LNG,” or “FLNG,” design pairs advancements in modular, midsize liquefaction technology with jack up rigs, semi-submersible rigs or similar marine floating infrastructure to enable a lower cost and faster deployment schedule than other greenfield alternatives. Semi-permanently moored floating storage unit(s) (FSUs) will provide LNG storage alongside the floating liquefaction infrastructure, which can be deployed anywhere there is abundant and stranded natural gas. As noted below, we are also in discussions with CFE to utilize our FLNG design in an onshore application.
Our initial Fast LNG units are being constructed at the Kiewit Offshore Services shipyard near Corpus Christi, Texas. The Kiewit facility specializes in the fabrication and integration of offshore projects. In partnership with Kiewit, we believe we have established an efficient and repeatable process to reduce cost and time to build incremental liquefaction capacity. Our first Fast LNG unit has been deployed offshore to Altamira, Mexico, and we expect to deploy additional units over the next two years.
We plan to deploy several Fast LNG units at different locations around the world and describe our currently planned projects below.
Altamira
In the first quarter of 2023, we executed an agreement, which includes conditions to effectiveness that have not been satisfied, with CFE to supply natural gas for one FLNG unit located off the coast of Altamira, Tamaulipas, Mexico. The 1.4 million ton per annum (“MTPA”) FLNG unit will utilize CFE’s firm pipeline transportation capacity on the Sur de Texas-Tuxpan Pipeline to receive feedgas volumes. Our first FLNG unit has been installed and connected to the gas pipeline at Altamira, and we are in the process of commissioning the project.
We have also entered into a non-binding MOU with CFE to develop and operate an onshore liquefied natural gas terminal with up to four 1.4 MTPA FLNG units. The terminal is to be located at the existing Altamira LNG import facility and would source feedgas from the Sur de Texas-Tuxpan Pipeline. The Altamira onshore LNG facility is a world class import facility that will be converted to export LNG similar to other gulf coast regasification terminals. Existing infrastructure at the facility includes two 150,000m3 storage tanks, deepwater marine berth and access to local gas and power networks.
Louisiana
In addition, we are considering a plan to install up to two FLNG units approximately 16 nautical miles off the southeast coast of Grand Isle, Louisiana. We have filed applications with the U.S. Maritime Administration ("MARAD") and the U.S. Coast Guard to obtain our deepwater port license application for this facility which remain subject to review and approval as described under “Risk Factors—Risks Related to Our Business—Failure to obtain and maintain permits, approvals and authorizations from governmental and regulatory agencies and third parties on favorable terms could impede operations and construction.” If constructed, the facility would be capable of exporting up to approximately 145 billion cubic feet of natural gas per year, equivalent to approximately 2.8 MTPA of LNG.
Lakach
60
Table of Contents
We have been in discussions with Petróleos Mexicanos (“Pemex”) to form a long-term strategic partnership to develop the Lakach deepwater natural gas field for Pemex to supply natural gas to Mexico's onshore domestic market and for NFE to produce LNG for export to global markets. Our initial agreements were terminated in the fourth quarter of 2023, however, NFE continues to be in active discussions with Pemex to develop or monetize an offshore project.
Puerto Sandino Facility
We are developing an offshore liquefied natural gas receiving and storage facility off the coast of Puerto Sandino, Nicaragua, as well as an onshore regasification facility. We have entered into a 25-year PPA with Nicaragua’s electricity distribution companies, and we expect to utilize approximately 57,000 MMBtu from LNG per day to provide natural gas to the Puerto Sandino Power Plant in connection with the 25-year power purchase agreement. As part of our long-term partnership with the local utility, we are evaluating solutions to optimize power generation efficiency and allow for additional electrical capacity in a market that is underserved. We expect to complete this optimization in 2024.
Barcarena Facility
The Barcarena Facility consists of an FSRU and associated infrastructure, including mooring and offshore and onshore pipelines. The Barcarena Facility is capable of processing over one million MMBtu from LNG per day and storing up to 160,000 cubic meters of LNG. We have entered into a 15-year gas supply agreement with a subsidiary of Norsk Hydro ASA for the supply of natural gas to the Alunorte Alumina Refinery in Pará, Brazil, through our Barcarena Facility. We substantially completed our Barcarena Facility in 2022 and expect to commence operations, including delivery to the Alunorte Alumina Refinery in the first half of 2024.
The Barcarena Facility will also supply our new 630MW combined cycle thermal power plant to be located in Pará, Brazil (the “Barcarena Power Plant”). The power plant is fully contracted under multiple 25-year power purchase agreements to supply electricity to the national electricity grid. We expect to complete the Barcarena Power Plant and begin delivering power to nine committed offtakers for 25 years beginning in 2025.
In the fourth quarter of 2023, we entered into an agreement to acquire a 1.6GW PPA in exchange for newly issued 5% NFE redeemable Series A Convertible Preferred Stock, the closing of which remains subject to customary closing conditions, including regulatory approval for the transfer of the PPA. NFE has applied to transfer the 1.6 GW PPA to a site owned by NFE that is adjacent to the Barcarena Facility, where NFE will build a power plant to supply the PPA using gas from the Barcarena Facility. We expect to begin delivering electricity under the acquired PPA in July 2026.
We have financed the development of the Barcarena Power Plant pursuant to a financing agreement. For information on this financing agreement, see “—Long-Term Debt and Preferred Stock” in this Annual Report.
Santa Catarina Facility
The Santa Catarina Facility is located on the southern coast of Brazil and consists of an FSRU with a processing capacity of approximately 500,000 MMBtu from LNG per day and LNG storage capacity of up to 138,000 cubic meters. We are developing a 33-kilometer, 20-inch pipeline that will connect the Santa Catarina Facility to the existing inland Transportadora Brasileira Gasoduto Bolivia-Brasil S.A. (“TBG”) pipeline via an interconnection point in the municipality of Garuva. The Santa Catarina Facility and associated pipeline are expected to have a total addressable market of 15 million cubic meters per day. We expect to complete our Santa Catarina Facility and commence operations in the first half of 2024.
Ireland Facility
We intend to develop and operate an LNG facility and power plant on the Shannon Estuary, near Tarbert, Ireland. In April 2023, we were awarded a capacity contract for the development of a power plant for approximately 353 MW of electricity generation with a duration of ten years as part of the auction process operated by Ireland’s Transmission System Operator. The power plant is required to be operational by October 2026. In the third quarter of 2023, An Bord Pleanála, Ireland's planning commission, denied our application for the development of an LNG terminal and power plant. We are challenging this decision. The continued development of this project is uncertain and there are multiple risks, including regulatory risks, that could preclude the development of this project, and the results of these risks could have a material effect on our results of operations.
61
Table of Contents
ZeroParks
In 2020, we formed our Zero division to develop and operate facilities that produce clean hydrogen in an environmentally sustainable manner, and to invest in emerging technologies that enable the production of clean hydrogen to be more efficient and scalable. Our business plan is to build a portfolio of clean hydrogen production sites, each referred to as a ZeroPark, in key regions throughout the United States, utilizing the most efficient and reliable electrolyzer technologies.
Our first clean hydrogen project, known as ZeroPark I, is located in Beaumont, Texas. The ZeroPark I facility is sited within a 10-mile radius of the two largest refineries in the western hemisphere and numerous petrochemical manufacturers, many of which require significant amounts of hydrogen for their businesses. ZeroPark I, as planned, could use up to 200 MW of power, constructed in two distinct phases, each using 100 MW of electrolysis technology. In total, ZeroPark I is expected to produce up to 86,000 kg of clean hydrogen per day, or approximately 31,000 TPA. We have commenced design, engineering and permitting for ZeroPark I and expect to commence operations on the first phase in the first half of 2025. Additionally, we have secured a binding offtake commitment for the clean hydrogen produced at ZeroPark I. Once completed, we expect our Beaumont Facility to be the largest green hydrogen plant in the United States.
Recent Developments
On February 14, 2024, we completed a transaction to sell substantially all of our stake in Energos, receiving proceeds of approximately $136.4 million. As a result of the transaction, we recognized an other than temporary impairment of our investment in Energos of $5.3 million for the year ended December 31, 2023, and this loss was recognized in Income (loss) from equity method investments in the Consolidated Statements of Operations and Comprehensive Income.
On February 28, 2024, we entered into a commitment letter for the Company to receive $700 million in financing secured by our onshore FLNG project in Altamira, Mexico as well as the collateral securing the 2025 Notes and the 2026 Notes. The commitment letter is subject to the finalization of a credit agreement and customary closing conditions. The proceeds will be used to complete our onshore FLNG project in Altamira.
Other Matters
On June 18, 2020, we received an order from the Federal Energy Regulatory Commission ("FERC"), which asked us to explain why our San Juan Facility is not subject to FERC’s jurisdiction under section 3 of the NGA. Because we do not believe that the San Juan Facility is jurisdictional, we provided our reply to FERC on July 20, 2020 and requested that FERC act expeditiously. On March 19, 2021, FERC issued an order that the San Juan Facility does fall under FERC jurisdiction. FERC directed us to file an application for authorization to operate the San Juan Facility within 180 days of the order, which was September 15, 2021, but also found that allowing operation of the San Juan Facility to continue during the pendency of an application is in the public interest. FERC also concluded that no enforcement action against us is warranted, presuming we comply with the requirements of the order. Parties to the proceeding, including the Company, sought rehearing of the March 19, 2021 FERC order, and FERC denied all requests for rehearing in an order issued on July 15, 2021; the FERC order was affirmed by the United States Court of Appeals for the District of Columbia Circuit on June 14, 2022. In order to comply with the FERC’s directive, on September 15, 2021, we filed an application for authorization to operate the San Juan Facility, which remains pending.
On July 18, 2023, we filed for an amendment to the March 19, 2021 and July 15, 2021 FERC orders allowing the continued operation of the San Juan Facility during the pendency of the formal application to allow us to construct and interconnect 220 feet of incremental 10-inch pipeline needed to supply natural gas for temporary power generation solicited through the Puerto Rico Power Stabilization Task Force. On July 31, 2023, FERC issued an order stating that it would not take action to prevent the construction and operation of the pipeline and interconnect and on January 30, 2024, FERC reaffirmed the order allowing the construction and operation to continue.
Factors Impacting Comparability of Our Financial Results
Our historical results of operations and cash flows are not indicative of results of operations and cash flows to be expected in the future, principally for the following reasons:
•Our historical financial results do not reflect our Fast LNG solution that will lower the cost of our LNG supply. We currently purchase the majority of our supply of LNG from third parties, sourcing approximately 99% of our
62
Table of Contents
LNG volumes from third parties for the year ended December 31, 2023. We anticipate that the deployment of Fast LNG liquefaction facilities will significantly lower the cost of our LNG supply and reduce our dependence on third-party suppliers. We expect to deploy our first Fast LNG unit upon the completion of commissioning in 2024.
•Our historical financial results do not include significant projects that have recently been completed or are near completion. Our results of operations for the year ended December 31, 2023 include our Montego Bay Facility, Old Harbour Facility, San Juan Facility, certain industrial end-users and our Miami Facility. We have placed our La Paz Facility in service in 2021, and in the third quarter of 2023, we placed the La Paz Power Plant into service. We have executed agreements to extend and amend our supply of natural gas to multiple CFE power generation facilities in Baja California Sur, and as such, our revenue and results of operations have begun to be impacted by our operations in Mexico. We are also continuing to develop our Puerto Sandino Facility, Barcarena Facility, Santa Catarina Facility and Ireland Facility, and our current results do not include revenue and operating results from these projects.
Additionally, we began to deliver power to the Puerto Rican grid from the Palo Seco Power Plant as part of the grid stabilization project in the second quarter of 2023. At the end of September 2023, we placed additional power generation assets in service at the San Juan Power Plant. We expect that our power generation assets at both the Palo Seco Power Plant and at the San Juan Power Plant will operate at full capacity, and we expect that our revenue and results of operations will benefit from significant gas consumption required to operate these assets.
•Our historical financial results include the results from our investments in the common units of Hilli LLC and CELSEPAR. On March 15, 2023, we completed a transaction with Golar LNG Limited (“GLNG”) for the sale of our investment in the common units of Hilli LLC (“Hilli Common Units”), disponent owner and operator of the Hilli Episeyo (the “Hilli”) through its subsidiary Golar Hilli Corporation, in exchange for approximately 4.1 million NFE shares and $100 million in cash (the "Hilli Exchange"). In the fourth quarter of 2022, we sold our interest in Centrais Elétricas de Sergipe Participações S.A. (“CELSEPAR”), the indirect owner of the Sergipe Power Plant in Brazil. As a result of these transactions, we no longer have any ownership interest in either the Hilli or the Sergipe Power Plant, and their results will no longer be included in NFE's results of operations.
63
Table of Contents
Results of Operations – Three Months Ended December 31, 2023 compared to Three Months Ended September 30, 2023 and Year Ended December 31, 2023 compared to Year Ended December 31, 2022
Performance of our two segments, Terminals and Infrastructure and Ships, is evaluated based on Segment Operating Margin. Segment Operating Margin reconciles to Consolidated Segment Operating Margin as reflected below, which is a non-GAAP measure. We reconcile Consolidated Segment Operating Margin to GAAP Gross margin, inclusive of depreciation and amortization. Consolidated Segment Operating Margin is mathematically equivalent to Revenue minus Cost of sales (excluding depreciation and amortization reflected separately) minus Operations and maintenance minus Vessel operating expenses, each as reported in our financial statements. We believe this non-GAAP measure, as we have defined it, offers a useful supplemental measure of the overall performance of our operating assets in evaluating our profitability in a manner that is consistent with metrics used for management’s evaluation of the overall performance of our operating assets.
Consolidated Segment Operating Margin is not a measurement of financial performance under GAAP and should not be considered in isolation or as an alternative to Gross margin, income from operations, net income, cash flow from operating activities or any other measure of performance or liquidity derived in accordance with GAAP. As Consolidated Segment Operating Margin measures our financial performance based on operational factors that management can impact in the short-term, items beyond the control of management in the short term, such as depreciation and amortization are excluded. As a result, this supplemental metric affords management the ability to make decisions and facilitates measuring and achieving optimal financial performance of our current operations. The principal limitation of this non-GAAP measure is that it excludes significant expenses and income that are required by GAAP. A reconciliation is provided for the non-GAAP financial measure to the most directly comparable GAAP measure, Gross margin. Investors are encouraged to review the related GAAP financial measures and the reconciliation of the non-GAAP financial measure to our Gross margin, and not to rely on any single financial measure to evaluate our business.
The tables below present our segment information for the three months ended December 31, 2023 and September 30, 2023, and for the year ended December 31, 2023 and December 31, 2022:
| Three Months Ended December 31, 2023 | |||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| (in thousands of $) | Terminals andInfrastructure(1) | Ships(2) | Total Segment | Consolidationand Other(3) | Consolidated | ||||||||||||||
| Total revenues | $ | 695,068 | $ | 63,290 | $ | 758,358 | $ | — | $ | 758,358 | |||||||||
| Cost of sales(4) | $ | 259,976 | — | 259,976 | (1,491) | 258,485 | |||||||||||||
| Vessel operating expenses(5) | — | 9,092 | 9,092 | — | 9,092 | ||||||||||||||
| Operations and maintenance(5) | $ | 61,938 | — | 61,938 | — | 61,938 | |||||||||||||
| Segment Operating Margin | $ | 373,154 | $ | 54,198 | $ | 427,352 | $ | 1,491 | $ | 428,843 |
| Three Months Ended December 31, 2023 | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| (in thousands of $) | Consolidated | ||||||||||
| Gross margin (GAAP) | $ | 366,679 | |||||||||
| Depreciation and amortization | 62,164 | ||||||||||
| Consolidated Segment Operating Margin (Non-GAAP) | $ | 428,843 |
| Three Months Ended September 30, 2023 | |||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| (in thousands of $) | Terminals andInfrastructure(1) | Ships(2) | Total Segment | Consolidationand Other(3) | Consolidated | ||||||||||||||
| Total revenues | $ | 447,905 | $ | 66,557 | $ | 514,462 | $ | — | $ | 514,462 | |||||||||
| Cost of sales(4) | 208,683 | — | 208,683 | (423) | 208,260 | ||||||||||||||
| Vessel operating expenses(5) | — | 11,613 | 11,613 | — | 11,613 | ||||||||||||||
| Operations and maintenance(5) | 44,479 | — | 44,479 | — | 44,479 | ||||||||||||||
| Segment Operating Margin | $ | 194,743 | $ | 54,944 | $ | 249,687 | $ | 423 | $ | 250,110 |
64
Table of Contents
| Three Months Ended September 30, 2023 | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| (in thousands of $) | Consolidated | ||||||||||
| Gross margin (GAAP) | $ | 201,440 | |||||||||
| Depreciation and amortization | 48,670 | ||||||||||
| Consolidated Segment Operating Margin (Non-GAAP) | $ | 250,110 |
| Year Ended December 31, 2023 | |||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| (in thousands of $) | Terminals and Infrastructure | Ships | Total Segment | Consolidationand Other(4) | Consolidated | ||||||||||||||
| Total revenues | $ | 2,141,085 | $ | 293,605 | $ | 2,434,690 | $ | (21,394) | $ | 2,413,296 | |||||||||
| Cost of sales(4) | 764,828 | — | 764,828 | 112,623 | 877,451 | ||||||||||||||
| Vessel operating expenses(5) | — | 51,387 | 51,387 | (5,948) | 45,439 | ||||||||||||||
| Operations and maintenance(5) | 166,785 | — | 166,785 | — | 166,785 | ||||||||||||||
| Segment Operating Margin | $ | 1,209,472 | $ | 242,218 | $ | 1,451,690 | $ | (128,069) | $ | 1,323,621 |
| Year Ended December 31, 2023 | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| (in thousands of $) | Consolidated | ||||||||||
| Gross margin (GAAP) | $ | 1,136,297 | |||||||||
| Depreciation and amortization | 187,324 | ||||||||||
| Consolidated Segment Operating Margin (Non-GAAP) | $ | 1,323,621 |
| Year Ended December 31, 2022 | |||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| (in thousands of $) | Terminals and Infrastructure | Ships | Total Segment | Consolidationand Other(4) | Consolidated | ||||||||||||||
| Total revenues | $ | 2,168,565 | $ | 444,616 | $ | 2,613,181 | $ | (244,909) | $ | 2,368,272 | |||||||||
| Cost of sales(4) | 1,142,374 | — | 1,142,374 | (131,946) | 1,010,428 | ||||||||||||||
| Vessel operating expenses(5) | — | 90,544 | 90,544 | (27,026) | 63,518 | ||||||||||||||
| Operations and maintenance(5) | 129,970 | — | 129,970 | (24,170) | 105,800 | ||||||||||||||
| Segment Operating Margin | $ | 896,221 | $ | 354,072 | $ | 1,250,293 | $ | (61,767) | $ | 1,188,526 |
| Year Ended December 31, 2022 | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| (in thousands of $) | Consolidated | ||||||||||
| Gross margin (GAAP) | $ | 1,045,886 | |||||||||
| Depreciation and amortization | 142,640 | ||||||||||
| Consolidated Segment Operating Margin (Non-GAAP) | $ | 1,188,526 |
(1)Prior to the completion of the sale of our ownership interest in CELSEPAR, Terminals and Infrastructure included our effective share of revenues, expenses and operating margin attributable to our 50% ownership of CELSEPAR. Terminals and Infrastructure does not include the unrealized mark-to-market gains on derivative instruments of $1.5 million and $0.4 million for the three months ended December 31, 2023 and September 30, 2023, respectively. The segment measure also excludes losses and gains of $106.4 million and $106.1 million for the years ended December 31, 2023 and 2022, respectively, reported in Cost of sales.
(2)Prior to the Hilli Exchange, Ships included our effective share of revenues, expenses and operating margin attributable to our 50% ownership of the Hilli Common Units.
(3)Consolidation and Other adjusts for the inclusion of the effective share of revenues, expenses and operating margin attributable to our 50% ownership of CELSEPAR and Hilli Common Units in our segment measure prior to the disposition of these investments, the exclusion of the unrealized mark-to-market gain or loss on derivative instruments and the exclusion of non-capitalizable contract acquisition costs.
65
Table of Contents
(4)Cost of sales is presented exclusive of costs included in Depreciation and amortization in the Consolidated Statements of Operations and Comprehensive Income.
(5)Operations and maintenance and Vessel operating expenses are directly attributable to revenue-producing activities of our terminals and vessels and are included in the calculation of Gross margin as defined under GAAP.
Terminals and Infrastructure Segment
| Three Months Ended, | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|
| (in thousands of $) | December 31, 2023 | September 30, 2023 | Change | |||||||
| Total revenues | $ | 695,068 | $ | 447,905 | $ | 247,163 | ||||
| Cost of sales (exclusive of depreciation and amortization) | $ | 259,976 | 208,683 | 51,293 | ||||||
| Operations and maintenance | 61,938 | 44,479 | 17,459 | |||||||
| Segment Operating Margin | $ | 373,154 | $ | 194,743 | $ | 178,411 |
| Year Ended, | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|
| (in thousands of $) | December 31, 2023 | December 31, 2022 | Change | |||||||
| Total revenues | $ | 2,141,085 | $ | 2,168,565 | $ | (27,480) | ||||
| Cost of sales (exclusive of depreciation and amortization) | 764,828 | 1,142,374 | (377,546) | |||||||
| Operations and maintenance | 166,785 | 129,970 | 36,815 | |||||||
| Segment Operating Margin | $ | 1,209,472 | $ | 896,221 | $ | 313,251 |
Total revenue
Total revenue for the Terminals and Infrastructure Segment increased by $247.2 million for the three months ended December 31, 2023 as compared to the three months ended September 30, 2023. The increase was primarily driven by additional volumes delivered in Puerto Rico, and increases to the Henry Hub index that forms a portion of the pricing to invoice most of our downstream customers in this segment.
•Volumes delivered to downstream terminal customers increased from 20.1 TBtus in the third quarter of 2023 to 22.2 TBtu in the fourth quarter of 2023. We continue to support the grid stabilization project in Puerto Rico, and we recognized a full quarter of operations for our San Juan Power Plant during the fourth quarter; we completed the commissioning of these additional power assets at the San Juan Power Plant in September 2023. We also realize higher margins for volumes delivered at the temporary power plants at Palo Seco and San Juan, and our segment operating margin in the fourth quarter benefited from delivering additional volumes to these projects.
•The average Henry Hub index pricing used to invoice our downstream customers increased by 13% for the three months ended December 31, 2023 as compared to the three months ended September 30, 2023.
Total revenue for the Terminals and Infrastructure Segment decreased by $27.5 million for the year ended December 31, 2023 as compared to the year ended December 31, 2022. The decrease was primarily driven by lower LNG cargo sales, no pro rata share of revenue from our former investment in CELSEPAR and a reduction in the Henry Hub index that forms a portion of the pricing to invoice most of our customers in this segment. The decrease in revenue was partially offset by increased revenue from sales to downstream terminal customers.
The decrease in revenue in the year ended December 31, 2023 when compared to the year ended December 31, 2022 was primarily attributable to the following:
•LNG cargo sales to third parties decreased by $557.4 million for the year ended December 31, 2023, decreasing from $1,175.9 million for the year ended December 31, 2022 to $618.5 million for the year ended December 31,
66
Table of Contents
2023. In the second half of 2023, we utilized all LNG purchased under our long-term supply contracts for sales to our downstream terminal customers.
•After the completion of the sale of our investment in CELSEPAR in the fourth quarter of 2022, we no longer recognize revenue from this investment in our segment measure. Our share of revenue from CELSEPAR was $148.3 million for the year ended December 31, 2022, which was primarily comprised of fixed capacity payments received under related PPAs.
•The average Henry Hub index pricing used to invoice our downstream customers decreased by 59% for the year ended December 31, 2023 as compared to the year ended December 31, 2022.
Such decrease was offset by increases to revenue in the year ended December 31, 2023 when compared to the year ended December 31, 2022, due to the following:
•Volumes delivered to downstream customers were 68.3 TBtu for the year ended December 31, 2023 as compared to 39.5 TBtu for the year ended December 31, 2022, and these increased volumes were primarily attributable to our operations in Puerto Rico, Jamaica and Mexico.
•In the prior year, maintenance activities significantly lowered consumption at our facilities; there was no significant maintenance downtime during 2023. The maintenance downtime in the prior year was across our facilities, including downtime at our CHP Plant for unplanned maintenance, downtime at our Montego Bay Facility due to a reconfiguration of our assets required by the Port of Montego Bay and maintenance at PREPA's San Juan Power Plant. Volumes delivered across from these facilities increased by 13.5 TBtu as compared to the year ended December 31, 2022.
•In May 2023, we began to support the grid stabilization project in Puerto Rico, commissioning power generation assets at the Palo Seco Power Plant. In September 2023, we finished commissioning additional power generation assets at the San Juan Power Plant. We have delivered 13.3 TBtu at a higher margin at these power plants during the year ended December 31, 2023.
Cost of sales
Cost of sales includes the procurement of feedgas or LNG, as well as shipping and logistics costs to deliver LNG or natural gas to our facilities. Our LNG and natural gas supply are purchased from third parties or converted in our Miami Facility. Costs to convert natural gas to LNG, including labor, depreciation and other direct costs to operate our Miami Facility are also included in Cost of sales. Starting in the third quarter of 2023, our subsidiary, Genera, began to provide operations and maintenance services to PREPA's thermal generation assets, and cost to provide these services is included in Cost of sales. Under our contract with PREPA, we pass all of these costs onto PREPA, and such billings are recognized as revenue.
Cost of sales increased $51.3 million for the three months ended December 31, 2023 as compared to the three months ended September 30, 2023.
•Cost of LNG purchased from third parties for sale to our downstream customers increased by $25.7 million for the three months ended December 31, 2023 as compared to the three months ended September 30, 2023. The increase was primarily attributable to a 10% increase in volumes delivered compared to the three months ended September 30, 2023. The weighted-average cost of LNG purchased from third parties for sale to our customers increased from $6.78 per MMBtu for the three months ended September 30, 2023 to $7.08 per MMBtu for the three months ended December 31, 2023
•We also incurred additional costs of $19.6 million to make reimbursable improvements to our assets that are utilized as part of the Puerto Rican grid stabilization project. The reimbursement of these costs has been recognized as Other revenue.
Cost of sales decreased by $377.5 million for the year ended December 31, 2023 as compared to the year ended December 31, 2022.
67
Table of Contents
•We incurred decreased cost of LNG purchased from third parties for LNG cargo sales of $310.3 million during the year ended December 31, 2023.
•During the year ended December 31, 2023, realized gains of $139.1 million from the settlement of commodity swap transactions, entered into as an economic hedge to reduce the market risks associated with commodity prices, were included as reduction of cost of sales. For segment performance measures, unrealized mark to market gains and losses are excluded until settled.
•Cost of sales for the year ended December 31, 2022 included $28.6 million of our share of cost of sales from our investment in CELSEPAR, which was primarily comprised of LNG costs to fuel a power plant owned by CELSEPAR.
•We incurred increased cost of LNG purchased from third parties for sale to our downstream customers of $48.0 million during the year ended December 31, 2023 due to increased volumes delivered; we delivered 74% more volumes to our downstream terminal customers in the current period as compared to the year ended December 31, 2022. While we delivered significantly more volumes to our downstream customers, our pricing to purchase LNG for delivery to such customers was substantially lower, decreasing to $7.23 per MMBtu for the year ended December 31, 2023 from $10.84 per MMBtu for the year ended December 31, 2022.
•We recognized additional payroll and other operating costs of $35.6 million to provide services under Genera's operations and maintenance contract.
The weighted-average cost of our LNG inventory balance to be used in our operations as of December 31, 2023 and December 31, 2022 was $7.33 per MMBtu and $10.42 per MMBtu, respectively.
Operations and maintenance
Operations and maintenance includes costs of operating our facilities, exclusive of costs to convert that are reflected in Cost of sales.
Operations and maintenance increase by $17.5 million for the three months ended December 31, 2023 as compared to the three months ended September 30, 2023, which was primarily related to additional vessel costs incurred in our terminal operations as costs related to the Winter and Princess are recognized in our terminal costs following the conclusion of these vessels long-term charters.
Operations and maintenance increased by $36.8 million for the year ended December 31, 2023 as compared to the year ended December 31, 2022, which was attributable to the following activity:
•In 2023, we leased turbines to generate power at the Palo Seco Power Plant as part of the grid stabilization project in Puerto Rico. We also undertook activities to ensure that we have LNG supply available for our expanded Puerto
68
Table of Contents
Rican operations, including leasing berth space to place a storage vessel to service Puerto Rico, increasing operations and maintenance costs when compared to the prior year.
•These increases were partially offset by the exclusion of our share of Operations and maintenance from the investment in CELSEPAR; after the sale of our investment in CELSEPAR in the fourth quarter of 2022, we do not include these costs during the year ended December 31, 2023.
Ships Segment
| Three Months Ended, | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|
| (in thousands of $) | December 31, 2023 | September 30, 2023 | Change | |||||||
| Total revenues | $ | 63,290 | $ | 66,557 | $ | (3,267) | ||||
| Vessel operating expenses | 9,092 | 11,613 | (2,521) | |||||||
| Segment Operating Margin | $ | 54,198 | $ | 54,944 | $ | (746) |
| Year Ended, | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|
| (in thousands of $) | December 31, 2023 | December 31, 2022 | Change | |||||||
| Total revenues | $ | 293,605 | $ | 444,616 | $ | (151,011) | ||||
| Vessel operating expenses | 51,387 | 90,544 | (39,157) | |||||||
| Segment Operating Margin | $ | 242,218 | $ | 354,072 | $ | (111,854) |
Revenue in the Ships segment is comprised of operating lease revenue under time charters, fees for positioning and repositioning vessels as well as the reimbursement of certain vessel operating costs. Prior to the completion of the Energos Formation Transaction, we also recognized revenue related to the interest portion of lease payments and the operating and service agreements in connection with the sales-type lease of the Nanook. We included the interest income earned under sales-type leases as revenue as amounts earned under chartering and operating service agreements represented our ongoing ordinary business operations.
On March 15, 2023, we completed the "Hilli Exchange. In the fourth quarter of 2022, we recognized a loss on the investment in Hilli LLC of $118.6 million; this loss was recognized in Loss from equity method investments in the Consolidated Statements of Operations and Comprehensive Income. Upon completion of the Hilli Exchange during the first quarter of 2023, we recognized an additional loss on disposal of $37.4 million, which was included in Other expense (income), net. As a result of the Hilli Exchange we no longer have an ownership interest in the Hilli. NFE shares received from GLNG were cancelled upon the closing of the Hilli Exchange.
As of December 31, 2023, three FSRUs and one LNG carrier were leased to customers under long-term arrangements. In July 2023, we sold the vessel Spirit for a total consideration of $15.8 million resulting in a gain of $7.8 million. The gain on sale is included in Gain on sale of assets, net in the Consolidated Statements of Operations and Comprehensive Income. In December 2023, we entered into an agreement to sell the vessel Mazo, for $22.4 million; the sale closed in the first quarter of 2024, and as such, the vessel has been classified as held for sale as of December 31, 2023. In conjunction with the classification as held for sale, the Company recognized an impairment of $10.9 million within Asset impairment expense in the Consolidated Statements of Operations and Comprehensive Income.
Total revenue
Total revenue for the Ships segment decreased $3.3 million for the three months ended December 31, 2023 as compared to the three months ended September 30, 2023. Subsequent to the Energos Formation Transaction, we continue to be, for accounting purposes, the owner of vessels included in the transaction (except the Nanook), and as such, we continue to recognize revenue from the charter of these vessels to third parties. The decrease in revenue was primarily driven by end of third-party charter of Winter and Princess during the fourth quarter of 2023.
Total revenue for the Ships segment decreased by $151.0 million for the year ended December 31, 2023 as compared to the year ended December 31, 2022. The decrease in revenue was primarily the result of the sale of the Nanook as part of the Energos Formation Transaction; we no longer recognize revenue related to the Nanook in 2023. After the Hilli
69
Table of Contents
Exchange at the end of the first quarter of 2023, we no longer recognize revenue from the Hilli, further decreasing revenue in the Ships segment. Additionally the charters for two vessels concluded in the first quarter of 2023 and the charters for another two vessels concluded in the fourth quarter of 2023, lowering vessel revenue for the year ended December 31, 2023. We plan to utilize these vessels in our operations following conversion and other upgrades starting in 2024.
Vessel operating expenses
Vessel operating expenses include direct costs associated with operating a vessel, such as crewing, repairs and maintenance, insurance, stores, lube oils, communication expenses, management fees and costs to operate the Hilli prior to the Hilli Exchange discussed above. We also recognize voyage expenses within Vessel operating expenses, which principally consist of fuel consumed before or after the term of time charter or when the vessel is off hire. Under time charters, the majority of voyage expenses are paid by customers. To the extent that these costs are a fixed amount specified in the charter, which is not dependent upon redelivery location, the estimated voyage expenses are recognized over the term of the time charter.
Vessel operating expenses decreased by $2.5 million for the three months ended December 31, 2023, compared to the three months ended September 30, 2023 primarily due to end of third-party charter of Winter and Princess during the fourth quarter of 2023.
Vessel operating expenses decreased by $39.2 million for the year ended December 31, 2023 as compared to the year ended December 31, 2022. The decrease in vessel operating expenses was primarily due to lower costs related to the Hilli after the Hilli Exchange at the end of the first quarter of 2023. During 2023, the Company started using four vessels that were in the Ships segment in 2022 for its terminal operations, resulting in lower vessel operating costs. The costs also decreased as a result of the sale of the Nanook as part of the Energos Formation Transaction; we recognized vessel operating expenses related to the Nanook during 2022 and no longer recognize vessel operating expenses related to the Nanook in 2023.
70
Table of Contents
Other operating results
| Three Months Ended, | Year Ended, | |||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| (in thousands of $) | December 31, 2023 | September 30, 2023 | Change | December 31, 2023 | December 31, 2022 | Change | ||||||||||||||||
| Selling, general and administrative | $ | 48,056 | $ | 49,107 | $ | (1,051) | $ | 205,104 | $ | 236,051 | $ | (30,947) | ||||||||||
| Transaction and integration costs | 2,159 | 2,739 | (580) | 6,946 | 21,796 | (14,850) | ||||||||||||||||
| Depreciation and amortization | 62,164 | 48,670 | 13,494 | 187,324 | 142,640 | 44,684 | ||||||||||||||||
| Asset impairment expense | 10,958 | — | 10,958 | 10,958 | 50,659 | (39,701) | ||||||||||||||||
| Gain on sale of assets, net | (21,534) | (7,844) | (13,690) | (29,378) | — | (29,378) | ||||||||||||||||
| Total operating expenses | 101,803 | 92,672 | 9,131 | 380,954 | 451,146 | (70,192) | ||||||||||||||||
| Operating income | 327,040 | 157,438 | 169,602 | 942,667 | 737,380 | 205,287 | ||||||||||||||||
| Interest expense | 76,951 | 64,822 | 12,129 | 277,842 | 236,861 | 40,981 | ||||||||||||||||
| Other expense (income), net | (13,586) | 5,573 | (19,159) | 10,408 | (48,044) | 58,452 | ||||||||||||||||
| Loss on extinguishment of debt, net | — | — | — | — | 14,997 | (14,997) | ||||||||||||||||
| Income before income from equity method investments and income taxes | 263,675 | 87,043 | 176,632 | 654,417 | 533,566 | 120,851 | ||||||||||||||||
| Income (loss) from equity method investments | (2,766) | 489 | (3,255) | 9,972 | (472,219) | 482,191 | ||||||||||||||||
| Tax provision (benefit) | 46,037 | 25,194 | 20,843 | 115,513 | (123,439) | 238,952 | ||||||||||||||||
| Net income | $ | 214,872 | $ | 62,338 | $ | 152,534 | $ | 548,876 | $ | 184,786 | $ | 364,090 |
Selling, general and administrative
Selling, general and administrative includes compensation expenses for our corporate employees, employee travel costs, insurance, professional fees for our advisors, and screening costs for projects that are in initial stages and development is not yet probable.
Selling, general and administrative for the three months ended December 31, 2023 decreased by $1.1 million as compared to the three months ended September 30, 2023.
Selling, general and administrative decreased by $30.9 million for the year ended December 31, 2023, compared to the year ended December 31, 2022. The decreases were primarily due to lower share-based compensation expense, as we did not recognize any cost related to employee performance share units in 2023, as well as lower professional fees and screening costs.
Transaction and integration costs
For the three months ended December 31, 2023, we did not incur significant transaction and integration costs as compared to the prior quarter.
For the year ended December 31, 2023, we incurred $6.9 million for transaction and integration costs, as compared to $21.8 million for the year ended December 31, 2022. In the prior year, we incurred transaction and integration costs primarily associated with the sale of our investment in CELSEPAR and the Energos Formation Transaction, and there were no such similar significant transactions during the year-ended December 31, 2023.
71
Table of Contents
Depreciation and amortization
Depreciation and amortization increased by $13.5 million for the three months ended December 31, 2023 as compared to the three months ended September 30, 2023. In September 2023, we placed assets at the San Juan Power Plant in service as part of the grid stabilization project in Puerto Rico. Additionally, in September 2023 we placed our La Paz Power Plant into partial service, and we recognized a full quarter of depreciation in the fourth quarter of 2023.
Depreciation and amortization increased by $44.7 million for the year ended December 31, 2023 as compared to the year ended December 31, 2022, primarily the result of assets including turbines placed into service as part of the grid stabilization project at the Palo Seco Power Plant and San Juan Power Plant during 2023.
Asset impairment expense
As a result of our acquisition of Hygo Energy Transition Limited in 2021, we recognized long-lived assets associated with the expansion of the Sergipe Power Plant. During the year ended December 31, 2022, we recognized asset impairment expense of $50.7 million, as the fair value of these assets was less than the carrying value, and the asset group was held for sale. In December 2023, we entered into an agreement to sell the vessel Mazo, for $22.4 million; the sale closed in the first quarter of 2024. The vessel has been classified as held for sale as of December 31, 2023, and in conjunction with the classification as held for sale, the Company recognized an impairment of $10.9 million.
Gain on sale of assets, net
In July 2023, we sold the vessel Golar Spirit for a total consideration of $15.8 million resulting in a gain of $7.8 million. In addition, during the fourth quarter of 2023, we completed the sale of 100% of shares of Pecém and Muricy for a total gain of $21.5 million.
Interest expense
Interest expense increased by $12.1 million for the three months ended December 31, 2023 as compared to the three months ended September 30, 2023. The increase was primarily due to the higher borrowing costs on our Term Loan B (defined below) issued in October 2023 and Barcarena Debentures (defined below) issued in November 2023.
Interest expense increased by $41.0 million for the year ended December 31, 2023, as compared to the year ended December 31, 2022. The increase was primarily due to an increase in total principal outstanding, including obligations incurred as a result of the Energos Formation Transaction, under which we incur higher borrowing costs. The total principal balance on outstanding facilities was $6.9 billion as of December 31, 2023 as compared to total outstanding debt of $4.6 billion as of December 31, 2022.
72
Table of Contents
Other expense (income), net
Other income, net and other expense, net was $13.6 million and $5.6 million for the three months ended December 31, 2023 and September 30, 2023, respectively. Other expense, net and Other income, net was $10.4 million and $48.0 million for the year ended December 31, 2023 and December 31, 2022, respectively.
Other income, net recognized in the three months ended December 31, 2023 was primarily comprised of interest income and foreign currency remeasurement gains.
Other expense, net recognized in the year ended December 31, 2023 was primarily comprised of loss on disposal of our equity method investment in Hilli LLC in the Hilli Exchange during the first quarter of 2023. The losses were partially offset by the interest income and gains on certain derivative transactions.
Loss on extinguishment of debt
Loss on extinguishment of debt was $15.0 million for the year ended December 31, 2022 as a result of the extinguishment of the certain debt facilities and sale leaseback financing arrangements with VIEs with proceeds from the Energos Formation Transaction. We did not have any such transactions during the year ended December 31, 2023.
Income (loss) from equity method investments
We recognized a loss from our investment in Energos of $2.8 million for the three months ended December 31, 2023 as compared to income of $0.5 million and for the three months ended September 30, 2023. We have entered into a Unit Purchase Agreement to sell substantially all of our stake in the Energos, and as a result of the transaction, we recognized an other than temporary impairment ("OTTI") totaling $5.3 million.
We recognized income from our equity method investments of $10.0 million for the year ended December 31, 2023. For the year ended December 31, 2022, we recognized losses from our equity method investments of $472.2 million. The losses were primarily driven by an other than temporary impairment of the investments in CELSEPAR and Hilli LLC of $487.8 million recognized in connection with the announced sale of these investments, partially offset by income attributable to our investments in Energos.
Tax provision
We recognized a tax provision of $115.5 million for the year ended December 31, 2023 compared to a tax benefit of $123.4 million year ended December 31, 2022. For the year ended December 31, 2023, the tax provision was primarily driven by domestic income tax expense from significant income generated by our foreign operations on our domestic tax expense; this additional U.S. tax expense was partially offset by the tax benefit from the utilization of foreign tax credits.
For the year ended December 31, 2022, we reflected an excess benefit from stock compensation of $24.4 million. Prior to the completion of the sale of our investment in CELSEPAR, our equity method investment in CELSEPAR was directly held by a subsidiary domiciled in the United Kingdom; the investment was previously held by a subsidiary domiciled in Brazil, resulting in a discrete benefit of $76.5 million recognized in the first quarter of 2022. Additionally, in the second and third quarters of 2022, we recognized an impairment on the value of this investment, resulting in a further discrete benefit of $122.4 million.
Liquidity and Capital Resources
We believe we will have sufficient liquidity from proceeds from recent borrowings, access to additional capital sources and cash flow from operations to fund our capital expenditures and working capital needs for the next 12 months and the reasonably foreseeable future. Our significant capital projects, primarily our first FLNG unit, are nearing completion, and as with many capital projects, a significant portion of the overall capital spending becomes due near the completion of the project.
We expect the current working capital position to improve based on the following: (1) expected cash flows generated from the temporary power project and from sales of our own LNG generated by our first deployed Fast LNG unit; (2) we have fully funded the construction of our Barcarena Power Plant with new long-term financing in Brazil and we have commitments to fund substantially all of the the remaining cost of our onshore FLNG project at Altamira; (3) our credit
73
Table of Contents
agreements allow for proceeds from the sale of assets to be reinvested in our business, and we have significant non-core assets that could be used to fund our developments; and (4) our relationships with certain significant vendors constructing our Fast LNG assets have allowed us to extend our payment terms to better align with the expected completion of our first Fast LNG project.
We expect to fund our current operations and continued development of additional facilities through cash on hand, borrowings under our debt facilities, cash generated from certain sales and financing transactions and cash generated from operations. We may also opportunistically elect to generate additional liquidity through future debt or equity issuances and asset sales to fund our developments and transactions. From time to time, we may seek to repay, refinance or restructure all or a portion of our debt or to repurchase our outstanding debt through, as applicable, tender offers, exchange offers, open market purchases, privately negotiated transactions or otherwise. Such transactions, if any, will depend on a number of factors, including prevailing market conditions, our liquidity requirements and contractual requirements (including compliance with the terms of our debt agreements), among other factors.
Our remaining committed capital expenditures is approximately $1,365 million and includes remaining expenditures to complete our first Fast LNG project and our onshore liquefaction project at Altamira, as well as committed expenditures necessary to complete the Puerto Sandino Facility, Barcarena Facility, Barcarena Power Plant, Santa Catarina Facility and Beaumont Facility. We have secured financing commitments to continue to develop our onshore Altamira project and the Barcarena Power Plant, which represents approximately $1,072 million of our upcoming committed capital expenditures.
We expect fully completed Fast LNG units to cost between $1.0 billion and $1.6 billion per unit. Unlike engineering, procurement and construction agreements for traditional liquefaction construction, our contracts with vendors to construct the Fast LNG units allow us to closely control the timing of our spending and construction schedules so that we can complete each project in time frames to meet our business needs. For example, expected spending for our second and third Fast LNG units that is not currently contracted is excluded from the estimated committed spending. Each Fast LNG completion is subject to permitting, various contractual terms, project feasibility, our decision to proceed and timing. We carefully manage our contractual commitments, the related funding needs and our various sources of funding including cash on hand, cash flow from operations, and borrowings under existing and future debt facilities. We may also enter into other financing arrangements to generate proceeds to fund our developments.
As of December 31, 2023, we have spent approximately $128.6 million to develop the Pennsylvania Facility. Approximately $22.5 million of construction and development costs have been expensed as we have not issued a final notice to proceed to our engineering, procurement and construction contractors. Cost for land, as well as engineering and equipment that could be deployed to other facilities and associated financing costs of approximately $106.1 million, has been capitalized, and to date, we have repurposed approximately $16.8 million of engineering and equipment to our Fast LNG project. We intend to apply for updated permits for the Pennsylvania Facility with the aim of obtaining these permits to coincide with the commencement of construction activities.
On December 12, 2022, our Board of Directors approved an update to our dividend policy. In connection with the dividend policy update, the Board declared a dividend of $626.3 million, representing $3.00 per Class A share, which was paid during the first quarter of 2023. Additionally, we declared and paid quarterly dividends totaling $81,976 during the year ended December 31, 2023, representing $0.10 per Class A share. Our future dividend policy is within the discretion of our Board of Directors and will depend upon then-existing conditions, including our results of operations and financial condition, capital requirements, business prospects, statutory and contractual restrictions on our ability to pay dividends, including restrictions contained in our debt agreements, and other factors our Board of Directors may deem relevant. In the third quarter of 2023, our Board of Directors reinstated a dividend policy of targeting a quarterly dividend of $0.10 per share.
74
Table of Contents
Contractual Obligations
We are committed to make cash payments in the future pursuant to certain contracts. The following table summarizes certain contractual obligations in place as of December 31, 2023:
| (in thousands) | Total | Year 1 | Years 2 to 3 | Years 4 to 5 | More than 5 years | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Long-term debt obligations | $ | 9,789,792 | $ | 909,103 | $ | 4,747,337 | $ | 1,728,806 | $ | 2,404,546 | ||||||||
| Purchase obligations | 14,526,719 | 1,744,718 | 1,605,535 | 1,422,191 | 9,754,275 | |||||||||||||
| Lease obligations | 759,231 | 210,212 | 218,753 | 155,048 | 175,218 | |||||||||||||
| Total | $ | 25,075,742 | $ | 2,864,033 | $ | 6,571,625 | $ | 3,306,045 | $ | 12,334,039 |
Long-term debt obligations
For information on our long-term debt obligations, see “—Liquidity and Capital Resources—Long-Term Debt.” The amounts included in the table above are based on the total debt balance, scheduled maturities, and interest rates in effect as of December 31, 2023.
A portion of our long-term debt obligations will be paid to Energos under charters of vessels included in the Energos Formation Transaction to third parties. The residual value of these vessels also forms a part of the obligation and will be recognized as a bullet payment at the end of the charters. As neither these third party charter payments nor the residual value of these vessels represent cash payments due by NFE, such amounts have been excluded from the table above.
We entered into the BNDES Credit Agreement and an agreement to issue the Barcarena Debentures (defined below). Proceeds from these new credit arrangements have been or will be used to refinance the Barcarena Term Loan on a long term basis, and as such, these principal balances have been shown as non-current on the Consolidated Balance Sheets as of December 31, 2023.
Purchase obligations
We are party to contractual purchase commitments for the purchase, production and transportation of LNG and natural gas, as well as engineering, procurement and construction agreements to develop our terminals and related infrastructure. Our commitments to purchase LNG and natural gas are principally take-or-pay contracts, which require the purchase of minimum quantities of LNG and natural gas, and these commitments are designed to assure sources of supply and are not expected to be in excess of normal requirements. Certain LNG purchase commitments are subject to conditions precedent, and we include these expected commitments in the table above beginning when delivery is expected assuming that all contractual conditions precedent are met. For purchase commitments priced based upon an index such as Henry Hub, the amounts shown in the table above are based on the spot price of that index as of December 31, 2023.
We have construction purchase commitments in connection with our development projects, including our Fast LNG projects, Puerto Sandino Facility, Barcarena Facility, Santa Catarina Facility and Beaumont Facility. Commitments included in the table above include commitments under engineering, procurement and construction contracts where a notice to proceed has been issued.
Lease obligations
Future minimum lease payments under non-cancellable lease agreements, inclusive of fixed lease payments for renewal periods we are reasonably certain will be exercised, are included in the above table. Our lease obligations are primarily related to LNG vessel time charters, marine port leases, ISO tank leases, office space, gas turbines and a land lease.
75
Table of Contents
Cash Flows
The following table summarizes the changes to our cash flows for the year ended December 31, 2023 and 2022, respectively:
| Year Ended December 31, | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|
| (in thousands) | 2023 | 2022 | Change | |||||||
| Cash flows from: | ||||||||||
| Operating activities | $ | 824,756 | $ | 355,111 | $ | 469,645 | ||||
| Investing activities | (2,904,143) | (82,726) | (2,821,417) | |||||||
| Financing activities | 1,528,950 | 321,957 | 1,206,993 | |||||||
| Net (decrease) increase in cash, cash equivalents, and restricted cash | $ | (550,437) | $ | 594,342 | $ | (1,144,779) |
Cash provided by operating activities
Our cash flow provided by operating activities was $824.8 million for the year ended December 31, 2023, which increased by $469.6 million from cash provided by operating activities of $355.1 million for the year ended December 31, 2022. Our net income for the year ended December 31, 2023, when adjusted for non-cash items, increased by $175.5 million from the year ended December 31, 2022. The increase in cash provided by operating activities for the year ended December 31, 2023 was also driven by changes in working capital, including improved collection of receivables and the settlement of a significant commodity derivative, as well as significant cash receipts under our temporary power agreements that are required to be deferred as contract liabilities.
Cash used in investing activities
Our cash flow used in investing activities was $2,904.1 million for the year ended December 31, 2023, which increased by $2,821.4 million from cash used in investing activities of $82.7 million for the year ended December 31, 2022. Cash outflows from investing activities during the year ended December 31, 2023 were used primarily for continued development of our Fast LNG project and assets to service the grid stabilization project in Puerto Rico. Cash outflows were offset by proceeds of $100.0 million from the sale of our equity method investment in Hilli LLC in the Hilli Exchange, proceeds received from the sale of Pecém and Muricy, as well as proceeds received from the sale of the Spirit and a portion of our investment in equity securities.
Cash outflows for investing activities during the year ended December 31, 2022 were used for continued development of our Fast LNG project, Santa Catarina Facility, and Barcarena Facility. Cash outflows were offset by proceeds of $593.0 million from the sale of the finance lease of the Nanook and $500.1 million from selling our investment in CELSEPAR.
Cash provided by financing activities
Our cash flow provided by financing activities was $1,529.0 million for the year ended December 31, 2023, which increased by $1,207.0 million from cash provided by financing activities of $322.0 million for the year ended December 31, 2022. On December 12, 2022, the Company's Board of Directors approved an update to its dividend policy and declared a dividend of $626,310, representing $3.00 per Class A share, which was paid in January 2023. We have borrowed under our new Term Loan B Agreement, expanded Revolving Facility, Bridge Term Loans, Equipment Notes, Barcarena Debentures, EB-5 Loan, Tugboat Financing, as well as short-term borrowings under repurchase arrangements for total additional borrowings of $3.0 billion. Such borrowings were primarily used to fund the ongoing development of our Fast LNG project and to support our grid stabilization project in Puerto Rico. Increased borrowings during 2023 were offset by repayments of debt totaling $686.5 million, primarily the repayment of the Bridge Term Loans and short-term borrowings under repurchase arrangements.
Cash provided by financing activities during the year ended December 31, 2022 was due to proceeds from issuance of debt of $2.0 billion, offset by repayments of debt of $1.5 billion, payment of dividends of $99.1 million and payments related to tax withholdings for share-based compensation of $72.6 million.
76
Table of Contents
Long-Term Debt and Preferred Stock
2025 Notes
In September 2020, we issued $1,000.0 million of 6.75% senior secured notes in a private offering pursuant to Rule 144A under the Securities Act (the “2025 Notes”). Interest is payable semi-annually in arrears on March 15 and September 15 of each year; no principal payments are due until maturity on September 15, 2025. We may redeem the 2025 Notes, in whole or in part, at any time prior to maturity, subject to certain make-whole premiums.
The 2025 Notes are guaranteed, jointly and severally, by certain of our subsidiaries, in addition to other collateral. The 2025 Notes may limit our ability to incur additional indebtedness or issue certain preferred shares, make certain payments, and sell or transfer certain assets subject to certain financial covenants and qualifications. The 2025 Notes also provide for customary events of default and prepayment provisions.
In December 2020, we issued $250.0 million of additional notes on the same terms as the 2025 Notes in a private offering pursuant to Rule 144A under the Securities Act (subsequent to this issuance, these additional notes are included in the definition of 2025 Notes herein).
2026 Notes
In April 2021, we issued $1,500.0 million of 6.50% senior secured notes in a private offering pursuant to Rule 144A under the Securities Act (the “2026 Notes”). Interest is payable semi-annually in arrears on March 31 and September 30 of each year; no principal payments are due until maturity on September 30, 2026. We may redeem the 2026 Notes, in whole or in part, at any time prior to maturity, subject to certain make-whole premiums.
The 2026 Notes are guaranteed on a senior secured basis by each domestic subsidiary and foreign subsidiary that is a guarantor under the 2025 Notes, and the 2026 Notes are secured by substantially the same collateral as the first lien obligations under the 2025 Notes.
Vessel Financing Obligation
In connection with the Energos Formation Transaction, we entered into long-term time charter agreements for certain vessels for periods of up to 20 years. Vessels chartered to us at the time of closing were classified as finance leases. Additionally, our charter of certain other vessels will commence only upon the expiration of the vessel's existing third-party charters. These forward starting charters prevented the recognition of a sale of the vessels to Energos. As such, we accounted for the Energos Formation Transaction as a failed sale-leaseback and have recorded a financing obligation for consideration received.
We continue to be the owner for accounting purposes of vessels included in the Energos Formation Transaction (except the Nanook), and as such, we recognize revenue and operating expenses related to vessels under charter to third parties. Revenue recognized from these third-party charters form a portion of the debt service for the financing obligation; the effective interest rate on this financing obligation of approximately 15.9% includes the cash flows that Energos receives from these third-party charters.
Revolving Facility
In April 2021, we entered into a credit agreement (the "Revolving Credit Agreement") with a bank for $200.0 million senior secured revolving credit facility (the "Revolving Facility"). The borrowings under the Revolving Facility bear interest at a Secured Overnight Financing Rate ("SOFR") based rate plus a margin based upon usage of the Revolving Facility. The Revolving Facility will mature in 2026 if the 2025 Notes are refinanced prior to maturity, with the potential for us to extend the maturity date of the Revolving Facility once for a one-year increment; if not, the Revolving Facility becomes due approximately 60 days prior to the maturity of the 2025 Notes. Borrowings under the Revolving Facility may be prepaid, at our option, at any time without premium.
In 2022, the Revolving Credit Agreement was amended twice to increase the borrowing capacity by a total of $240.0 million, and in the year ended December 31, 2023, we entered into additional amendments which increased the borrowing capacity by $510.0 million, for a total capacity of $950,000.0 million. The amendments did not impact the interest rate or
77
Table of Contents
term of the Revolving Facility, and no deferred costs were written off. During the year ended December 31, 2023, we drew $866.6 million from the Revolving Facility, which is outstanding as of December 31, 2023.
The obligations under the Revolving Facility are guaranteed by certain of our subsidiaries, including those that own the Company's first Fast LNG asset, and are secured by substantially the same collateral as the first lien obligations under the 2025 Notes and 2026 Notes. Additionally the Revolving Facility is secured by assets comprising our first Fast LNG project in Altamira, Mexico. We are required to comply with covenants under the Revolving Facility and Letter of Credit Facility (defined below), including requirements to maintain Debt to Capitalization Ratio of less than 0.7:1.0, and for quarters in which the Revolving Facility is greater than 50% drawn, the Debt to Annualized EBITDA Ratio must be less than 4.0:1.0. We were in compliance with all covenants as of December 31, 2023.
The Revolving Credit Agreement contains usual and customary representations and warranties, usual and customary affirmative and negative covenants and events of default.
Letter of Credit Facility
In July 2021, we entered into an uncommitted letter of credit and reimbursement agreement (the "Letter of Credit Agreement") with a bank for the issuance of letters of credit for an aggregate amount of up to $75 million (the “Letter of Credit Facility”). In July 2022, the Letter of Credit Facility was upsized to $250 million with the ability to increase the total limit by up to $100 million, subject to satisfaction of certain conditions. In February 2023, the Letter of Credit Facility was upsized to $325 million, and in November 2023, the Letter of Credit Facility was upsized to $350 million. The letters of credit bear interest at a rate equal to a base rate plus 2.75%.
The obligations under the Letter of Credit Facility are guaranteed by certain of our subsidiaries, including those that own the Company's first Fast LNG asset, and are secured by substantially the same collateral as the first lien obligations under the 2025 Notes and 2026 Notes. Additionally the Letter of Credit Facility is secured by assets comprising our first Fast LNG project in Altamira, Mexico.
The Letter of Credit Agreement contains usual and customary representations and warranties, usual and customary affirmative and negative covenants and events of default.
Term Loan B Credit Agreement
On August 3, 2023, we entered into a credit agreement (the “Bridge Term Loan Agreement”) pursuant to which the lenders funded term loans (the “Bridge Term Loans”) to us in an aggregate principal amount of $400.0 million. The Bridge Term Loans were to mature on August 1, 2024 and were payable in full on the maturity date. The Bridge Term Loans bore interest at a per annum rate equal to Adjusted Term SOFR (as defined in the Bridge Term Loan Agreement) plus 3.50%.
On October 30, 2023, we entered into a credit agreement (the “Term Loan B Agreement”) pursuant to which the lenders funded term loans to us in an aggregate principal amount of $856.0 million ("Term Loan B"). Borrowings were issued at a discount, and we received proceeds of $787.5 million. The proceeds from the Term Loan B issuance were used to repay the Bridge Term Loans and may be used for working capital and other general corporate purposes. The Term Loan B will mature on the earliest of (i) October 30, 2028 if the 2025 Notes and 2026 Notes are refinanced in full prior to their maturities, (ii) July 16, 2025, if any of the 2025 Notes remain outstanding as of such date, and (iii) July 31, 2026, if any of the 2026 Notes remain outstanding as of such date. Quarterly principal payments of approximately $2.1 million will be due starting March 2024.
The obligations under the Term Loan B are guaranteed by certain of our subsidiaries, including those that own our first Fast LNG project in Altamira, Mexico. The Term Loan B is secured by substantially the same collateral as the first lien obligations under the 2025 Notes and the 2026 Notes, and, in addition, is secured by assets comprising our first Fast LNG project..
The Term Loan B bears interest at a per annum rate equal to Term SOFR (as defined in the Term Loan B Agreement) plus 5.0%. We may prepay the Term Loan B at our option subject to prepayment premiums until October 2025 and customary break funding costs. We are required to prepay the Term Loan B with the net proceeds of certain asset sales, condemnations, and debt and convertible securities issuances, in each case subject to certain exceptions and thresholds. Additionally, commencing with the fiscal quarter ending December 31, 2024, we will be required to prepay the Term Loan B with our Excess Cash Flow (as defined in the Term Loan B Agreement).
78
Table of Contents
The Term Loan B Agreement contains usual and customary representations and warranties, and usual and customary affirmative and negative covenants. No financial covenant compliance is required under the Term Loan B Agreement.
South Power 2029 Bonds
In January 2022, NFE South Power Holdings Limited (“South Power”), a wholly owned subsidiary of NFE, entered into an agreement for the issuance of up to $285.0 million secured bonds (“South Power 2029 Bonds”). The South Power 2029 Bonds are secured by, amongst other things, our combined heat and power plant in Clarendon, Jamaica (“CHP Plant”), and NFE has provided a guarantee of the obligations under the South Power 2029 Bonds. As of both December 31, 2023 and 2022, South Power had $221.8 million, respectively, of South Power 2029 Bonds issued and outstanding.
The South Power 2029 Bonds bear interest at an annual fixed rate of 6.50% and shall be repaid in quarterly installments beginning in August 2025 with the final repayment date in May 2029. Interest payments on outstanding principal balances are due quarterly.
South Power is required to comply with certain financial covenants as well as customary affirmative and negative covenants. The South Power 2029 Bonds also provide for customary events of default, prepayment and cure provisions. We were in compliance with all covenants as of December 31, 2023 and 2022.
Barcarena Financings
In the third quarter of 2022, certain of our indirect subsidiaries entered into a financing agreement to borrow up to $200.0 million due upon maturity in February 2024 (the “Barcarena Term Loan”); proceeds were utilized to fund a portion of the construction of the Barcarena Power Plant. As of December 31, 2022, the loan was fully funded. Interest is due quarterly, and outstanding borrowings bear interest at a rate equal to the Secured Overnight Financing Rate ("SOFR") plus 4.70%.
The obligations under the Barcarena Term Loan are guaranteed by certain indirect Brazilian subsidiaries that are constructing the Barcarena Power Plant, and New Fortress Energy Inc. has provided a parent company guarantee. Collateral on the Barcarena Term Loan includes liens on shares of entities constructing the our Barcarena Terminal and Barcarena Power Plant, liens on equipment and machinery owned by these entities, and rights to future operating cash flows and receivables under the Barcarena Power Plant's power purchase agreements. We are required to comply with customary affirmative and negative covenants, and the Barcarena Term Loan also provides for customary events of default, prepayment and cure provisions. We were in compliance with all covenants as of December 31, 2023 and 2022.
In October 2023, certain of our Brazilian subsidiaries entered into two long-term financing arrangements, fully funding the construction of the Barcarena Power Plant. Proceeds received will be used to repay the Barcarena Term Loan and to pay for all remaining expected construction costs through the planned completion of the Barcarena Power Plant in 2025. As we have committed financing in place to extinguish the Barcarena Term Loan as of December 31, 2023, the Barcarena Term Loan has been presented as long-term debt on the Consolidated Balance Sheets.
The parent of the owner of the Barcarena Power Plant entered into an agreement for the issuance of up to $200.0 million of convertible debentures maturing in October 2028 ("Barcarena Debentures") and issued $180 million of the Barcarena Debentures prior to December 31, 2023. Interest on the Barcarena Debentures is due quarterly, and interest accrues at an annual rate of 12%, increasing 1.25% each year after the third anniversary of issuance. We are able to prepay the Barcarena Debentures, subject to customary break funding costs, and we are required to utilize certain excess cash flows from our Brazilian operations to prepay principal.
The Barcarena Debentures are convertible to shares of one of our indirect Brazilian subsidiaries on the maturity date at the creditors' option, based on the current fair value of this subsidiary's equity at the time of conversion.
The obligations under the Barcarena Debentures are guaranteed by certain indirect Brazilian subsidiaries that own the Barcarena Terminal and Santa Catarina Terminal. NFE has also provided a parent company guarantee that will be released once the Barcarena Terminal commences commercial operations. Brazilian subsidiaries guaranteeing these obligations are
79
Table of Contents
required to comply with customary affirmative and negative covenants, and the Barcarena Debentures also provides for customary events of default, prepayment and cure provisions.
Additionally, the owner of the Barcarena Power Plant entered into a credit agreement with BNDES, the Brazilian Development Bank (the "BNDES Credit Agreement"). We are able to borrow up to R$1.8 billion under the BNDES Credit Agreement, segregated into three tranches based on the use of proceeds ("BNDES Term Loan"); no amounts were funded under the BNDES Credit Agreement as of December 31, 2023. Each tranche bears a different rate of interest ranging from 2.61% to 4.41% plus the fixed rate announced by BNDES. No principal payments are required until April 2026 and are due quarterly thereafter until maturity in 2045.
The obligations under the BNDES Credit Agreement are guaranteed by certain indirect Brazilian subsidiaries that are constructing the Barcarena Power Plant, and are secured by the Barcarena Power Plant and receivables under the Barcarena Power Plant's PPAs. These Brazilian subsidiaries are required to comply with customary affirmative and negative covenants, and the BNDES Credit Agreement also provides for customary events of default, prepayment and cure provisions.
Equipment Notes
In June 2023, we executed a Master Loan and Security Agreement with a lender to borrow up to $200.0 million under promissory notes secured by certain turbines acquired in the first quarter of 2023 to support our grid stabilization project in Puerto Rico (the “Equipment Notes”). During the second and third quarters of 2023, we borrowed the full capacity bearing interest at approximately 7.7%, and the principal is partially repayable in monthly installments over the 36 month term of the loan with the balance due upon maturity in July 2026.
The Equipment Notes contains usual and customary representations and warranties, and usual and customary affirmative and negative covenants. The Equipment Notes do not contain any restrictive financial covenants. NFE has provided a guarantee of the obligations under the Equipment Notes.
EB-5 Loan Agreement
On July 21, 2023, we entered into a loan agreement under the U.S. Citizenship and Immigration Services EB-5 Program (“EB-5 Loan Agreement”) to pay for the development and construction of a new green hydrogen facility in Texas. The maximum aggregate principal amount available under the EB-5 Loan Agreement is $100.0 million, and outstanding borrowings bear interest at a fixed rate of 4.75%. The loan matures in 5 years from the initial advance with an option to extend the maturity by two one-year periods. It is expected that the loan will be secured by NFE's green hydrogen facility, and NFE has provided a guarantee of the obligations under the EB-5 Loan Agreement. In the year ended December 31, 2023, $62.9 million was funded under the EB-5 Loan Agreement.
The EB-5 Loan Agreement contains usual and customary representations and warranties, and usual and customary affirmative and negative covenants. The EB-5 Loan Agreement does not contain any restrictive financial covenants.
Short-term Borrowings
We may, from time to time, enter into sales and repurchase agreements with a financial institution, whereby we sell to the financial institution an LNG cargo and concurrently enters into an agreement to repurchase the same LNG cargo immediately with the repurchase price payable at a future date, generally not to exceed 90-days from the date of the sale and repurchase (the “Short-term Borrowings”). As of December 31, 2023, we had $182.3 million outstanding under these arrangements.
Tugboat Financing
In December 2023, we sold and leased back four tugboat vessels for 15 years receiving proceeds of $46.7 million. ("Tugboat Financing"). The leasebacks of the tugboat vessels were classified as finance leases, and as such, we accounted for the Tugboat Financing as a failed sale-leaseback and have recorded a financing obligation for consideration received. The effective interest rate on this financing obligation is approximately 16.92%.
80
Table of Contents
Summary of Critical Accounting Estimates
The preparation of consolidated financial statements in conformity with GAAP requires us to make certain estimates and assumptions that affect the amounts reported in the consolidated financial statements and the accompanying notes. Changes in facts and circumstances or additional information may result in revised estimates, and actual results may differ from these estimates. We evaluate our estimates and related assumptions regularly, and we believe that the accounting policies discussed below are critical to understanding our historical and future performance, as these policies relate to the more significant areas involving management’s judgments and estimates.
Impairment of long-lived assets
We perform a recoverability assessment of long-lived assets whenever events or changes in circumstances indicate that the carrying amount of an asset may not be recoverable. Indicators may include, but are not limited to, adverse changes in the regulatory environment in a jurisdiction where we operate, unfavorable events impacting the supply chain for LNG to our operations, a decision to discontinue the development of a long-lived asset, early termination of a significant customer contract, or the introduction of newer technology. We exercise judgment in determining if any of these events represent an impairment indicator requiring a recoverability assessment.
Our business model requires investments in infrastructure often concurrently with our customer’s investments in power generation or other assets to utilize LNG. Our costs to transport and store LNG are based upon our customer’s contractual commitments once their assets are fully operational. We expect revenue under these contracts to exceed construction and operational costs, based on the expected term and revenue of these contracts. Additionally, our infrastructure assets are strategically located to provide critical inputs to our committed customer’s operations and our locations allow us to expand to additional opportunities within existing markets. These projects are subject to risks related to successful completion, including those related to government approvals, site identification, financing, construction permitting and contract compliance.
Geopolitical and other macroeconomic events can substantially impact natural gas and LNG markets, leading to volatility in market pricing. The majority of our LNG supply contracts are based on a natural gas-based index, Henry Hub, plus a contractual spread. We primarily operate under long-term contracts with customers, many of which contain fixed minimum volumes that must be purchased on a “take-or-pay” basis. We limit our exposure to fluctuations in natural gas prices as our pricing in contracts with customers is largely based on the Henry Hub index price plus a contractual spread. Based on the long-term nature of our supply and customer contracts, the nature of the pricing in these contracts and the market value of our underlying assets, changes in the price of natural gas or LNG do not indicate that a recoverability assessment of our assets is necessary. Further, with our own LNG production from FLNG facilities expected to commence in 2024, we plan to further mitigate our exposure to variability in LNG and natural gas prices.
When performing a recoverability assessment, the Company measures whether the estimated future undiscounted net cash flows expected to be generated by the asset exceeds its carrying value. In the event that an asset does not meet the recoverability test, the carrying value of the asset will be adjusted to fair value resulting in an impairment charge. We develop the assumptions used in the recoverability assessment based on active contracts, current and future expectations of the global demand for LNG and natural gas, as well as information received from third party industry sources.
Recent Accounting Standards
For descriptions of recently issued accounting standards, refer to “Note 3. Adoption of new and revised standards” of our notes to consolidated financial statements included in this Annual Report.
FY 2022 10-K MD&A
SEC filing source: 0001749723-23-000010.
Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations.
Certain information contained in the following discussion and analysis, including information with respect to our plans, strategy, projections and expected timeline for our business and related financing, includes forward-looking statements. Forward-looking statements are estimates based upon current information and involve a number of risks and uncertainties. Actual events or results may differ materially from the results anticipated in these forward-looking statements as a result of a variety of factors. You should read “Part 1, Item 1A. Risk Factors” and “Cautionary Statement on Forward-Looking Statements” elsewhere in this Annual Report on Form 10-K (“Annual Report”) for a discussion of important factors that could cause actual results to differ materially from the results described in or implied by the forward-looking statements contained in the following discussion and analysis.
The comparison of the years ended December 31, 2021 and 2020 can be found in our Annual Report on Form 10‑K for the year ended December 31, 2021 located within “Part II, Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations.”
The following information should be read in conjunction with our audited consolidated financial statements and accompanying notes included elsewhere in this Annual Report. Our financial statements have been prepared in accordance with GAAP. This information is intended to provide investors with an understanding of our past performance and our current financial condition and is not necessarily indicative of our future performance. Please refer to “—Factors Impacting Comparability of Our Financial Results” for further discussion. Unless otherwise indicated, dollar amounts are presented in millions.
Unless the context otherwise requires, references to “Company,” “NFE,” “we,” “our,” “us” or like terms refer to (i) prior to the completion of Mergers (defined below), New Fortress Energy Inc. and its subsidiaries, excluding Hygo Energy Transition Ltd. (“Hygo”) and its subsidiaries and Golar LNG Partners LP (“GMLP”) and its subsidiaries, and (ii) after completion of the Mergers, New Fortress Energy Inc. and its subsidiaries, including Hygo and its subsidiaries and GMLP and its subsidiaries.
Overview
We are a global energy infrastructure company founded to help address energy poverty and accelerate the world’s transition to reliable, affordable, and clean energy. We own and operate natural gas and liquefied natural gas ("LNG") infrastructure, and an integrated fleet of ships and logistics assets to rapidly deliver turnkey energy solutions to global markets; additionally, we have expanded our focus to building our modular LNG manufacturing business. Our near-term mission is to provide modern infrastructure solutions to create cleaner, reliable energy while generating a positive economic impact worldwide. Our long-term mission is to become one of the world’s leading companies providing power free from carbon emissions by leveraging our global portfolio of integrated energy infrastructure. We discuss this important goal in more detail in this Annual Report, “Items 1 and 2: Business and Properties” under “Sustainability—Toward a Very-Low-Carbon Future.”
Our chief operating decision maker makes resource allocation decisions and assesses performance on the basis of two operating segments, Terminals and Infrastructure and Ships.
Our Terminals and Infrastructure segment includes the entire production and delivery chain from natural gas procurement and liquefaction to logistics, shipping, facilities and conversion or development of natural gas-fired power generation. We currently source LNG from long-term supply agreements with third-party suppliers and from our own liquefaction facility in Miami, Florida. Starting in 2023, we expect to begin to source a portion of our LNG from our modular floating liquefaction facilities, which we refer to as "Fast LNG" or "FLNG." The Terminals and Infrastructure segment includes all terminal operations in Jamaica, Puerto Rico, Mexico and Brazil, as well as vessels utilized in our terminal or logistics operations. We centrally manage our LNG supply and the deployment of our vessels utilized in our terminal or logistics operations, which allows us to optimally manage our LNG supply and fleet.
Our Ships segment includes all vessels which are leased to customers under long-term or spot arrangements. The Company’s investments in Hilli LLC, owner and operator of the Hilli, and Energos (defined below) are also included in the Ships segment. Over time, we expect to utilize these vessels in our own terminal operations as charter agreements for these vessels expire.
Our Current Operations – Terminals and Infrastructure
Our management team has successfully employed our strategy to secure long-term contracts with significant customers, including Jamaica Public Service Company Limited (“JPS”), the sole public utility in Jamaica, South Jamaica
54
Table of Contents
Power Company Limited (“SJPC”), an affiliate of JPS, Jamalco, a bauxite mining and alumina producer in Jamaica, the Puerto Rico Electric Power Authority (“PREPA”), and Comisión Federal de Electricidad (“CFE”), a subsidiary of Federal Electricity Commission (Comisión Federal de Electricidad), Mexico’s power utility, each of which is described in more detail below. Our assets built to service these significant customers have been designed with capacity to service other customers.
Montego Bay Facility
The Montego Bay Facility serves as our supply hub for the north side of Jamaica, providing natural gas to JPS to fuel the 145MW Bogue Power Plant in Montego Bay, Jamaica ("Bogue Power Plant"). Our Montego Bay Facility commenced commercial operations in October 2016 and is capable of processing up to 61,000 MMBtu from LNG per day and features approximately 7,000 cubic meters of onsite storage. The Montego Bay Facility also consists of an ISO loading facility that can transport LNG to numerous on-island industrial users.
Old Harbour Facility
The Old Harbour Facility is an offshore facility consisting of an FSRU that is capable of processing up to 750,000 MMBtus of LNG per day. The Old Harbour Facility commenced commercial operations in June 2019 and supplies natural gas to the 190MW Old Harbour power plant (the “Old Harbour Power Plant”) operated by SJPC. The Old Harbour Facility is also supplying natural gas to our dual-fired combined heat and power facility in Clarendon, Jamaica (the “CHP Plant”). The CHP Plant supplies electricity to JPS under a long-term agreement. The CHP Plant also provides steam to Jamalco under a long-term take-or-pay agreement. The Old Harbour Facility also supplies gas directly to Jamalco to utilize in their gas-fired boilers.
San Juan Facility
Our San Juan Facility became fully operational in the third quarter of 2020. It is designed as a landed micro-fuel handling facility located in the Port of San Juan, Puerto Rico. The San Juan Facility has multiple truck loading bays to provide LNG to on-island industrial users. The San Juan Facility is near the PREPA San Juan Power Plant and serves as our supply hub for the PREPA San Juan Power Plant and other industrial end-user customers in Puerto Rico.
La Paz Facility
In July 2021, we began commercial operations at the Port of Pichilingue in Baja California Sur, Mexico (the “La Paz Facility”). The La Paz Facility is expected to supply approximately 22,300 MMBtu from LNG per day to our 100MW of power supplied by gas-fired modular power units (the “La Paz Power Plant”) following the start of operations. Natural gas supply to the La Paz Power Plant may be increased to approximately 29,000 MMBtu from LNG per day for up to 135MW of power.
In the fourth quarter of 2022, we finalized short-form agreements with CFE to expand and extend our supply of natural gas to multiple CFE power generation facilities in Baja California Sur and to sell the La Paz Power Plant to CFE and are in the process of finalizing long-form agreements to commemorate all binding terms. The gas sales and power plant sale agreements are subject to execution of the long-form final agreements and certain conditions precedent, and we expect to execute the long-form final agreements in the first quarter of 2023. We do not expect to recognize a loss on sale upon completion of this transaction.
Miami Facility
Our Miami Facility began operations in April 2016. This facility has liquefaction capacity of approximately 8,300 MMBtu from LNG per day and enables us to produce LNG for sales directly to industrial end-users in southern Florida, including Florida East Coast Railway via our train loading facility, and other customers throughout the Caribbean using ISO containers.
Our LNG Supply and Cargo Sales
NFE provides reliable, affordable and clean energy supplies to customers around the world that we plan to satisfy through the following sources: 1) our current contractual supply commitments; 2) additional LNG supply contracts
55
Table of Contents
expected to commence in 2026; 3) our Miami Facility; and 4) supply from our own Fast LNG production. We have secured commitments to purchase and receive physical delivery of LNG volumes for 100% of our expected committed volumes for each of our downstream terminals inclusive of our Montego Bay Facility, Old Harbour Facility, San Juan Facility, La Paz Facility, Puerto Sandino Facility, Barcarena Facility and Santa Catarina Facility. Additionally, we have binding contracts for LNG volumes from two separate U.S. LNG facilities, each with a 20-year term, that are expected to commence in 2026 and 2027. Finally, we plan to commence our own Fast LNG production in 2023, when our first FLNG facility is expected to begin operation, and we plan to expand that capacity when additional units come online over the next two years.
The recent geopolitical events in Europe have substantially impacted the natural gas and LNG markets with unprecedented price increases and volatility. The majority of our LNG supply contracts are based on a natural gas-based index, Henry Hub, plus a contractual spread. We limit our exposure to fluctuations in natural gas prices as our pricing in contracts with customers is largely based on the Henry Hub index price plus a fixed fee component. Additionally, with our own Fast LNG production from FLNG facilities expected to commence in 2023, we plan to further mitigate our exposure to variability in LNG prices. Due to current market conditions, we expect that our revenue and results of operations will benefit in the near term from selling cargos into the elevated global LNG market. As FLNG facilities commence production, our long-term strategy is to sell substantially all cargos produced to customers on a long-term, take-or-pay basis through our downstream terminals.
Our Current Operations – Ships
Our Ships segment includes five FSRUs and five LNG carriers, which are leased to customers under long-term or spot arrangements and our investment in Hilli LLC, owner and operator of the Hilli. As these charter arrangements expire, we expect to use these vessels in our terminal operations and reflect such vessels in our Terminals and Infrastructure segment. One LNG carrier and FSRU are currently utilized in our terminal operations, and the results of operations of these vessels are reflected in the Terminals and Infrastructure segment. In August 2022, we completed a financing transaction with an affiliate of Apollo Global Management, Inc. collateralized by our vessels. See “—Factors Impacting Comparability of Our Financial Results” for more details about this transaction; the results of operations from charters of vessels included in this transaction continue to be included in our Ships segment as well as our equity method investment in Energos (defined below).
Our Development Projects
Our projects currently under development include our development of a series of modular floating liquefaction facilities to provide a source of low-cost supply of LNG to customers around the world through our Fast LNG technologies; our LNG terminal facility in Puerto Sandino, Nicaragua (“Puerto Sandino Facility”); our LNG terminal (“Barcarena Facility”) and power plant (“Barcarena Power Plant”) located in Pará, Brazil; our LNG terminal located on the southern coast of Brazil ("Santa Catarina Terminal"); and our LNG terminal (“Ireland Facility”) and power plant in Ireland. We are also in active discussions to develop projects in multiple regions around the world that may have significant demand for additional power, LNG and natural gas, although there can be no assurance that these discussions will result in additional contracts or that we will be able to achieve our target revenue or results of operations.
The design, development, construction and operation of our projects are highly regulated activities and subject to various approvals and permits. The process to obtain required permits, approvals and authorizations is complex, time-consuming, challenging and varies in each jurisdiction in which we operate. We obtain required permits, approvals and authorizations in due course in connection with each milestone for our projects.
We describe each of our current development projects below.
Fast LNG
We are currently developing multiple modular floating liquefaction facilities to provide a source of low-cost supply of LNG to customers around the world. We have designed and are constructing offshore liquefaction facilities for our growing customer base that we believe are both faster and more economical to construct than many traditional liquefication solutions. The “Fast LNG,” or “FLNG,” design pairs advancements in modular, midsize liquefaction technology with jack up rigs, semi-submersible rigs or similar marine floating infrastructure to enable a lower cost and faster deployment schedule than land-based alternatives. Semi-permanently moored floating storage unit(s) (FSUs) will provide LNG storage alongside the floating liquefaction infrastructure, which can be deployed anywhere there is abundant and stranded natural gas.
56
Table of Contents
Our initial Fast LNG units are being constructed at the Kiewit Offshore Services shipyard near Corpus Christi, Texas. The Kiewit facility specializes in the fabrication and integration of offshore projects. In partnership with Kiewit, we believe we have established an efficient and repeatable process to reduce cost and time to build incremental liquefaction capacity. We expect to deploy our first Fast LNG unit in 2023 and additional units in 2024.
We plan to deploy several Fast LNG units at different locations around the world and describe our currently planned projects below.
Altamira
In the fourth quarter of 2022, we finalized short-form agreements, which include conditions to effectiveness that have not been satisfied, with the Comisión Federal de Electricidad (“CFE”) to supply natural gas to two FLNG units located off the coast of Altamira, Tamaulipas, Mexico. These arrangements are subject to finalizing long-form definitive agreements and satisfying certain conditions precedent. Each 1.4 million tons per annum (“MTPA”) FLNG unit will utilize CFE’s firm pipeline transportation capacity on the Sur de Texas-Tuxpan Pipeline to receive feedgas volumes. We expect to deploy our first FLNG unit to Altamira in 2023.
Louisiana
In addition, we plan to install up to two FLNG units approximately 16 nautical miles off the southeast coast of Grand Isle, Louisiana. We have filed applications with the U.S. Maritime Administration ("MARAD") and the U.S. Coast Guard to obtain our deepwater port license application for this facility. The facility will be capable of exporting up to approximately 145 billion cubic feet of natural gas per year, equivalent to approximately 2.8 MTPA of LNG.
Lakach
Also, in the fourth quarter of 2022, we finalized agreements, which include conditions to effectiveness that have not been satisfied, with Petróleos Mexicanos (“Pemex”) to form a long-term strategic partnership to develop the Lakach deepwater natural gas field for Pemex to supply natural gas to Mexico's onshore domestic market and for NFE to produce LNG for export to global markets. If the agreements become effective, NFE would invest in the continued development of the Lakach field over a two-year period by completing seven offshore wells and to deploy a 1.4 MTPA Fast LNG unit to liquefy the majority of the produced natural gas. Remaining natural gas and associated condensate volumes would be utilized by Pemex in Mexico's onshore domestic market.
Puerto Sandino Facility
We are developing an offshore facility consisting of an FSRU and associated infrastructure, including mooring and offshore pipelines, in Puerto Sandino, Nicaragua. We have entered into a 25-year PPA with Nicaragua’s electricity distribution companies, and we expect to utilize approximately 57,500 MMBtu from LNG per day to provide natural gas to the Puerto Sandino Power Plant in connection with the 25-year power purchase agreement. As part of our long-term partnership with the local utility, we are evaluating solutions to optimize power generation efficiency and allow for additional electrical capacity in a market that is underserved. We expect to complete this optimization in 2024.
Barcarena Facility
The Barcarena Facility consists of an FSRU and associated infrastructure, including mooring and offshore and onshore pipelines. The Barcarena Facility is capable of processing up to 790,000 MMBtu per day and storing up to 170,000 cubic meters of LNG. The Barcarena Facility is expected to supply gas to third-party industrial and power customers as well as the Barcarena Power Plant, a new 605MW combined cycle thermal power plant to be located in Pará, Brazil, which we own and which is supported by multiple 25-year power purchase agreements to supply electricity to the national electricity grid. The power project is scheduled to deliver power to nine committed offtakers for 25 years beginning in 2025. We substantially completed our Barcarena Facility in 2022 and expect to commence operations by the end of 2023. We expect to complete the Barcarena Power Plant and to commence operations in 2025.
We have financed the development of the Barcarena Power Plant pursuant to a financing agreement. See “—Long-Term Debt and Preferred Stock.”
Santa Catarina Facility
57
Table of Contents
The Santa Catarina Facility will be located on the southern coast of Brazil and will consist of an FSRU with a processing capacity of approximately 570,000 MMBtus per day and LNG storage capacity of up to 170,000 cubic meters. We are developing a 33-kilometer, 20-inch pipeline that will connect the Santa Catarina Facility to the existing inland Transportadora Brasileira Gasoduto Bolivia-Brasil S.A. (“TBG”) pipeline via an interconnection point in the municipality of Garuva. The Santa Catarina Facility and associated pipeline are expected to have a total addressable market of 15 million cubic meters per day. We expect to complete our Santa Catarina Facility and commence operations in 2023.
Ireland Facility
We intend to develop and operate an LNG facility and power plant on the Shannon Estuary, near Tarbert, Ireland. We are in the process of obtaining final planning permission from An Bord Pleanála (“ABP”) in Ireland. While the specific timing for receiving the required permits is unknown, we have undertaken pre-development work that will allow us to complete the terminal in approximately 9-15 months after receiving the required permits. We currently expect to begin operations in the first half of 2024.
Recent Developments
On February 6, 2023, we announced an agreement with Golar LNG Limited (“GLNG”) for the sale of our ownership stake in the Hilli Episeyo (the “Hilli”) in exchange for the return of approximately 4.1 million NFE shares and $100.0 million in cash (the "Hilli Exchange"). Pursuant to the transaction, we will no longer have any interest in the 2.4 MTPA floating liquefaction facility Hilli. This transaction is expected to close in the first quarter of 2023 and is subject to customary closing conditions.
Recent market prices of NFE shares and the terms of the Hilli Exchange implied that the fair value of the investment may be lower than the carrying value as of December 31, 2022, which triggered an assessment of the recoverability of the carrying amount of this investment. We estimated the fair value of the investment as of December 31, 2022 and concluded that the estimated fair value was below the carrying value and that this decline was other than temporary. As a result of this recoverability assessment, we recognized an OTTI of the investment in Hilli of $118,558 for the year ended December 31, 2022; this loss was recognized in (Loss) income from equity method investments in the consolidated statements of operations and comprehensive income (loss). The gain or loss recognized upon the closing of the Hilli Exchange will be determined based upon the share price at closing.
In February 2023, the Revolving Facility (defined below) was amended to increase the facility size by $301.7 million to $741.7 million. The interest rate for borrowings under the Revolving Facility based on the current usage of the facility has not changed. No changes were made to the maturity date or covenants. Also, in February 2023, our uncommitted letter of credit and reimbursement agreement was upsized to $325 million; no changes to interest rates or other terms were made as part of this amendment.
Other Matters
On June 18, 2020, we received an order from FERC, which asked us to explain why our San Juan Facility is not subject to FERC’s jurisdiction under section 3 of the NGA. Because we do not believe that the San Juan Facility is jurisdictional, we provided our reply to FERC on July 20, 2020 and requested that FERC act expeditiously. On March 19, 2021, FERC issued an order that the San Juan Facility does fall under FERC jurisdiction. FERC directed us to file an application for authorization to operate the San Juan Facility within 180 days of the order, which was September 15, 2021, but also found that allowing operation of the San Juan Facility to continue during the pendency of an application is in the public interest. FERC also concluded that no enforcement action against us is warranted, presuming we comply with the requirements of the order. Parties to the proceeding, including the Company, sought rehearing of the March 19, 2021, FERC order, and FERC denied all requests for rehearing in an order issued on July 15, 2021; the FERC orders were affirmed by the United States Court of the Appeals for the District of Columbia Circuit on June 14, 2022. In order to comply with the FERC’s directive, on September 15, 2021, we filed an application for authorization to operate the San Juan Facility, which remains pending.
58
Table of Contents
Factors Impacting Comparability of Our Financial Results
Significant 2022 Transactions
We completed significant transactions in 2022 and 2021, including a significant sales and financing transaction collateralized by certain vessels as further described below, the sale of our investment in entities owning the Sergipe Power Plant (defined below) and our acquisitions of GMLP and Hygo, and these significant transactions impact the comparability of our historical financial results of operations.
Energos Formation Transaction
On August 15, 2022, the Company and an affiliate of certain funds or investment vehicles managed by affiliates of Apollo Global Management, Inc., AP Neptune Holdings Ltd. ("Purchaser"), created a joint venture and completed a sales and financing transaction resulting in cash proceeds of approximately $1.85 billion. This sales and financing transaction comprised (1) the formation of a joint venture doing business as Energos Infrastructure ("Energos"), (2) the sale for cash of eight vessels, along with these vessels' owning and operating entities to the Purchaser, (3) the contribution of acquired vessel-owning entities to Energos by the Purchaser and (4) the Company's contribution of three vessels, along with each vessel's' owning and operating entities, to Energos in exchange for equity in Energos (the “Energos Formation Transaction”). As a result of the Energos Formation Transaction, we own approximately a 20% equity interest in Energos, with the remaining interest owned by the Purchaser. We have accounted for the investment in Energos as an equity method investment.
In connection with the Energos Formation Transaction, we entered into long-term time charter agreements for periods of up to 20 years in respect of ten of the eleven vessels, the terms of which will commence upon the expiration of each vessel's existing charter. These charters prevent the recognition of a sale of these ten vessels to Energos, and as such, proceeds associated with these ten vessels have been treated as failed sale leasebacks. These vessels continue to be recognized on our consolidated balance sheet as Property, plant and equipment, and we have recognized this failed sale leaseback financing as debt. Certain vessels included in the Energos Formation Transaction are currently chartered to third parties under operating leases. As we have not recognized the sale of these vessels and proceeds received under the Energos Formation Transaction are collateralized by the cash flows from these charters, revenue generated from these operating leases continues to be recognized as Vessel charter revenue; costs of operating the vessels is included in Vessel operating expenses over the terms of the third-party charters. Cash flows from these third-party charters are included as part of debt service for the sale leaseback financing debt, and we will recognize additional financing costs within Interest expense, net.
We have not entered into a charter agreement to leaseback the Nanook. The Nanook was previously accounted for as a finance lease and proceeds received have been allocated between financing of other vessels and the sale of the Nanook. After closing this transaction, we no longer recognize revenue from the sales-type lease of the Nanook to CELSE and the related operating services agreement.
Sergipe Sale
We acquired a 50% interest in Centrais Elétricas de Sergipe Participações S.A. (“CELSEPAR”) as part of the Hygo Merger (defined below); CELSEPAR owns 100% of the share capital of Centrais Elétricas de Sergipe S.A. (“CELSE”), the owner and operator of a 1.5GW power plant in Sergipe, Brazil (the "Sergipe Power Plant"). The Sergipe Power Plant was jointly owned and operated with Ebrasil Energia Ltda. (“Ebrasil”), an affiliate of Eletricidade do Brasil S.A., and the Company accounted for this 50% investment using the equity method.
On May 31, 2022, one of our subsidiaries and certain Ebrasil sellers as owners of CELSEPAR (the “Sergipe Sellers”), Eneva S.A., as purchaser ("Eneva") and Eletricidade do Brasil S.A. -- Ebrasil, entered into a Share Purchase Agreement pursuant to which Eneva agreed to acquire all of the outstanding shares of (a) CELSEPAR and (b) Centrais Elétricas Barra dos Coqueiros S.A. ("CEBARRA"), which owns 1.7GW of expansion rights adjacent to the Sergipe Power Plant (the “Sergipe Sale”). The Sergipe Sale was completed on October 3, 2022, and Eneva paid the Sergipe Sellers R$6.8 billion (approximately $1.3 billion using the exchange rate as of the closing date). We also entered into a foreign currency forward associated to mitigate foreign currency risk to the expected proceeds from the transaction, and this foreign currency forward settled on October 3, 2022, resulting in a gain of $20.4 million.
59
Table of Contents
Since the Sergipe Sale in October 2022, we no longer include the results of our equity method investment in CELSEPAR in our financial statements. The results of operations of the Sergipe Power Plant were included in our Terminal and Infrastructure segment results, contributing segment operation margin of $95.6 million for the year ended December 31, 2022. Finally, we have recognized an other than temporary impairment on our investment in CELSEPAR of $369.2 million and an impairment loss on the assets held by CEBARRA of $50.7 million; as the Sergipe Sale closed in 2022, there will be no further impairment loss on this investment in future periods.
Hygo Merger and GMLP Merger
On April 15, 2021, we completed the acquisitions of Hygo (the "Hygo Merger") and GMLP (the "GMLP Merger," and collectively with the Hygo Merger, the “Mergers”) As a result of the Mergers, we acquired a 50% interest in the Sergipe Power Plant and its operating FSRU terminal in Sergipe, Brazil (the “Sergipe Facility”), the Barcarena Facility, Barcarena Power Plant, Santa Catarina Facility and the Nanook, a newbuild FSRU moored and in service at the Sergipe Facility. We also acquired a fleet of six other FSRUs, six LNG carriers and an interest in a floating liquefaction vessel, the Hilli. The results of operations of the vessels acquired are included in our results of operations for the period after the acquisition date in 2021 and for a full year in 2022; the Nanook is only included in our results of operations in 2022 for the period prior to the Energos Formation Transaction.
Comparability to future periods
Our historical results of operations and cash flows are not indicative of results of operations and cash flows to be expected in the future, principally for the following reasons:
•Our historical financial results do not reflect our Fast LNG solution that will lower the cost of our LNG supply. We currently purchase the majority of our supply of LNG from third parties, sourcing approximately 97% of our LNG volumes from third parties for the year ended December 31, 2022. We anticipate the deployment of Fast LNG facilities will significantly lower the cost of our LNG supply and reduce our dependence on third-party suppliers.
•Our historical financial results do not include significant projects that have recently been completed or are near completion. Our results of operations for the year ended December 31, 2022 include our Montego Bay Facility, Old Harbour Facility, San Juan Facility, certain industrial end-users and our Miami Facility. We have placed a portion of our La Paz Facility into service, and our revenue and results of operations have begun to be impacted by operations in Mexico. We have executed short-form agreements to extend our supply of natural gas to multiple CFE power generation facilities in Baja California Sur and are in the process of finalizing long-form agreements to commemorate all binding terms. We are also continuing to develop our Puerto Sandino Facility, and our current results do not include revenue and operating results from this project. Our current results also exclude other developments, including the Barcarena Facility, Santa Catarina Facility and Ireland Facility.
60
Table of Contents
Results of Operations – Three Months Ended December 31, 2022 compared to Three Months Ended September 30, 2022 and Year Ended December 31, 2022 compared to Year Ended December 31, 2021
Performance of our two segments, Terminals and Infrastructure and Ships, is evaluated based on Segment Operating Margin. Segment Operating Margin reconciles to Consolidated Segment Operating Margin as reflected below, which is a non-GAAP measure. We reconcile Consolidated Segment Operating Margin to GAAP Gross margin, inclusive of depreciation and amortization. Consolidated Segment Operating Margin is mathematically equivalent to Revenue minus Cost of sales (excluding depreciation and amortization reflected separately) minus Operations and maintenance minus Vessel operating expenses, each as reported in our financial statements. We believe this non-GAAP measure, as we have defined it, offers a useful supplemental measure of the overall performance of our operating assets in evaluating our profitability in a manner that is consistent with metrics used for management’s evaluation of the overall performance of our operating assets.
Consolidated Segment Operating Margin is not a measurement of financial performance under GAAP and should not be considered in isolation or as an alternative to Gross margin, income/(loss) from operations, net income/(loss), cash flow from operating activities or any other measure of performance or liquidity derived in accordance with GAAP. As Consolidated Segment Operating Margin measures our financial performance based on operational factors that management can impact in the short-term, items beyond the control of management in the short term, such as depreciation and amortization are excluded. As a result, this supplemental metric affords management the ability to make decisions to facilitate measuring and achieving optimal financial performance of our current operations overall. The principal limitation of this non-GAAP measure is that it excludes significant expenses and income that are required by GAAP. A reconciliation is provided for the non-GAAP financial measure to the most directly comparable GAAP measure, Gross margin. Investors are encouraged to review the related GAAP financial measures and the reconciliation of the non-GAAP financial measure to our Gross margin, and not to rely on any single financial measure to evaluate our business.
The tables below present our segment information for the three months ended December 31, 2022 and September 30, 2022, and for the year ended December 31, 2022 and December 31, 2021:
| Three Months Ended December 31, 2022 | |||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| (in thousands of $) | Terminals andInfrastructure(1) | Ships(2) | Total Segment | Consolidationand Other(3) | Consolidated | ||||||||||||||
| Total revenues | $ | 457,324 | $ | 106,990 | $ | 564,314 | $ | (17,945) | $ | 546,369 | |||||||||
| Cost of sales(4) | 232,436 | — | 232,436 | (96,537) | 135,899 | ||||||||||||||
| Vessel operating expenses(5) | — | 19,515 | 19,515 | (6,729) | 12,786 | ||||||||||||||
| Operations and maintenance(5) | 28,931 | — | 28,931 | — | 28,931 | ||||||||||||||
| Segment Operating Margin | $ | 195,957 | $ | 87,475 | $ | 283,432 | $ | 85,321 | $ | 368,753 |
| Three Months Ended December 31, 2022 | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| (in thousands of $) | Consolidated | ||||||||||
| Gross margin (GAAP) | $ | 332,552 | |||||||||
| Depreciation and amortization | 36,201 | ||||||||||
| Consolidated Segment Operating Margin (Non-GAAP) | $ | 368,753 |
| Three Months Ended September 30, 2022 | |||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| (in thousands of $) | Terminals andInfrastructure(1) | Ships(2) | Total Segment | Consolidationand Other(3) | Consolidated | ||||||||||||||
| Total revenues | $ | 687,437 | $ | 111,660 | $ | 799,097 | $ | (67,167) | $ | 731,930 | |||||||||
| Cost of sales(4) | 402,458 | — | 402,458 | (8,628) | 393,830 | ||||||||||||||
| Vessel operating expenses(5) | — | 23,799 | 23,799 | (6,912) | 16,887 | ||||||||||||||
| Operations and maintenance(5) | 33,510 | — | 33,510 | (8,046) | 25,464 | ||||||||||||||
| Segment Operating Margin | $ | 251,469 | $ | 87,861 | $ | 339,330 | $ | (43,581) | $ | 295,749 |
61
Table of Contents
| Three Months Ended September 30, 2022 | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| (in thousands of $) | Consolidated | ||||||||||
| Gross margin (GAAP) | $ | 259,956 | |||||||||
| Depreciation and amortization | 35,793 | ||||||||||
| Consolidated Segment Operating Margin (Non-GAAP) | $ | 295,749 |
| Year Ended December 31, 2022 | |||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| (in thousands of $) | Terminals and Infrastructure⁽¹⁾ | Ships⁽²⁾ | Total Segment | Consolidationand Other⁽³⁾ | Consolidated | ||||||||||||||
| Total revenues | $ | 2,168,565 | $ | 444,616 | $ | 2,613,181 | $ | (244,909) | $ | 2,368,272 | |||||||||
| Cost of sales(4) | 1,142,374 | — | 1,142,374 | (131,946) | 1,010,428 | ||||||||||||||
| Vessel operating expenses(5) | — | 90,544 | 90,544 | (27,026) | 63,518 | ||||||||||||||
| Operations and maintenance(5) | 129,970 | — | 129,970 | (24,170) | 105,800 | ||||||||||||||
| Segment Operating Margin | $ | 896,221 | $ | 354,072 | $ | 1,250,293 | $ | (61,767) | $ | 1,188,526 |
| Year Ended December 31, 2022 | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| (in thousands of $) | Consolidated | ||||||||||
| Gross margin (GAAP) | $ | 1,045,886 | |||||||||
| Depreciation and amortization | 142,640 | ||||||||||
| Consolidated Segment Operating Margin (Non-GAAP) | $ | 1,188,526 |
| Year Ended December 31, 2021 | |||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| (in thousands of $) | Terminals and Infrastructure⁽¹⁾ | Ships⁽²⁾ | Total Segment | Consolidation and Other⁽³⁾ | Consolidated | ||||||||||||||
| Total revenues | $ | 1,366,142 | $ | 329,608 | $ | 1,695,750 | $ | (372,940) | $ | 1,322,810 | |||||||||
| Cost of sales(4) | 789,069 | — | 789,069 | (173,059) | 616,010 | ||||||||||||||
| Vessel operating expenses(5) | 3,442 | 64,385 | 67,827 | (16,150) | 51,677 | ||||||||||||||
| Operations and maintenance(5) | 92,424 | — | 92,424 | (19,108) | 73,316 | ||||||||||||||
| Segment Operating Margin | $ | 481,207 | $ | 265,223 | $ | 746,430 | $ | (164,623) | $ | 581,807 |
| Year Ended December 31, 2021 | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| (in thousands of $) | Consolidated | ||||||||||
| Gross margin (GAAP) | $ | 483,430 | |||||||||
| Depreciation and amortization | 98,377 | ||||||||||
| Consolidated Segment Operating Margin (Non-GAAP) | $ | 581,807 |
(1)Prior to the completion of the Sergipe Sale, Terminals and Infrastructure included the Company’s effective share of revenues, expenses and operating margin attributable to the Company's 50% ownership of CELSEPAR. The losses attributable to the investment of $0 and $44.6 million for the three months ended December 31, 2022 and September 30, 2022, respectively and $397.9 million and $17.9 million for the years ended December 31, 2022 and 2021, respectively, are reported in (Loss) income from equity method investments in the consolidated statements of operations and comprehensive income (loss). Terminals and Infrastructure does not include the unrealized mark-to-market earnings and loss on derivative instruments of $96.4 million and $6.9 million for the three months ended December 31, 2022 and September 30, 2022, respectively and $106.1 million and $2.8 million for the years ended December 31, 2022 and 2021, respectively, reported in Cost of sales.
(2)Ships includes the Company’s effective share of revenues, expenses and operating margin attributable to the Company's 50% ownership of the Hilli Common Units. The loss and earnings attributable to the investment of $120.6 million and $12.8 million for the three months ended December 31, 2022 and September 30, 2022, respectively, and $77.1 million and $32.4 million for the years ended December 31, 2022 and 2021, respectively, are reported in (Loss)
62
Table of Contents
income from equity method investments in the consolidated statements of operations and comprehensive income (loss).
(3)Consolidation and Other adjusts for the inclusion of the effective share of revenues, expenses and operating margin attributable to our 50% ownership of CELSEPAR and Hilli Common Units in our segment measure and exclusion of the unrealized mark-to-market gain or loss on derivative instruments.
(4)Cost of sales is presented exclusive of costs included in Depreciation and amortization in the consolidated statements of operations and comprehensive income (loss).
(5)Operations and maintenance and Vessel operating expenses are directly attributable to revenue-producing activities of our terminals and vessels and are included in the calculation of Gross margin as defined under GAAP.
Terminals and Infrastructure Segment
| Three Months Ended, | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|
| (in thousands of $) | December 31, 2022 | September 30, 2022 | Change | |||||||
| Total revenues | $ | 457,324 | $ | 687,437 | $ | (230,113) | ||||
| Cost of sales (exclusive of depreciation and amortization) | 232,436 | 402,458 | (170,022) | |||||||
| Operations and maintenance | 28,931 | 33,510 | (4,579) | |||||||
| Segment Operating Margin | $ | 195,957 | $ | 251,469 | $ | (55,512) |
| Year Ended, | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|
| (in thousands of $) | December 31, 2022 | December 31, 2021 | Change | |||||||
| Total revenues | $ | 2,168,565 | $ | 1,366,142 | $ | 802,423 | ||||
| Cost of sales (exclusive of depreciation and amortization) | 1,142,374 | 789,069 | 353,305 | |||||||
| Vessel operating expenses | — | 3,442 | (3,442) | |||||||
| Operations and maintenance | 129,970 | 92,424 | 37,546 | |||||||
| Segment Operating Margin | $ | 896,221 | $ | 481,207 | $ | 415,014 |
Total revenue
Total revenue for the Terminals and Infrastructure Segment decreased by $230.1 million for the three months ended December 31, 2022 as compared to the three months ended September 30, 2022. The decrease was primarily driven by decreased revenue from LNG cargo sales and decreases to the Henry Hub index that forms a portion of the pricing to invoice most of our downstream customers in this segment. Revenue from cargo sales was $231.1 million for the three months ended December 31, 2022 and $350.6 million for the three months ended September 30, 2022. The average Henry Hub index pricing used to invoice our downstream customers decreased by 24% for the three months ended December 31, 2022 as compared to the three months ended September 30, 2022.
Total volumes delivered to downstream customers also contributed to the decrease in revenue for the three months ended December 31, 2022; volumes delivered for the three months ended December 31, 2022 were 11.0 TBtus as compared to 12.9 TBtus for the three months ended September 30, 2022. Volumes delivered decreased primarily due to maintenance at the San Juan Power Plant.
Total revenue for the Terminals and Infrastructure Segment increased by $802.4 million for the year ended December 31, 2022 as compared to the year ended December 31, 2021. The increase was primarily driven by increased revenue from LNG cargo sales and increases to the Henry Hub index that forms a portion of the pricing to invoice most of our downstream customers in this segment. Revenue from cargos sales was $1,175.9 million for the year ended December 31, 2022 as compared to $462.7 million for the year ended December 31, 2021. The average Henry Hub index pricing used to invoice our downstream customers increased by 73% for the year ended December 31, 2022 as compared to the year ended December 31, 2021.
The significant increase in pricing was partially offset by decreases in total volumes delivered to downstream customers; for the year ended December 31, 2022 volumes delivered to downstream customers were 39.5 TBtus as
63
Table of Contents
compared to 41.8 TBtus for the year ended December 31, 2021. Volumes delivered decreased due to maintenance at the Montego Bay Facility and San Juan Power Plant.
After the completion of the Sergipe Sale, we no longer recognize our share of revenue from our ownership interest in CELSEPAR, and no revenue was recognized for three months ended December 31, 2022. Our share of revenue from our investment in CELSEPAR was $41.3 million for the three months ended September 30, 2022, which was primarily comprised of fixed capacity payments received under CELSE's PPAs. Our share of revenue from our investment in CELSEPAR was $148.3 million for the year ended December 31, 2022 as compared to $299.2 million for the year ended December 31, 2021, which represents our share of revenue for the period after the Mergers. Prior year revenue was higher due to revenue recognized from the emergency dispatch of the Sergipe Power Plant in the third quarter of 2021 due to poor hydrological conditions in Brazil.
Cost of sales
Cost of sales includes the procurement of feedgas or LNG, as well as shipping and logistics costs to deliver LNG or natural gas to our facilities. Our LNG and natural gas supply are purchased from third parties or converted in our Miami Facility. Costs to convert natural gas to LNG, including labor, depreciation and other direct costs to operate our Miami Facility are also included in Cost of sales.
Cost of sales decreased $170.0 million for the three months ended December 31, 2022 as compared to the three months ended September 30, 2022.
•We recognized $97.8 million during the three months ended December 31, 2022 to acquire cargos sold to third parties, as compared to $185.7 million for the three months ended September 30, 2022. The weighted-average cost of LNG from cargo sales decreased from $18.26 per MMBtu for the three months ended September 30, 2022 to $10.52 per MMBtu for the three months ended December 31, 2022.
•Cost of LNG purchased from third parties for sale to our downstream customers decreased $33.3 million for the three months ended December 31, 2022 as compared to the three months ended September 30, 2022. The decrease was primarily attributable to a 15% decrease in volumes delivered compared to the three months ended September 30, 2022, and decreases in LNG cost. The weighted-average cost of LNG purchased from third parties for sale to our customers decreased from $12.17 per MMBtu for the three months ended September 30, 2022 to $10.95 per MMBtu for the three months ended December 31, 2022.
•During the three months ended December 31, 2022, we settled a commodity swap transaction to swap market pricing exposure for a portion of January 2023 deliveries (approximately 1.5 TBtus) for a fixed price of $61.87 per MMBtu, at a gain of $36.5 million.
Cost of sales increased by $353.3 million for the year ended December 31, 2022 as compared to the year ended December 31, 2021.
•The increase in Cost of sales was primarily due to higher cost of LNG cargos NFE sold into the market. We recognized cost to acquire LNG cargos sold to third parties totaling $485.4 million during the year ended December 31, 2022 compared to $191.3 million for the year ended December 31, 2021.
•Cost of LNG purchased from third parties for sale to our terminal customers increased $141.5 million for the year ended December 31, 2022 as compared to the year ended December 31, 2021. While we delivered 6% less volumes to our terminal customers in the current period as compared to the prior year, our cost of LNG was significantly higher in the current period. The weighted-average cost of LNG purchased from third parties increased from $7.09 per MMBtu for the year ended December 31, 2021 to $10.84 per MMBtu for the year ended December 31, 2022.
•Vessel costs increased $53.0 million for the year ended December 31, 2022 as compared to the year ended December 31, 2021 due to additional vessels used in our expanded operations.
•These increases were partially offset by a decrease in our share of cost of sales from our former investment in CELSEPAR from $175.8 million during the year ended December 31, 2021 to $28.6 million during the year ended December 31, 2022. As hydrology conditions have continued to improve in Brazil, the Sergipe Power Plant
64
Table of Contents
was not dispatched as regularly in 2022 and the investment in CELSEPAR was sold during the fourth quarter of 2022, reducing cost of sales from our share of our investment in CELSEPAR.
The weighted-average cost of our LNG inventory balance to be used in our operations as of December 31, 2022 and December 31, 2021 was $10.42 per MMBtu and $9.71 per MMBtu, respectively.
Vessel operating expenses
Vessel operating expenses include direct costs associated with operating a vessel, and these costs are typically included in the Ships segment. Once we begin to use a vessel in our terminal operations, the costs of the vessel begin to be included in the Terminals and Infrastructure segment. Vessel operating expenses were $3.4 million for the year ended December 31, 2021. We did not incur similar costs in this segment during the year ended December 31, 2022.
Operations and maintenance
Operations and maintenance includes costs of operating our facilities, exclusive of costs to convert that are reflected in Cost of sales.
Operations and maintenance decreased $4.6 million for the three months ended December 31, 2022 as compared to the three months ended September 30, 2022, which was primarily attributable to the decrease in our share of Operations and maintenance from our former investment in CELSEPAR. After the completion of the Sergipe Sale, we no longer recognize our share of Operations and maintenance from our former ownership interest in CELSEPAR, and no Operations and maintenance costs were recognized for the three months ended December 31, 2022.
Operations and maintenance increased $37.5 million for the year ended December 31, 2022 as compared to the year ended December 31, 2021.
•The increase for the year ended December 31, 2022 as compared to the year ended December 31, 2021 was primarily attributable to maintenance costs at our Montego Bay Facility and San Juan Power Plant, and higher logistics costs associated with our ISO container distribution system. Due to the reconfiguration and partial relocation of our assets at the Port of Montego Bay in 2022, we began to source LNG from our Miami Facility to service industrial end users in Jamaica, and we incurred additional costs to distribute LNG to customers via our ISO container distribution system. Maintenance costs and logistics costs increased by $10.2 million and $18.1 million, respectively.
•Additionally, Operations and maintenance increased $5.1 million due to the inclusion of our share of Operations and maintenance from our former investment in CELSEPAR from $19.1 million for the year ended December 31, 2021 to $24.2 million for the year ended December 31, 2022, which represents the costs for the period after the Merger. These costs are primarily related to the operation and services agreement for the Nanook, insurance costs and costs for connecting to the transmission system.
65
Table of Contents
Ships Segment
| Three Months Ended, | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|
| (in thousands of $) | December 31, 2022 | September 30, 2022 | Change | |||||||
| Total revenues | $ | 106,990 | $ | 111,660 | $ | (4,670) | ||||
| Vessel operating expenses | 19,515 | 23,799 | (4,284) | |||||||
| Segment Operating Margin | $ | 87,475 | $ | 87,861 | $ | (386) |
| Year Ended, | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|
| (in thousands of $) | December 31, 2022 | December 31, 2021 | Change | |||||||
| Total revenues | $ | 444,616 | $ | 329,608 | $ | 115,008 | ||||
| Vessel operating expenses | 90,544 | 64,385 | 26,159 | |||||||
| Segment Operating Margin | $ | 354,072 | $ | 265,223 | $ | 88,849 |
Revenue in the Ships segment is comprised of operating lease revenue under time charters, fees for positioning and repositioning vessels as well as the reimbursement of certain vessel operating costs. Prior to the completion of the Energos Formation Transaction, we also recognized revenue related to the interest portion of lease payments and the operating and service agreements in connection with the sales-type lease of the Nanook. We included the interest income earned under sales-type leases as revenue as amounts earned under chartering and operating service agreements represented our ongoing ordinary business operations.
At the completion of the Mergers, five of the FSRUs and two LNG carriers were on hire under long-term charter agreements, and one LNG carriers, the Grand, was operating in the spot market. In the third quarter of 2021, the Grand, began to be utilized in our terminal and logistics operations, and as such, the results of operations of the Grand are included in the Terminals and Infrastructure segment from the third quarter of 2021 onward. The Spirit and the Mazo continue to be in cold lay-up, and no vessel charter revenue was generated from these vessels.
Total revenue
Total revenue for the Ships segment was substantially consistent for the three months ended December 31, 2022 as compared to the three months ended September 30, 2022. Subsequent to the Energos Formation Transaction, we continue to be, for accounting purposes, the owner of vessels included in the transaction (except the Nanook), and as such, we continue to recognize revenue from the charter of these vessels to third parties. Revenues from the Ships segment remained substantially consistent as decreased revenue due to the sale of the Nanook was offset by additional sub-charter revenue.
Total revenue for the Ships segment increased $115.0 million for the year ended December 31, 2022 as compared to the year ended December 31, 2021. We completed the Mergers, including all of the vessels comprising the Ships segment, on April 15, 2021, and the increase in revenue is due to the inclusion of the Ships segment in our results of operations for a full year.
Vessel operating expenses
Vessel operating expenses include direct costs associated with operating a vessel, such as crewing, repairs and maintenance, insurance, stores, lube oils, communication expenses, management fees and costs to operate the Hilli. We also recognize voyage expenses within Vessel operating expenses, which principally consist of fuel consumed before or after the term of time charter or when the vessel is off hire. Under time charters, the majority of voyage expenses are paid by customers. To the extent that these costs are a fixed amount specified in the charter, which is not dependent upon redelivery location, the estimated voyage expenses are recognized over the term of the time charter.
Vessel operating expenses decreased by $4.3 million for the three months ended December 31, 2022, compared to the three months ended September 30, 2022. The decrease is related to reduced operating costs and management fees due to the sale of the Nanook as a result of the Energos Formation Transaction.
66
Table of Contents
Vessel operating expenses increased $26.2 million for the year ended December 31, 2022 as compared to the year ended December 31, 2021. We completed the Mergers, including all of the vessels comprising the Ships segment, on April 15, 2021, and the increase in vessel operating expenses is due to the inclusion of the Ships segment in our results of operations for a full year.
Other operating results
| Three Months Ended, | Year Ended, | |||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| (in thousands of $) | December 31, 2022 | September 30, 2022 | Change | December 31, 2022 | December 31, 2021 | Change | ||||||||||||||||
| Selling, general and administrative | $ | 70,099 | $ | 67,601 | $ | 2,498 | $ | 236,051 | $ | 199,881 | $ | 36,170 | ||||||||||
| Transaction and integration costs | 9,409 | 5,620 | 3,789 | 21,796 | 44,671 | (22,875) | ||||||||||||||||
| Depreciation and amortization | 36,201 | 35,793 | 408 | 142,640 | 98,377 | 44,263 | ||||||||||||||||
| Asset impairment expense | 2,550 | — | 2,550 | 50,659 | — | 50,659 | ||||||||||||||||
| Total operating expenses | 118,259 | 109,014 | 9,245 | 451,146 | 342,929 | 108,217 | ||||||||||||||||
| Operating income | 250,494 | 186,735 | 63,759 | 737,380 | 238,878 | 498,502 | ||||||||||||||||
| Interest expense | 80,517 | 63,588 | 16,929 | 236,861 | 154,324 | 82,537 | ||||||||||||||||
| Other (income) expense, net | (16,431) | 10,214 | (26,645) | (48,044) | (17,150) | (30,894) | ||||||||||||||||
| Loss on extinguishment of debt, net | — | 14,997 | (14,997) | 14,997 | 10,975 | 4,022 | ||||||||||||||||
| Income (loss) before income from equity method investments and income taxes | 186,408 | 97,936 | 88,472 | 533,566 | 90,729 | 442,837 | ||||||||||||||||
| (Loss) income from equity method investments | (117,793) | (31,734) | (86,059) | (472,219) | 14,443 | (486,662) | ||||||||||||||||
| Tax provision (benefit) | 2,810 | 9,971 | (7,161) | (123,439) | 12,461 | (135,900) | ||||||||||||||||
| Net income (loss) | $ | 65,805 | $ | 56,231 | $ | 9,574 | $ | 184,786 | $ | 92,711 | $ | 92,075 |
Selling, general and administrative
Selling, general and administrative includes compensation expenses for our corporate employees, employee travel costs, insurance, professional fees for our advisors and screening costs associated with development activities for projects that are in initial stages and development is not yet probable.
Selling, general and administrative was substantially consistent for the three months ended December 31, 2022 as compared to the three months ended September 30, 2022.
Selling, general and administrative increased $36.2 million for the year ended December 31, 2022, compared to the year ended December 31, 2021. The increase was primarily attributable to higher payroll and professional fees associated with the continued expansion of our operations.
Transaction and integration costs
For the three months ended December 31, 2022, we incurred $9.4 million of transaction and integration costs, as compared to $5.6 million for the three months ended September 30, 2022. For the both the three months ended December 31, 2022 and three months ended September 30, 2022, transaction and integration costs incurred were primarily associated with closing the Sergipe Sale. Additionally, during the third quarter of 2022, we incurred costs to close the Energos Formation Transaction. Certain costs could not be deferred as a reduction of the principal balance of the financing obligation incurred as a result of the Energos Formation Transaction, and these costs were recognized in the third quarter of 2022.
67
Table of Contents
For the year ended December 31, 2022, we incurred $21.8 million for transaction and integration costs, as compared to $44.7 million for the year ended December 31, 2021. In the current year, we have incurred transaction and integration costs primarily associated with the Sergipe Sale and the Energos Formation Transaction. For the year ended December 31, 2021, we incurred transaction and integration costs in connection with the Mergers, which consisted primarily of financial advisory, legal accounting and consulting costs. We have incurred such integration costs to a lesser extent in the current year as the integration of GMLP and Hygo has progressed since the acquisition date.
Depreciation and amortization
Depreciation and amortization was substantially consistent for the three months ended December 31, 2022 as compared to the three months ended September 30, 2022. We continue to be the owner for accounting purposes of vessels included in the Energos Formation Transaction (except the Nanook), and as such, we continue to recognize depreciation expense for these vessels, resulting in consistent depreciation quarter over quarter.
Depreciation and amortization increased $44.3 million for the year ended December 31, 2022 as compared to the year ended December 31, 2021. The increase was primarily due to the following:
•Our results of operations include depreciation expense for the vessels acquired in the Mergers for a full year. We recognized $20.8 million of incremental depreciation expense for the acquired vessels during the year ended December 31, 2022.
•Amortization of the value recorded for favorable and unfavorable contracts of an additional $18.3 million for the year ended December 31, 2022.
Asset impairment expense
In conjunction with the Sergipe Sale, the assets of CEBARRA met the criteria to be represented as held for sale and stated at fair value. These assets were reviewed for impairment upon classification to held for sale, and we recognized an impairment loss of $50.7 million in Asset impairment expense during the year ended December 31, 2022 in the consolidated statements of operations and comprehensive income (loss).
Interest expense
Interest expense increased by $16.9 million for the three months ended December 31, 2022 as compared to the three months ended September 30, 2022. The increase was primarily due to the higher borrowing costs associated with financing obligations incurred as a result of the Energos Formation Transaction. Subsequent to the Energos Formation Transaction, we continue to be, for accounting purposes, the owner of vessels included in the transaction (except the Nanook), and as such, we continue to recognize revenue and vessel operating expenses from the charter of these vessels to third parties. The revenue recognized from third-party charters services the financing obligation, resulting in higher interest expense.
Interest expense increased by $82.5 million for the year ended December 31, 2022, as compared to the year ended December 31, 2021. The increase was primarily due to an increase in total principal outstanding, including obligations incurred as a result of the Energos Formation Transaction, under which we incur higher borrowing costs. The total principal balance on outstanding facilities was $4,582.3 million as of December 31, 2022 as compared to total outstanding debt of $3,896.2 million as of December 31, 2021.
68
Table of Contents
Other (income) expense, net
Other (income) expense, net was $(16.4) million and $10.2 million for the three months ended December 31, 2022 and September 30, 2022, respectively. Other (income) expense, net was $(48.0) million and $(17.2) million for the year ended December 31, 2022 and December 31, 2021, respectively.
Other (income) expense, net recognized in the three months ended December 31, 2022 was primarily comprised of a $20.4 million gain related to the settlement of the foreign currency forward during the fourth quarter of 2022.
Other (income) expense, net recognized in the year ended December 31, 2022 was primarily comprised of a $20.4 million gain related to the settlement of the foreign currency forward during the fourth quarter of 2022 and changes in the fair value of the cross-currency interest rate swap and the interest rate swap resulting in income of $31.0 million.
Loss on extinguishment of debt
Loss on extinguishment of debt was $15.0 million for the year ended December 31, 2022 as a result of the extinguishment of the Vessel Term Loan Facility and sale leaseback financing arrangements with VIEs with proceeds from the Energos Formation Transaction. The Debenture Loan was also extinguished in the third quarter of 2022. There is no additional loss from the three months ended September 30, 2022 to the three months ended December 31, 2022, as there were no such transactions during the fourth quarter of 2022.
Loss on extinguishment of debt was $11.0 million for the year ended December 31, 2021. In November 2021, we exercised our option to terminate the sale leaseback agreement of the Eskimo assumed in the Mergers. The counterparty to this sale leaseback arrangement ("Eskimo SPV") was consolidated in our financial statements subsequent to the Mergers. In connection with the termination of this financing arrangement, we recognized a loss on extinguishment of debt based on the difference between the repurchase price under the sale leaseback arrangement and the carrying value of the net assets of the Eskimo SPV upon deconsolidation.
(Loss) income from equity method investments
We recognized losses from our equity method investments of $117.8 million and $31.7 million and for the three months ended December 31, 2022 and September 30, 2022, respectively. The loss in the fourth quarter of 2022 was primarily the result of the other-than-temporary impairment of our investment in Hilli of $118.6 million, as compared to an additional other-than-temporary impairment of the investment in CELSEPAR of $23.8 million recognized in the third quarter of 2022. Additionally, we began to recognize income from our equity method investment in Energos in the fourth quarter of 2022.
We recognized losses from our equity method investments of $472.2 million for the year ended December 31, 2022. For the year ended December 31, 2021, during the period after the completion of the Mergers, we recognized income from our investments in Hilli and CELSEPAR of $14.4 million. The loss in the current year was primarily driven by an other than temporary impairment of the investment in CELSEPAR and Hilli of $487.8 million recognized in connection with the Sergipe Sale, partially offset by income attributable to our investments in Energos.
Tax provision
We recognized a tax provision for the three months ended December 31, 2022 of $2.8 million compared to a tax provision of $10.0 million for the three months ended September 30, 2022, primarily driven by earnings recognized in jurisdictions with a lower tax rate offset by the realization of deferred tax assets in jurisdictions with a valuation allowance.
The change to the tax provision for the year ended December 31, 2022 resulted principally from the excess benefit on stock compensation, the remeasurement of a deferred income tax liability in conjunction with an internal reorganization and tax benefit associated with the OTTI of the investment in CELSEPAR. For the year ended December 31, 2022, we reflected an excess benefit from stock compensation of $24.4 million. Prior to the completion of the Sergipe Sale, our equity method investment in CELSEPAR was directly held by a subsidiary domiciled in the United Kingdom; the investment was previously held by a subsidiary domiciled in Brazil, resulting in a discrete benefit of $76.5 million recognized in the first quarter of 2022. Additionally, in the second and third quarters of 2022, we recognized an impairment on the value of this investment, resulting in a further discrete benefit of $122.4 million. This increase in tax benefit for the
69
Table of Contents
year ended December 31, 2022 was partially offset by additional tax expense resulting from an increase in pretax income for certain profitable operations.
Liquidity and Capital Resources
We believe we will have sufficient liquidity from proceeds from recent borrowings, access to additional capital sources and cash flow from operations to fund our capital expenditures and working capital needs for the next 12 months and the reasonably foreseeable future. We expect to fund our current operations and continued development of additional facilities through cash on hand, borrowings under our debt facilities, cash generated from certain sales and financing transactions and cash generated from operations. We may also opportunistically elect to generate additional liquidity through future debt or equity issuances and asset sales to fund developments and transactions. We have historically funded our developments through proceeds from our IPO, debt and equity financing, asset sales and cash from operations, including (capitalized terms defined in “—Long-Term Debt and Preferred Stock.” below):
•In April 2021, we issued $1,500.0 million of 2026 Notes; we also entered into the $200.0 million Revolving Facility that has a term of approximately five years. In February and May 2022, we amended the Revolving Facility to increase the borrowing capacity by $115.0 million and $125.0 million, respectively, for a total capacity under the Revolving Facility of $440.0 million.
•In January 2022, we entered into an agreement for the issuance of the South Power 2029 Bonds secured by our CHP Plant. In 2022, we received proceeds of $221.8 million from the issuance of South Power 2029 Bonds.
•In August 2022, we completed the Energos Formation Transaction, receiving cash proceeds of approximately $1.85 billion. We used $882.5 million of the proceeds for the repayment of the existing Vessel Term Loan and existing sale leaseback facilities.
•Upon closing of the Sergipe Sale in the fourth quarter of 2022, we received proceeds of approximately $530.0 million, inclusive of approximately $20.4 million of proceeds received from two foreign currency contingent, non-deliverable forwards that were entered into to manage foreign currency impacts of the sale.
•To fund the construction of our Barcarena Power Plant, we borrowed $200.0 million in the third and fourth quarters of 2022 under the Barcarena Term Loan.
We have assumed total committed expenditures for all completed and existing projects to be approximately $3,826 million, with approximately $2,473 million having already been spent through December 31, 2022. This estimate represents the committed expenditures for our Fast LNG project, as well as committed expenditures necessary to complete the La Paz Facility, Puerto Sandino Facility, Barcarena Facility, Barcarena Power Plant and Santa Catarina Facility. We expect fully completed Fast LNG units to cost between $800 million and $900 million per unit. Unlike engineering, procurement and construction agreements for traditional liquefaction construction, our contracts with vendors to construct the Fast LNG units allow us to closely control the timing of our spending and construction schedules so that we can complete each project in time frames to meet our business needs. Each Fast LNG completion is subject to permitting, various contractual terms, project feasibility, our decision to proceed and timing. We carefully manage our contractual commitments, the related funding needs and our various sources of funding including cash on hand, cash flow from operations, and borrowings under existing and future debt facilities.
On December 12, 2022, our Board of Directors approved an update to our dividend policy. In connection with the dividend policy update, the Board declared a dividend of $626.3 million, representing $3.00 per Class A share, which was paid in January 2023. Our future dividend policy is within the discretion of our Board of Directors and will depend upon then-existing conditions, including our results of operations and financial condition, capital requirements, business prospects, statutory and contractual restrictions on our ability to pay dividends, including restrictions contained in our debt agreements, and other factors our Board of Directors may deem relevant.
As of December 31, 2022, we have spent approximately $128.6 million to develop the Pennsylvania Facility. Approximately $22.5 of construction and development costs have been expensed as we have not issued a final notice to proceed to our engineering procurement and construction contractors. Cost for land, as well as engineering and equipment that could be deployed to other facilities and associated financing costs of approximately $106.1 million, has been capitalized, and to date, we have repurposed approximately $16.8 million of engineering and equipment to our Fast LNG
70
Table of Contents
Project. We intend to apply for updated permits for the Pennsylvania Facility with the aim of obtaining these permits to coincide with the commencement of construction activities.
Contractual Obligations
We are committed to make cash payments in the future pursuant to certain contracts. The following table summarizes certain contractual obligations in place as of December 31, 2022:
| (in thousands) | Total | Year 1 | Years 2 to 3 | Years 4 to 5 | More than 5 years | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Long-term debt obligations | $ | 7,106,259 | $ | 278,229 | $ | 2,080,532 | $ | 2,039,111 | $ | 2,708,387 | ||||||||
| Purchase obligations | 20,833,093 | 2,056,856 | 2,053,995 | 1,928,998 | 14,793,244 | |||||||||||||
| Lease obligations | 497,087 | 74,369 | 135,131 | 104,195 | 183,392 | |||||||||||||
| Total | $ | 28,436,439 | $ | 2,409,454 | $ | 4,269,658 | $ | 4,072,304 | $ | 17,685,023 |
Long-term debt obligations
For information on our long-term debt obligations, see “—Liquidity and Capital Resources—Long-Term Debt.” The amounts included in the table above are based on the total debt balance, scheduled maturities, and interest rates in effect as of December 31, 2022. A portion of the debt service amounts of the Vessel Financing Obligation (defined below) is amounts paid to Energos under charters of vessels included in the Energos Formation Transaction to third parties. The residual value of these vessels also forms a part of the obligation and will be recognized as a bullet payment at the end of the charters. As neither these third party charter payments nor the residual value of these vessels represent cash payments due by NFE, such amounts have been excluded from the table above.
Purchase obligations
The Company is party to contractual purchase commitments for the purchase, production and transportation of LNG and natural gas, as well as engineering, procurement and construction agreements to develop our terminals and related infrastructure. Our commitments to purchase LNG and natural gas are principally take-or-pay contracts, which require the purchase of minimum quantities of LNG and natural gas, and these commitments are designed to assure sources of supply and are not expected to be in excess of normal requirements. Certain LNG purchase commitments are subject to conditions precedent, and we include these expected commitments in the table above beginning when delivery is expected assuming that all contractual conditions precedent are met. For purchase commitments priced based upon an index such as Henry Hub, the amounts shown in the table above are based on the spot price of that index as of December 31, 2022.
We have construction purchase commitments in connection with our development projects, including Fast LNG, La Paz Facility, Puerto Sandino Facility, Barcarena Facility and our Santa Catarina Facility. Commitments included in the table above include commitments under engineering, procurement and construction contracts where a notice to proceed has been issued.
Lease obligations
Future minimum lease payments under non-cancellable lease agreements, inclusive of fixed lease payments for renewal periods we are reasonably certain will be exercised, are included in the above table. Fixed lease payments for short-term leases are also included in the table above. Our lease obligations are primarily related to LNG vessel time charters, marine port leases, ISO tank leases, office space and a land lease.
The Company currently has five vessels under time charter leases with remaining non-cancellable terms ranging from one month to nine years. The lease commitments in the table above include only the lease component of these arrangements due over the non-cancellable term and does not include any operating services.
We have leases for port space and a land site for the development of our facilities. Terms for leases of port space range from 15 to 25 years. The land site lease is held with an affiliate of the Company and has a remaining term of approximately 22 years with an automatic renewal term of five years for up to an additional 20 years.
71
Table of Contents
Office space includes space shared with affiliated companies in New York, as well as offices in Houston, New Orleans, and Rio de Janeiro, which have lease terms between one to nine years.
Cash Flows
The following table summarizes the changes to our cash flows for the year ended December 31, 2022 and 2021, respectively:
| Year Ended December 31, | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|
| (in thousands) | 2022 | 2021 | Change | |||||||
| Cash flows from: | ||||||||||
| Operating activities | $ | 355,111 | $ | 84,770 | $ | 270,341 | ||||
| Investing activities | (82,726) | (2,273,561) | 2,190,835 | |||||||
| Financing activities | 321,957 | 1,816,944 | (1,494,987) | |||||||
| Net increase (decrease) in cash, cash equivalents, and restricted cash | $ | 594,342 | $ | (371,847) | $ | 966,189 |
Cash provided by operating activities
Our cash flow provided by operating activities was $355.1 million for the year ended December 31, 2022, which increased by $270.3 million from cash provided by operating activities of $84.8 million for the year ended December 31, 2021. Our net income for the year ended December 31, 2022, when adjusted for non-cash items, increased by $227.3 million from the year ended December 31, 2021. Changes in working capital accounts, primarily increases in accounts payable and accrued liabilities, also increased the cash provided by operating activities in 2022.
Cash used in investing activities
Our cash flow used in investing activities was $82.7 million for the year ended December 31, 2022, which decreased by $2,190.8 million from cash used in investing activities of $2,273.6 million for the year ended December 31, 2021. Cash outflows from investing activities during the year ended December 31, 2022 were used for continued development of our Fast LNG solution, La Paz Facility, Santa Catarina Facility, and Barcarena Facility. Cash outflows for capital expenditures of $1,174.0 million were partially funded from proceeds of $593.0 million from the sale of the finance lease of the Nanook and proceeds of $500.1 million from the Sergipe Sale.
Cash used for the Mergers, net of cash acquired was $1,586.0 million for the year ended December 31, 2021. Cash outflows for investing activities during the year ended year ended December 31, 2021 were also used for continued development of the Puerto Sandino Facility, Barcarena Facility, Santa Catarina Facility, as well as our Fast LNG Solution.
Cash provided by financing activities
Our cash flow provided by financing activities was $322.0 million for the year ended December 31, 2022, which decreased by $1,495.0 million from cash provided by financing activities of $1,816.9 million for the year ended December 31, 2021. Cash provided by financing activities during the year ended December 31, 2022 primarily consisted of proceeds received from issuance of debt of $2,032.0 million, offset by repayments of debt of $1,520.8 million, payment of dividends of $99.1 million and payments related to tax withholding for share-based compensation of $72.6 million.
Cash provided by financing activities during the year ended December 31, 2021 primarily consisted of proceeds received from the borrowings under the 2026 Notes of $1,500.0 million, draw of $200.0 million on the Revolving Facility, and borrowing of $430.0 million under the Vessel Term Loan Facility. The proceeds received were further offset by repayments of debt, primarily the settlement of the sale-leaseback financing arrangement of the Eskimo for a total payment of $190.5 million, financing fees paid in connection with the borrowings, tax payments for equity compensation made on behalf of employees and dividends paid for the year ended December 31, 2021.
72
Table of Contents
Long-Term Debt and Preferred Stock
2025 Notes
In September 2020, we issued $1,000,000 of 6.75% senior secured notes in a private offering pursuant to Rule 144A under the Securities Act (the “2025 Notes”). Interest is payable semi-annually in arrears on March 15 and September 15 of each year, commencing on March 15, 2021; no principal payments are due until maturity on September 15, 2025. We may redeem the 2025 Notes, in whole or in part, at any time prior to maturity, subject to certain make-whole premiums.
The 2025 Notes are guaranteed, jointly and severally, by certain of our subsidiaries, in addition to other collateral. The 2025 Notes may limit our ability to incur additional indebtedness or issue certain preferred shares, make certain payments, and sell or transfer certain assets subject to certain financial covenants and qualifications. The 2025 Notes also provide for customary events of default and prepayment provisions.
We used a portion of the net cash proceeds received from the 2025 Notes, together with cash on hand, to repay in full the outstanding principal and interest under previously existing credit agreements and secured and unsecured bonds, including related premiums, costs and expenses.
In December 2020, we issued $250,000 of additional notes on the same terms as the 2025 Notes in a private offering pursuant to Rule 144A under the Securities Act (subsequent to this issuance, these additional notes are included in the definition of 2025 Notes herein). As of December 31, 2022 and 2021, remaining unamortized deferred financing costs for the 2025 Notes were $6,649 and $8,804, respectively.
2026 Notes
In April 2021, we issued $1,500.0 million of 6.50% senior secured notes in a private offering pursuant to Rule 144A under the Securities Act (the “2026 Notes”) at an issue price equal to 100% of principal. Interest is payable semi-annually in arrears on March 31 and September 30 of each year, commencing on September 30, 2021; no principal payments are due until maturity on September 30, 2026. We may redeem the 2026 Notes, in whole or in part, at any time prior to maturity, subject to certain make-whole premiums.
The 2026 Notes are guaranteed on a senior secured basis by each domestic subsidiary and foreign subsidiary that is a guarantor under the 2025 Notes, and the 2026 Notes are secured by substantially the same collateral as the first lien obligations under the 2025 Notes.
We used the net proceeds from this offering to fund the cash consideration for the Mergers and pay related fees and expenses.
In connection with the issuance of the 2026 Notes, we incurred $25.2 million in origination, structuring and other fees, which was deferred as a reduction of the principal balance of the 2026 Notes on the consolidated balance sheets. As of December 31, 2022 and 2021, total remaining unamortized deferred financing costs for the 2026 Notes was $18.4 million and $22.5 million, respectively.
Vessel Financing Obligation
In connection with the Energos Formation Transaction, we entered into long-term time charter agreements for certain vessels. Vessels chartered to us at the time of closing were classified as finance leases. Additionally, our charter of certain other vessels will commence only upon the expiration of the vessel's existing third-party charters. These forward starting charters prevented the recognition of a sale of the vessels to Energos. As such, on August 15th, 2022, we accounted for the Energos Formation Transaction as a failed sale-leaseback and has recorded a financing obligation of $1.4billion for consideration received from the Purchaser.
We continue to be the owner for accounting purposes of vessels included in the Energos Formation Transaction (except the Nanook), and as such, we will recognize revenue and operating expenses related to vessels under charter to third parties. Revenue recognized from these third-party charters form a portion of the debt service for the financing
73
Table of Contents
obligation; the effective interest rate on this financing obligation of approximately 15.9% includes the cash flows that Energos receives from these third-party charters.
The lease terms for the charter agreements were for periods of up to 20 years. In connection with closing the Energos Formation Transaction, we incurred $10.0 million in origination, structuring and other fees, of which $3.0 million was allocated to the sale of the Nanook and recognized as Other (income) expense, net in the consolidated statements of operations and comprehensive income (loss). Financing costs of $7.0 million were allocated and deferred as a reduction of the principal balance of the financing obligation on the consolidated balance sheets. As of December 31, 2022, the remaining unamortized deferred financing costs for the Vessel Financing Obligation was $6.9 million.
South Power 2029 Bonds
In August 2021, NFE South Power Holdings Limited (“South Power”), a wholly owned subsidiary of NFE, entered into a financing agreement (“CHP Facility”), initially receiving approximately $100.0 million. The CHP Facility was secured by a mortgage over the lease of the site on which our combined heat and power plant in Clarendon, Jamaica (“CHP Plant”) is located and related security. In January 2022, South Power and the counterparty to the CHP Facility agreed to rescind the CHP Facility and entered into an agreement for the issuance of secured bonds (“South Power 2029 Bonds”) and subsequently authorized the issuance of up to $285.0 million in South Power 2029 Bonds. The South Power 2029 Bonds are secured by, amongst other things, the CHP Plant. Amounts outstanding at the time of the mutual rescission of the CHP Facility of $100,000 were credited towards the purchase price of the South Power 2029 Bonds. During the year ended December 31, 2022, the Company issued $121,824, of South Power 2029 Bonds for a total amount outstanding of $221,824 as of December 31, 2022.
The South Power 2029 Bonds bear interest at an annual fixed rate of 6.50% and shall be repaid in quarterly installments beginning in August 2025 with the final repayment date in May 2029. Interest payments on outstanding principal balances are due quarterly.
South Power is required to comply with certain financial covenants as well as customary affirmative and negative covenants. The South Power 2029 Bonds also provide for customary events of default, prepayment and cure provisions. We are in compliance with all covenants as of December 31, 2022.
In conjunction with obtaining the CHP Facility, we incurred $3.2 million in origination, structuring and other fees. The rescission of the CHP Facility and issuance of South Power 2029 Bonds was treated as a modification, and fees attributable to lenders that participated in the CHP Facility will be amortized over the life of the South Power 2029 Bonds; additional third-party fees associated with such lenders of $0.3 million were recognized as expense in the first quarter of 2022. Additional fees for new lenders participating in the South Power 2029 Bonds were recognized as a reduction of the principal balance on the consolidated balance sheets. As of December 31, 2022 and December 31, 2021, the remaining unamortized deferred financing costs for the CHP Facility was $5.6 million and $3.2 million, respectively.
Barcarena Term Loan
In the third quarter of 2022, certain of our indirect subsidiaries entered into a financing agreement to borrow up to $200.0 million due upon maturity in February 2024 (the “Barcarena Term Loan”); proceeds will be utilized to fund construction of the Barcarena Power Plant. As of December 31, 2022, the loan has been fully funded. Interest is due quarterly, and outstanding borrowings bear interest at a rate equal to the Secured Overnight Financing Rate ("SOFR") plus 4.70%. Additionally, undrawn balances incur a commitment fee of 1.9%.
The obligations under the Barcarena Term Loan are guaranteed by certain indirect Brazilian subsidiaries that are constructing the Barcarena Power Plant, and New Fortress Energy Inc. has provided a parent company guarantee. We are required to comply with customary affirmative and negative covenants, and the Barcarena Term Loan also provides for
74
Table of Contents
customary events of default, prepayment and cure provisions. We were in compliance with all covenants as of December 31, 2022.
We incurred $4.0 million of structuring and other fees, and such fees have been deferred as a reduction to the principal balance of the Barcarena Term Loan. As of December 31, 2022, the remaining unamortized deferred financing costs for the Barcarena Term Loan was $3.1 million.
Vessel Term Loan Facility
In September 2021, Golar Partners Operating LLC, an indirect subsidiary of NFE, closed a senior secured amortizing term loan facility (the “Vessel Term Loan Facility”). Under this facility, we borrowed an initial amount of $430.0 million. Loans under the Vessel Term Loan Facility had an interest at a rate of LIBOR plus a margin of 3%. The Vessel Term Loan Facility was repaid in quarterly installments of $15.4 million, with the final repayment date in September 2024.
Obligations under the Vessel Term Loan Facility were guaranteed by GMLP and certain of GMLP’s subsidiaries. Lenders have been granted a security interest covering three floating storage and regasification vessels and four liquified natural gas carriers, and the issued and outstanding shares of capital stock of certain GMLP subsidiaries have been pledged as security. As of December 31, 2021, the aggregate net book value of the three floating storage and regasification vessels and four liquified natural gas carriers pledged as security was approximately $660.6 million.
On August 3, 2022, we exercised the accordion feature under the Vessel Term Loan Facility, drawing $115.0 million, increasing the total principal outstanding to $498.9 million. Net proceeds of $113.9 million were received, and origination and other fees of $1.2 million were deferred as a reduction to the balance of the Vessel Term Loan Facility. As part of the Energos Formation Transaction, all amounts outstanding under the Vessel Term Loan Facility, including this additional principal draw, were repaid. Unamortized deferred financing costs of $5.4 million were recognized as Loss on extinguishment of debt in the consolidated statements of operations and comprehensive income (loss).
Debenture Loan
As part of the Hygo Merger, we assumed non-convertible Brazilian debentures in the aggregate principal amount of BRL 255.6 million due September 2024 (the “Debenture Loan”) bearing interest at a rate equal to the one-day interbank deposit futures rate in Brazil plus 2.65%. The Debenture Loan was recognized at fair value of $44.6 million on the date of the Hygo Merger, and the discount recognized in purchase accounting resulted in additional interest expense until maturity. Interest and principal was payable on the Debenture Loan semi-annually on September 13 and March 13.
In the third quarter of 2022, we repaid the outstanding amount of the Debenture Loan of BRL 198.6 million ($39.2 million); unamortized adjustments to the fair value of the Debenture Loan recognized as a result of the Mergers of $0.5 million was recognized as Loss on extinguishment of debt, net in the consolidated statement of operations and comprehensive income (loss).
Revolving Facility
In April 2021, we entered into a $200.0 million senior secured revolving credit facility (the "Revolving Facility"). The proceeds of the Revolving Facility may be used for working capital and other general corporate purposes (including permitted acquisitions and other investments). In February and May 2022, the Revolving Facility was amended to increase the borrowing capacity by $115.0 million and $125.0 million, respectively, for a total capacity under the Revolving Facility of $440.0 million. Letters of credit issued under the $100.0 million letter of credit sub-facility may be used for general corporate purposes. The Revolving Facility will mature in 2026, with the potential for us to extend the maturity date once in a one-year increment.
Borrowings under the Revolving Facility bear interest at a rate equal to SOFR plus 0.15% plus 2.50% if the usage under the Revolving Facility is equal to or less than 50% of the commitments under the Revolving Facility and SOFR plus 0.15% plus 2.75% if the usage under the Revolving Facility is in excess of 50% of the commitments under the Revolving Facility, subject in each case to a 0% SOFR floor. Borrowings under the Revolving Facility may be prepaid, at our option, at any time without premium.
The obligations under the Revolving Facility are guaranteed by certain of our subsidiaries. We are required to comply with covenants under the Revolving Facility and letter of credit facility, including requirements to maintain Debt to
75
Table of Contents
Capitalization Ratio of less than 0.7:1.0, and for quarters in which the Revolving Facility is greater than 50% drawn, the Debt to Annualized EBITDA Ratio must be less than 5.0:1.0 for fiscal quarters ending December 31, 2021 until September 30, 2023 and less than 4.0:1.0 for the fiscal quarter ended December 31, 2023 until maturity. We were in compliance with all covenants as of December 31, 2022.
We incurred $5.4 million in origination, structuring and other fees, associated with entry into the Revolving Facility, which includes additional fees incurred to expand the facility in 2022. These costs have been capitalized within Other non-current assets on the consolidated balance sheets. As of December 31, 2022 and December 31, 2021, total remaining unamortized deferred financing costs for the Revolving Facility was $5.2 million and $3.8 million, respectively.
In February 2023, the Revolving Credit Facility was amended to increase the facility by $301.7 million, for a total capacity under the Revolving Facility of $741.7 million. The interest rate for borrowings under the Revolving Facility based on the current usage of the facility has not changed. No changes were made to the maturity date or covenants.
SPV Leasebacks and Loans
As part of the Mergers, we assumed the following debt of entities that were consolidated as VIEs. We were the primary beneficiary of these VIEs, and therefore these loan facilities were presented as part of our consolidated financial statements until these arrangements were terminated in conjunction with the Energos Formation Transaction.
Nanook SPV facility
In September 2018, the Nanook was sold to a subsidiary of CCB Financial Leasing Corporation Limited, Compass Shipping 23 Corporation Limited, and subsequently leased back on a bareboat charter for a term of twelve years. We had options to repurchase the vessel throughout the charter term at fixed pre-determined amounts, commencing from the third anniversary of the commencement of the bareboat charter, with an obligation to repurchase the vessel at the end of the twelve-year lease period. The SPV, Compass Shipping 23 Corporation Limited, the owner of the Nanook, had a long-term loan facility due to its parent that was denominated in USD and bore interest at a fixed rate of 2.5%.
Penguin SPV facility
In December 2019, the Penguin was sold to a subsidiary of Oriental Shipping Company, Oriental Fleet LNG 02 Limited, and subsequently leased back on a bareboat charter for a term of six years. We had options to repurchase the vessel throughout the charter term at fixed pre-determined amounts, commencing from the first anniversary of the commencement of the bareboat charter, with an obligation to repurchase the vessel at the end of the six-year lease period. The SPV, Oriental Fleet LNG 02 Limited, the owner of the Penguin, had a long-term loan facility that was denominated in USD and bore interest at LIBOR plus a margin of 1.7%.
Celsius SPV facility
In March 2020, the Celsius was sold to a subsidiary of AVIC International Leasing Company Limited, Noble Celsius Shipping Limited, and subsequently leased back on a bareboat charter for a term of seven years. We had options to repurchase the vessel throughout the charter term at fixed predetermined amounts, commencing from the first anniversary of the commencement of the bareboat charter, with an obligation to repurchase the vessel at the end of the seven-year lease period. The SPV, Noble Celsius Shipping Limited, the owner of the Celsius, had two long-term loan facilities that were denominated in USD. The first facility was paid in quarterly installments over seven years that bore an interest rate of LIBOR plus a margin of 1.8%. The second facility with its parent bore a fixed interest rate of 4.0%.
As part of the Energos Formation Transaction, we exercised our option to repurchase the Penguin, Celsius, and Nanook vessels for a total payment of $380.2 million. After exercising the repurchase options, we no longer had a controlling financial interest in these VIEs and deconsolidated the VIEs. We recognized a loss of $9.1 million from exiting this financing arrangements in Loss on extinguishment of debt, net in the consolidated statements of operations and comprehensive income (loss).
Series A Preferred Units
The 8.75% Series A Cumulative Redeemable Preferred Units issued by GMLP (the “Series A Preferred Units”) remained outstanding following the GMLP Merger and were recognized as non-controlling interest on the consolidated
76
Table of Contents
balance sheets. Distributions on the Series A Preferred Units are payable out of amounts legally available therefor at a rate equal to 8.75% per annum of the stated liquidation preference. In the event of a liquidation, dissolution or winding up, whether voluntary or involuntary, holders of Series A Preferred Units will have the right to receive a liquidation preference of $25.00 per unit plus an amount equal to all accumulated and unpaid distributions thereon to the date of payment, whether declared or not. At any time on or after October 31, 2022, the Series A Preferred Units may be redeemed, in whole or in part, at a redemption price of $25.00 per unit plus an amount equal to all accumulated and unpaid distributions thereon on the date of redemption, whether declared or not.
Golar Hilli Leaseback
We account for our investment in Hilli LLC under the equity method of accounting. The debt obligations of Hilli LLC and its subsidiaries are not reported separately in our consolidated financial statements. Golar Hilli Corporation (“Hilli Corp”), is a direct subsidiary of Hilli LLC and is a party to a Memorandum of Agreement with Fortune Lianjiang Shipping S.A., a subsidiary of China State Shipbuilding Corporation (“Fortune”), pursuant to which Hilli Corp has sold to and leased back from Fortune the Hilli under a 10-year bareboat charter agreement (the “Hilli Leaseback”). Under the Hilli Facility, Hilli Corp pays Fortune equal quarterly principal payments plus interest based on LIBOR plus a margin of 4.15%. Our 50% share of Hilli Corp’s indebtedness of $646.5 million amounted to $323.3 million as of December 31, 2022.
As part of the Mergers, we have assumed a guarantee of 50% of the outstanding principal and interest amounts payable by Hilli Corp under the Hilli Leaseback. We also assumed a guarantee of the letter of credit (“LOC Guarantee”) issued by a financial institution in the event of Hilli Corp’s underperformance or non-performance under its tolling agreement. Certain of our subsidiaries are required to comply with the following covenants and ratios: (i) free liquid assets of at least $30 million throughout the Hilli Leaseback period; (ii) a maximum net debt to EBITDA ratio for the previous 12 months of 6.5:1; and (iii) a consolidated tangible net worth of $124.0 million. We were in compliance with these covenants as of December 31, 2022.
Letter of Credit Facility
In July 2021, the Company entered into an uncommitted letter of credit and reimbursement agreement with a bank for the issuance of letters of credit for an aggregate amount of up to $75 million. In July 2022, the facility was upsized to $250 million with the ability to increase the total limit by up to $100 million, subject to satisfaction of certain conditions. The letters of credit bear interest at a rate equal to (i) a base rate equal to the higher of the rate last quoted by The Wall Street Journal as the “Prime Rate” and a rate tied to the Federal Reserve Bank of New York, plus 0.50%, plus (ii) an applicable margin of 2.25%. We are using this uncommitted letter of credit and reimbursement agreement to reduce the cash collateral required under existing letters of credit releasing restricted cash. A portion of our restricted cash balance supports existing letters of credit, and this uncommitted letter of credit and reimbursement agreement has replaced these letters of credit and released restricted cash, enhancing our ability to manage the working capital needs of the business.
In February 2023, the uncommitted letter of credit and reimbursement agreement was upsized to $325 million; no changes to interest rates or other terms were made as part of this amendment.
Summary of Critical Accounting Estimates
The preparation of consolidated financial statements in conformity with GAAP requires us to make certain estimates and assumptions that affect the amounts reported in the consolidated financial statements and the accompanying notes. Changes in facts and circumstances or additional information may result in revised estimates, and actual results may differ from these estimates. We evaluate our estimates and related assumptions regularly, and we believe that the accounting policies discussed below are critical to understanding our historical and future performance, as these policies relate to the more significant areas involving management’s judgments and estimates.
Impairment of equity method investments
Equity method investments are assessed for impairment when events or changes in circumstances indicate a loss in value may have occurred. In 2022, we sold our equity method investment in CELSEPAR, and in the first quarter of 2023, we have announced our intention to exchange our interest in Hilli LLC for cash and NFE shares, and these events have triggered an analysis to review the recoverability of the carrying value. When evidence of loss in value has occurred, we compare the estimated fair value of the investment to the carrying value of the investment to determine whether impairment has occurred.
77
Table of Contents
In the second quarter of 2022, we considered whether there was any indication of impairment of the equity method investment in CELSEPAR and the long-lived assets of CEBARRA due to the Sergipe Sale. NFE determined that there was an OTTI of the CELSEPAR equity method investment and an impairment of CEBARRA long-lived assets. The decline in fair value of these investments was driven by the impact of significant increases in risk-free rates to future cash flows, as well as the country specific risk premium observed in connection with where such investment is held, in the second quarter of 2022.
Our estimate of fair value used in the impairment assessments was based on the purchase price in the SPA, as adjusted by contractual adjustments expected to be made to this purchase price at Closing. Judgments used to estimate the fair value included the estimation of expected adjustment to the purchase price and the allocation of the purchase price between CELSEPAR and CEBARRA.
In connection with our analysis for the recoverability of our interest in Hilli, we estimated the fair value of the investment as of December 31, 2022 based on discounted cash flows using an income approach reflecting certain Level 3 inputs. This fair value was corroborated utilizing the terms of the Hilli Exchange linked to market price of NFE shares. The inputs into an income approach, particularly the discount rate, are judgmental, and we considered a range of results using discount rates from 11.5% to 13.5%. Our corroboration of the calculated impairment to other information validated our chosen assumptions. Judgement is also required to determine if the decline in estimated fair values is other than temporary. The decline in fair value of our interest in Hilli was primarily driven by the impact of increases in risk-free rates to future cash flows.
When an other-than-temporary impairment is identified, the excess of the carrying value over the estimated fair value is recognized as an impairment loss in (Loss) income from equity method investments.
Impairment of long-lived assets
We perform a recoverability assessment of long-lived assets whenever events or changes in circumstances indicate that the carrying amount of an asset may not be recoverable. Indicators may include, but are not limited to, adverse changes in the regulatory environment in a jurisdiction where we operate, unfavorable events impacting the supply chain for LNG to our operations, a decision to discontinue the development of a long-lived asset, early termination of a significant customer contract, or the introduction of newer technology. We exercise judgment in determining if any of these events represent an impairment indicator requiring a recoverability assessment.
Our business model requires investments in infrastructure often concurrently with our customer’s investments in power generation or other assets to utilize LNG. Our costs to transport and store LNG are based upon our customer’s contractual commitments once their assets are fully operational. We expect revenue under these contracts to exceed construction and operational costs, based on the expected term and revenue of these contracts. Additionally, our infrastructure assets are strategically located to provide critical inputs to our committed customer’s operations and our locations allow us to expand to additional opportunities within existing markets. These projects are subject to risks related to successful completion, including those related to government approvals, site identification, financing, construction permitting and contract compliance.
The recent geopolitical events in Europe have substantially impacted natural gas and LNG markets with unprecedented price increases and volatility. The majority of our LNG supply contracts are based on a natural gas-based index, Henry Hub, plus a contractual spread. We primarily operate under long-term contracts with customers, many of which contain fixed minimum volumes that must be purchased on a “take-or-pay” basis. We limit our exposure to fluctuations in natural gas prices as our pricing in contracts with customers is largely based on the Henry Hub index price plus a contractual spread. Additionally, due to current market conditions, we expect that our revenue and results of operations will benefit in the near term from selling cargos into the elevated global LNG market. Based on the long-term nature of our supply and customer contracts, the nature of the pricing in these contracts and the market value of our underlying assets, changes in the price of natural gas or LNG do not indicate that a recoverability assessment of our assets is necessary. Further, with our own LNG production from FLNG facilities expected to commence in 2023, we plan to further mitigate our exposure to variability in LNG and natural gas prices.
When performing a recoverability assessment, the Company measures whether the estimated future undiscounted net cash flows expected to be generated by the asset exceeds its carrying value. In the event that an asset does not meet the recoverability test, the carrying value of the asset will be adjusted to fair value resulting in an impairment charge. We
78
Table of Contents
develop the assumptions used in the recoverability assessment based on active contracts, current and future expectations of the global demand for LNG and natural gas, as well as information received from third party industry sources.
Allocation of Vessel Financing Obligation
To account for the Energos Formation Transaction, we allocated $1.85 billion of proceeds received between the proceeds received for the sale of a financial asset (net investment in lease of the Nanook) and proceeds that are a financing obligation due to the failed sale leasebacks of ten vessels included in the Energos Formation Transaction. The Company allocated the proceeds using estimates of expected cash flows attributable to each vessel from both third party and NFE charters, which were discounted using counterparty market discount rates. The amortization of the financing obligation was calculated using the effective interest rate method. Upon termination of the NFE's charter of the vessels, we will derecognize the value of the vessel recorded in property, plant and equipment and the remaining financing obligation. The effective interest rate was adjusted to ensure that there is no loss recognized at the end of the charter term.
Share-based compensation
We estimate the fair value of RSUs and performance stock units (“PSUs”) granted to employees and non-employees on the grant date based on the closing price of the underlying shares on the grant date and other fair value adjustments to account for a post-vesting holding period. These fair value adjustments were estimated based on the Finnerty model.
For our PSUs, we reassess the probability of the achievement of the performance metric each reporting period to estimate the amount of shares that will vest. Any increase or decrease in share-based compensation expense resulting from an adjustment in the estimated vesting is treated as a cumulative catch-up in the period of adjustment. Our estimate of whether the performance metric will be met is impacted by the timing of our development projects becoming operational and our ability to achieve the expected results of operations, execution of definitive agreements for new projects, costs of LNG and our ability to execute sale of LNG cargos at favorable pricing and facilitate delivery of these cargos during periods of significant volatility in LNG prices. If any of the assumptions or estimates used change significantly, share-based compensation expense may differ materially from what we have recorded in the current period.
Business combinations and goodwill
We evaluate each purchase transaction to determine whether the acquired assets meet the definition of a business. If substantially all of the fair value of gross assets acquired is concentrated in a single identifiable asset or group of similar identifiable assets, then the set of transferred assets and activities is not a business. If not, for an acquisition to be considered a business, it would have to include an input and a substantive process that together significantly contribute to the ability to create outputs. A substantive process is not ancillary or minor, cannot be replaced without significant costs, effort or delay or is otherwise considered unique or scarce. To qualify as a business without outputs, the acquired assets would require an organized workforce with the necessary skills, knowledge and experience that performs a substantive process.
For acquisitions that are not deemed to be businesses, the assets acquired are recognized based on their cost to us as the acquirer, and no gain or loss is recognized. The cost of assets acquired in a group is allocated to individual assets within the group based on their relative fair values and no goodwill is recognized. Transaction costs related to acquisition of assets are included in the cost basis of the assets acquired.
We account for acquisitions that qualify as business combinations by applying the acquisition method. Transaction costs related to the acquisition of a business are expensed as incurred and excluded from the fair value of consideration transferred. Under the acquisition method of accounting, the identifiable assets acquired, liabilities assumed and noncontrolling interests in an acquired entity are recognized and measured at their estimated fair values. The excess of the fair value of consideration transferred over the fair values of identifiable assets acquired, liabilities assumed and noncontrolling interests in an acquired entity, net of fair value of any previously held interest in the acquired entity, is recorded as goodwill.
The Company performs valuations of assets acquired, liabilities assumed and noncontrolling interests in an acquired entity and allocates the purchase price to its respective assets, liabilities and noncontrolling interests. Determining the fair value of assets acquired, liabilities assumed and noncontrolling interests in an acquired entity requires management to use significant judgment and estimates, including the selection of appropriate valuation methodologies, vessel market day rates, and discount rates. The Company estimated the fair value of the vessels acquired in the Mergers using a combination of the
79
Table of Contents
income approach and the cost approach, which determines the replacement costs for the vessel assets, adjusting for age and condition. Management’s estimates of fair value are based upon assumptions believed to be reasonable, but which are inherently uncertain and unpredictable. As a result, actual results may differ from these estimates. During the measurement period, the Company may record adjustments to acquired assets, liabilities assumed and noncontrolling interests, with corresponding offsets to goodwill. Upon the conclusion of a measurement period, any subsequent adjustments are recorded to earnings.
We use estimates, assumptions and judgments when assessing the recoverability of goodwill. We test for impairment on an annual basis, or more frequently if a significant event of circumstance indicates the carrying amounts may not be recoverable. The assessment of goodwill for impairment may initially be performed based on qualitative factors to determine if it is more likely than not that the fair value of the reporting unit to which the goodwill is assigned is less than the carrying value. If so, a quantitative assessment is performed to determine if an impairment has occurred and to measure the impairment loss.
We completed our annual goodwill impairment evaluation using a qualitative analysis assessment during the fourth quarter of 2022. Under the qualitative assessment, we consider several qualitative factors, including macroeconomic conditions (including changes in interest rates and foreign currency exchange rates), industry and market considerations (including demand for cleaner energy sources and the market price for LNG), the recent and projected financial performance of the reporting unit, as well as other factors.
There was no indication of impairments of goodwill for the year ended December 31, 2022.
Recent Accounting Standards
For descriptions of recently issued accounting standards, refer to “Note 3. Adoption of new and revised standards” of our notes to consolidated financial statements included in this Annual Report.
FY 2021 10-K MD&A
SEC filing source: 0001140361-22-007364.
Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations.
Certain information contained in this discussion and analysis, including information with respect to our plans, strategy, projections and expected timeline for our business and
related financing, includes forward-looking statements. Forward-looking statements are estimates based upon current information and involve a number of risks and uncertainties. Actual events or results may differ materially from the results
anticipated in these forward-looking statements as a result of a variety of factors. You should read “Part 1, Item 1A. Risk Factors” and “Cautionary Statement on Forward-Looking Statements” elsewhere in this Annual Report on Form 10-K (“Annual
Report”) for a discussion of important factors that could cause actual results to differ materially from the results described in or implied by the forward-looking statements contained in the following discussion and analysis.
The comparison of the years ended December 31, 2020 and 2019 can be found in our Annual Report on Form 10‑K for the year ended December 31, 2020 located within “Part II, Item 7.
Management’s Discussion and Analysis of Financial Condition and Results of Operations.”
The following information should be read in conjunction with our audited consolidated financial statements and accompanying notes included elsewhere in this Annual Report. Our
financial statements have been prepared in accordance with GAAP. This information is intended to provide investors with an understanding of our past performance and our current financial condition and is not necessarily indicative of our future
performance. Please refer to “—Factors Impacting Comparability of Our Financial Results” for further discussion. Unless otherwise indicated, dollar amounts are presented in thousands.
Unless the context otherwise requires, references to “Company,” “NFE,” “we,” “our,” “us” or like terms refer to (i) prior to our conversion from a limited
liability company to a corporation, New Fortress Energy LLC and its subsidiaries and (ii) following the conversion from a limited liability company to a corporation, New Fortress Energy Inc. and its subsidiaries. Unless the context otherwise
requires, references to “Company,” “NFE,” “we,” “our,” “us” or like terms refer to (i) prior to the completion of Mergers, New Fortress Energy Inc. and its subsidiaries, excluding Hygo Energy Transition Ltd. (“Hygo”) and its subsidiaries
and Golar LNG Partners LP (“GMLP”) and its subsidiaries, and (ii) after completion of the Mergers, New Fortress Energy Inc. and its subsidiaries, including Hygo and its subsidiaries and GMLP and its subsidiaries.
Overview
We are a global integrated gas-to-power infrastructure company that seeks to use natural gas to satisfy the world’s large and growing power needs. We deliver targeted energy solutions to customers around the world,
thereby reducing their energy costs and diversifying their energy resources, while also reducing pollution and generating compelling margins. Our near-term mission is to provide modern infrastructure solutions to create cleaner, reliable energy
while generating a positive economic impact worldwide. Our long-term mission is to become one of the world’s leading carbon emission-free independent power providing companies. We discuss this important goal in more detail in this Annual Report,
“Items 1 and 2: Business and Properties” under “Sustainability—Toward a Carbon-Free Future”.
On April 15, 2021, we completed the acquisitions of Hygo and GMLP; referred to as the “Hygo Merger” and “GMLP Merger,” respectively and, collectively, the “Mergers.” NFE paid $580
million in cash and issued 31,372,549 shares of Class A common stock to Hygo’s shareholders in connection with the Hygo Merger. NFE paid $3.55 per each common unit of GMLP outstanding and for each of the outstanding membership interest of GMLP’s
general partner, totaling $251 million. The Company also repaid certain outstanding debt facilities of GMLP in conjunction with closing the GMLP Merger. The results of Hygo and GMLP have been included in the Company’s consolidated financial
statements for the period subsequent to the Mergers. As a result of the Hygo Merger, we acquired a 50% interest in a 1.5GW power plant in Sergipe, Brazil (the “Sergipe Power Plant”) and its operating FSRU terminal in Sergipe, Brazil (the “Sergipe
Facility”), the Barcarena Facility and Power Plant, the Santa Catarina Facility and the Nanook, a newbuild FSRU moored and in service at the Sergipe Facility. As a result of the GMLP Merger, we acquired a fleet of six other FSRUs, six LNG carriers and an interest in a floating liquefaction vessel, the Hilli Episeyo (the “Hilli”), each of which are expected to help support our existing facilities and international project pipeline. The majority of the FSRUs are operating in Brazil,
Indonesia, Jamaica and Jordan under time charters, and uncontracted vessels are available for short term employment in the spot market.
Subsequent to the completion of the Mergers, our chief operating decision maker makes resource allocation decisions and assesses performance on the basis of two operating segments, Terminals and
Infrastructure and Ships.
53
Table of Contents
Our Terminals and Infrastructure segment includes the entire production and delivery chain from natural gas procurement and liquefaction to logistics, shipping, facilities and
conversion or development of natural gas-fired power generation. We currently source LNG from long-term supply agreements with third party suppliers and from our own liquefaction facility in Miami, Florida. Leased vessels as well as the cost to
operate our vessels that are utilized in our terminal or logistics operations are included in this segment. We centrally manage our LNG supply and the deployment of our vessels utilized in our terminal or logistics operations, which allow us more
optimally manage our LNG supply and acquired and leased fleet. The Terminals and Infrastructure segment includes all terminal operations in Jamaica, Puerto Rico, Mexico and Brazil, including our interest in the
Sergipe Power Plant.
Our Ships segment includes all vessels acquired in the Mergers, which are leased to customers under long-term or spot arrangements, including the 25-year charter of Nanook with CELSE. The Company’s investment in Hilli LLC, owner and operator of the Hilli, is also included in the Ships segment. Over time, we expect to utilize these vessels in our own
terminal operations as charter agreements for these vessels expire.
Our Current Operations – Terminals and Infrastructure
Our management team has successfully employed our strategy to secure long-term contracts with significant customers in Jamaica and Puerto Rico, including Jamaica Public Service Company Limited
(“JPS”), the sole public utility in Jamaica, South Jamaica Power Company Limited (“SJPC”), an affiliate of JPS, Jamalco, a bauxite mining and alumina producer in Jamaica, and the Puerto Rico Electric Power Authority (“PREPA”), each of which is
described in more detail below. Our assets built to service these significant customers have been designed with capacity to service other customers.
We currently procure our LNG either by purchasing from a supplier or by manufacturing it in our Miami Facility. Our long-term goal is to develop the infrastructure necessary to supply our existing
and future customers with LNG produced primarily at our own facilities, including Fast LNG and our expanded delivery logistics chain in Northern Pennsylvania (the “Pennsylvania Facility”) in addition to supplying our customers through long-term LNG
contracts.
Montego Bay Facility
The Montego Bay Facility serves as our supply hub for the north side of Jamaica, providing natural gas to JPS to fuel the 145MW Bogue Power Plant in Montego Bay, Jamaica. Our Montego Bay Facility
commenced commercial operations in October 2016 and is capable of processing up to 740,000 gallons of LNG (61,000 MMBtu) per day and features approximately 7,000 cubic meters of onsite storage. The Montego Bay Facility also consists of an ISO
loading facility that can transport LNG to numerous on-island industrial users.
Old Harbour Facility
The Old Harbour Facility is an offshore facility consisting of an FSRU that is capable of processing approximately six million gallons of LNG (500,000 MMBtus) per day. The Old Harbour Facility
commenced commercial operations in June 2019 and supplies natural gas to the 190MW Old Harbour power plant (the “Old Harbour Power Plant”) operated by SJPC. The Old Harbour Facility is also supplying natural gas to our dual-fired combined heat and
power facility in Clarendon, Jamaica (the “CHP Plant”). The CHP Plant supplies electricity to JPS under a long-term PPA. The CHP Plant also provides steam to Jamalco under a long-term take-or-pay SSA. In March 2020, the CHP Plant commenced
commercial operation under both the PPA and the SSA and began supplying power and steam to JPS and Jamalco, respectively. In August 2020, we began to deliver gas to Jamalco to utilize in their gas-fired boilers.
San Juan Facility
Our San Juan Facility became fully operational in the third quarter of 2020. It is designed as a landed micro-fuel handling facility located in the Port of San Juan, Puerto
Rico. The San Juan Facility has multiple truck loading bays to provide LNG to on-island industrial users. The San Juan Facility is near the PREPA San Juan Power Plant and serves as our supply hub for the PREPA
San Juan Power Plant and other industrial end-user customers in Puerto Rico. We have delivered natural gas to PREPA’s power plant under the Fuel Sale and Purchase Agreement with PREPA since April 2020.
Sergipe Power Plant and Sergipe Facility
As part of the Hygo Merger, we acquired a 50% interest in Centrais Elétricas de Sergipe Participações S.A. (“CELSEPAR”), which owns CELSE,
the owner and operator of the Sergipe Power Plant. The Sergipe Power Plant, a 1.5GW combined cycle power plant, receives natural gas from the Sergipe Facility through a dedicated 8-kilometer pipeline. The Sergipe Power Plant is one of the largest
natural gas-fired thermal power stations in Latin America and was built to provide electricity on demand throughout the Brazilian electric integrated system, particularly during dry seasons when hydropower is unable to meet the growing demand for
electricity in the country. CELSE has executed multiple PPAs pursuant to which the Sergipe Power Plant is delivering power to 26 committed offtakers (utilities) for a period of 25 years. In any period in which power is not being produced pursuant
to the PPAs, we are able to sell merchant power into the electricity grid at spot prices, subject to local regulatory approval.
54
Table of Contents
We also own expansion rights with respect to the Sergipe Power Plant, which are owned by Centrais Elétricas Barra dos Coqueiros S.A. (“CEBARRA”), a joint venture with Ebrasil, of which we own 75%. These rights include
190 acres of land and regulatory permits for two new power generation projects of 2.0GW in the aggregate. CEBARRA has obtained all permits and other rights necessary to participate in future government power
auctions.
The Sergipe Facility is capable of processing up to 790,000 MMBtu per day and storing up to 170,000 cubic meters of LNG, and supplies approximately 230,000 MMBtu/d (30% of the
Sergipe Facility’s maximum regasification capacity) of natural gas to to the Sergipe Power Plant, at full dispatch.
Miami Facility
Our Miami Facility began operations in April 2016. This facility has liquefaction capacity of approximately 100,000 gallons of LNG (8,300 MMBtu) per day and enables us to produce LNG for sales
directly to industrial end-users in southern Florida, including Florida East Coast Railway via our train loading facility, and other customers throughout the Caribbean using ISO containers.
Our Current Operations – Ships
Our Ships segment includes six FSRUs and five LNGCs, which are leased to customers under long-term or spot arrangements, including a 25-year charter of Nanook
with CELSE. As these charter arrangements expire, we expect to use these vessels in our terminal operations and reflect such vessels in our Terminals and Infrastructure segment. We began to use one acquired LNGC in our terminal operations in the
third quarter of 2021, and the results of operations of this vessel are no longer included in the Ships segment.
The Company’s investment in Hilli LLC, owner and operator of the Hilli, is also included in the Ships segment. Hilli Corp, a wholly owned subsidiary of
Hilli LLC, has a Liquefication Tolling Agreement (“LTA”) with Perenco Cameroon S.A. and Société Nationale des Hydrocarbures under which the Hilli provides liquefaction services through July 2026. Under the
LTA, Hilli Corp receives a monthly tolling fee, consisting of a fixed element of hire and incremental tolling fees based on the price of Brent crude oil.
Our Development Projects
La Paz Facility
In July 2021, we began commercial operations at the Port of Pichilingue in Baja California Sur, Mexico (the “La Paz Facility”). Initially, we are supplying CFEnergia with natural gas to power
plants located in Punta Prieta and Coromuel for an estimated 250,000 gallons of LNG (20,700 MMBtu) per day, and we are in commercial discussions with CFEnergia to increase the volumes and extend the tenor of agreements to further their transition
to gas-fired power. The La Paz Facility is expected to supply approximately an additional 270,000 gallons of LNG (22,300 MMBtu) per day to our 100MW of power supplied by gas-fired modular power units (the “La Paz Power Plant”) following the start
of operations. Natural gas supply to the La Paz Power Plant may be increased to approximately 350,000 gallons (29,000 MMBtu) of LNG per day for up to 135MW of power.
Puerto Sandino Facility
Development of our offshore facility consisting of an FSRU and associated infrastructure, including mooring and offshore pipelines, in Puerto Sandino, Nicaragua (the “Puerto Sandino
Facility”) is ongoing and we expect to begin commercial operations at the Puerto Sandino Facility in 2022. We have entered into a 25-year PPA with Nicaragua’s electricity distribution companies. We expect to utilize approximately 695,000
gallons of LNG (57,500 MMBtu) per day to provide natural gas to the Puerto Sandino Power Plant in connection with the 25-year power purchase agreement.
Barcarena Facility
The Barcarena Facility will consist of an FSRU and associated infrastructure, including mooring and offshore and onshore pipelines. The Barcarena Facility will be capable of
processing up to 790,000 MMBtu per day and storing up to 170,000 cubic meters of LNG. The Barcarena Facility is expected to supply gas to a new 605MW combined cycle thermal power plant to be located in Pará, Brazil (the “Barcarena Power
Plant”), which is supported by multiple 25-year power purchase agreement to supply electricity to the national electricity grid. The power project is scheduled to
deliver power to nine committed offtakers for 25 years beginning in 2025.
55
Table of Contents
Santa Catarina Facility
The Santa Catarina Facility will be located on the southern coast of Brazil and will consist of an FSRU with a processing capacity of approximately 570,000 MMBtu per day and LNG storage capacity of
up to 170,000 cubic meters. We are also developing a 33-kilometer, 20-inch pipeline that will connect the Santa Catarina Facility to the existing inland Transportadora Brasileira Gasoduto Bolivia-Brasil S.A. (“TBG”) pipeline via an interconnection
point in Garuva. The Santa Catarina Facility and associated pipeline are expected to have a total addressable market of 15 million cubic meters per day.
Suape Facility
We are developing our LNG terminal in the State of Pernambuco, Brazil (the “Suape Facility” and, together with the Sergipe Facility, the Barcarena Facility and the Santa Catarina Facility, our “Brazil Facilities”). We
intend for the Suape Facility to supply LNG to a 288MW thermoelectric power plant to be located in the State of Pernambuco, Brazil (the “Suape Power Plant”, and together with the Sergipe Power Plant and the Barcarena Power Plant, the “Brazil Power
Plants”). We have obtained certain key permits and authorizations to develop an LNG terminal and up to 1.37GW of gas-fired power at the Port of Suape, in the city of Ipojuca, State of Pernambuco, Brazil, pursuant to the purchase of CH4 Energia Ltda. on January 12, 2021. We own certain 15-year power purchase agreements totaling 288MW for the development of two thermoelectric power plants, in the State of
Bahia, Brazil, following the acquisition of 100% of the outstanding shares of Pecém Energia S.A. (“Pecém”) and Energética Camaçari Muricy II S.A. (“Muricy”) on March 11, 2021. As of January 2022, we had commenced power sales under these power
purchase agreements via forward selling agreements. We are seeking to obtain the necessary approvals from ANEEL and other relevant regulatory authorities in Brazil to transfer the site for the power purchase agreements to the Suape Facility, and
to update the technical characteristics to develop and construct an initial 288MW gas-fired power plant and LNG import terminal at the Port of Suape, to provide LNG and natural gas to major energy consumers within the port complex and across the
greater Northeast region of Brazil.
Ireland Facility
We intend to develop and operate an LNG facility and power plant (the “Ireland Facility” and, together with the Jamaica Facilities, the San Juan Facility, the Brazil Facilities the La Paz Facility and the Puerto
Sandino Facility, our “LNG Facilities”) and a CHP plant on the Shannon Estuary, near Tarbert, Ireland (the “Ireland Power Plant” and, together with the La Paz Power Plant, the Nicaragua Power Plant and the Brazil Power Plants, the “Power Plants,”
and together with the LNG Facilities, the “Facilities”). We are in the process of obtaining final planning permission from An Bord Pleanála (“ABP”) in Ireland and we intend to begin construction of the Ireland Facility after we have obtained the
necessary consents and secured contracts with downstream customers with volumes sufficient to support the development.
Fast LNG
We are currently developing a modular floating liquefaction facility to provide a low-cost supply of liquefied natural gas for our growing customer base. The “Fast LNG” design pairs advancements in
modular, midsize liquefaction technology with jack up rigs, semi-submersible rigs or similar floating infrastructure to enable a much lower cost and faster deployment schedule than today’s floating liquefaction vessels. A permanently moored FSU
will serve as an LNG storage facility alongside the floating liquefaction infrastructure, which can be deployed anywhere there is abundant and stranded natural gas.
Other Projects
We are in active discussions to develop projects in multiple regions around the world that may have significant demand for additional power, LNG and natural gas, although there can be no assurance that these
discussions will result in additional contracts or that we will be able to achieve our target pricing or margins.
Recent Developments
Cargo Sales
Since August 2021, LNG prices have increased materially. We have supply commitments to secure LNG volumes equal to approximately 100% of our expected needs for our Montego Bay Facility, Old Harbour
Facility, San Juan Facility, La Paz Facility and Puerto Sandino Facility for the next six years. Due to this significant increase in market pricing of LNG, we have optimized our supply portfolio to sell a portion of these cargos in the market, and
these sales have positively impacted our results for the third and fourth quarters of 2021. Cargo sales of 18.5 TBtus were completed in the third and fourth quarters of 2021, increasing our revenues and results of operations for the year ended
December 31, 2021.
56
Table of Contents
COVID-19 Pandemic
We are closely monitoring the impact of the novel coronavirus (“COVID-19”) pandemic on all aspects of our operations and development projects, including our marine operations acquired
in the Mergers. Customers in our Terminals and Infrastructure segment primarily operate under long-term contracts, many of which contain fixed minimum volumes that must be purchased on a “take-or-pay” basis. We continue to invoice our
customers for fixed minimum volumes even in cases when our customer’s consumption has decreased. We have not changed our payment terms with these customers, and there has not been deterioration in the timing or volume of collections.
Many of the vessels acquired in the Mergers operate under long-term contracts with fixed payments. We are required to have adequate crewing aboard our vessels to fulfill the obligations under our
contracts, and we have implemented safety measures to ensure that we have healthy qualified officers and crew. We monitor local or international transport or quarantine restrictions limiting the ability to transfer crew members off vessels or bring
a new crew on board, and restrictions in availability of supplies needed on board due to disruptions to third-party suppliers or transportation alternatives, and we have not experienced significant disruptions in our operations due to these
measures or restrictions.
Based on the essential nature of the services we provide to support power generation facilities, our operations and development projects have not currently been significantly impacted by responses
to the COVID-19 pandemic. We remain committed to prioritizing the health and well-being of our employees, customers, suppliers and other partners. We have implemented policies to screen employees, contractors, and vendors for COVID-19 symptoms upon
entering our development projects, operations and office facilities. For the year ended December 31, 2021, we have incurred approximately $0.8 million for safety measures introduced into our operations and other responses to the COVID-19 pandemic.
We are actively monitoring the spread of the pandemic and the actions that governments and regulatory agencies are taking to fight the spread. We have not experienced
significant disruptions in development projects, charter or terminal operations from the COVID-19 pandemic; however, there are important uncertainties including the scope, severity and duration of the pandemic, the actions taken to contain the
pandemic or mitigate its impact, and the direct and indirect economic effects of the pandemic and containment measures. We do not currently expect these factors to have a significant impact on our results of operations, liquidity or financial
position, or our development budgets or timelines.
Other Matters
On June 18, 2020, we received an order from FERC, which asked us to explain why our San Juan Facility is not subject to FERC’s jurisdiction under section 3 of the NGA. Because we do not believe
that the San Juan Facility is jurisdictional, we provided our reply to FERC on July 20, 2020 and requested that FERC act expeditiously. On March 19, 2021 FERC issued an order that the San Juan Facility does fall under FERC jurisdiction. FERC
directed us to file an application for authorization to operate the San Juan Facility within 180 days of the order, which is September 15, 2021, but also found that allowing operation of the San Juan Facility to continue during the pendency of an
application is in the public interest. FERC also concluded that no enforcement action against us is warranted, presuming we comply with the requirements of the order. Parties to the proceeding, including the Company, sought rehearing of the March
19, 2021 FERC order, and FERC denied all requests for rehearing in an order issued on July 15, 2021. We have filed petitions for review of FERC’s March 19 and July 15 orders with the United States Court of the Appeals for the District of Columbia
Circuit. To date, no other party has sought review of FERC’s orders. While our petitions for review are pending, and in order to comply with the FERC’s directive, on September 15, 2021 we filed an application for authorization to operate the San
Juan Facility, which remains pending.
57
Table of Contents
Results of Operations – Year Ended December 31, 2021 compared to Year Ended December 31, 2020 (in thousands)
Segment performance is evaluated based on segment operating margin and the tables below presents our segment information for the years ended December 31, 2021 and 2020:
| Year Ended December 31, 2021 | |||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| (in thousands of $) | Terminals and Infrastructure⁽¹⁾ | Ships⁽²⁾ | Total Segment | Consolidation and Other⁽³⁾ | Consolidated | ||||||||||||||
| Statement of operations: | |||||||||||||||||||
| Total revenues | $ | 1,366,142 | $ | 329,608 | $ | 1,695,750 | $ | (372,940 | ) | $ | 1,322,810 | ||||||||
| Cost of sales | 789,069 | - | 789,069 | (173,059 | ) | 616,010 | |||||||||||||
| Vessel operating expenses | 3,442 | 64,385 | 67,827 | (16,150 | ) | 51,677 | |||||||||||||
| Operations and maintenance | 92,424 | - | 92,424 | (19,108 | ) | 73,316 | |||||||||||||
| Segment Operating Margin | $ | 481,207 | $ | 265,223 | $ | 746,430 | $ | (164,623 | ) | $ | 581,807 |
⁽¹⁾ Terminals and Infrastructure includes the Company’s effective share of revenues, expenses and operating margin attributable to 50% ownership of CELSEPAR. The losses
attributable to the investment of $17,925 for the year ended December 31, 2021 are reported in income from equity method investments on the consolidated statements of operations and comprehensive income (loss). Terminals and Infrastructure does
not include the unrealized mark-to-market loss on derivative instruments of $2,788 for the year ended December 31, 2021 reported in Cost of sales.
⁽²⁾ Ships includes the Company’s effective share of revenues, expenses and operating margin attributable to 50% ownership of the Hilli Common
Units. The earnings attributable to the investment of $32,368 for the year ended December 31, 2021 are reported in income from equity method investments on the consolidated statements of operations and comprehensive income (loss).
⁽³⁾ Consolidation and Other adjusts for the inclusion of the effective share of revenues, expenses and operating margin attributable to 50%
ownership of CELSEPAR and Hilli Common Units in our segment measure and exclusion of the unrealized mark-to-market gain or loss on derviative instruments.
Terminals and Infrastructure Segment
| Year Ended December 31, 2021 | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| (in thousands of $) | 2021 | 2020 | Change | ||||||||
| Statement of operations: | |||||||||||
| Total revenues | $ | 1,366,142 | $ | 451,650 | $ | 914,492 | |||||
| Cost of sales | 789,069 | 278,767 | 510,302 | ||||||||
| Vessel operating expenses | 3,442 | - | 3,442 | ||||||||
| Operations and maintenance | 92,424 | 47,581 | 44,843 | ||||||||
| Segment Operating Margin | $ | 481,207 | $ | 125,302 | $ | 355,905 |
Total revenue
Total revenue for the Terminals and Infrastructure Segment increased $914,492 for the year ended December 31, 2021 as compared to the year ended December 31, 2020. The increase was primarily driven
by the overall increase in price and volumes delivered in the current period, the sale of cargos of LNG to third parties outside of our terminal operations and the inclusion of incremental revenue in our segment measure from CELSEPAR after the
completion of the Mergers. Our contracts with customers in this segment are primarily priced based on the Henry Hub index, and there have been significant increases in this price index in the second half of 2021, positively impacting our revenue.
The average Henry Hub index pricing used to invoice our customers increased by 85% for the year ended December 31, 2021 as compared to the year ended December 31, 2020. Additionally, we recognized additional revenue from more volumes sold to the
PREPA San Juan Power Plant in Puerto Rico.
58
Table of Contents
The following tables summarize the volumes delivered in the year ended December 31, 2021 as compared to the year ended December 31, 2020:
| Year Ended December 31, | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| (in millions of gallons) | 2021 | 2020 | Change | |||||||||
| Old Harbour Facility | 211.2 | 192.2 | 19.0 | |||||||||
| Montego Bay Facility | 84.0 | 94.2 | (10.2 | ) | ||||||||
| San Juan Power Plant | 184.0 | 129.5 | 54.5 | |||||||||
| Other | 16.9 | 12.9 | 4.0 | |||||||||
| Total volumes delivered in the current period | 496.1 | 428.8 | 67.3 |
| Year Ended December 31, | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| (in TBtu) | 2021 | 2020 | Change | |||||||||
| Old Harbour Power Plant | 17.5 | 15.9 | 1.6 | |||||||||
| Montego Bay Facility | 7.1 | 7.9 | (0.8 | ) | ||||||||
| San Juan Power Plant | 14.9 | 10.7 | 4.2 | |||||||||
| Other | 2.3 | 1.1 | 1.2 | |||||||||
| Total volumes delivered in the current period | 41.8 | 35.6 | 6.2 |
The Old Harbour Facility sold additional volumes in the year ended December 31, 2021 as compared to the year ended December 31, 2020. Increases in revenue were further impacted by substantial
increases to natural gas pricing. Revenue was impacted by operations at our Old Harbour Facility:
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| • | Sales at the Old Harbour Facility increased by $46,307 from $189,196 for the year ended December 31, 2020 to $235,503 for the year ended December 31, 2021. The increase in revenue from the Old Harbour Facility was due to an increase in the Henry Hub index used to invoice our customers as compared to the year ended December 31, 2020 and an increase in volumes delivered at the Old Harbour Power Plant. |
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| • | Revenue from the delivery of power and steam increased by $5,833 from $23,415 for the year ended December 31, 2020 to $29,248 for the year ended December 31, 2021, which began during March 2020 under our contracts with JPS and Jamalco. |
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| • | The increase in volumes delivered at the Old Harbour Power Plant was partially offset by a decrease in consumption by the CHP Plant and Jamalco’s boilers. The Jamalco refinery experienced a fire in August 2021, and no gas volumes have been consumed by their boilers since this event. However, steam revenue has been consistent with previous periods as our contract with Jamalco has take-or-pay provisions that allow us to invoice for minimum volumes. |
Revenue was also impacted by operations at our Montego Bay Facility.
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| • | Sales at the Montego Bay Facility increased by $4,067 from $93,236 for the year ended December 31, 2020 to $97,303 for the year ended December 31, 2021. The increase in revenue from the Montego Bay Facility was due to an increase in the Henry Hub index used to invoice our customers compared to the year ended December 31, 2020 and increased volume sold to industrial end users. Additional revenue from industrial end users offset the decrease in volumes consumed by the Bogue Power Plant. |
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| • | The decrease in volumes delivered at the Montego Bay Facility of 10.2 million gallons (0.8 TBtu) was driven by a reconfiguration of the Port of Montego Bay where our facility resides required by the port authority. During this reconfiguration, we are unable to deliver volumes to the Bogue Power Plant; we expect this reconfiguration to be completed in the first half of 2022. |
Sales at the PREPA San Juan Power Plant increased by $61,921 from $129,753 for the year ended December 31, 2020 to $191,674 for the year ended December 31, 2021. The increase was driven by
additional volumes consumed at the San Juan Power Plant, increasing by 54.5 million gallons (4.2 TBtu), as our San Juan Facility was not completed until July 2020.
Revenue from cargo sales was $462,695 for the year ended December 31, 2021; there were no comparable transactions in the year ended December 31, 2020.
Subsequent to the acquisition of our interest in the Sergipe Facility as part of the Mergers, our share of revenue from our investment in CELSEPAR was $299,168 for the year ended December 31, 2021,
which was primarily comprised of fixed capacity payments received under our PPAs. Revenue recognized from the operation of the Sergipe Power Plant was significantly increased in the third and fourth quarters of 2021 by emergency dispatch due to
poor hydrological conditions in Brazil. Our proportionate share of revenue from the Sergipe Facility is included in this discussion as such revenue is included in our segment measure; in our consolidated statement of operations and comprehensive
loss, we report the results from our investment in CELSEPAR as Income from equity method investments.
59
Table of Contents
Cost of sales
Cost of sales includes the procurement of feedgas or LNG, as well as shipping and logistics costs to deliver LNG or natural gas to our facilities. Our LNG and natural gas supply are purchased from
third parties or converted in our Miami Facility. Costs to convert natural gas to LNG, including labor, depreciation and other direct costs to operate our Miami Facility are also included in Cost of sales.
Cost of sales increased $510,302 for the year ended December 31, 2021 as compared to the year ended December 31, 2020.
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| • | Cost of LNG purchased from third parties for sale to our customers increased $117,943 for the year ended December 31, 2021 as compared to the year ended December 31, 2020. The increase was primarily attributable to a 16% increase in volumes delivered compared to the year ended December 31, 2020 and an increase in LNG cost. The weighted-average cost of LNG purchased from third parties increased from $0.46 per gallon ($5.58 per MMBtu) for the year ended December 31, 2020 to $0.59 per gallon ($7.09 per MMBtu) for the year ended December 31, 2021. |
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| • | Cost of LNG from the sale of cargos in the market was $191,308 for the year ended December 31, 2021 as compared to $0 for the year ended December 31, 2020. Due to the significant increase in market pricing of LNG in the second half of 2021, we have optimized our supply portfolio to sell a portion of our committed cargos in the market. The weighted-average cost of LNG from the sale of a portion of our cargos was $0.81 per gallon ($9.82 per MMBtu). |
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| • | Subsequent to the acquisition of the Sergipe Facility as part of the Mergers, our share of Cost of sales from our investment in CELSEPAR was $175,847 for the year ended December 31, 2021, which was comprised of LNG costs to fuel the power plant and costs of power to fulfill requirements under the PPAs. |
The weighted-average cost of our LNG inventory balance to be used in our Jamaican and Puerto Rican operations as of December 31, 2021 and December 31, 2020 was $0.80 per gallon ($9.71 per MMBtu)
and $0.40 per gallon ($4.81 per MMBtu), respectively.
Charter costs increased Cost of sales by $7,633 for the year ended December 31, 2021 as compared to the year ended December 31, 2020. The increase was attributable to an additional vessel in our
fleet associated with our San Juan Facility after our assets were placed in service in the third quarter of 2020, as well as an additional vessel lease that we assumed as part of the Mergers. These increases were partially offset by lower costs
associated with the Freeze, that we now own as a result of the Mergers.
Operations and maintenance
Operations and maintenance includes costs of operating our facilities, exclusive of costs to convert that are reflected in Cost of sales. Operations and maintenance increased $44,843 for the year
ended December 31, 2021 as compared to the year ended December 31, 2020.
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| • | The increase for the year ended December 31, 2021 as compared to the year ended December 31, 2020 was also the result of San Juan Facility and the CHP Facility during the year ended December 31, 2021 that were still in development during a portion of the year ended December 31, 2020. Operations and maintenance increased by the costs of operating the San Juan Facility and CHP Plant, and an increase in payroll costs, maintenance costs, insurance costs and port fees. |
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| • | Subsequent to acquisition of the Sergipe Facility as part of the Mergers, our share of Operations and maintenance from our investment in CELSEPAR was $19,108 for the year ended December 31, 2021, which was primarily comprised of costs related to the operation and services agreement for the Nanook, insurance costs and costs for connecting to the transmission system. |
60
Table of Contents
Ships Segment
| (in thousands of $) | Year Ended December 31, 2021 | ||
|---|---|---|---|
| Statement of operations: | |||
| Total revenues | $ | 329,608 | |
| Cost of sales | - | ||
| Vessel operating expenses | 64,385 | ||
| Operations and maintenance | - | ||
| Segment Operating Margin | $ | 265,223 |
Prior to the completion of the Mergers, we reported our results of operations in a single segment. All the assets and operations that comprise the Ships segment were acquired
in the Mergers, and as such, there are no results of operations prior to the completion of the Mergers during the second quarter of 2021, and the results of operations for the Ships segment for the year ended December 31, 2021 represents eight and
a half months of operations.
Revenue in the Ships segment is comprised of operating lease revenue under time charters, fees for repositioning vessels as well as the reimbursement of certain vessel operating
costs. We have also recognized revenue related to the interest portion of lease payments and the operating and service agreements in connection with the sales-type lease of the Nanook. We include the interest income earned under sales-type leases as revenue as amounts earned under chartering and operating service agreements represent our ongoing ordinary
business operations.
At the completion of the Mergers, five of the FSRUs and two LNGCs were on hire under long-term charter agreements, and one LNGCs, the Grand, was operating
in the spot market. In the third quarter, the Grand, began to be utilized in our terminal and logistics operations, and as such, the results of operations of the Grand are
included in the Terminals and Infrastructure segment from the third quarter of 2021 onward. The Spirit and the Mazo continue to be in cold lay-up, and no vessel
charter revenue was generated from these vessels.
Two of the vessels acquired in the Mergers, the Celsius and the Penguin, have participated in a pooling
arrangement, which we refer to as the Cool Pool. Under this arrangement, the pool manager markets participating vessels in the LNG shipping spot market, and the vessel owner continues to be fully responsible for the manning and technical management
of their respective vessels. Revenue for charters of our vessels in the Cool Pool is presented on a gross basis in revenue, and our allocation of our share of the net revenues earned from the other pool participants’ vessels, which may be either
income or expense depending on the results of all pool participants, is reflected on a net basis within Vessel operating expenses. The Penguin exited the Cool Pool in the third quarter of 2021, and we have
chartered this vessel to a third party outside of the Cool Pool.
For the year ended December 31, 2021, revenue recognized in the Ships segment included $32,880 of interest income for the Nanook sales-type lease and $5,549 of revenue for operating services provided to CELSE. As all operations of the Ships segment were acquired in the Mergers, the results of operations for the Nanook for the year ended December 31, 2021 represents eight and a half months of operations.
Our segment measure includes our proportionate share of the results of operations of the Hilli. Our share of
revenue from our investment in Hilli LLC was $73,772 for the year ended December 31, 2021 which was primarily comprised of fees received under the long-term tolling arrangement.
Vessel operating expenses
Vessel operating expenses includes direct costs associated with operating a vessel, such as
crewing, repairs and maintenance, insurance, stores, lube oils, communication expenses, management fees and costs to operate the Hilli. We also recognize voyage expenses
within Vessel operating expenses, which principally consist of fuel consumed before or after the term of time charter or when the vessel is off hire. Under time charters, the majority of voyage expenses are paid by customers. To the extent
that these costs are a fixed amount specified in the charter, which is not dependent upon redelivery location, the estimated voyage expenses are recognized over the term of the time charter.
For the year ended December 31, 2021, we recognized $64,385 in Vessel operating expenses. As all operations of the Ships segment were acquired in the Mergers, Vessel
operating expenses for the year ended December 31, 2021 represents eight and a half months of operations of each of the acquired vessels.
61
Table of Contents
Other operating results
| Year Ended December 31, | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| (in thousands of $) | 2021 | 2020 | Change | |||||||||
| Selling, general and administrative | $ | 199,881 | $ | 120,142 | $ | 79,739 | ||||||
| Transaction and integration costs | 44,671 | 4,028 | 40,643 | |||||||||
| Contract termination charges and loss on mitigation sales | - | 124,114 | (124,114 | ) | ||||||||
| Depreciation and amortization | 98,377 | 32,376 | 66,001 | |||||||||
| Total operating expenses | 342,929 | 280,660 | 62,269 | |||||||||
| Operating income (loss) | 238,878 | (155,358 | ) | 394,236 | ||||||||
| Interest expense | 154,324 | 65,723 | 88,601 | |||||||||
| Other (income) expense, net | (17,150 | ) | 5,005 | (22,155 | ) | |||||||
| Loss on extinguishment of debt, net | 10,975 | 33,062 | (22,087 | ) | ||||||||
| Net income (loss) before income from equity method investments and income taxes | 90,729 | (259,148 | ) | 349,877 | ||||||||
| Income from equity method investments | 14,443 | - | 14,443 | |||||||||
| Tax provision | 12,461 | 4,817 | 7,644 | |||||||||
| Net income (loss) | $ | 92,711 | $ | (263,965 | ) | $ | 356,676 |
Selling, general and administrative
Selling, general and administrative includes compensation expenses for our corporate employees, employee travel costs, insurance, professional fees for our advisors and screening costs associated
with development activities for projects that are in initial stages and development is not yet probable.
Selling, general and administrative increased $79,739 for the year ended December 31, 2021, as compared to the year ended December 31, 2020. The increase was primarily attributable to $33,059 of
higher payroll costs associated with increased headcount for the year ended December 31, 2021. Subsequent to the Mergers, we now have employees that were part of Hygo’s operations; we have also hired additional employees to support our larger
organization, including personnel to support additional development projects. In the fourth quarter of 2021, due to the significant impact of cargo sales on our results of operations, we determined that the performance metric associated with our
performance share units granted in 2020 was probable of vesting, and we recognized $30,467 of share-based compensation expense.
We have incurred higher office lease, insurance and IT expenses associated with additional office space, and our travel and entertainment expenses have increased due to the relaxation of travel
restrictions that were in place for much of 2020 due to COVID-19 pandemic. These costs increased our Selling, general and administrative by $10,918.
Transaction and integration costs
For the year ended December 31, 2021, we incurred $44,671 for transaction and integration costs, as compared to $4,028 for the year ended December 31, 2020. As part of arranging financing for the
Mergers, we incurred $15,000 in bridge financing commitment fees. We issued the 2026 Notes to pay for a portion of the consideration for the Mergers and did not utilize the commitments under the bridge financing, and as such, the fees were expensed
with the termination of the bridge financing commitment letter in the second quarter of 2021. We also incurred $3,978 of costs related to the settlement of a contractual indemnification obligation under a pre-existing lease arrangement prior to the
GMLP Merger. The remaining transaction and integration costs were incurred in connection with the Mergers, which consisted primarily of financial advisory, legal, accounting and consulting costs.
For the year ended December 31, 2020, we incurred $4,028 of third-party fees associated with a new credit agreement that was accounted for as a modification.
62
Table of Contents
Contract termination charges and loss on mitigation sales
Loss on mitigation sales for the year ended December 31, 2020 was $124,114. In June 2020, we executed an agreement to terminate our obligation to purchase LNG from our supplier for the remainder of
2020 in exchange for a payment of $105,000, and we recognized this cancellation charge during the second quarter of 2020. We terminated our obligation in the second quarter of 2020 to both take advantage of the low pricing in the open market and to
align future deliveries of LNG with our expected needs. Additionally, in the second quarter of 2020, we experienced lower than expected consumption by some of our customers, primarily as a result of unplanned maintenance at one of our customer’s
facilities in Jamaica. As a result, we were unable to utilize a firm cargo purchased under our LNG supply agreement, incurring a loss of $18,906 on the sale of this cargo that was recognized during the second quarter of 2020. We did not have such
transactions during the year ended December 31, 2021.
Depreciation and amortization
Depreciation and amortization increased $66,001 for the year ended December 31, 2021 as compared to the year ended December 31, 2020. The increase was primarily due to the following:
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| • | Subsequent to the completion of the Mergers, our results of operations include depreciation expense primarily for the vessels acquired. We recognized $38,950 of incremental depreciation expense for the acquired vessels during the year ended December 31, 2021; |
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| • | Amortization of the value recorded for favorable and unfavorable contracts acquired in the Mergers of $16,658 for the year ended December 31, 2021; |
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| • | Increase in depreciation of $5,179 for the San Juan Facility that went into service in July 2020 for the year ended December 31, 2021; and |
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| • | Increase in depreciation of $2,536 for the CHP Plant that went into service in March 2020 for the year ended December 31, 2021. |
Interest expense
Interest expense increased by $88,601 for the year ended December 31, 2021 as compared to the year ended December 31, 2020. The increase was primarily due to an increase in total principal
outstanding due to the issuance of the 2025 Notes in September 2020, the 2026 Notes in April 2021, draws on the Revolving Facility, borrowings under the Vessel Term Loan Facility and the CHP Facility (all defined below); principal balance on
outstanding facilities was $3,896,155 as of December 31, 2021 as compared to total outstanding debt of $1,250,000 as of December 31, 2020.
In conjunction with the Mergers, we assumed outstanding debentures issued by a subsidiary of Hygo and the outstanding debt of variable interest entities (“VIEs”) that are now consolidated in our
financial statements, totaling $630,563 as of the acquisition date. Although we have no control over the funding arrangements of these entities, we are the primary beneficiary of these VIEs and therefore these loan facilities are presented as part
of the consolidated financial statements.
Upon assumption of the debt held by VIEs, we recognized the liabilities assumed at fair value and amortization of the discount from carrying value has been recorded as additional interest expense.
For the year ended December 31, 2021, we recognized additional interest expense attributable to assumed debt of VIEs of $11,766.
Other (income) expense, net
Other (income) expense, net increased by $22,155 for the year ended December 31, 2021, respectively, as compared to the year ended December 31, 2020. Other (income), net of $17,150 primarily
consisted of:
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| • | Gains in investments in equity securities of $8,254 for the year ended December 31, 2021; |
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| • | Changes in the fair value of the cross-currency interest rate swap and the interest rate swaps acquired in connection with the Mergers, resulting additional income of $5,562 for the year ended December 31, 2021. |
Loss on extinguishment of debt, net
Loss on extinguishment of debt for the year ended December 31, 2021 was $10,975. In November 2021, we exercised our option to terminate the sale leaseback agreement of the Eskimo assumed in the Mergers in exchange for a total payment of $190,518. The counterparty to this sale leaseback arrangement (“Eskimo SPV”) has been consolidated in our financial statements subsequent to the Mergers. In
connection with the termination of this financing arrangement, we recognized a loss on extinguishment of debt based on the difference between the repurchase price under the sale leaseback arrangement and the carrying value of the net assets of the
Eskimo SPV upon deconsolidation.
63
Table of Contents
Loss on extinguishment of debt for the year ended December 31, 2020 was $33,062 as a result of the extinguishment of previous credit facilities in January 2020 and September 2020.
Tax provision
We recognized a tax provision for the year ended December 31, 2021 of $12,461 compared to a tax provision of $4,817 for the year ended December 31, 2020. The increase to the tax provision and
effective tax rate for the year ended December 31, 2021 was primarily driven by an increase in pre-tax income in certain profitable foreign operations, primarily in Jamaica. We also acquired profitable vessel operations in the United Kingdom in the
Mergers. For the year ended December 31, 2021, these increases in tax expense were partially offset by earnings generated in foreign jurisdictions with preferential tax rates.
Income from equity method investments
During the period after the completion of the Mergers, we recognized income from our investments in Hilli and CELSEPAR of $14,443 for the year ended December 31, 2021. Our proportionate share of
the earnings of $36,866 were offset by amortization of basis differences through our equity earnings of $22,423 for the year ended December 31, 2021. During the period after the Mergers, our share of earnings from CELSEPAR was impacted by a foreign
currency remeasurement gain of $2,261 for the year ended December 31, 2021, primarily as a result of the remeasurement of the Nanook finance lease obligation.
Factors Impacting Comparability of Our Financial Results
Our historical results of operations and cash flows are not indicative of results of operations and cash flows to be expected in the future, principally for the following reasons:
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| • | Our historical financial results include the results of operations of Hygo and GMLP only since the completion of the Mergers in April 2021. Upon completion of the Mergers, we acquired a fleet of seven FSRUs, six LNG carriers and an interest in a floating liquefaction vessel. We also acquired a 50% interest in the Sergipe Facility and the Sergipe Power Plant, as well as the Barcarena Facility and Barcarena Power Plant and the Santa Catarina Facility that are currently in development. The results of operations of Hygo and GMLP began to be included in our financial statements upon the closing of the acquisitions on April 15, 2021. Our results of operations in 2021 also include transaction and integration costs associated with these acquisitions, some of which would not be expected in future periods. Our future results of operations may continue to be impacted by costs to integrate the operations of Hygo and GMLP, including costs to exit or modify transition service agreements or vessel management agreements, all of which may be significant. |
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| • | Our historical financial results do not include significant projects that have recently been completed or are near completion. Our results of operations for the year ended December 31, 2021 include our Montego Bay Facility, Old Harbour Facility, San Juan Facility, certain industrial end-users and our Miami Facility. We recently placed a portion of our La Paz Facility into service, and in the fourth quarter of 2021, our revenue and results of operations began to be impacted by operations in Mexico. We are continuing to develop of our La Paz Power Plant and our Puerto Sandino Facility, and our current results do not include revenue and operating results from these projects. Our current results also exclude other developments, including the Suape Facility, Barcarena Facility, Santa Catarina Facility and Ireland Facility. |
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| • | Our historical financial results do not reflect new LNG supply agreements, as well as our Fast LNG solution that will lower the cost of our LNG supply. We currently purchase the majority of our supply of LNG from third parties, sourcing approximately 96% of our LNG volumes from third parties for the year ended December 31, 2021. During 2020 and 2021, we entered into LNG supply agreements for the purchase of approximately 601 TBtu of LNG at a price indexed to Henry Hub from 2021 and 2030, resulting in expected pricing below the pricing in our previous long-term supply agreement. We have now secured supply for LNG volumes equal to approximately 100% of our expected needs for our Montego Bay Facility, Old Harbour Facility, San Juan Facility, La Paz Facility and Puerto Sandino Facility for the next six years. We also anticipate that the deployment of Fast LNG floating liquefaction facilities will significantly lower the cost of our LNG supply and reduce our dependence on third party suppliers. |
Since August 2021, LNG prices have increased materially. Due to this significant increase in market pricing of LNG, we have optimized our supply portfolio to sell a portion of our committed cargos
in the market with delivery in the fourth quarter of 2021, and these cargo sales increased our revenues and results of operations.
64
Table of Contents
Liquidity and Capital Resources
We believe we will have sufficient liquidity from proceeds from recent borrowings, access to additional capital sources and cash flow from operations to fund our capital expenditures and working
capital needs for the next 12 months. We expect to fund our current operations and continued development of additional facilities through cash on hand, borrowings under our debt facilities and cash generated from operations. We may also
opportunistically elect to generate additional liquidity through future debt or equity issuances and asset sales to fund developments and transactions. We have historically funded our developments through proceeds from our IPO and debt and equity
financing, most recently as follows:
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| • | In January 2020, we borrowed $800,000 under a credit agreement, and repaid our prior term loan facility in full. |
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| • | In September 2020, we issued $1,000,000 of 2025 Notes and repaid all other outstanding debt. No principal payments are due on the 2025 Notes until maturity in 2025. |
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| • | In December 2020, we received proceeds of $263,125 from the issuance of $250,000 of additional notes on the same terms as the 2025 Notes (subsequent to this issuance, these additional notes are included in the definition of 2025 Notes herein). |
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| • | In December 2020, we issued 5,882,352 shares of Class A common stock and received proceeds of $290,771, net of $1,221 in issuance costs. |
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| • | In April 2021, we issued $1,500,000 of 2026 Notes; we also entered into the $200,000 Revolving Facility that has a term of approximately five years. |
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| • | In August 2021, we entered into the CHP Facility (defined below) and initially drew $100,000, which may be increased to $285,000. |
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| • | In September 2021, Golar Partners Operating LLC, our indirect subsidiary, closed on the Vessel Term Loan Facility (defined below). Under this facility, we borrowed an initial amount of $430,000, which may be increased to $725,000, subject to satisfaction of certain conditions including the provision of security in relation to additional vessels. |
We have assumed total committed expenditures for all completed and existing projects to be approximately $1,913 million, with approximately $1,439 million having already been spent through
December 31, 2021. This estimate represents the committed expenditures necessary to complete the La Paz Facility, Puerto Sandino Facility, the Suape Facility, the Barcarena Facility and the Santa Catarina Facility, as well committed expenditures
to serve new industrial end-users. We expect to be able to fund all such committed projects with a combination of cash on hand, cash flows from operations and proceeds from the South Power 2029 Bonds (defined below). We may also enter into other
financing arrangements to generate proceeds to fund our developments. Through December 31, 2021, we have spent approximately $128 million to develop the Pennsylvania Facility. Approximately $22 million of construction and development costs have
been expensed as we have not issued a final notice to proceed to our engineering, procurement and construction contractors. Cost for land, as well as engineering and equipment that could be deployed to other facilities and associated financing
costs of approximately $106 million, has been capitalized, and to date, we have repurposed approximately $17 million of engineering and equipment to our Fast LNG project.
Contractual Obligations
We are committed to make cash payments in the future pursuant to certain contracts. The following table summarizes certain contractual obligations in place as of December 31, 2021:
| (in thousands) | Total | Year 1 | Years 2 to 3 | Years 4 to 5 | More than 5 years | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Long-term debt obligations | $ | 4,936,353 | $ | 305,575 | $ | 878,471 | $ | 3,341,677 | $ | 410,630 | |||||||||
| Purchase obligations | 5,265,356 | 784,060 | 1,637,783 | 1,450,817 | 1,392,696 | ||||||||||||||
| Lease obligations | 420,329 | 67,131 | 101,295 | 68,393 | 183,510 | ||||||||||||||
| Total | $ | 10,622,038 | $ | 1,156,766 | $ | 2,617,549 | $ | 4,860,887 | $ | 1,986,836 |
65
Table of Contents
Long-term debt obligations
For information on our long-term debt obligations, see “—Liquidity and Capital Resources—Long-Term Debt.” The amounts included in the table above are based on the total debt balance, scheduled
maturities, and interest rates in effect as of December 31, 2021.
Purchase obligations
The Company is party to contractual purchase commitments for the purchase, production and transportation of LNG and natural gas, as well as engineering, procurement and construction agreements to
develop our terminals and related infrastructure. Our commitments to purchase LNG and natural gas are principally take-or-pay contracts, which require the purchase of minimum quantities of LNG and natural gas, and these commitments are designed
to assure sources of supply and are not expected to be in excess of normal requirements. For purchase commitments priced based upon an index such as Henry Hub, the amounts shown in the table above are based on the spot price of that index as of
December 31, 2021. We have secured supply of LNG for approximately 100% of our expected needs for our Montego Bay Facility, Old Harbour Facility, San Juan Facility, La Paz Facility and Puerto Sandino Facility for the next six years.
We have construction purchase commitments in connection with our development projects, including the La Paz Facility, Puerto Sandino Facility, Suape Facility, Barcarena Facility, Santa Catarina Facility, as well as
our Fast LNG solution. Commitments included in the table above include commitments under engineering, procurement and construction contracts where a notice to proceed has been issued.
Lease obligations
Future minimum lease payments under non-cancellable lease agreements, inclusive of fixed lease payments for renewal periods we are reasonably certain will be exercised, are included in the above
table. Fixed lease payments for short-term leases are also included in the table above. Our lease obligations are primarily related to LNG vessel time charters, marine port leases, ISO tank leases, office space and a land lease.
The Company currently has seven vessels under time charter leases with remaining non-cancellable terms ranging from one month to ten years. The lease commitments in the table above include only
the lease component of these arrangements due over the non-cancellable term and does not include any operating services. The Company has executed a lease for an LNG carrier that has not commenced as of December 31, 2021, which has a
noncancelable terms of 7 years and includes fixed payments of approximately $198,100; these payments are not included in the table above.
We have leases for port space and a land site for the development of our facilities. Terms for leases of port space range from 20 to 25 years. The land site lease is held with an affiliate of the
Company and has a remaining term of approximately five years with an automatic renewal term of five years for up to an additional 20 years.
During 2020, we executed multiple lease agreements for the use of ISO tanks, and we began to receive these ISO tanks and the lease terms commenced during the second quarter of 2021. The lease
term for each of these leases is five years and expected payments under these lease agreements have been included in the above table.
Office space includes space shared with affiliated companies in New York, as well as offices in Miami, New Orleans, and Rio de Janeiro, which have lease terms between three to seven years.
Cash Flows
The following table summarizes the changes to our cash flows for the year ended December 31, 2021 and 2020, respectively:
| Year Ended December 31, | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| (in thousands) | 2021 | 2020 | Change | |||||||||
| Cash flows from: | ||||||||||||
| Operating activities | $ | 84,770 | $ | (125,566 | ) | $ | 210,336 | |||||
| Investing activities | (2,273,561 | ) | (157,631 | ) | (2,115,930 | ) | ||||||
| Financing activities | 1,816,944 | 819,498 | 997,446 | |||||||||
| Net (decrease) increase in cash, cash equivalents, and restricted cash | $ | (371,847 | ) | $ | 536,301 | $ | (908,148 | ) |
66
Table of Contents
Cash provided by (used in) operating activities
Our cash flow provided by operating activities was $84,770 for the year ended December 31, 2021, which increased by $210,336 from cash used in operating activities of $125,566 for the year ended
December 31, 2020. Our net income for the year ended December 31, 2021, when adjusted for non-cash items, increased by $380,719 compared to the net loss, when adjusted for non-cash items, for the year ended December 31, 2020. The increase to net
income was offset by changes in working capital accounts, primarily increases in receivables, which was primarily comprised of a significant invoice of approximately $109,000 for a cargo sale that was settled shortly after December 31, 2021.
Cash used in investing activities
Our cash flow used in investing activities was $2,273,561 for the year ended December 31, 2021, which increased by $2,115,930 from cash used in investing activities of $157,631 for the year ended
December 31, 2020. Cash used for the Mergers, net of cash acquired was $1,586,042. Cash outflows for investing activities during the year ended December 31, 2021 were also used for continued development of the La Paz Facility, Puerto Sandino
Facility, Suape Facility, Barcarena Facility, Santa Catarina Facility, as well as our Fast LNG solution.
During the year ended December 31, 2020, we completed the CHP Plant and were in the final stages of development of the San Juan Facility, and we incurred lower cash outflows for investing
activities for the year ended December 31, 2020.
Cash provided by financing activities
Our cash flow provided by financing activities was $1,816,944 for the year ended December 31, 2021, which increased by $997,446 from cash provided by financing activities of $819,498 for the year
ended December 31, 2020. Cash provided by financing activities during the year ended December 31, 2021 primarily consisted of proceeds received from the borrowings under the 2026 Notes of $1,500,000, draw of $200,000 on the Revolving Facility, and
borrowing of $430,000 under the Vessel Term Loan Facility. The proceeds received were further offset by repayments of debt, primarily the settlement of the sale-leaseback financing arrangement of the Eskimo
for a total payment of $190,518, financing fees paid in connection with the borrowings, tax payments for equity compensation made on behalf of employees and dividends paid for the year ended December 31, 2021.
Cash flow provided by financing activities during the year ended December 31, 2020 primarily consisted of proceeds received from the borrowings under the 2025 Notes of $1,000,000 and the borrowings
under our previous credit agreement of $800,000, partially offset by an original issue discount of $20,000 and financing fees. Additionally, the remaining proceeds from secured bonds issued in Jamaica of $52,144 were received during the first
quarter of 2020. A portion of these proceeds was used to fund the repayment of our previous credit agreement of $800,000, the senior secured and unsecured bonds that had been issued in Jamaica of $183,600, and our previous term loan facility of
$506,402.
Long-Term Debt and Preferred Stock
2025 Notes
In September 2020, we issued $1,000,000 of 6.75% senior secured notes in a private offering pursuant to Rule 144A under the Securities Act (the “2025 Notes”). Interest is payable semi-annually in
arrears on March 15 and September 15 of each year, commencing on March 15, 2021; no principal payments are due until maturity on September 15, 2025. We may redeem the 2025 Notes, in whole or in part, at any time prior to maturity, subject to
certain make-whole premiums.
The 2025 Notes are guaranteed, jointly and severally, by certain of our subsidiaries, in addition to other collateral. The 2025 Notes may limit our ability to incur additional indebtedness or
issue certain preferred shares, make certain payments, and sell or transfer certain assets subject to certain financial covenants and qualifications. The 2025 Notes also provide for customary events of default and prepayment provisions.
We used a portion of the net cash proceeds received from the 2025 Notes, together with cash on hand, to repay in full the outstanding principal and interest under previously existing credit
agreements and secured and unsecured bonds, including related premiums, costs and expenses.
In connection with the issuance of the 2025 Notes, we incurred $17,937 in origination, structuring and other fees. Issuance costs of $13,909 were deferred as a reduction of the principal balance
of the 2025 Notes on the consolidated balance sheets; unamortized deferred financing costs related to lenders in the previously credit agreement that participated in the 2025 Notes were $6,501 and such unamortized costs were also included as a
reduction of the principal balance of the 2025 Notes and will be amortized over the remaining term of the 2025 Notes. As a portion of the repayment of the previous credit agreement was a modification, in the third quarter of 2020, we recorded
$4,028 of third-party fees as an expense in the consolidated statements of operations and comprehensive loss.
67
Table of Contents
In December 2020, we issued $250,000 of additional notes on the same terms as the 2025 Notes in a private offering pursuant to Rule 144A under the Securities Act (subsequent to this issuance,
these additional notes are included in the definition of 2025 Notes herein). Proceeds received included a premium of $13,125, which was offset by additional financing costs incurred of $4,566. As of December 31, 2021 and December 31, 2020,
remaining unamortized deferred financing costs for the 2025 Notes was $8,804 and $10,439, respectively.
2026 Notes
In April 2021, we issued $1,500,000 of 6.50% senior secured notes in a private offering pursuant to Rule 144A under the Securities Act (the “2026 Notes”) at an issue price equal to 100% of
principal. Interest is payable semi-annually in arrears on March 31 and September 30 of each year, commencing on September 30, 2021; no principal payments are due until maturity on September 30, 2026. We may redeem the 2026 Notes, in whole or in
part, at any time prior to maturity, subject to certain make-whole premiums.
The 2026 Notes are guaranteed on a senior secured basis by each domestic subsidiary and foreign subsidiary that is a guarantor under the existing 2025 Notes, and the 2026 Notes are secured by
substantially the same collateral as our existing first lien obligations under the 2025 Notes.
We used the net proceeds from this offering to fund the cash consideration for the Merger and pay related fees and expenses.
In connection with the issuance of the 2026 Notes, we incurred $25,217 in origination, structuring and other fees, which was deferred as a reduction of the principal balance of the 2026 Notes on
the consolidated balance sheets. As of December 31, 2021, total remaining unamortized deferred financing costs for the 2026 Notes was $22,488.
Vessel Term Loan Facility
In September 2021, Golar Partners Operating LLC, an indirect subsidiary of NFE, closed a senior secured amortizing term loan facility (the “Vessel Term Loan Facility”). Under this facility, the
Company borrowed an initial amount of $430,000, which may be increased to $725,000, subject to satisfaction of certain conditions including the provision of security in relation to additional vessels.
Loans under the Vessel Term Loan Facility bear interest at a rate of LIBOR plus a margin of 3%. The Vessel Term Loan Facility shall be repaid in quarterly installments of $15,357, with the final
repayment date in September 2024. Quarterly principal payments will be increased to reflect any upsize of the Vessel Term Loan Facility to reflect a straight-line amortization profile over the remaining term.
Obligations under the Vessel Term Loan Facility are guaranteed by GMLP and certain of GMLP’s subsidiaries. Lenders have been granted a security interest covering three floating storage and
regasification vessels and four liquified natural gas carriers, and the issued and outstanding shares of capital stock of certain GMLP subsidiaries have been pledged as security.
The Company may prepay outstanding indebtedness without penalty, and certain events, such as (i) total loss; (ii) minimum security value; (iii) the sale or transfer of certain vessels; or (iv)
the termination of the charter over the Hilli, will require a mandatory prepayment.
The Vessel Term Loan Facility contains customary representations and warranties and customary affirmative and negative covenants, including financial covenants, chartering restrictions,
restrictions on indebtedness, liens, investments, mergers, dispositions, prepayment of other indebtedness and dividends and other distributions. Financial covenants include requirements that GMLP and Golar Partners Operating LLC maintain a
certain amount of Free Liquid Assets, that the EBITDA to Consolidated Debt Service and the Net Debt to EBITDA ratios are no less than 1.15:1 and no greater than 6.50:1, respectively, and that Consolidated Net Worth is greater than $250,000, each
as defined in the Vessel Term Loan Facility. The Company was in compliance with these covenants as of December 31, 2021.
68
Table of Contents
In connection with the closing the Vessel Term Loan Facility, we incurred $6,324 in origination, structuring and other fees, which were deferred as a reduction of the principal balance of the
Vessel Term Loan Facility on the consolidated balance sheets. As of December 31, 2021, total remaining unamortized deferred financing costs for the Vessel Term Loan Facility was $5,652.
Debenture Loan
As part of the Mergers, we assumed non-convertible Brazilian debentures issued by NFE Brasil, our indirect subsidiary, in the aggregate principal amount of BRL 255,600 (approximately
$45,000) due September 2024, bearing interest at a rate equal to the one-day interbank deposit futures rate in Brazil plus 2.65% (the “Debenture Loan”). The Debenture Loan was recognized at fair value of $44,566 on the date of the Mergers, and
the discount recognized in purchase accounting will result in additional interest expense until maturity. Interest and principal is payable on the Debenture Loan semi-annually on September 13 and March 13.
The Debenture Loan is fully and unconditionally guaranteed by 100% of the shares issued by NFE Brasil owned by our consolidated subsidiary, LNG Power Ltd.
CHP Facility
In August 2021, NFE South Power Holdings Limited, a wholly owned subsidiary of NFE, entered into a financing agreement (“CHP Facility”). We received approximately $100,000 under the CHP Facility,
and the CHP Facility is secured by a mortgage over the lease of the site on which the CHP Plant and related security. We incurred $3,243 in origination, structuring and other fees associated with entry into the CHP Facility, which was deferred as a
reduction of the principal balance of the CHP Facility on the consolidated balance sheets. As of December 31, 2021, the remaining unamortized deferred financing costs for the CHP Facility was $3,180.
Subsequent to December 31, 2021, South Power and the counterparty to the CHP Facility agreed to rescind the CHP Facility and entered into an agreement for the issuance of secured bonds (“South
Power 2029 Bonds”) and subsequently authorized the issuance of up to $285,000 in South Power 2029 Bonds. The South Power 2029 Bonds are secured by, amongst other things, the CHP Plant. Amounts outstanding at the time of the mutual rescission of the
CHP Facility of $100,000 were credited towards the purchase price of the South Power 2029 Bonds. In February 2022, $59,730 was funded under the South Power 2029 Bonds.
The South Power 2029 Bonds will bear interest at an annual fixed rate of 6.50% and will mature seven years from the closing date of the final tranche. No principal payments will be due until 2025.
It is expected that beginning in May 2025, principal payments will be due on a quarterly basis. Interest payments on outstanding principal balances will be due quarterly.
South Power will continue to be required to comply with certain financial covenants as well as customary affirmative and negative covenants. The South Power 2029 Bonds also provides for customary
events of default, prepayment and cure provisions.
Revolving Facility
In April 2021, we entered into a $200,000 senior secured revolving facility (the “Revolving Facility”). The proceeds of the Revolving Facility may be used for working capital and other general corporate purposes
(including permitted acquisitions and other investments). Letters of credit issued under the $100,000 letter of credit sub-facility may be used for general corporate purposes. The Revolving Facility will mature in 2026, with the potential for us to
extend the maturity date once in a one-year increment.
Borrowings under the Revolving Facility bear interest at a per annum rate equal to LIBOR plus 2.50% if the usage under the Revolving Facility is equal to or less than 50% of the commitments under the Revolving Facility
and LIBOR plus 2.75% if the usage under the Revolving Facility is in excess of 50% of the commitments under the Revolving Facility, subject in each case to a 0.00% LIBOR floor. Borrowings under the Revolving Facility may be prepaid, at our option,
at any time without premium.
The obligations under the Revolving Facility are guaranteed by each domestic and foreign subsidiary that is a guarantor under the existing 2025 Notes, and the Revolving Facility is secured by substantially the same
collateral as our existing first lien obligations under the 2025 Notes. The Revolving Facility contains usual and customary representations and warranties, and usual and customary affirmative and negative covenants. Financial covenants include
requirements to maintain Debt to Capitalization Ratio of less than 0.7:1.0, and for quarters in which the Revolving Facility is greater than 50% drawn, the Debt to Annualized EBITDA Ratio must be less than 5.0:1.0 for fiscal quarters ending
December 31, 2021 until September 30, 2023 and less than 4.0:1.0 for the fiscal quarter ended December 31, 2023 (each as defined in the Revolving Facility). The Company was in compliance with these covenants as of December 31, 2021.
69
Table of Contents
We incurred $4,321 in origination, structuring and other fees, associated with entry into the Revolving Facility. These costs have been capitalized within Other non-current assets on the consolidated balance sheets. As
of December 31, 2021, total remaining unamortized deferred financing costs for the Revolving Facility was $3,807. As of December 31, 2021, the full capacity of the Revolving Facility has been drawn and $200,000
remains outstanding.
Subsequent to December 31, 2021, on February 28, 2022, we entered into an amendment to the Revolving Facility to increase the commitment thereunder by up to $200,000.
SPV Leasebacks and Loans
We assumed sale leaseback arrangements for four vessels as part of the Mergers. The counterparty to each of the sale leaseback arrangements is a special purpose vehicle (“SPV”) wholly owned by
financial institutions. The sale leasebacks with SPVs were funded by loan facilities obtained by the SPV. Although we have no control over the funding arrangements of these entities, we are the primary beneficiary of the SPVs and consolidate the
SPVs. Therefore, the effects of the sale leaseback arrangements are eliminated upon consolidation of the SPVs and only the outstanding loan facilities are presented as part of our consolidated financial statements. The SPVs service the loan
facilities through payments made by us under the sale leaseback arrangements.
The SPV loans and the sale leaseback arrangements assumed in the Mergers contain certain operating and financing restrictions and covenants that require: (a) certain subsidiaries to maintain a
minimum level of liquidity of $30,000 and consolidated net worth of $123,950, (b) certain subsidiaries to maintain a minimum debt service coverage ratio of 1.20:1, (c) certain subsidiaries to not exceed a maximum net debt to EBITDA ratio of 6.5:1,
(d) certain subsidiaries to maintain a minimum percentage of the vessel values over the relevant outstanding loan facility balances of either 110% and 120%, (e) certain subsidiaries to maintain a ratio of liabilities to total assets of less than
0.70:1. As of December 31, 2021, the Company was in compliance with all covenants under debt and lease agreements.
Nanook Leaseback and Credit Facility
As part of the Mergers, we have assumed obligations under a sale and leaseback of the Nanook with Compass Shipping 23 Corporation Limited (the “Nanook Leaseback”). Payments are
due quarterly in 48 installments of $2,943 along with amounts owed for interest due based on LIBOR plus 3.5%, with a balloon payment of approximately $94,000 upon maturity.
Compass Shipping 23 Corporation Limited, the owner of the Nanook, has a long-term loan facility that is denominated in USD, which matures in September 2030 and bears interest
at a fixed rate of 2.5% (the “Nanook SPV Facility”) and is repayable in a balloon payment on maturity. As of the acquisition date, the outstanding principal balance was $202,249, and we recognized the fair value of this facility of $201,484 on the
date of the Mergers. The discount recognized in purchase accounting will result in additional interest expense until maturity.
Penguin Leaseback and Credit Facility
As part of the Mergers, we have assumed obligations under a sale and leaseback of the Penguin with Oriental LNG 02 Limited (the “Penguin Leaseback”). Payments are due quarterly
in 24 installments of $1,890 along with amounts owed for interest due based on LIBOR plus 3.6%, with a balloon payment of approximately $63,000 upon maturity.
Oriental Fleet LNG 02 Limited, the owner of the Penguin, has a long-term loan facility that is denominated in USD, is repayable in quarterly installments with a balloon payment
due upon maturity in December 2025 and bears interest at LIBOR plus a margin of 1.7%. The SPV also has amounts payable to its parent. As of the acquisition date, the outstanding principal balance was $104,882, and we recognized the fair value of
this facility and the amount due to the parent of $105,126 on the date of the Mergers. The premium recognized in purchase accounting will result in a reduction to interest expense until maturity.
Celsius Leaseback and Credit Facility
As part of the Mergers, we have assumed obligations under a sale and leaseback of the Celsius with Noble Celsius Shipping Limited (the “Celsius Leaseback”). Payments are due
quarterly in 28 installments of $2,679 in addition to amounts owed for interest based on LIBOR plus 3.9%, with a balloon payment of approximately $45,000 upon maturity.
70
Table of Contents
Noble Celsius Shipping Limited, the owner of the Celsius, has a long-term loan facility that is denominated in USD, $76,179 of which is repayable in quarterly installments over
a term of approximately seven years with a balloon payment of $37,179 due upon maturity in May 2027 and bears interest at LIBOR plus a margin of 1.8%. The SPV has another facility with its parent for the remaining principal of $45,200, which is due
as a balloon payment upon maturity in March 2023 and bears interest at a fixed rate of 4.0%. As of the acquisition date, the total outstanding principal balance was $121,379, and we recognized the fair value of these facilities of $121,308 on the
date of the Mergers. The discount recognized in purchase accounting will result in additional interest expense until maturity.
Eskimo Leaseback and Credit Facility
As part of the Mergers, we assumed obligations under a sale and leaseback of the Eskimo with Sea 23 Leasing Co. Limited of China Merchants Bank Leasing (the “Eskimo Leaseback”). Sea 23 Leasing Co. Limited (“Eskimo
SPV”), the owner of the Eskimo, had a long-term loan facility that is denominated in USD, had a loan term of ten years and bore interest at a rate of LIBOR plus a margin of 2.66% (the “Eskimo SPV Facility”). As of the acquisition date of GMLP, the
outstanding principal balance was $160,520, and we recognized the fair value of this facility of $158,072. The discount recognized in purchase accounting was recognized as additional interest expense until the
deconsolidation of the Eskimo SPV.
In November 2021, we exercised our option to repurchase the Eskimo for a total payment of $190,518. After exercising the repurchase option, we no longer
have a controlling financial interest in the Eskimo SPV and no longer recognize the Eskimo SPV Facility in our consolidated financial statements. In connection with the repurchase of the Eskimo, we
recognized a loss on extinguishment of debt of $10,975 for the year ended December 31, 2021.
Series A Preferred Units
The 8.75% Series A Cumulative Redeemable Preferred Units issued by GMLP (the “Series A Preferred Units”) remained outstanding following the GMLP Merger and were recognized as non-controlling interest on the
consolidated balance sheets. Distributions on the Series A Preferred Units are payable out of amounts legally available therefor at a rate equal to 8.75% per annum of the stated liquidation preference. In the event of a liquidation, dissolution or
winding up, whether voluntary or involuntary, holders of Series A Preferred Units will have the right to receive a liquidation preference of $25.00 per unit plus an amount equal to all accumulated and unpaid distributions thereon to the date of
payment, whether declared or not. At any time on or after October 31, 2022, the Series A Preferred Units may be redeemed, in whole or in part, at a redemption price of $25.00 per unit plus an amount equal to all accumulated and unpaid distributions
thereon on the date of redemption, whether declared or not.
Debt obligations of equity method investees
We account for the investments in CELSEPAR and Hilli LLC acquired in the Mergers under the equity method of accounting. The debt obligations of these entities are not reported separately in our consolidated financial
statements, and the following discussion summarizes the key terms of each entity’s obligations.
Sergipe Debt Financing
To finance construction of the Sergipe Facility and the Sergipe Power Plant, CELSE signed financing agreements with amounts made available by banks and multilateral organizations throughout 2018 (the “CELSE Facility”).
As of December 31, 2021, amounts outstanding and the effective interest rates under the CELSE Facility were as set forth below. Principal and interest payments are due each October and April. The CELSE Facility matures in April 2032.
| Credit facility (Real and USD in millions) | Principal Outstanding | Effective Interest Rate (1) | |||
|---|---|---|---|---|---|
| IFC | R$ | 899.4($160.3) | IPCA + 9.69% | ||
| Inter-American Development Bank | R$ | 744.1($132.6) | IPCA + 9.79% | ||
| IDB Invest | $ | 35.7 | 3M LIBOR + 5.4% | ||
| IDC China Fund | $ | 46.9 | 3M LIBOR + 5.4% |
(1) The IFC and Inter-American Development Bank facilities are Real-denominated and indexed to the Índice Nacional de Preços ao Consumidor Amplo
(“IPCA”).
CELSE also issued debentures in the aggregate principal amount of R$3,370.0 million (net proceeds of $897.2 million as of the issuance date), due April 2032, bearing interest at a fixed rate of 9.85% (the “CELSE
Debentures”). As of December 31, 2021, the principal balance of the CELSE Debentures was R$3,113 million ($554.7 million as of December 31, 2021). Interest is payable on the CELSE Debentures semi-annually on each April 15 and October 15, beginning
on October 15, 2018. The CELSE Debentures are amortized and repaid in 24 consecutive semi-annual installments on each of April 15 and October 15, that commenced on October 15, 2020.
71
Table of Contents
The indenture governing the CELSE Debentures contains covenants that: (i) requires CELSE to maintain a historical debt service coverage ratio for a twelve month period on or after March 31, 2021 of no less than 1.10 to
1.00; (ii) prohibit certain restricted payments; (iii) limit the ability of CELSE from creating any liens or incurring additional indebtedness; (iv) prohibit certain fundamental changes; (v) limit the ability of CELSE to transfer or purchase
assets; (vi) prohibit certain affiliate transactions; (vii) limit the ability of CELSE to make change orders or give other directions under the documents related to the construction and operation of the project in certain circumstances; (viii)
limit the ability of CELSE to enter into additional contracts; (ix) limit CELSE’s operating expenses and capital expenditures; and (x) prohibit CELSE from transferring, purchasing or otherwise acquiring any portion of the CELSE Debentures, other
than pursuant to the exercise of the put option.
In July 2021, CELSE successfully completed a consent solicitation to amend certain provisions of the financing documents to permit CELSE to incur certain debt related to the working capital facility described below and
to release certain existing security over the variable revenues to be received by CELSE under its power purchase agreements.
CELSEPAR has entered into a Standby Guarantee and Credit Facility Agreement with GE Capital EFS Financing, Inc. (“GE Capital”), as lender, and Ebrasil Energia Ltda. (“Ebrasil”)
and us, each as sponsor (the “GE Credit Facility”). Pursuant to the GE Credit Facility, GE Capital agreed to provide $120,000 to CELSEPAR in connection with its obligation to make certain contingent equity contributions to CELSE. Amounts disbursed
under the GE Credit Facility accrue interest at a fixed rate of LIBOR plus a margin of 11.4% and are payable on May 30 and November 30 each year, beginning on May 30, 2020. All interest due to date has been capitalized into the principal balance,
and there have been no principal payments paid to date. The GE Credit Facility matures on November 30, 2024. The GE Credit Facility includes covenants and events of default that are customary for similar transactions.
In July 2021, CELSE and CELSEPAR entered into a working capital facility for the posting of certain letters of credit in favor of the supplier of LNG and the financing of LNG costs to satisfy dispatch requirements
prior to receiving related variable revenues. The working capital facility is in an aggregate amount of up to $200.0 million (or its equivalent in Reais). The facility has a term of 12 months, renewable for equal periods by mutual agreement of the
parties. Amounts disbursed under the working capital facility accrue interest at a rate of (i) DI Rate + 3.50% per year in respect of a bank credit bill, (ii) 2.50% per year for standby letters of credit, (iii) DI Rate + 3.50% per year in respect
of any import financing (FINIMP) modality, and (iv) DI Rate + 3.50% per year for any bank loan. The DI Rate is made by reference to Libor+, according to the pricing at the time of request. As of December 31, 2021, standby letters of credit issued
under this facility for the benefit of CELSE pursuant to the working capital facility totaled $106 million. Standby letters of credit are guaranteed, jointly but not severally, by CELSE’s shareholders, NFE and Electricidade do Brasil S.A.—Ebrasil.
Golar Hilli Leaseback
As part of the Mergers, we acquired an investment in Hilli LLC; Golar Hilli Corporation (“Hilli Corp”), is a direct subsidiary of Hilli LLC and is a party to a Memorandum of Agreement with Fortune Lianjiang Shipping
S.A., a subsidiary of China State Shipbuilding Corporation (“Fortune”), pursuant to which Hilli Corp has sold to and leased back from Fortune the Hilli under a 10-year bareboat charter agreement (the “Hilli
Leaseback”). Under the Hilli Facility, Hilli Corp pays Fortune equal quarterly principal payments plus interest based on LIBOR plus a margin of 4.15%. Our 50% share of Hilli Corp’s indebtedness of $729
million amounted to $364.5 million as of December 31, 2021.
As part of the Mergers, we have assumed a guarantee of 50% of the outstanding principal and interest amounts payable by Hilli Corp under the Hilli Leaseback. We also assumed a guarantee of the letter of credit (“LOC
Guarantee”) issued by a financial institution in the event of Hilli Corp’s underperformance or non-performance under its tolling agreement. Certain of our subsidiaries are required to comply with the following covenants and ratios: (i) free liquid
assets of at least $30 million throughout the Hilli Leaseback period; (ii) a maximum net debt to EBITDA ratio for the previous 12 months of 6.5:1; and (iii) a consolidated tangible net worth of $123,950.
Letter of Credit Facility
In July 2021, the Company entered into an uncommitted letter of credit and reimbursement agreement with a bank for the issuance of letters of credit for an aggregate amount of up to $75,000. Outstanding letters of
credit are subject to a fee of 1.75% to be paid quarterly, and interest is payable on the principal amounts of unreimbursed letter of credit draws under the facility at a rate of the higher of the bank’s prime rate or the Federal Funds Effective
Rate plus 0.50% and a margin of 1.75%. We are using this uncommitted letter of credit and reimbursement agreement to reduce the cash collateral required under existing letters of credit releasing restricted cash. A portion of our restricted cash
balance supports existing letters of credit, and this uncommitted letter of credit and reimbursement agreement has replaced these letters of credit and released restricted cash, enhancing our ability to manage the working capital needs of the
business.
72
Table of Contents
Summary of Critical Accounting Estimates
The preparation of consolidated financial statements in conformity with GAAP requires management to make certain estimates and assumptions that affect the amounts reported in the consolidated
financial statements and the accompanying notes. Changes in facts and circumstances or additional information may result in revised estimates, and actual results may differ from these estimates. Management evaluates its estimates and related
assumptions regularly and will continue to do so as we further grow our business. We believe that the accounting policies discussed below are critical to understanding our historical and future performance, as these policies relate to the more
significant areas involving management’s judgments and estimates.
Revenue recognition
Terminals and infrastructure
Within the Terminals and Infrastructure segment, our contracts with customers may contain one or several performance obligations usually consisting of the sale of LNG, natural gas, power and
steam, which are outputs from our natural gas-fueled infrastructure and the sale of LNG cargos. The transaction price for each of these contracts is structured using similar inputs and factors regardless of the output delivered to the customer.
The customers consume the benefit of the natural gas, power and steam when they are delivered to the customer’s power generation facilities or interconnection facility. Natural gas, power and steam qualify as a series with revenue being
recognized over time using an output method, based on the quantity of natural gas, power or steam that the customer has consumed. LNG is typically delivered in containers transported by truck to customer sites but may also be delivered via vessel
to an unloading point specified in a contract. Revenue from sales of LNG delivered by truck is recognized at the point in time at which physical possession and the risks and rewards of ownership transfer to the customer, either when the
containers are shipped or delivered to the customers’ storage facilities, depending on the terms of the contract. Because the nature, timing and uncertainty of revenue and cash flows are substantially the same for LNG, natural gas, power and
steam, we have presented Operating revenue on an aggregated basis.
We have concluded that variable consideration included in its agreements meets the exception for allocating variable consideration. As such, the variable consideration for these contracts is
allocated to each distinct unit of LNG, natural gas, power or steam delivered and recognized when that distinct unit is delivered to the customer.
Our contracts with customers to supply natural gas or LNG may contain a lease of equipment, which may be accounted for as a finance or operating lease. For operating leases, we have concluded
that the predominant component of the transaction is the sale of natural gas or LNG and therefore have elected not to separate the lease component. The lease component of such operating leases is recognized as Operating revenue in the
consolidated statements of operations and comprehensive income (loss). We allocate consideration in agreements containing finance leases between lease and non-lease components based on the relative fair value of each component. The fair value of
the lease component is estimated based on the estimated standalone selling price of the same or similar equipment leased to the customer. We estimate the fair value of the non-lease component by forecasting volumes and pricing of gas to be
delivered to the customer over the lease term.
The current and non-current portion of finance leases are recorded within Prepaid expenses and other current assets and Finance leases, net on the consolidated balance sheets, respectively. For finance leases accounted for as sales-type leases, the profit from the sale of equipment is recognized upon lease commencement in Other revenue in the consolidated statements of operations and comprehensive income
(loss). The lease payments for finance leases are segregated into principal and interest components similar to a loan. Interest income is recognized on an effective interest method over the lease term and included in Other revenue in the
consolidated statements of operations and comprehensive income (loss). The principal component of the lease payment is reflected as a reduction to the net investment in the lease.
In addition to the revenue recognized from the finance lease components of agreements with customers, Other revenue includes revenue recognized from the construction, installation and commissioning
of equipment, inclusive of natural gas delivered for the commissioning process, to transform customers’ facilities to operate utilizing natural gas or to allow customers to receive power or other outputs from our natural gas-fueled power generation
facilities and the sale of LNG cargos. Revenue from these development services is recognized over time as we transfer control of the asset to the customer or based on the quantity of natural gas consumed as part of commissioning the customer’s
facilities until such time that the customer has declared such conversion services have been completed. If the customer is not able to obtain control over the asset under construction until such services are completed,
revenue is recognized when the services are completed and the customer has control of the infrastructure. Such agreements may also include a significant financing component, and we recognize revenue for the interest income component over the term
of the financing as Other revenue.
73
Table of Contents
The timing of revenue recognition, billings and cash collections results in receivables, contract assets and contract liabilities. Receivables represent unconditional rights to consideration.
Contract assets are comprised of the transaction price allocated to completed performance obligations that will be billed to customers in subsequent periods. Contract assets are recognized within Prepaid expenses and other current assets, net and
Other non-current assets, net on the consolidated balance sheets. Contract liabilities consist of deferred revenue and are recognized within Other current liabilities on the consolidated balance sheets.
Shipping and handling costs are not considered to be separate performance obligations. All such shipping and handling activities are performed prior to the customer obtaining control of the LNG or
natural gas.
We collect sales taxes from our customers based on sales of taxable products and remits such collections to the appropriate taxing authority. We have elected to present sales tax collections in the
consolidated statements of operations and comprehensive income (loss) on a net basis and, accordingly, such taxes are excluded from reported revenues.
We elected the practical expedient under which we do not adjust consideration for the effects of a significant financing component for those contracts where we expect at contract inception that the
period between transferring goods to the customer and receiving payment from the customer will be one year or less.
Ships
Charter contracts for the use of the FSRUs and LNG carriers acquired as part of the Mergers are leases as the contracts convey the right to obtain substantially all of the economic benefits from
the use of the asset and allow the customer to direct the use of that asset.
At inception, we make an assessment on whether the charter contract is an operating lease or a finance lease. In making the classification assessment, we estimate the residual value of the
underlying asset at the end of the lease term with reference to broker valuations. None of the vessel lease contracts contain residual value guarantees. Renewal periods and termination options are included in the lease term if we believe such
options are reasonably certain to be exercised by the lessee. Generally, lease accounting commences when the asset is made available to the customer, however, where the contract contains specific customer acceptance testing conditions, the lease
will not commence until the asset has successfully passed the acceptance test. We assess leases for modifications when there is a change to the terms and conditions of the contract that results in a change in the scope or the consideration of the
lease.
For charter contracts that are determined to be finance leases accounted for as sales-type leases, the profit from the sale of the vessel is recognized upon lease commencement in Other revenue in
the consolidated statements of operations and comprehensive income (loss). The lease payments for finance leases are segregated into principal and interest components similar to a loan. Interest income is recognized on an effective interest method
over the lease term and included in Other revenue in the consolidated statements of operations and comprehensive income (loss). The principal component of the lease payment is reflected as a reduction to the net investment in the lease. Revenue
related to operating and service agreements in connection with charter contracts accounted for as sales-type leases are recognized over the term of the charter as the service is provided within Vessel charter revenue in the consolidated statements
of operations and comprehensive income (loss).
Revenues include fixed minimum lease payments under charters accounted for as operating leases and fees for repositioning vessels. Revenues generated from charters contracts are recorded over the
term of the charter on a straight-line basis as service is provided and is included in Vessel charter revenue in the consolidated statements of operations and comprehensive loss. Fixed revenue includes fixed payments (including in-substance fixed
payments that are unavoidable) and variable payments based on a rate or index. For operating leases, we have elected the practical expedient to combine service revenue and operating lease income as the timing and pattern of transfer of the
components are the same. Variable lease payments are recognized in the period in which the circumstances on which the variable lease payments are based occur.
Repositioning fees are included in Vessel charter revenues and are recognized at the end of the charter when the fee becomes fixed and determinable. However, where there is a fixed amount specified
in the charter, which is not dependent upon redelivery location, the fee will be recognized evenly over the term of the charter.
74
Table of Contents
Costs directly associated with the execution of the lease or costs incurred after lease inception but prior to the commencement of the lease that directly relate to preparing the asset for the
contract are capitalized and amortized in Vessel operating expenses in the consolidated statements of operations and comprehensive income (loss) over the lease term.
Our LNG carriers may participate in a LNG carrier pool collaborative arrangement with Golar LNG Limited, referred to as the Cool Pool. The Cool Pool allows the pool participants to optimize the
operation of the pool vessels through improved scheduling ability, cost efficiencies and common marketing. Under the Pool Agreement, the Pool Manager is responsible, as agent, for the marketing and chartering of the participating vessels and paying
certain voyage costs such as port call expenses and brokers’ commissions in relation to employment contracts, with each of the pool participants continuing to be fully responsible for fulfilling the performance obligations in the contract.
We are primarily responsible for fulfilling the performance obligations in the time charters of vessels owned by the Company, and we are the principal in such time charters. Revenue and expenses
for charters of our vessels that participate in the Cool Pool are presented on a gross basis within Vessel charter revenues and Vessel operating expenses, respectively, in the consolidated statements of operations and comprehensive loss. Our
allocation of our share of the net revenues earned from the other pool participants’ vessels, which may be either income or expense depending on the results of all pool participants, is reflected on a net basis within Vessel operating expenses in
the consolidated statements of operations and comprehensive loss.
Impairment of long-lived assets
We perform a recoverability assessment of long-lived assets whenever events or changes in circumstances indicate that the carrying amount of an asset may not be recoverable. Indicators may
include, but are not limited to, adverse changes in the regulatory environment in a jurisdiction where we operate, unfavorable events impacting the supply chain for LNG to our operations, a decision to discontinue the development of a long-lived
asset, early termination of a significant customer contract, or the introduction of newer technology. We exercise judgment in determining if any of these events represent an impairment indicator requiring a recoverability assessment.
Our business model requires investments in infrastructure often concurrently with our customer’s investments in power generation or other assets to utilize LNG. Our costs to transport and store
LNG are based upon our customer’s contractual commitments once their assets are fully operational. We expect revenue under these contracts to exceed construction and operational costs, based on the expected term and revenue of these contracts.
Additionally, our infrastructure assets are strategically located to provide critical inputs to our committed customer’s operations and our locations allow us to expand to additional opportunities within existing markets. These projects are
subject to risks related to successful completion, including those related to government approvals, site identification, financing, construction permitting and contract compliance.
Our long-term, take-or pay contracts to deliver natural gas or LNG to our customers also limit our exposure to fluctuations in natural gas and LNG as our pricing is largely based on the Henry Hub
index plus a contractual spread. Based on the long-term nature of our contracts and the market value of the underlying assets, changes in the price of LNG do not indicate that a recoverability assessment of our assets is necessary. Further, we
plan to utilize our own liquefaction facilities to manufacture our own LNG at attractive prices, secure LNG to supply our expanding operations and reduce our exposure to future LNG price variations in the long term.
We have also considered the impacts of the ongoing COVID-19 pandemic, including the restrictions that governments may put in place and the resulting direct and indirect economic impacts on our
current operations and expected development budgets and timelines. We primarily operate under long-term contracts with customers, including long-term charter contracts acquired in the Mergers and many of which contain fixed minimum volumes that
must be purchased on a “take-or-pay” basis, even in cases when our customer’s consumption has decreased. We have not changed our payment terms with customers, and there has not been any deterioration in the timing or volume of collections.
Based on the essential nature of the services we provide to support power generation facilities, our operations and development projects have not been significantly impacted by responses to the
COVID-19 pandemic to date. We will continue to monitor this uncertain situation and local responses in jurisdictions where we do business to determine if there are any indicators that a recoverability assessment for our assets should be
performed.
The COVID-19 pandemic has also significantly impacted energy markets, and the price of oil traded at historic low prices in 2020. Future expansion of our business is dependent upon LNG being a
competitive source of energy and available at a lower cost than the cost to deliver other alternative energy sources, such as diesel or other distillate fuels. Although LNG is currently trading at historical high prices, we believe that over the
long-term LNG and natural gas will remain a competitive fuel source for customers.
75
Table of Contents
We have considered that the market price of LNG can vary widely, including decreases throughout 2019 and 2020 and dramatic increases in the second half of 2021. Our extensive
and growing portfolio of downstream terminals and infrastructure, together with our locked-in gas supply, provides powerful flexibility to serve customer needs and participate in the opportunities created by market disruptions. Due to the decline in LNG prices in 2019 and 2020, we executed four long-term LNG supply agreements in 2020 at prices that are expected to be significantly lower our supply contract executed in 2018. Further, we took advantage of
the lower market pricing of LNG to supply our operations for the second half of 2020. We also executed an additional addendum to one of our supply agreements in 2021 to continue to secure 100% of our LNG supply needs for our Montego Bay Facility,
Old Harbour Facility, San Juan Facility, La Paz Facility and Puerto Sandino Facility through 2030. LNG prices are currently experiencing dramatic increases. We have used optimized our supply portfolio
to sell a portion of our committed cargos in the market with delivery in fourth quarter of 2021, and these cargo sales have increased our revenues and results of operations.
When performing a recoverability assessment, the Company measures whether the estimated future undiscounted net cash flows expected to be generated by the asset exceeds its carrying value. In the
event that an asset does not meet the recoverability test, the carrying value of the asset will be adjusted to fair value resulting in an impairment charge. Management develops the assumptions used in the recoverability assessment based on active
contracts, current and future expectations of the global demand for LNG and natural gas, as well as information received from third party industry sources.
Share-based compensation
We estimate the fair value of RSUs and performance stock units (“PSUs”) granted to employees and non-employees on the grant date based on the closing price of the underlying shares on the grant
date and other fair value adjustments to account for a post-vesting holding period. These fair value adjustments were estimated based on the Finnerty model.
For our PSUs, we reassess the probability of the achievement of the performance metric each reporting period to estimate the amount of shares that will vest. Any increase or decrease in share-based
compensation expense resulting from an adjustment in the estimated vesting is treated as a cumulative catch-up in the period of adjustment. Our estimate of whether the performance metric will be met is impacted by the timing of our development
projects becoming operational and our ability to achieve the expected results of operations, execution of definitive agreements for new projects, costs of LNG and our ability to execute sale of LNG cargos at favorable pricing and facilitate
delivery of these cargos during periods of significant volatility in LNG prices. If any of the assumptions or estimates used change significantly, share-based compensation expense may differ materially from what we have recorded in the current
period.
Business combinations and goodwill
We evaluate each purchase transaction to determine whether the acquired assets meet the definition of a business. If substantially all of the fair value of gross assets acquired is concentrated in
a single identifiable asset or group of similar identifiable assets, then the set of transferred assets and activities is not a business. If not, for an acquisition to be considered a business, it would have to include an input and a substantive
process that together significantly contribute to the ability to create outputs. A substantive process is not ancillary or minor, cannot be replaced without significant costs, effort or delay or is otherwise considered unique or scarce. To qualify
as a business without outputs, the acquired assets would require an organized workforce with the necessary skills, knowledge and experience that performs a substantive process.
For acquisitions that are not deemed to be businesses, the assets acquired are recognized based on their cost to us as the acquirer, and no gain or loss is recognized. The cost of assets acquired
in a group is allocated to individual assets within the group based on their relative fair values and no goodwill is recognized. Transaction costs related to acquisition of assets are included in the cost basis of the assets acquired.
We account for acquisitions that qualify as business combinations by applying the acquisition method. Transaction costs related to the acquisition of a business are expensed as incurred and
excluded from the fair value of consideration transferred. Under the acquisition method of accounting, the identifiable assets acquired, liabilities assumed and noncontrolling interests in an acquired entity are recognized and measured at their
estimated fair values. The excess of the fair value of consideration transferred over the fair values of identifiable assets acquired, liabilities assumed and noncontrolling interests in an acquired entity, net of fair value of any previously held
interest in the acquired entity, is recorded as goodwill.
76
Table of Contents
The Company performs valuations of assets acquired, liabilities assumed and noncontrolling interests in an acquired entity and allocates the purchase price to its respective assets,
liabilities and noncontrolling interests. Determining the fair value of assets acquired, liabilities assumed and noncontrolling interests in an acquired entity requires management to use significant judgment and estimates, including the selection
of appropriate valuation methodologies, vessel market day rates, and discount rates. The Company estimated the fair value of the vessels acquired in the Mergers using a combination of the income approach
and the cost approach, which determines the replacement costs for the vessel assets, adjusting for age and condition. Management’s estimates of fair value are based upon assumptions believed to be reasonable, but which are inherently uncertain
and unpredictable. As a result, actual results may differ from these estimates. During the measurement period, the Company may record adjustments to acquired assets, liabilities assumed and noncontrolling interests, with corresponding offsets to
goodwill. Upon the conclusion of a measurement period, any subsequent adjustments are recorded to earnings.
We use estimates, assumptions and judgments when assessing the recoverability of goodwill. We test for impairment on an annual basis, or more frequently if a significant event of circumstance
indicates the carrying amounts may not be recoverable. The assessment of goodwill for impairment may initially be performed based on qualitative factors to determine if it is more likely than not that the fair value of the reporting unit to which
the goodwill is assigned is less than the carrying value. If so, a quantitative assessment is performed to determine if an impairment has occurred and to measure the impairment loss.
We completed our annual goodwill impairment evaluation using a qualitative analysis assessment during the fourth quarter of 2021. Under the qualitative assessment, we consider several qualitative
factors, including macroeconomic conditions (including changes in interest rates and foreign currency exchange rates), industry and market considerations (including demand for cleaner energy sources and the market price for LNG), the recent and
projected financial performance of the reporting unit, as well as other factors.
There was no indication of impairments of goodwill for the year ended December 31, 2021.
Recent Accounting Standards