Montauk Renewables, Inc. (MNTK)
SIC breadcrumb: Transportation, Communications, Electric, Gas, And Sanitary Services > Electric, Gas, And Sanitary Services > SIC 4932 Gas & Other Services Combined
SEC company page: https://www.sec.gov/edgar/browse/?CIK=1826600. Latest filing source: 0001193125-26-102364.
Informational only. Descriptive public-record data — not a rating, forecast, or investment advice. See Disclaimer.
At a glance
- Revenue
- 176,382,000 USD verified
- Net income
- 1,748,000 USD verified
- Assets
- 435,460,000 USD verified
- Free cash flow
- -86,208,000 USD computed
- Net margin
- 0.99% computed
- Operating margin
- 0.48% computed
- Revenue YoY
- +0.37% computed
- ROE
- 0.66% computed
Peer & cluster context
Peer percentile fingerprint
Percentile = share of the N covered peers reporting that ratio whose value is lower (ties counted half); computed among grepcent-covered companies in SIC major-group 49 Electric, Gas, And Sanitary Services, not the whole market. A higher percentile means a higher value of the ratio, not a better company. Ratios with fewer than 8 reporting peers are omitted. Latest reported values per company; fiscal periods may differ. Descriptive arithmetic - not a score, rating, or ranking.
Selected Fundamentals
| Metric | Value | Unit | FY | Filed |
|---|---|---|---|---|
| Revenue | 176,382,000 | USD | 2025 | 2026-03-11 |
| Net income | 1,748,000 | USD | 2025 | 2026-03-11 |
| Assets | 435,460,000 | USD | 2025 | 2026-03-11 |
Financials
Annual standardized facts from SEC companyfacts as of latest extracted filing date 2026-03-11. Source: https://data.sec.gov/api/xbrl/companyfacts/CIK0001826600.json. Derived margins, ratios, and free cash flow are computed from the extracted annual SEC facts.
| Metric | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 |
|---|---|---|---|---|---|---|---|
| Revenue | 105,714,000 | 100,383,000 | 148,127,000 | 205,559,000 | 174,904,000 | 175,736,000 | 176,382,000 |
| Net income | 5,820,000 | 4,603,000 | -4,528,000 | 35,194,000 | 14,948,000 | 9,734,000 | 1,748,000 |
| Operating income | 11,005,000 | 3,581,000 | 3,335,000 | 44,566,000 | 23,640,000 | 16,123,000 | 852,000 |
| Diluted EPS | -0.03 | 0.25 | 0.11 | 0.07 | 0.01 | ||
| Operating cash flow | 27,825,000 | 28,684,000 | 42,879,000 | 81,066,000 | 41,053,000 | 43,795,000 | 30,334,000 |
| Capital expenditures | 9,986,000 | 22,277,000 | 63,091,000 | 62,323,000 | 116,542,000 | ||
| Assets | 243,613,000 | 253,356,000 | 286,480,000 | 332,316,000 | 350,238,000 | 349,015,000 | 435,460,000 |
| Liabilities | 93,734,000 | 104,187,000 | 105,225,000 | 99,999,000 | 91,598,000 | 172,312,000 | |
| Stockholders' equity | 154,257,000 | 159,622,000 | 182,293,000 | 227,091,000 | 250,239,000 | 257,417,000 | 263,148,000 |
| Cash and cash equivalents | 9,788,000 | 20,992,000 | 53,266,000 | 105,177,000 | 73,811,000 | 45,621,000 | 23,752,000 |
| Free cash flow | 32,893,000 | 58,789,000 | -22,038,000 | -18,528,000 | -86,208,000 |
Ratios
| Metric | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 |
|---|---|---|---|---|---|---|---|
| Net margin | 5.51% | 4.59% | -3.06% | 17.12% | 8.55% | 5.54% | 0.99% |
| Operating margin | 10.41% | 3.57% | 2.25% | 21.68% | 13.52% | 9.17% | 0.48% |
| Return on equity | 3.77% | 2.88% | -2.48% | 15.50% | 5.97% | 3.78% | 0.66% |
| Return on assets | 2.39% | 1.82% | -1.58% | 10.59% | 4.27% | 2.79% | 0.40% |
| Liabilities / equity | 0.59 | 0.57 | 0.46 | 0.40 | 0.36 | 0.65 | |
| Current ratio | 1.14 | 3.06 | 4.40 | 3.07 | 1.71 | 1.11 |
Industry Peer Context
Net margin peer context
Operating margin peer context
ROE peer context
ROA peer context
Financial Bridges
Free cash flow = operating cash flow - capital expenditures
Figure provenance: SEC companyfacts FY 2025. Operating cash flow: accession 0001193125-26-102364; concept NetCashProvidedByUsedInOperatingActivities; source concepts us-gaap:NetCashProvidedByUsedInOperatingActivities | Capital expenditures: accession 0001193125-26-102364; concept PaymentsToAcquirePropertyPlantAndEquipment; source concepts us-gaap:PaymentsToAcquirePropertyPlantAndEquipment | Free cash flow: accession 0001193125-26-102364; concept NetCashProvidedByUsedInOperatingActivities - PaymentsToAcquirePropertyPlantAndEquipment; source concepts us-gaap:NetCashProvidedByUsedInOperatingActivities; us-gaap:PaymentsToAcquirePropertyPlantAndEquipment
Financial Charts
Figure provenance: SEC companyfacts. Latest point: FY 2025 ended 2025-12-31; accession 0001193125-26-102364; filed 2026-03-11. Concept: Revenues. Source concepts: us-gaap:Revenues.
Figure provenance: SEC companyfacts. Latest point: FY 2025 ended 2025-12-31; accession 0001193125-26-102364; filed 2026-03-11. Concept: NetIncomeLoss. Source concepts: us-gaap:NetIncomeLoss.
Figure provenance: SEC companyfacts. Latest point: FY 2025 ended 2025-12-31; accession 0001193125-26-102364; filed 2026-03-11. Concept: OperatingIncomeLoss. Source concepts: us-gaap:OperatingIncomeLoss.
Figure provenance: SEC companyfacts. Latest point: FY 2025 ended 2025-12-31; accession 0001193125-26-102364; filed 2026-03-11. Concept: EarningsPerShareDiluted. Source concepts: us-gaap:EarningsPerShareDiluted.
Figure provenance: SEC companyfacts. Latest point: FY 2025 ended 2025-12-31; accession 0001193125-26-102364; filed 2026-03-11. Concept: NetCashProvidedByUsedInOperatingActivities. Source concepts: us-gaap:NetCashProvidedByUsedInOperatingActivities.
Figure provenance: SEC companyfacts. Latest point: FY 2025 ended 2025-12-31; accession 0001193125-26-102364; filed 2026-03-11. Concept: PaymentsToAcquirePropertyPlantAndEquipment. Source concepts: us-gaap:PaymentsToAcquirePropertyPlantAndEquipment.
Figure provenance: SEC companyfacts. Latest point: FY 2025 ended 2025-12-31; accession 0001193125-26-102364; filed 2026-03-11. Concept: Assets. Source concepts: us-gaap:Assets.
Figure provenance: SEC companyfacts. Latest point: FY 2025 ended 2025-12-31; accession 0001193125-26-102364; filed 2026-03-11. Concept: Liabilities. Source concepts: us-gaap:Liabilities.
Figure provenance: SEC companyfacts. Latest point: FY 2025 ended 2025-12-31; accession 0001193125-26-102364; filed 2026-03-11. Concept: StockholdersEquity. Source concepts: us-gaap:StockholdersEquity.
Figure provenance: SEC companyfacts. Latest point: FY 2025 ended 2025-12-31; accession 0001193125-26-102364; filed 2026-03-11. Concept: CashAndCashEquivalentsAtCarryingValue. Source concepts: us-gaap:CashAndCashEquivalentsAtCarryingValue.
Figure provenance: SEC companyfacts. Latest point: FY 2025 ended 2025-12-31; accession 0001193125-26-102364; filed 2026-03-11. Concept: NetCashProvidedByUsedInOperatingActivities - PaymentsToAcquirePropertyPlantAndEquipment. Source concepts: us-gaap:NetCashProvidedByUsedInOperatingActivities; us-gaap:PaymentsToAcquirePropertyPlantAndEquipment.
As-reported value updates
Quarterly
Quarterly standardized facts from SEC companyfacts as of latest extracted filing date 2026-11-16. Source: https://data.sec.gov/api/xbrl/companyfacts/CIK0001826600.json.
| Quarter | End Date | Revenue | Net Income | Diluted EPS | Method |
|---|---|---|---|---|---|
| 2023-Q1 | 2023-03-31 | -0.03 | reported discrete quarter | ||
| 2023-Q2 | 2023-06-30 | 0.01 | reported discrete quarter | ||
| 2023-Q3 | 2023-09-30 | 0.09 | reported discrete quarter | ||
| 2023-Q4 | 2023-12-31 | 46,807,000 | 4,799,000 | derived Q4 = FY annual - nine-month YTD | |
| 2024-Q1 | 2024-03-31 | 38,787,000 | 1,850,000 | 0.01 | reported discrete quarter |
| 2024-Q2 | 2024-06-30 | 43,338,000 | -712,000 | -0.01 | reported discrete quarter |
| 2024-Q3 | 2024-09-30 | 65,917,000 | 17,048,000 | 0.12 | reported discrete quarter |
| 2024-Q4 | 2024-12-31 | 27,694,000 | -8,452,000 | derived Q4 = FY annual - nine-month YTD | |
| 2025-Q1 | 2025-03-31 | 42,603,000 | -464,000 | 0.00 | reported discrete quarter |
| 2025-Q2 | 2025-06-30 | 45,127,000 | -5,487,000 | -0.04 | reported discrete quarter |
| 2025-Q3 | 2025-09-30 | 45,258,000 | 5,205,000 | 0.04 | reported discrete quarter |
| 2025-Q4 | 2025-12-31 | 43,394,000 | 2,494,000 | derived Q4 = FY annual - nine-month YTD | |
| 2026-Q1 | 2026-03-31 | 46,428,000 | 5,000 | 0.00 | reported discrete quarter |
| 2026-Q2 | 2026-06-30 | 54,020,000 | 226,000 | 0.00 | reported discrete quarter |
| 2026-Q3 | 2026-09-30 | 50,192,000 | 2,140,000 | 0.01 | reported discrete quarter |
Quarterly Charts
Figure provenance: SEC companyfacts. Latest point: FY 2026 ended 2026-09-30; accession 0001193125-26-462160; filed 2026-11-16. Concept: Revenues. Source concepts: us-gaap:Revenues.
Figure provenance: SEC companyfacts. Latest point: FY 2026 ended 2026-09-30; accession 0001193125-26-462160; filed 2026-11-16. Concept: NetIncomeLoss. Source concepts: us-gaap:NetIncomeLoss.
Figure provenance: SEC companyfacts. Latest point: FY 2026 ended 2026-09-30; accession 0001193125-26-462160; filed 2026-11-16. Concept: EarningsPerShareDiluted. Source concepts: us-gaap:EarningsPerShareDiluted.
Business
Read MNTK's verbatim Item 1 Business section from its latest 10-K: Business.
Risk Factors
Read MNTK's verbatim Item 1A Risk Factors from its latest 10-K: Risk Factors.
Latest quarter (10-Q)
Latest 10-Q source: 0001193125-26-462160.
ITEM 2. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS
The following discussion and analysis of our financial condition and results of operations should be read in conjunction with our financial statements and the related notes to those statements included elsewhere in this Quarterly Report on Form 10-Q. Throughout this section, dollar amounts and production volumes are expressed in thousands, except for per share amounts and RIN pricing amounts and unless otherwise indicated.
In addition to historical financial information, the following discussion and analysis contains forward-looking statements that involve risks, uncertainties, and assumptions. Our actual results may differ materially from those anticipated in these forward-looking statements as a result of many factors, including those discussed under “Cautionary Note Regarding Forward-Looking Statements,” Item 1A.–Risk Factors" and elsewhere in this report, “Item 1A.–Risk Factors” of our 2025 Annual Report, and in our other SEC filings.
Overview
Montauk Renewables is a renewable energy company specializing in the recovery and processing of biogas from landfills and other non-fossil fuel sources for beneficial use as a replacement to fossil fuels. We develop, own, and operate RNG projects, using proven technologies that supply RNG into the transportation industry and use RNG to produce Renewable Electricity. We are one of the largest U.S. producers of RNG. We established our operating portfolio of 11 RNG and two Renewable Electricity projects through self-development, partnerships, and acquisitions that span seven states.
Biogas is produced by microbes as they break down organic matter in the absence of oxygen (during a process called anaerobic digestion). Our two current sources of commercial scale biogas are LFG or ADG. We typically secure our biogas feedstock through long-term fuel supply agreements and property lease agreements with biogas site hosts. Once we secure long-term fuel supply rights, we design, build, own, and operate facilities that convert the biogas into RNG or use the processed biogas to produce Renewable Electricity. We sell the RNG and Renewable Electricity through a variety of term length agreements. Because we are capturing waste methane and making use of a renewable source of energy, our RNG and Renewable Electricity generate valuable Environmental Attributes, which we are able to monetize under federal and state renewable initiatives.
Our current operating projects produce either RNG or Renewable Electricity by processing biogas from landfill sites or agricultural waste from livestock farms. We view agricultural waste from livestock farms as a significant opportunity for us to expand our RNG business, and we continue to evaluate other agricultural feedstock opportunities. We believe that our business model and technology are highly scalable given availability of biogas from agriculturally derived sources, which will allow us to continue to grow through prudent development and complimentary acquisitions.
Recent Developments
RINs Generated but Unsold
Our profitability is highly dependent on the market price of Environmental Attributes, including the market price for RINs. As we self-market a significant portion of our RINs and as the RFS is based on annual compliance, a decision not to commit to transfer and monetize available RINs during a period will impact the timing of our operating revenues and operating profit recognized during a period. We had approximately 120 RINs generated but unseparated at September 30, 2026. The average D3 RIN index price for the third quarter of 2026 was approximately $2.47. The following table summarizes select historical data related to RINs generated, RINs sold, and RINs generated but unsold from our RNG operations. Realized prices for Environmental Attributes monetized in a year may not correspond directly to index prices due to the forward selling of commitments. The results related to our GreenWave joint venture are excluded from the table below. The timing of RIN transfers can vary year over year and by period within a year and is contingent on various factors including, but not limited to: (a) the Company’s expectations on RIN index price, (b) operational needs of the Company, (c) obligated parties purchase needs, or (d) the type of customer among other matters.
32
Table of Contents
| Calendar Quarter | RINs Available for Sale | RINs Sold | RINs sold as % of RINs Available | RINs Available but Unsold | RINs Unsold as % of RINs Available |
|---|---|---|---|---|---|
| 2024 Fourth Quarter | 9,822 | 3,000 | 30.5% | 6,822 | 69.5% |
| 2025 First Quarter | 13,801 | 9,885 | 71.6% | 3,916 | 28.4% |
| 2025 Second Quarter | 11,158 | 11,050 | 99.0% | 108 | 1.0% |
| 2025 Third Quarter | 12,421 | 12,411 | 99.9% | 10 | 0.1% |
| 2025 Fourth Quarter | 10,786 | 10,786 | 100.0% | - | 0.0% |
| 2026 First Quarter | 12,482 | 12,403 | 99.4% | 79 | 0.6% |
| 2026 Second Quarter | 14,265 | 14,265 | 100.0% | - | 0.0% |
| 2026 Third Quarter | 14,063 | 13,927 | 99.0% | 136 | 1.0% |
Capital Development Summary
The following summarizes our ongoing development growth plans expected capacity contribution, anticipated commencement of operations, and capital expenditure estimate, respectively excluding the Montauk Ag Renewables Development Project:
| Development Opportunity | Estimated Capacity Contribution(MMBtu/day) | Anticipated Commencement Date | Estimated Capital Expenditure |
|---|---|---|---|
| Bowerman RNG Facility | 3,600 | 2029 | $85,000-$95,000 |
| Atascocita LCO2 Facility | N/A | TBD | $30,000-$40,000 |
| Tulsa RNG Facility | 1,500 | 2029 | $25,000-$35,000 |
| Rumpke RNG Relocation Project | 7,500 | 2029 | $70,000-$90,000 |
Liquidity Developments
As discussed in Note 2, we have experienced difficulty in meeting certain engineering review and operational requirements in placing our Montauk Ag Renewables project in service, which has impacted our ability to draw down additional debt under our New Senior Credit Facility and adversely affected our liquidity outlook. We are in active negotiations with the Lender and have executed a non-binding term sheet for an amendment to borrow additional debt and temporarily forbear and standstill certain debt covenant requirements.
To preserve liquidity, we plan to temporarily limit development and discretionary capital expenditures, prioritize expenditures needed to support existing operations and revenue generation, negotiate payment arrangements with certain vendors and evaluate other liquidity and restructuring alternatives including potential asset sales under the amendment being negotiated. These actions may delay project completion and related production and cash-flow contributions. Furthermore, we may owe contractual penalties or damages to third parties for reducing or changing the timeline for capital expenditures.
We expect our focus to be on increasing the production capabilities of and completing enhancements of our Montauk Ag Renewables project.
Significant factors contributing to the temporary development delays at the projects above include, but are not limited to:
•
Bowerman RNG Facility: continued lack of approval from state regulatory agencies for our proposed gas interconnection and a proposal from the landfill host to change the location of the RNG facility
•
Atascocita LCO2 Facility: our termination of a previous offtake contract due to lack of contractual assurances
•
Tulsa RNG Facility: our reconsideration of current interconnection location
•
Rumpke RNG Relocation Project: a request by the landfill to change the design of the facility to include the ability to add compression and vehicle filling capacity and an expected delay from the landfill with respect to our planned wellfield infrastructure
We expect to engage our project vendors about changes to our development schedules. While we will work with our vendors, we give no assurances that our current estimated capital expenditure ranges will not be impacted resulting from these temporary delays.
Montauk Ag Renewables Acquisition
In 2021, Montauk Ag Renewables purchased technology and assets (the “Montauk Ag Renewables Acquisition”) to recover residual natural resources from swine waste and to refine and recycle such waste products through proprietary and other processes to
33
Table of Contents
produce high quality renewable electricity, North Carolina swine RECs, and micronutrient organic fertilizer alternatives. Upon completion of the first phase of the project, we expect that it will annually produce 41 MWh of electric power, approximately 120 RECs, 8.7 tons of biochar and up to 3,500 gallons of biocrude.
In July 2026, we began generating power for sale from our Turkey, North Carolina facility and continued to generate power, RECs, biochar and biocrude at nominal levels throughout the third quarter of 2026. In August 2026, we received notice from our power purchase utility that the facility had received notice of commercial operation date. Our production of power and notice from the utility permitted us to generate both swine RECs and enhanced RECs in subsequent months. We identified specific programming modifications to our installed electrical switchgear which were completed during the third quarter of 2026.
Throughout our operations over the third quarter of 2026, we identified enhancements to address two specific concerns limiting the commercial production volumes of the facility, those being the moisture control of our inlet feedstock and the preservation of syngas temperature from our reactors to our compression and power generation. These concerns reduce the volume of feedstock that can be conveyed to our reactors, and increase the frequency of maintenance intervals to address the consequences of gas separation through the facility due to premature temperature loss. We anticipate these enhancements to take approximately three months to complete from the placement of componentry orders, and cost approximately $15,000. We expect to commence these enhancement projects immediately upon the execution of the amendment to our New Senior Credit Facility.
As described in Note 2, we are in discussions with our Board on additional shareholder financing dedicated to the development of our Turkey, North Carolina facility which includes $10,000 - $15,000 primarily related to the aforementioned moisture control of our inlet feedstock and the preservation of syngas temperature from our reactors to our compression and power generation.
With the change in REC generation passed by the state of North Carolina in 2024, we continue our negotiations with other utility users to provide swine RECs from our expected first phase production of MWh. We expect the annual REC capacity of the Turkey, NC location to be approximately 120 RECs and have signed a REC agreement with Duke Energy for annual sales of 47 RECs, which represents approximately 45% of the set-aside compliance volumes for swine under North Carolina’s Renewable Energy and Energy Efficiency Portfolio Standard. We continue to optimize our monetization strategies for the currently uncontracted portion of annually generated RECs and are in various stages of negotiation and responses to requests from obligated purchasers. Many of these agreements contain competitive details and, while there remains a limited active swine REC market in North Carolina, we believe the prices we are negotiating will be market based. We believe our average achievable price per swine REC could fall within the range of $200 to $400 per REC.
During the third quarter of 2026, we entered into another agreement to provide RECs under the North Carolina Clean Energy and Portfolio Standard. Given the delays in our startup and while we continue contract negotiations with other entities required to purchase RECs specifically, the portfolio standar
[Excerpt truncated for page length; source filing is linked above.]
Latest 10-K MD&A (excerpt)
Latest 10-K Item 7 source: 0001193125-26-102364. The complete FY 2025 MD&A is published at /company/MNTK/mda/fy2025/.
Overview
Montauk is a renewable energy company specializing in the recovery and processing of biogas from landfills and other non-fossil fuel sources for beneficial use as a replacement to fossil fuels. We develop, own, and operate RNG projects, using proven technologies that supply RNG into the transportation industry and use RNG to produce Renewable Electricity. We are one of the largest U.S. producers of RNG, having participated in the industry for over 30 years. We established our currently operating portfolio of 11 RNG and two Renewable Electricity and development projects through self-development, partnerships, and acquisitions that span seven states.
Biogas is produced by microbes as they break down organic matter in the absence of oxygen (during a process called anaerobic digestion). Our two current sources of commercial scale biogas are LFG and ADG, which is produced inside an airtight tank used to breakdown organic matter, such as livestock waste. We typically secure our biogas feedstock through long-term fuel supply agreements and property lease agreements with biogas site hosts. Once we secure long-term fuel supply rights, we design, build, own, and operate facilities that convert the biogas into RNG or use the processed biogas to produce Renewable Electricity. We sell the RNG and Renewable Electricity through a variety of short-, medium-, and long-term agreements. Because we are capturing waste methane and making use of a renewable source of energy, our RNG and Renewable Electricity generate valuable Environmental Attributes, which we are able to monetize under federal and state initiatives.
-36-
Table of Contents
Recent Developments
RINs Generated but Unsold
Our profitability is highly dependent on the market price of Environmental Attributes, including the market price for RINs. As we self-market a significant portion of our RINs, a decision not to commit to transfer available RINs during a period will impact our revenue and operating profit. We expect the timing between RINs generated and unseparated and RINs available for sale to only impact 2025 which is the year BRRR became effective. We have entered into commitments to transfer all RINs generated and available for sale from 2025 RNG production. We had approximately 190 RINs generated and unseparated at December 31, 2025. We have entered into commitments to transfer approximately 2,500 RINs generated and available for sale from 2026 RNG production. The average D3 RIN index price for the fourth quarter of 2025 and January 2026 through February 28, 2026 was approximately $2.39 and $2.41, respectively. The following table summarizes select historical data related to RINs generated, RINs sold, and RINs generated but unsold. As we self-market a significant portion of our RINs and as the RFS is based on annual compliance, any strategic decision to not monetize available RINs in a quarter could impact the timing of operating revenues recognized during a fiscal year. Realized prices for Environmental Attributes monetized in a year may not correspond directly to index prices due to the forward selling of commitments. The timing of RIN transfers can vary year over year and by period within a year and is contingent on various factors including, but not limited to: (a) the Company’s expectations on RIN index price, (b) operational needs of the Company, (c) obligated parties’ purchase needs, or (d) the type of customer among other matters.
| Calendar Quarter | RINs Available for Sale | RINs Sold | RINs sold as % of RINs Available | RINs Available but Unsold | RINs Unsold as % of RINs Available |
|---|---|---|---|---|---|
| 2024 First Quarter | 11,240 | 7,889 | 70.2% | 3,351 | 29.8% |
| 2024 Second Quarter | 14,707 | 10,000 | 68.0% | 4,707 | 32.0% |
| 2024 Third Quarter | 15,895 | 15,750 | 99.1% | 145 | 0.9% |
| 2024 Fourth Quarter | 9,822 | 3,000 | 30.5% | 6,822 | 69.5% |
| 2025 First Quarter | 13,801 | 9,885 | 71.6% | 3,916 | 28.4% |
| 2025 Second Quarter | 11,158 | 11,050 | 99.0% | 108 | 1.0% |
| 2025 Third Quarter | 12,421 | 12,411 | 99.9% | 10 | 0.1% |
| 2025 Fourth Quarter | 10,786 | 10,786 | 100.0% | - | 0.0% |
Capital Development Summary
The following summarizes our ongoing development growth plans, expected capacity contribution, anticipated commencement of operations, and capital expenditure estimate, excluding the Montauk Ag Renewables Development project:
| Development Opportunity | Estimated Capacity Contribution(MMBtu/day) | Anticipated Commencement Date | Estimated Capital Expenditure |
|---|---|---|---|
| Bowerman RNG Facility | 3,600 | 2027 | $85,000-$95,000 |
| European Energy Facilities | N/A | TBD | $65,000-$75,000 |
| Tulsa RNG Facility | 1,500 | 2027 | $25,000-$35,000 |
| Rumpke RNG Relocation Project | 7,500 | 2028 | $70,000-$90,000 |
Pico Digestion Capacity Increase
In 2025, we began processing the final tranche of increased feedstock. Upon receipt of the final tranche, we made the final contractual payment to the dairy host. As a result of the increased digestion capacity, we produced approximately 31.8% more MMBtu during 2025 as compared to 2024. During 2025, our digestion inlet feedstock averaged approximately 458 gallons per day, approximately 17% in excess of our contracted minimums of 390 gallons per day. We are currently evaluating additional development expansion opportunities to ensure beneficial processing of all available feedstock volumes.
Second Apex RNG Facility
In 2025, we successfully completed the construction and commissioning of a second RNG processing facility at the Apex landfill. The construction of a second facility under our existing fuel supply agreement was triggered by biogas feedstock volumes exceeding production capabilities, discussions with the landfill host, and the host's waste intake forecasted projections. We continue to expect there will be a period where we have excess availability capacity after the second facility is commissioned while the landfill host increases its waste intake. We continue to collaborate with the landfill host to mitigate impacts from wellfield extraction factors
-37-
Table of Contents
which could impact capacity utilization. In connection with the commissioning of the second facility, we produced approximately 7.8% more MMBtu during 2025 as compared to 2024.
Blue Granite RNG Project
In 2025, we received notice from the utility that it will no longer accept RNG into its distribution system, which was in opposition of the letter of intent that was issued when we were awarded the gas rights to the site. As a result, we impaired the capital associated with the interconnection and equipment. We continue to have $1,000 recorded associated with the payment upon award of the gas rights agreement. We continue to review various alternatives related to interconnection opportunities as part of our considerations for offtake options with the understanding those alternatives may differ from initial development project assumptions, including physical and virtual and fixed interconnections. We are also reviewing alternatives for this site around producing energy other than RNG. We have paused capital expenditures related to this site while we consider all alternatives and continue discussions with the landfill host.
Tulsa REG Conversion to RNG
In 2025, we announced the conversion of our Tulsa, Oklahoma Renewable Electric Generation facility to RNG project. The project will offer a variable inlet capacity, ranging from 550 scfm to 2,250 scfm per day, providing average production capacity we target to be approximately 1,500 MMBtu per day and designed to beneficially process all of available inlet gas feedstock from its landfill host. We expect commissioning in 2027 and to continue incurring capital expenditures for long lead items. For the second half of 2025, our wellfield development initiatives have yielded increased feedstock totaling an overage of 1200 scfm per day.
GreenWave Joint Venture
In 2025, through our wholly-owned subsidiary Pesta Energy, LLC, we entered into an agreement with Pioneer Renewables Energy Marketing, LLC to form a joint venture, GreenWave Energy Partners, LLC (“Greenwave”). The primary goal of the joint venture is to help address the limited capacity of RNG utilization for transportation by offering third party RNG volumes access to exclusive unique and proprietary pathways. In the third quarter of 2025, Greenwave began matching available RNG volumes to dispensing opportunities through Greenwaves's transportation pathways. The joint venture has matched available dispensing capacity with available third party RNG volumes to separate RINs. We recorded income from Greenwave of $1,485 in 2025. Our capital investment in the joint venture is estimated to be up to approximately $4,500, subject to various and certain requirements as defined in the underlying agreements.
Carbon Dioxide Beneficial Use Opportunity
In 2024, we signed a contract for the delivery of 140 thousand tons per year of biogenic carbon dioxide (“CO2”) from our four Texas facilities. We intend to capture, clean and liquefy CO2 at select Texas facilities, at which point it will be transported to EE North America (“EENA”), a Texas-based e-methanol facility. The delivery term is expected to last at least 15 years with first delivery expected to begin in 2027. In 2025, we have been recognizing an exclusivity fee related to the minimum tons of CO2. The annual price per ton under the contract is adjusted annually by the U.S. consumer price index. The agreement with EENA includes a 50% sharing component of any available tax attributes generated by us under code section 45Q, Carbon dioxide sequestration credit, in the Inflation Reduction Act, as applicable. We have completed the initial site surveys related to location of the CO2 processing equipment, evaluated equipment suppliers, and started engineering design. We believe that we can fulfill the contracted volumes with the development of CO2 at two of our Texas facilities. We continue to match our capital investment in these project opportunities with the development timeline of EENA’s facility.
Montauk Ag Asset Acquisition
In 2021, Montauk Ag Renewables purchased technology and assets (the “Montauk Ag Renewables Acquisition”) to recover residual natural resources from swine waste and to refine and recycle such waste products through proprietary and other processes to produce high quality renewable electricity, North Carolina swine RECs, and micronutrient organic fertilizer alternatives. Upon completion of the first phase of the project, we expect that it will annually produce 41 MWh of electric power, approximately 121 RECs and 8.7 tons of organic fertilizer alternative.
Regulatory Developments
In 2024, the North Carolina Utilities Commission ("NCUC") approved our Turkey, North Carolina location for a New Renewable Energy Facility (“NREF”) designation and Certificate of Public Convenience and Necessity. In October 2024, our amended NREF application was approved. In 2024, the North Carolina legislature approved a statutory change to its Clean Energy and Energy Efficiency Portfolio Standards ("CEPS") governing the generation of RECs from swine waste that established a REC multiplier for swine waste produced in a Tier 1 county, which includes Sampson County, the location of our Turkey facility. For
-38-
Table of Contents
qualifying projects, for each swine REC generated, 2 enhanced RECs will be credited for a total three RECs for a period of 8 years, followed by one enhanced REC for a total two RECs for a period of 6 years and a credit of one REC thereafter. There is a limit of 80 enhanced RECs in a year.
In September 2025, a joint motion was filed with the NCUC by various entities seeking to modify and delay certain aspects of the CEPS, specifically, the portfolio standards relating to swine RECs. In October 2025, we filed response comments to the j
[Excerpt truncated for page length; the complete text is on the linked full-MD&A page.]
MD&A history
Prior-year 10-K MD&A spans are extracted from SEC filings with the same bounded parser used for the latest filing. Each year's full verbatim text is on its own sub-page.