ITEM 1. BUSINESS.
General
Portland General Electric Company (PGE or the Company), a vertically-integrated electric utility with corporate headquarters located in Portland, Oregon, is engaged in the generation, wholesale purchase and sale, transmission, distribution, and retail sale of electricity to customers in the state of Oregon (State). The Company operates as a cost-based, regulated electric utility with revenue requirements and customer prices determined based on the forecasted cost to serve retail customers and a reasonable rate of return as determined by the Public Utility Commission of Oregon (OPUC). PGE meets its retail load requirement with both Company-owned generation and power purchased in the wholesale market. The Company participates in the wholesale market through the purchase and sale of electricity, natural gas, and environmental credits in an effort to obtain reasonably-priced power to serve its retail customers, manage risk, and administer its long-term wholesale contracts. PGE, incorporated in 1930, is publicly-owned, with its common stock listed on the New York Stock Exchange (NYSE). The Company operates as a single business segment, with revenues and costs related to its business activities maintained and analyzed on a total electric operations basis. PGE owns unregulated, non-utility property that it utilizes for its corporate headquarters.
PGE’s State-approved service area allocation of 4,000 square miles is located entirely within Oregon and includes 51 incorporated cities. During 2025, the Company added 10,000 customers, and as of December 31, 2025, served a total of approximately 960,000 retail customers.
Available Information
PGE’s periodic and current reports, and amendments to those reports, are available and may be accessed free of charge through the Investors section of the Company’s website at PortlandGeneral.com as soon as reasonably practicable after the reports are electronically filed with, or furnished to, the United States Securities and Exchange Commission (SEC). It is not intended that PGE’s website and the information contained therein or connected thereto be incorporated into this Annual Report on Form 10-K.
Regulation
Federal and State regulation each have a significant influence on PGE’s business operations. In addition to the agencies and activities discussed below, the Company is subject to regulation by certain environmental agencies, as described in the Environmental Matters section in this Item 1.
Regulatory Accounting
PGE prepares financial statements in accordance with accounting principles generally accepted in the United States of America (GAAP) and, as a regulated public utility, the effects of rate regulation are reflected in its financial statements. Accounting for the economics of rate regulation impacts multiple financial statement line items and disclosures, such as: i) property, plant, and equipment; ii) regulatory assets and liabilities; iii) revenues; iv) certain operating expenses; v) depreciation expense; and vi) income tax expense. GAAP provides for the deferral, or recording of expenses and revenues in periods other than when an unregulated entity would. As a result, the Company may record regulatory assets, of certain actual or estimated costs that would otherwise be charged to expense, based on expected recovery from customers in future prices. Likewise, certain actual or anticipated credits that would otherwise be recognized as revenue, or reduce expense, can be deferred as regulatory liabilities, based on expected future credits or refunds to customers. PGE records regulatory assets or liabilities if it is probable that they will be reflected in future prices, based on regulatory orders or other available evidence.
4
Table of Contents
The Company periodically assesses the applicability of regulatory accounting to its business, considering both the current and anticipated future regulatory environment and related accounting guidance. For additional information, see “Regulatory Assets and Liabilities” in Note 2, Summary of Significant Accounting Policies, and Note 7, Regulatory Assets and Liabilities, in the Notes to Consolidated Financial Statements in Item 8.—“Financial Statements and Supplementary Data.”
Federal Regulation
Multiple federal agencies, including the Federal Energy Regulatory Commission (FERC), the U.S. Department of Transportation’s Pipeline and Hazardous Materials Safety Administration (PHMSA), and the Nuclear Regulatory Commission (NRC), may have regulatory authority over certain aspects of PGE’s operations and activities, as further described in the paragraphs that follow.
PGE is a “licensee,” a “public utility,” and a “user, owner, and operator of the bulk power system,” as those terms are defined in the Federal Power Act (FPA). As such, the Company is subject to regulation by the FERC in matters related to wholesale energy activities, transmission services, reliability and cybersecurity standards, natural gas pipelines, hydroelectric projects, accounting policies and practices, short-term debt issuances, and certain other matters.
Wholesale Energy—PGE has authority under its FERC Market-Based Rates tariff to charge market-based rates for wholesale energy sales in all markets in which it sells electricity except in its own Balancing Authority Area (BAA). The BAA is the area in which PGE is responsible for balancing customer demand with electricity supply, in real time, and the tariff exception within PGE’s BAA does not have a material impact on the Company.
Transmission—PGE offers wholesale electricity transmission service pursuant to its Open Access Transmission Tariff (OATT), which contains rates, terms, and conditions of service, as filed with, and approved by, the FERC.
Reliability and Cybersecurity Standards—The FERC has adopted mandatory reliability standards for owners, users, and operators of the bulk power system. Such standards, which are applicable to PGE, were developed by the North American Electric Reliability Corporation (NERC) and the Western Electricity Coordinating Council (WECC), which have responsibility for compliance and enforcement of these standards, and are intended to help maintain and strengthen the reliable planning and operation of the bulk power system.
Natural Gas Pipelines—The FERC has authority in matters related to the construction, operation, extension, enlargement, safety, and abandonment of jurisdictional interstate natural gas pipeline facilities, as well as transportation rates and accounting for interstate natural gas commerce. PGE is subject to such authority as the Company has a 79.5% ownership interest in the Kelso-Beaver (KB) Pipeline, a 17-mile, 20-inch diameter, interstate pipeline that provides natural gas to the Company’s three natural gas-fired generating plants located near Clatskanie, Oregon: i) Port Westward Unit 1 (PW1); ii) Port Westward Unit 2 (PW2), and iii) Beaver. In addition, the KB Pipeline serves the North Mist storage facility, which is owned and operated by a local natural gas distribution company, and one additional delivery point for a local manufacturing concern. As the operator of record of the KB Pipeline, PGE is subject to the requirements and regulations enacted under the Pipeline Safety Laws administered by the PHMSA, which include safety and operator qualification standards and public awareness requirements.
Hydroelectric Licensing—As required under the FPA, PGE holds FERC licenses for all Company-owned and operated hydroelectric generating plants. The FERC license process includes an extensive public review that involves the consideration of numerous natural resource issues and environmental conditions. For additional information, see the Environmental Matters section in this Item 1. and the Generating Facilities section in Item 2.—“Properties.”
Accounting Policies and Practices—PGE prepares periodic and current reports in accordance with GAAP. In addition, the Company prepares, pursuant to applicable provisions of the FPA, financial statements in accordance with the accounting requirements of the FERC, as set forth in its applicable Uniform System of Accounts and published accounting releases. Such financial statements are included in annual and quarterly reports filed with the FERC.
5
Table of Contents
Short-term Debt—Pursuant to applicable provisions of the FPA and FERC regulations, regulated public utilities are required to obtain FERC approval to issue certain securities. For additional information on the Company’s Short-term Debt, see “Short-term Debt” in the Debt and Equity section of Liquidity and Capital Resources in Item 7.—“Management’s Discussion and Analysis of Financial Condition and Results of Operations.”
Spent Fuel Storage—The NRC regulates the licensing and decommissioning of nuclear power plants, including PGE’s decommissioned Trojan nuclear power plant (Trojan), which was closed in 1993. For additional information on spent nuclear fuel storage activities, see Note 8, Asset Retirement Obligations in the Notes to Consolidated Financial Statements in Item 8.—“Financial Statements and Supplementary Data” and “Hazardous Material” in the Environmental Matters section of this Item 1.
State Regulation
PGE is subject to the jurisdiction of the OPUC, which reviews and approves the Company’s retail prices and reviews the Company’s generation and transmission resource acquisition plans, pursuant to a biennial integrated resource planning process. In addition, PGE is required to develop a Clean Energy Plan (CEP) to be filed in connection with the Company’s Integrated Resource Plan (IRP) that articulates the Company’s strategy to show continued progress toward emission reduction targets through an equitable transition to a decarbonized grid. The OPUC also regulates the issuance of securities, prescribes accounting policies and practices, regulates the sale of utility assets, reviews transactions with affiliated companies, and has jurisdiction over the acquisition of, or exertion of substantial influence over, public utilities.
Retail customer prices are determined through formal public proceedings that generally include testimony by participating parties, discovery, public hearings, and the issuance of a final order by the OPUC. Participants in such proceedings may include PGE, OPUC staff, and intervenors representing PGE customer groups, as well as other interested parties. The following lists the more significant regulatory mechanisms and proceedings under which customer prices are determined:
•
General Rate Cases (GRCs). PGE periodically evaluates the need to update its retail electric price structure as part of a comprehensive GRC process that reflects revenue requirements based on a forecasted test year. The OPUC authorizes the Company’s rate base, debt-to-equity capital structure, return on equity, overall rate of return, and customer prices.
•
Annual Power Cost Updates. The OPUC has approved an Annual Power Cost Update Tariff (AUT) by which PGE can adjust retail customer prices annually to reflect forecasted changes in the Company’s net variable power costs (NVPC). NVPC consists of the cost of power purchased in the wholesale market and fuel the Company uses to generate electricity, as well as the cost of settled electric and natural gas financial contracts (all classified as Purchased power and fuel expense in the Company’s consolidated statements of income). NVPC is net of wholesale revenues as well as gains and losses on the sale of excess natural gas, included in other operating revenue, that is not used to fuel PGE’s generation facilities, both of which are classified as Revenues, net in the consolidated statements of income. The OPUC has also authorized a Power Cost Adjustment Mechanism (PCAM), under which PGE may share with customers a portion of actual cost variances associated with NVPC.
•
Renewable Adjustment Clause mechanism. The State has a Renewable Portfolio Standard (RPS) that requires PGE to serve a portion of its retail load with renewable resources. In conjunction with the RPS, the State established a Renewable Adjustment Clause (RAC) mechanism that allows for the recovery in retail customer prices, outside of a GRC, of prudently incurred costs to comply with the RPS.
o
In 2016, the State passed Oregon Senate Bill (SB) 1547, which, among its provisions, increased the RPS percentages in certain future years and required the elimination of coal from Oregon utility customers’ energy supply. For further information on SB 1547, see “RPS standards and related laws” in the Overview section of Item 7.—“Management’s Discussion and Analysis of Financial Condition and Results of Operations.”
6
Table of Contents
o
During 2021, the State legislature passed Oregon House Bill (HB) 2021, which established clean energy targets and set out a framework that includes, among other things, the development and submittal of CEPs for investor-owned utilities, including PGE, and Electricity Service Suppliers (ESSs) in the State. The targets are an 80% reduction in greenhouse gas (GHG) emissions by 2030, 90% by 2035, and 100% by 2040 and every year thereafter. The CEP may accelerate investment in RPS compliant resources, the cost of which may then be recoverable under the RAC, if the resulting resources are needed for RPS compliance. For further information on HB 2021 and the baseline to which the target reductions apply, see “HB 2021” in the Laws and Regulations portion of the Overview section of Item 7.—“Management’s Discussion and Analysis of Financial Condition and Results of Operations.”
•
Wildfire Automatic Adjustment Clause mechanism. As required by the OPUC, PGE has developed and implemented a Wildfire Mitigation Plan, coordinating activities across the Company and with state-wide stakeholders. PGE strives to improve regional safety by reducing the risk of ignition from PGE assets, while limiting the impacts of public safety power shutoff (PSPS) events and other mitigation activities on customers and increasing the resiliency of PGE assets to wildfire damage. The OPUC has authorized an Automatic Adjustment Clause mechanism that allows the Company to recover a certain level of ongoing, prudent mitigation expenses in customer prices.
Customers and Revenues
PGE generates revenue primarily through the sale and delivery of electricity to retail customers located exclusively in Oregon. In addition, the Company distributes power to Direct Access customers that choose to purchase their energy from an ESS. Although the Company includes such customers in its customer counts and energy delivered to such commercial and industrial customers in its total retail energy deliveries, retail revenues for these Direct Access customers include only delivery charges and applicable transition adjustments, as the customers purchase energy directly from the ESSs. The Company conducts retail electric operations within its State-approved service territory and competes with ESSs to supply certain commercial and industrial customer energy needs. In addition, PGE competes with the local natural gas distribution company for the energy needs of residential and commercial space heating, water heating, and appliances. Energy efficiency, demand response, conservation measures, and the advancement of technology around distributed generation, including rooftop solar, and storage resources also have an influence on customer demand.
Retail Revenues
Retail customers are classified as residential, commercial, or industrial, with no single customer representing more than 9% of PGE’s total retail revenues or 13% of total retail deliveries during 2025.
7
Table of Contents
PGE’s Retail revenues, retail energy deliveries, and average number of retail customers consist of the following:
| Years Ended December 31, | ||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2025 | 2024 | 2023 | ||||||||||||||||||||||
| Retail revenues (1) (dollars in millions): | ||||||||||||||||||||||||
| Residential | $ | 1,486 | 48 | % | $ | 1,457 | 51 | % | $ | 1,263 | 52 | % | ||||||||||||
| Commercial | 985 | 32 | 924 | 33 | 808 | 33 | ||||||||||||||||||
| Industrial | 561 | 18 | 458 | 16 | 368 | 15 | ||||||||||||||||||
| Subtotal | 3,032 | 98 | % | 2,839 | 100 | % | 2,439 | 100 | % | |||||||||||||||
| Alternative revenue programs, net of amortization | 21 | 1 | (40 | ) | (1 | ) | 11 | — | ||||||||||||||||
| Other accrued (deferred) revenues, net | 17 | 1 | 16 | 1 | (3 | ) | — | |||||||||||||||||
| Total retail revenues | $ | 3,070 | 100 | % | $ | 2,815 | 100 | % | $ | 2,447 | 100 | % | ||||||||||||
| Retail energy deliveries (2) (MWh in thousands): | ||||||||||||||||||||||||
| Residential | 7,596 | 34 | % | 7,732 | 36 | % | 7,952 | 37 | % | |||||||||||||||
| Commercial | 7,015 | 31 | 7,024 | 32 | 7,178 | 34 | ||||||||||||||||||
| Industrial | 7,919 | 35 | 6,941 | 32 | 6,293 | 29 | ||||||||||||||||||
| Total retail energy deliveries | 22,530 | 100 | % | 21,697 | 100 | % | 21,423 | 100 | % | |||||||||||||||
| Average number of retail customers: | ||||||||||||||||||||||||
| Residential | 840,457 | 88 | % | 829,721 | 88 | % | 815,920 | 88 | % | |||||||||||||||
| Commercial | 114,912 | 12 | 113,942 | 12 | 112,667 | 12 | ||||||||||||||||||
| Industrial | 286 | — | 281 | — | 273 | — | ||||||||||||||||||
| Total | 955,655 | 100 | % | 943,944 | 100 | % | 928,860 | 100 | % |
(1)
Includes both revenues from customers who purchase their energy supplies from the Company and revenues from the delivery of energy to those commercial and industrial customers that purchase their energy from ESSs.
(2)
Includes both energy sold to retail customers and energy deliveries to those commercial and industrial customers that purchase their energy from ESSs.
The following table presents additional annual averages for retail customers. Certain supplemental tariff collections are excluded from revenues as they are not considered a part of the Company’s base retail prices for these calculations.
| Years Ended December 31, | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| 2025 | 2024 | 2023 | |||||||||
| Residential | |||||||||||
| Revenue per customer (in dollars): | $ | 1,699 | $ | 1,695 | $ | 1,481 | |||||
| Usage per customer (in kilowatt hours): | 9,038 | 9,318 | 9,746 | ||||||||
| Revenue per kilowatt hour (in cents): | 18.79¢ | 18.19¢ | 15.20¢ | ||||||||
| Commercial | |||||||||||
| Revenue per customer (in dollars): | $ | 8,538 | $ | 8,067 | $ | 7,133 | |||||
| Usage per customer (in kilowatt hours): | 61,050 | 61,641 | 63,713 | ||||||||
| Revenue per kilowatt hour (in cents): | 13.99¢ | 13.09¢ | 11.20¢ | ||||||||
| Industrial | |||||||||||
| Revenue per customer (in dollars): | $ | 1,959,780 | $ | 1,627,956 | $ | 1,347,661 | |||||
| Usage per customer (in kilowatt hours): | 27,685,423 | 24,702,680 | 23,052,538 | ||||||||
| Revenue per kilowatt hour (in cents): | 7.08¢ | 6.59¢ | 5.85¢ |
8
Table of Contents
For additional information, see the Results of Operations section in Item 7.—“Management’s Discussion and Analysis of Financial Condition and Results of Operations.”
Residential customers include single family housing, multiple family housing (such as apartments, duplexes, and town homes), mobile homes, and small farms. Residential demand is sensitive to the effects of the weather and seasonal temperature changes lead to variations in both heating and cooling needs. Based on the climate in PGE’s service area, the heating season tends to span a longer time period while cooling needs, although robust, are reflected over a shorter span concentrated in the summer months of June through September.
Economic conditions can also affect residential demand as job growth and population increases in PGE’s service territory have led to customer growth. Residential demand is also impacted by energy efficiency measures and increased rooftop solar penetration in the service territory.
Commercial customers consist of non-residential customers who accept energy deliveries at voltages equivalent to those delivered to residential customers. This customer class includes most businesses, small industrial companies, and public street and highway lighting accounts. The Company’s commercial customer demand is somewhat less susceptible to weather conditions than residential customer demand. Economic conditions and fluctuations in total employment in the region can be indicative of changes in energy demand from commercial customers. Energy efficiency measures also impact commercial demand.
Industrial customers consist of non-residential customers who accept delivery at higher voltages than commercial customers. Demand from industrial customers is primarily driven by economic conditions, with weather having limited impact on this customer class. Strength in the high-tech manufacturing and digital service sector, along with new data center facilities coming online, have increased deliveries to industrial customers. Federal and State tax incentives and connectivity both locally and to overseas markets via the transpacific cable have led to strong data center development in PGE's service area.
Customer Choice Programs—In addition to standard cost-of-service pricing, the Company offers different pricing options. Under cost-of-service pricing, residential and small commercial customers may select portfolio options from PGE that include time-of-use, time-of-day, and renewable resource pricing. The Company also offers various energy shifting programs like Peak Time Rebates, Smart Thermostat, and Smart Charging, all of which enable PGE to safely reduce power use on the system during peak demand.
Pricing options other than cost-of-service are available to certain commercial and industrial customers for a one-year period, including daily market index-based pricing under which the Company provides the electricity, and Direct Access, whereby customers purchase electricity directly from an ESS.
PGE receives revenue from Direct Access customers only for the transmission and delivery of the volume of electricity delivered, along with fixed transition adjustments intended to mitigate the shifting of excess charges to the Company’s cost-of-service customers. Certain large commercial and industrial customers may elect a fixed three-year or a minimum five-year term, to be served either by an ESS, or by the Company under the daily market index-based price option. Participation in the fixed three-year and minimum five-year opt-out programs for existing and planned load is capped at 300 average megawatts in aggregate.
PGE is also required to offer to eligible customers, enrollment in the New Large Load Direct Access program, which is capped at 119 average megawatts in total, for unplanned, large, new loads and large load growth at existing sites.
For further information regarding Direct Access deliveries, see “Customers and demand” in the Overview section of Item 7.—“Management’s Discussion and Analysis of Financial Condition and Results of Operations.”
9
Table of Contents
PGE’s customers have a desire for purchasing clean energy, as over 221 thousand residential and small commercial customers voluntarily participate in PGE’s Green Future Program, the largest renewable power program by participation in the nation. Oregon’s most populous city, Portland, and most populous county, Multnomah, have each passed resolutions to achieve 100 percent clean and renewable electricity by 2035 and 100 percent economy-wide clean and renewable energy by 2050. Other jurisdictions in PGE’s service area have set similar goals.
The Company’s Green Future Impact Program, which allows for customer-provided renewable resources, PGE-provided power purchase agreements (PPAs) for renewable resources, and Company-owned, cost-of-service resources under certain options, enables commercial and industrial customers access to bundled renewable attributes from those resources. Through this voluntary program, the Company seeks to align sustainability goals, cost and risk management, and reliable, integrated power while providing customer choice and a cleaner energy system. The total available capacity under the program is 750 MW. For more information on the Company’s PPAs that currently serve the Green Future Impact Program, see “Green Future Impact Program” within Purchased Power in the Power Supply section of this Item 1.
Wholesale Revenues
PGE participates in the wholesale electricity marketplace in an effort to balance its supply of power to meet the needs of, and obtain reasonably-priced power for, its retail customers, manage risk, and administer its long-term wholesale contracts through the purchase and sale of electricity, natural gas, and environmental credits. Interconnected transmission systems in the western United States and Canada serve utilities with diverse load requirements and allow the Company to purchase and sell electricity, largely through bi-lateral agreements, within the region to serve retail demand. PGE’s engagement in the wholesale electricity marketplace depends upon numerous factors, including: 1) the relative price and availability of power, whether purchased, generated, or from storage facilities; 2) hydro, wind, and solar conditions; and 3) daily and seasonal retail demand. The Company also participates in the California Independent System Operator’s (CAISO) western Energy Imbalance Market (western EIM), which allows for load balancing with other western EIM participants in five-minute intervals. Wholesale revenues represented 12% of total revenues in 2025, 16% in 2024, and 14% in 2023.
Other Operating Revenues
Other operating revenues consist primarily of gains and losses on the sale of natural gas volumes purchased that exceeded what was needed to fuel the Company’s generating facilities, as well as revenues from transmission services, excess transmission capacity resales, pole attachment rentals, and other electric services provided to customers. Other operating revenues represented 2% of total revenues in 2025, 2024, and 2023.
Seasonality
Demand for electricity by PGE’s residential and, to a lesser extent, commercial and industrial customers is affected by seasonal weather conditions. The Company uses various measures, including heating and cooling degree-days and wind speeds to determine the effect of weather on the demand for electricity. Heating and cooling degree-days, determined by taking the difference between the average daily temperature and a prescribed baseline, provide cumulative variances over a period of time, to indicate the extent to which customers are likely to have used electricity for heating or cooling. The greater the number of degree-days, the greater the expected demand for electricity.
10
Table of Contents
The following table presents the heating and cooling degree-days for the most recent three-year period, along with current 15-year averages for the most recent year provided by the National Weather Service, as measured at Portland International Airport:
| Heating Degree-Days | Cooling Degree-Days | ||||||
|---|---|---|---|---|---|---|---|
| 2025 | 3,549 | 694 | |||||
| 2024 | 3,662 | 751 | |||||
| 2023 | 3,845 | 898 | |||||
| 15-year average | 3,988 | 636 |
The following table presents PGE’s average winter (defined as January, February, and December) and summer (defined as June through September) loads for the periods presented, along with the corresponding peak load (in MWs) and month in which such peak occurred. As illustrated, although the average winter loads continue to exceed average summer loads, the Company has seen its highest annual peak loads during the summer months in recent years. In August 2023, PGE set a new all-time high net system load peak of 4,498 megawatts (MW), surpassing the previous all-time peak that occurred in June 2021. In December 2022, the Company recorded its current winter peak of 4,113 MW.
| Winter Loads | Summer Loads | |||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Average | Peak | Month | Average | Peak | Month | |||||||||||||||
| 2025 | 2,889 | 3,879 | February | 2,666 | 4,385 | August | ||||||||||||||
| 2024 | 2,802 | 3,969 | January | 2,566 | 4,367 | July | ||||||||||||||
| 2023 | 2,756 | 3,661 | January | 2,512 | 4,498 | August |
The Company tracks and evaluates both load growth and peak load requirements for purposes of long-term load forecasting, integrated resource planning, and preparing GRC assumptions. Behavior patterns, conservation, energy efficiency initiatives and measures, weather effects, economic conditions, including high-tech and digital services growth in its service territory, distributed generation including rooftop solar, transportation and building electrification, and demographic changes all play a role in determining expected future customer demand and the resulting resources the Company may need to adequately meet those loads and maintain adequate capacity reserves.
Power Supply
PGE utilizes its generating resources, as well as wholesale power purchases from third parties, to meet the needs of its retail customers. The volume of electricity the Company generates is dependent upon, among other factors, the capacity and availability of its generating resources and the price and availability of wholesale power and natural gas. As part of its power supply operations, the Company enters into short- and long-term power and fuel purchase and sale agreements. PGE executes economic dispatch decisions concerning its own generation and participates in the wholesale market in an effort to obtain reasonably-priced power for its retail customers, manage risk, and administer its long-term wholesale contracts. The Company also performs portfolio management and wholesale market sales services for third parties in the region and purchases and sells environmental credits in the wholesale marketplace. In addition, the Company encourages energy efficiency measures to help meet its energy requirements and promotes the use of various demand side management products to reduce load during peak time usage.
11
Table of Contents
PGE’s resource and contracted capacity (in MW) was as follows:
| As of December 31, | |||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2025 | 2024 | ||||||||||||||
| Capacity | % | Capacity | % | ||||||||||||
| Generation: | |||||||||||||||
| Thermal (1): | |||||||||||||||
| Natural gas | 1,827 | 31 | 1,818 | 28 | |||||||||||
| Coal | 296 | 5 | 296 | 4 | |||||||||||
| Total thermal | 2,123 | 36 | 2,114 | 32 | |||||||||||
| Wind (2) | 1,025 | 17 | 1,025 | 16 | |||||||||||
| Hydro (3) | 435 | 7 | 431 | 7 | |||||||||||
| Total generation | 3,583 | 60 | 3,570 | 55 | |||||||||||
| Purchased power: | |||||||||||||||
| Long-term contracts: | |||||||||||||||
| Hydro (3) | 1,024 | 17 | 1,270 | 20 | |||||||||||
| PURPA qualifying facilities (4) | 310 | 5 | 315 | 5 | |||||||||||
| Dispatchable standby generation | 129 | 2 | 129 | 2 | |||||||||||
| Capacity (5) | 250 | 4 | 250 | 4 | |||||||||||
| Wind (2) | 403 | 7 | 400 | 6 | |||||||||||
| Solar (6) | 219 | 4 | 219 | 3 | |||||||||||
| Biomass | — | — | 10 | — | |||||||||||
| Total long-term contracts | 2,335 | 39 | 2,593 | 40 | |||||||||||
| Short-term contracts | 67 | 1 | 333 | 5 | |||||||||||
| Total purchased power capacity | 2,402 | 40 | 2,926 | 45 | |||||||||||
| Total resource capacity | 5,985 | 100 | 6,496 | 100 |
(1)
Capacity represents the MW the plants are capable of generating under normal operating conditions, which is affected by ambient temperatures, net of electricity used in the operation of the plant.
(2)
Capacity represents nameplate and differs from expected energy to be generated, which is expected to range from 30 to 40% of capacity, dependent upon wind conditions.
(3)
Capacity represents most favorable operating conditions and differs from expected energy to be generated, which is expected to range from 40 to 50% of capacity, dependent upon river flows.
(4)
Capacity represents contracted capacity for PPAs under the Public Utility Regulatory Policies Act of 1978 (PURPA).
(5)
Capacity represents a heat rate call option of a natural gas generating station. For more information see “Natural gas heat rate call option” below.
(6)
Capacity includes 50 MW from the solar component of the Wheatridge Renewable Energy Facility (Wheatridge).
For information regarding actual generating output and purchases for the years ended December 31, 2025 and 2024, see the Results of Operations section of Item 7.—“Management’s Discussion and Analysis of Financial Condition and Results of Operations.”
12
Table of Contents
Generation
PGE’s generating resources consist of six thermal plants (natural gas- and coal-fired), four wind farms, and seven hydroelectric facilities. The portion of PGE’s retail load requirements generated by its plants varies from year to year and is determined by various factors, including planned and unplanned outages, availability and price of natural gas and coal, precipitation and snow-pack levels, the market price of electricity, and wind variability. For a complete listing of these facilities, see “Generating Facilities” in Item 2.—“Properties.”
| Thermal | The Company has five natural gas-fired generating facilities: PW1, PW2, Beaver, Coyote Springs Unit 1 (Coyote Springs), and Carty Generating Station (Carty). The Company also has a 20% ownership interest in the Colstrip Units 3 and 4 coal-fired generating plant (Colstrip), which is located in Colstrip, Montana and operated by a third party. For additional information on Colstrip as it relates to environmental laws and regulations in the State, see “RPS standards and related laws” in the Overview section in Item 7.—“Management’s Discussion and Analysis of Financial Condition and Results of Operations” and Note 19, Contingencies, in the Notes to Consolidated Financial Statements in Item 8.—“Financial Statements and Supplementary Data.” | |
|---|---|---|
| Wind | PGE owns and operates two wind farms, Biglow Canyon Wind Farm (Biglow Canyon) and Tucannon River Wind Farm (Tucannon River). Biglow Canyon, located in Sherman County, Oregon, consists of 217 turbines with a total nameplate capacity of 450 MW. Tucannon River, located in southeastern Washington, consists of 116 turbines with a total nameplate capacity of 267 MW. Although PGE does not operate the wind component of Wheatridge, located in Morrow County, Oregon, it owns 40 turbines with a total nameplate capacity of 100 MW and purchases the output of the remaining turbines, with a nameplate capacity of 200 MW, through a PPA. Although PGE does not operate Clearwater wind energy facility located in Eastern Montana, it owns 75 turbines with a total nameplate capacity of 208 MW and purchases the output of the remaining turbines, with a nameplate capacity of 103 MW, through a PPA. | |
| Hydro | The Company’s FERC-licensed hydroelectric projects consist of Pelton/Round Butte on the Deschutes River near Madras, Oregon (discussed below), four plants on the Clackamas River, and one on the Willamette River. PGE has a 50.01% ownership interest in the 455 MW Pelton/Round Butte hydroelectric project, with the remaining interest held by the Confederated Tribes of the Warm Springs Reservation of Oregon (CTWS). A 50-year joint license for the project, which is operated by PGE, was issued by the FERC in 2005. The CTWS has an option in 2036 to purchase an undivided 0.02% interest in Pelton/Round Butte. If the option is exercised, the CTWS’s ownership percentage would exceed 50%. PGE purchases 100% of the CTWS’s share of the project output. For more information see “CTWS” within Purchased Power in this Power Supply section of Item 1. |
13
Table of Contents
Fuel Supply—PGE contracts for natural gas and coal supplies required to fuel the Company’s thermal generating plants, with certain plants also able to operate on fuel oil, if needed. In addition, the Company utilizes financial instruments such as forward, future, swap, and option contracts to manage its exposure to volatility in natural gas prices.
| Natural Gas | Physical supplies of natural gas are generally purchased up to twelve months in advance of delivery and based on anticipated operation of the plants. PGE manages the price risk of natural gas supply through the use of financial contracts up to 60 months in advance of expected need of energy.PGE owns 79.5%, and is the operator of record, of the KB Pipeline which provides PGE access to 159,726 Decatherms (Dth) per day of firm natural gas transportation capacity. The KB Pipeline directly connects PW1, PW2, and Beaver to the Northwest Pipeline, an interstate natural gas pipeline operated between British Columbia and New Mexico by Williams Northwest Pipeline. Currently, PGE transports natural gas on the KB Pipeline for its own use under a firm transportation service agreement, with capacity offered to others on an interruptible basis to the extent not utilized by the Company. PGE has access to 111,805 Dth per day of firm natural gas transportation capacity on the Northwest Pipeline to serve the three plants.PGE has access to 4.1 billion cubic feet of natural gas storage in Mist, Oregon from which it can draw when economic factors favor its use or in the event that natural gas supplies are interrupted. The storage facility, owned and operated by NW Natural, may be utilized to provide fuel to PW1, PW2, and Beaver. To serve Coyote Springs and Carty, PGE has access to 119,500 Dth per day of firm natural gas transportation capacity on three pipeline systems accessing the gas market in Alberta, Canada. | |
|---|---|---|
| Coal | The Colstrip co-owners obtain coal to fuel the plant via conveyor belt from a mine that lies adjacent to the facility and is the sole source of coal supply for the plant. The coal supply contract with the owner of the mine is scheduled to expire at the end of 2029. The terms of the contract and the quality of coal are expected to allow the facility to operate within required emissions limits. |
Purchased Power
PGE supplements its own generation with power purchased in the wholesale market to meet its retail load requirements, manage risk, and administer its long-term wholesale contracts. The Company utilizes short- and long-term wholesale power purchase contracts in an effort to provide the most favorable economic mix on a variable cost basis.
PGE’s medium-term power cost strategy helps mitigate the effect of price volatility on its customers due to changing energy market conditions. The strategy allows the Company to take positions in power and fuel markets up to five years in advance of physical delivery. By purchasing a portion of anticipated energy needs for future years over an extended period, PGE attempts to mitigate a portion of the potential future volatility in the average cost of purchased power and fuel.
14
Table of Contents
The Company’s major power purchase contracts consist of the following (also see the preceding table which summarizes the average resource capabilities related to these contracts):
Hydro—During 2025, the Company had the following agreements:
•
Public Utility Districts—PGE has long-term power purchase contracts with certain public utility districts (PUDs) in the state of Washington for a portion of the output of certain hydroelectric projects on the mid-Columbia River. Although the projects currently provide PGE a total of 763 MW of nameplate capacity through contracts as shown below, actual energy received is dependent upon river flows and capacity amounts may decline over time:
o
434 MW of capacity under a contract expiring in 2026 in which PGE will purchase a 20% share of the project output and sell varying amounts of energy, in accordance with contract terms, back to the PUD in order to meet their load requirements;
o
71 MW of average monthly capacity with Douglas County PUD that expires in 2028;
o
79 MW of capacity under a contract expiring in 2030, with an option to renew until 2032, in which PGE will purchase 10% of the project output; and
o
179 MW of capacity with Grant County PUD that expires in 2052.
•
CTWS—PGE has a long-term agreement under which the Company purchases output from the CTWS’ interest in the Pelton/Round Butte hydroelectric project. Although the agreement provides approximately 224 MW of net capacity, actual energy received is dependent upon river flows. The term of the agreement coincides with the term of the FERC license for this project, which expires in 2055. Under a separate PPA executed in 2014, PGE paid fixed capacity and energy charges to the CTWS for 100% of its share of the project through 2024. The CTWS exercised their option to purchase an additional undivided 16.66% ownership interest in Pelton/Round Butte effective January 1, 2022. As a result of the sale, capacity from Company-owned generation decreased by approximately 76 MW, and capacity from purchased power increased by a corresponding amount. Under the PPA, PGE purchases 100% of the CTWS’s additional share of the project and payments under the PPA increase proportionately. PGE and the CTWS executed an additional 16-year PPA which began on January 1, 2025, that effectively extended the term from 2024 to 2040 and increased the capacity payments in the extension period.
•
Other—The remaining capacity is primarily comprised of a contract with Portland Hydro, which expires in 2032, that provides for the purchase of power generated from hydroelectric projects with capacity of 36 MW.
PURPA qualifying facilities—PGE is required to purchase power from PURPA qualifying facilities (QFs), as mandated by federal law. QFs are generating facilities that fall within one of the following two categories: i) qualifying generation facilities with a capacity of 80 MW or less and whose primary energy source is renewable (hydro, wind, solar, biomass, waste, or geothermal); or ii) qualifying cogeneration facilities that sequentially produce electricity and another form of useful thermal energy (e.g., heat, steam) in a way that is more efficient than the separate production of each form of energy. As of December 31, 2025, PGE had contracts with 67 online QFs, providing a total of 310 MW of capacity. As of December 31, 2025, PGE had one contract with a QF representing 63 MW of capacity that was not yet operational and in default because the QF has failed to complete construction and become operational by the date required by the PPA. The PPAs provide that the QF must cure its default within a period specified under the contract terms. If the QF has failed to cure, PGE is permitted to immediately terminate the QF PPA upon expiration of the cure period. The term of a QF PPA generally ranges from 15 to 23 years.
15
Table of Contents
The expense and volume of purchases from QFs for the years ended December 31, 2025 and 2024 were as follows:
| 2025 | 2024 | ||||||
|---|---|---|---|---|---|---|---|
| PURPA contract expense (in millions) | $ | 71 | $ | 64 | |||
| MWh purchased under PURPA contracts (in thousands) | 770 | 756 | |||||
| Average cost per MWh from PURPA contracts | $ | 92.16 | $ | 84.65 |
Expenses incurred related to PURPA contracts are included in PGE’s AUT.
Dispatchable Standby Generation (DSG)—PGE has a DSG program under which the Company can dispatch and monitor customer-owned backup generators to provide NERC-required operating reserves. As of December 31, 2025, there were 77 generators with a total DSG nameplate capacity of 129 MW. PGE continues to pursue expansion of the program through ongoing engagement with customers and incorporation of battery energy storage.
Wind—PGE has four contracts to purchase power generated from renewable wind resources. Although the projects as shown below currently provide PGE a total of 403 MW of capacity, the expected energy from these wind resources will vary from the nameplate capacity due to varying wind conditions:
•
25 MW of capacity that expires in 2028;
•
75 MW of capacity that expires in 2035;
•
200 MW of capacity that expires in 2051; and
•
103 MW of capacity that expires in 2053.
Solar—PGE has five contracts representing 219 MW of capacity to purchase power generated from photovoltaic solar projects. Two of these projects extend to 2036 while the other three extend to 2037, 2038, and 2042, respectively. The expected energy from these solar resources will vary from the nameplate capacity due to varying solar conditions.
PGE estimates within its service territory 370 MW of capacity of customer-sited, third-party owned, solar resources, including solar generation from customer rooftop solar meters, and PGE's community solar program. The expected energy from these solar resources will vary based on solar conditions and customer usage. This capacity is not reflected in the resource and contracted capacity table above.
Green Future Impact Program— PGE has four contracts representing 480 MW of capacity to purchase power generated from renewable resources to support the Green Future Impact Program:
•
a 15-year contract with Avangrid Renewables representing 162 MW from a renewable solar facility in Gilliam County, Oregon that was placed in service in January 2023. This capacity is reflected within solar purchased power in the resource and contracted capacity table above;
•
a 25-year contract with Avangrid Renewables representing 138 MW from a renewable solar facility in Wasco County, Oregon that was placed in service in January 2026. This additional capacity is not yet reflected in the resource and contracted capacity table above;
•
a 25-year contract with Avangrid Renewables representing 60 MW from a renewable solar facility in Wasco County, Oregon that was placed in service in January 2026. This additional capacity is not yet reflected in the resource and contracted capacity table above; and
•
a 20-year contract with Avangrid Renewables representing 120 MW from a renewable solar facility in Morrow County, Oregon that is expected to be placed in service in September 2026. This additional capacity is not reflected in the resource and contracted capacity table above.
16
Table of Contents
For additional information on the Green Future Impact Program, see “Customer Choice Programs” within the Customers and Revenues section of this Item 1.
Natural gas heat rate call option—In order to provide additional dispatchable firm capacity to meet customer demand, PGE has entered into a physical heat rate call option (HRCO) for 250 MW of the capacity, energy, and attributes associated with the facility that expires in 2029. In 2025, a new contract was executed to extend the HRCO through 2034.
Short-term contracts—These contracts are for delivery periods of one month to one year in length. They are entered into with various counterparties to provide additional firm energy to help meet the Company’s load requirements.
PGE also utilizes spot purchases of power in the open market to secure the energy required to serve its retail customers. Such purchases are made under contracts that range in duration from 15 minutes to less than one month. PGE is a market participant in the western EIM, which allows certain of the Company’s generating plants to receive automated dispatch signals from the CAISO for load balancing with other western EIM participants in five-minute intervals.
For additional information regarding PGE’s power purchase contracts, see Note 16, Commitments and Guarantees and Note 17, Leases, in the Notes to Consolidated Financial Statements in Item 8.—“Financial Statements and Supplementary Data.”
Energy Storage
PGE's energy storage portfolio includes approximately 522 MW of capacity, not reflected in the resource and capacity table above. PGE’s energy storage resources that are in operation as of December 31, 2025 are primarily as follows:
•
Wheatridge—The Wheatridge Renewable Energy Facility includes a 30 MW battery component. Subsidiaries of NextEra Energy Resources, LLC own the solar and battery components, and sell their portion of the output to PGE.
•
Sundial (formerly Troutdale Grid)—PGE entered into a storage capacity agreement for a 200 MW Battery Energy Storage System (BESS) in Troutdale, Oregon. NextEra Energy Resources, LLC owns the resource and sells the capacity to PGE under a 20-year agreement. The project was placed in-service in December 2024.
•
Coffee Creek—PGE entered into an agreement to construct a 17 MW BESS in Sherwood, Oregon. The project was placed in-service in November 2024, and is owned by PGE.
•
Constable (formerly Evergreen)—PGE entered into an agreement to construct a 75 MW BESS in Hillsboro, Oregon. The project was placed in-service in December 2024, and is owned by PGE.
•
Seaside Grid—PGE entered into an agreement to construct a 200 MW BESS in Portland, Oregon. The project was placed in service on July 8, 2025, and is owned by PGE.
Certain other energy storage assets are considered immaterial and are not reflected in the resource and contracted capacity table above.
Future Energy Resource Strategy
PGE’s IRP outlines the Company’s plan to meet future customer demand and describes PGE’s future energy supply strategy. For a detailed discussion of the IRPs and recent procurement activities, see “Investing in a Clean Energy Future” within the Overview section of Item 7.—“Management’s Discussion and Analysis of Financial Condition and Results of Operations.”
17
Table of Contents
Transmission and Distribution
Transmission systems deliver energy from generating facilities to distribution systems for final delivery to customers. PGE schedules energy deliveries over its transmission system in accordance with FERC requirements and operates one BAA in its service territory. In 2025, PGE delivered approximately 32 million megawatt hours (MWh) through 1,744 circuit miles of transmission lines operating at or above 57 kilovolts (kV).
PGE’s transmission system is part of the Western Interconnection, the regional grid in the western United States. The Western Interconnection includes the interconnected transmission systems of 11 western states, two Canadian provinces and parts of Mexico, and is subject to the reliability rules of the WECC and the NERC. PGE relies on transmission contracts with BPA to transmit a significant amount of the Company’s generation to serve its distribution system. PGE’s transmission system, together with contractual rights on other transmission systems, enables the Company to integrate and access generation resources to meet its customers’ energy requirements. PGE’s transmission system is managed on a coordinated basis to obtain maximum load-carrying capability and efficiency. PGE provided notice of withdrawal from the Western Power Pool’s resource adequacy program known as the Western Resource Adequacy Program (WRAP) in October 2025. The Company has participated in the western EIM for several years and signed an implementation agreement in 2025 to join the CAISO Extended Day Ahead Market (EDAM) as an EDAM Entity in Q4 2026. PGE and EDAM-committed western utilities are developing a resource adequacy program that aligns with the EDAM market with a target operational date of 2028. For further information, see “Operating Activities” within the Overview section of Item 7.—“Management’s Discussion and Analysis of Financial Condition and Results of Operations.”
The Company’s wholesale transmission activities are regulated by the FERC and are offered on a non-discriminatory basis, with all potential customers provided equal access to PGE’s transmission system through PGE’s OATT. In accordance with its OATT, PGE offers several transmission services to wholesale customers, including:
•
Network integration transmission service, a service that integrates generating resources to serve retail loads;
•
Short- and long-term firm point-to-point transmission service, a service with fixed delivery and receipt points; and
•
Non-firm point-to-point service, an “as available” service with fixed delivery and receipt points.
For additional information regarding the Company’s transmission and distribution facilities, see “Transmission and Distribution” in Item 2.—“Properties.”
Environmental Matters
PGE’s operations are subject to a wide range of environmental protection laws and regulations, which pertain to air and water quality, endangered species and wildlife protection, and hazardous materials. Various state and federal agencies also regulate environmental matters that relate to the siting, construction, and operation of generation, transmission, and substation facilities and the handling, accumulation, clean-up, and disposal of toxic and hazardous substances. In addition, certain of the Company’s hydroelectric projects and transmission facilities are located on property under the jurisdiction of federal and state agencies, and/or tribal entities that have authority in environmental protection matters. The following discussion provides further information on certain environmental regulations that affect the Company’s operations and facilities.
Air Quality
Clean Air Act—PGE’s operations, primarily its thermal generating plants, are subject to regulation under the federal Clean Air Act (CAA), which addresses particulate matter, hazardous air pollutants, and GHG emissions, in terms of both quantity and rate, among other things. Oregon and Montana, the states in which PGE’s thermal facilities are located, also implement and administer certain portions of the CAA and have set standards that are more stringent than federal standards. PGE manages its air emissions at its thermal generating plants by the use of
18
Table of Contents
low sulfur fuel, emissions and combustion controls and monitoring, and sulfur dioxide allowances awarded pursuant to the CAA.
In May 2023, the EPA proposed a successor rule to the prior GHG federal rules, including CAA emissions limits and guidelines for carbon dioxide emissions from fossil-fuel fired power plants based on cost-effective and available control technologies. On April 25, 2024, the EPA released final regulations pertaining to electric generation facilities. On April 8, 2025, the President issued a proclamation, Regulatory Relief for Certain Stationary Sources to Promote American Energy, granting a two-year compliance exemption pursuant to CAA Section 112(i)(4) for the EPA’s MATS rule. The EPA subsequently notified companies whether their sources had been granted the exemption. Colstrip was granted an exemption until July 8, 2029. Environmental groups have filed court challenges to the MATS exemptions.
On June 11, 2025, to advance the goals of the President’s Unleashing American Energy executive order, the EPA proposed to repeal the 2024 GHG emissions standards for fossil fuel-fired power plants promulgated under Section 111 of CAA. The EPA also proposed to repeal specific amendments to the updated MATS, that were promulgated in 2024, including the revised filterable particulate matter emissions standard. Additionally, on June 30, 2025, the EPA proposed to update the 2024 ELG Rule to extend compliance deadlines and explore flexibilities to promote reliable and affordable power generation. On February 12, 2026, the EPA revoked the 2009 endangerment finding, thus removing the EPA’s authority to regulate GHGs. For further information on the final regulations, see “EPA Regulations for Electric Generating Facilities” in the Laws and Regulations section of the Overview in Item 7.—“Management’s Discussion and Analysis of Financial Condition and Results of Operations.”
PGE continues to evaluate the final rules to assess the impact they may have on the Company’s continuing investment in Colstrip and on the Company’s operation of its existing natural gas fleet. Any impacts could be material. Compliance with the 2024 rules could require material upgrades at Colstrip with proposed compliance dates that may not be achievable or require the use of unproven technology, resulting in significant impacts to costs of Colstrip. If upheld, or not modified by the EPA, the 2024 MATS and GHG Rules would require compliance as early as 2027 and 2032, respectively.
In addition to the EPA’s proposed rulemakings, several legal challenges have been filed regarding these rules. In challenges to all three rules, at the EPA’s request, the courts have granted stays to allow new EPA leadership to reevaluate the rule. These challenges, or attempts by the federal government to withdraw or modify the regulations, if successful, could affect the applicability to PGE and Colstrip, specifically. Given the uncertainty surrounding applicability of these laws and regulations, PGE cannot reasonably estimate the impact to its results of operations, financial position, and cash flows, however, if the MATS Rule and GHG Rule are ultimately enforced, it would likely result in additional material compliance costs. To the extent these regulations result in increased compliance costs, the Company expects to seek recovery of those costs in customer prices.
HB 2021—In 2021, the Oregon Legislature passed HB 2021, which, among other things, requires retail electricity providers to reduce GHG emissions associated with serving Oregon retail electricity consumers 80% by 2030, 90% by 2035, and 100% by 2040, compared to their baseline emissions levels. The baseline emission level is calculated for each provider by using average annual emissions associated with power generated and purchased for retail load for the years 2010 through 2012. For additional information, see “HB 2021” in the Laws and Regulations section of the Overview section of Item 7.—“Management’s Discussion and Analysis of Financial Condition and Results of Operations.”
Any laws that would impose taxes or mandatory reductions in GHG emissions may have a material impact on PGE’s operations, as the Company utilizes fossil fuels in its own power generation and other companies use such fuels to generate power that PGE purchases in the wholesale market. If incremental costs were incurred as a result of changes in the regulations regarding GHG emissions, the Company expects to seek recovery in customer prices.
19
Table of Contents
For more information regarding GHG emissions and related environmental regulation, including Oregon’s RPS and the Company’s goals in this area, see “Renewable Adjustment Clause mechanism” under State Regulation in the Regulation section of this Item 1. and “Company Strategy” in the Overview section of Item 7.—“Management’s Discussion and Analysis of Financial Condition and Results of Operations.”
Water Quality
Under the federal Clean Water Act (CWA), entities that require any federal license or permit to conduct an activity that may result in a discharge to Waters of the United States (WOTUS) must first receive a water quality certification or permit from the state in which the activity will occur, or obtain an appropriate waiver. In Oregon, Montana, and Washington, the environmental regulatory agencies of each state are responsible for reviewing proposed projects under such requirements to ensure that federally approved activities will meet water quality standards and policies established by the respective state. The definition of WOTUS is undergoing significant changes to narrow federal jurisdiction under the CWA following the 2023 Sackett v. EPA Supreme Court decision. In November 2025, the EPA and U.S Army Corps of Engineers proposed a new rule to redefine WOTUS, limiting protection under the CWA to “relatively permanent” waters and wetlands with “continuous surface connection.” PGE is monitoring these rulemaking proceedings. PGE works continually with state agencies to obtain permits or certificates of compliance needed for its hydroelectric operations under the FERC licenses and continues to monitor and update equipment to meet federal and state standards. State standards and jurisdiction related to Waters of the State remain largely unchanged.
Threatened and Endangered Species and Wildlife
Fish Protection—The federal Endangered Species Act (ESA) has granted protection to many populations of migratory fish species in the Pacific Northwest. Long-term recovery plans for these species continue to have operational impacts on many of the region’s hydroelectric projects. PGE continues to implement fish protection measures at its hydroelectric projects that were prescribed by the U.S. Fish and Wildlife Service and the National Marine Fisheries Service under their authority granted in the ESA and the FPA. Conditions required with the operating licenses are expected to result in a minor reduction in power production and continued capital spending to modify the facilities to enhance fish passage and survival.
Avian Protection—Various statutes, including the Migratory Bird Treaty Act and Bald and Golden Eagle Protection Act, contain provisions for civil, criminal, and administrative penalties resulting from the unauthorized take of migratory birds and eagles. Because PGE operates facilities that can pose risks to a variety of such birds and eagles, the Company developed an Avian Protection Plan to help address and reduce risks to avian species that may be affected by Company operations. PGE has implemented such a plan for its transmission, distribution, and thermal generation facilities and additional, specific plans for its wind generation facilities.
Hazardous Materials
The handling and disposal of hazardous materials from Company facilities is subject to regulation under the federal Resource Conservation and Recovery Act. In addition, the use, disposal, and clean-up of polychlorinated biphenyls, contained in certain electrical equipment, are regulated under the federal Toxic Substances Control Act. PGE has a comprehensive program to comply with requirements of both federal and state regulations related to the storage, handling, and disposal of hazardous materials.
PGE is also subject to the Comprehensive Environmental Response Compensation and Liability Act, commonly referred to as Superfund, which provides authority to the EPA to assert joint and several liability for investigation and remediation costs for designated Superfund sites.
An investigation by the EPA that began in 1997 of a segment of the Willamette River in Oregon known as Portland Harbor revealed significant contamination of river sediments and prompted the EPA to designate Portland Harbor as a Superfund site. The EPA listed PGE among the more than one hundred Potentially Responsible Parties (PRPs) in this matter, as PGE historically owned or operated property near the river. For
20
Table of Contents
additional information regarding the EPA action on Portland Harbor, see Note 19, Contingencies, in the Notes to Consolidated Financial Statements in Item 8.—“Financial Statements and Supplementary Data.”
PGE is subject to regulation by the United States Department of Energy (USDOE), which, under the Nuclear Waste Policy Act of 1982, is responsible for the permanent storage and disposal of spent nuclear fuel. PGE has contracted with the USDOE for permanent disposal of spent nuclear fuel from Trojan that is stored in the Independent Spent Fuel Storage Installation (ISFSI), an NRC-licensed interim dry storage facility that houses the fuel. The NRC approved the transfer of spent nuclear fuel to the ISFSI where it is expected to remain until permanent off-site storage is available. Shipment of the spent nuclear fuel from the ISFSI to off-site storage is not expected to be completed prior to 2059. For additional information regarding this matter, see “Trojan decommissioning activities” in Note 8, Asset Retirement Obligations, in the Notes to Consolidated Financial Statements in Item 8.—“Financial Statements and Supplementary Data.”
Human Capital Management
PGE’s talent and culture are vital to its ability to execute its business strategy and realize continued success. Accordingly, the Company seeks to attract and retain a talented, motivated, and diverse workforce and maintain a culture that reflects PGE’s Guiding Behaviors, drive for performance, and commitment to acting with the highest levels of honesty, integrity, compliance, and safety.
Employees and Collective Bargaining Agreements—PGE had 2,877 employees in its workforce as of December 31, 2025, with 666 employees covered under one of two separate agreements with Local Union No. 125 of the International Brotherhood of Electrical Workers (IBEW). One agreement, which expires February 2028, covers 602 employees, and the other, which expires August 2027, covers 64 employees. The partnership with IBEW is key to a holistic labor relations approach. In addition, PGE utilizes independent contractors and temporary personnel to supplement its workforce.
Competitive Pay and Benefits—PGE offers a wide range of market-competitive benefits, including comprehensive health and welfare benefits and a 401(k) retirement plan, designed to support the physical, mental, and financial well-being of its employees.
Talent Development—PGE provides a variety of training and development programs for employees, as well as tuition reimbursement for job-related coursework. PGE offers a mentorship program for all regular, non-represented PGE employees to help support their growth and development. The PGE Board of Directors oversees executive talent development with the assistance of the Nominating, Governance, and Sustainability Committee and the Compensation, Culture and Talent Committee in an effort to increase the pool of internal candidates. At least annually, the Board conducts reviews of succession plans for senior management, which includes a review of the qualifications and development plans of potential internal candidates and diversity of the succession pipeline. PGE conducts employee engagement surveys periodically to give employees the opportunity to share their perspectives and provide feedback. Survey results are shared with PGE management so that managers can take action towards improving the employee experience.
Health and Safety—Management has established an Executive Safety Committee that has oversight of the Company’s efforts to create a safe workplace. This committee partners closely with International Brotherhood of Electrical Workers Local No. 125 and has active bargaining unit employees in attendance to voice concerns and suggestions and work with PGE management on solutions for continual improvement of the Company’s safety programs and culture. In addition, PGE provides various safety resources to its employees, such as safety manuals, trainings, and incident reporting tools that are all designed to incorporate safe practices into all daily activities and promote in all employees a sense of personal commitment, responsibility, and obligation regarding safety. PGE also has an Industrial Injury Prevention Specialist (IIPS) and accompanying 24/7 nurse line/injury care program, which focuses on building a culture of total worker health for field employees, providing coaching on ergonomics, muscle care, and acute/chronic injury prevention. The IIPS is also a mid-level medical service provider for employees, providing early intervention and first aid care for employees, focusing on timely and appropriate care for employees. PGE offers a variety of competitive wellness benefits to support physical, mental, social, emotional, and financial well-being. Programs include a digital wellness platform, an Employee Assistance Program that provides free and confidential wellness counseling to all employees and their families, financial
21
Table of Contents
education, on-site fitness facilities, volunteer opportunities, company-match on charitable contributions, and tuition reimbursement.
Information about Executive Officers
The following are PGE’s current executive officers:
| Name | Age | Current Position and Past Five Years Experience | YearAppointedOfficer | |||
|---|---|---|---|---|---|---|
| Larry N. Bekkedahl | 64 | Senior Vice President, Strategy and Advanced Energy Delivery (December 2023 to present), Senior Vice President, Advanced Energy Delivery (July 2021 to December 2023), Vice President, Grid Architecture, Integration and Systems Operations (January 2019 to July 2021). | 2014 | |||
| M. Angelica Espinosa | 48 | Senior Vice President, Chief Legal, Corporate Affairs and Compliance Officer (February 2026 to present), Senior Vice President, Chief Legal and Compliance Officer (June 2023 to February 2026), Vice President, General Counsel (March 2022 to June 2023), Deputy General Counsel and Corporate Secretary (June 2021 to March 2022), Chief Risk Officer and Vice President of Safety and Compliance at Southern California Gas Company (January 2019 to June 2021). | 2022 | |||
| Benjamin F. Felton | 55 | Executive Vice President, Chief Operating Officer (April 2023 to present), Senior Vice President, Energy Supply at DTE Energy (July 2019 to March 2023). | 2023 | |||
| Juan D. Gallegos | 45 | Vice President, People and Culture and Chief Human Resources Officer (April 2025 to present), Vice President of Human Resources & Administration at Clearway Energy (January 2024 to April 2025), Vice President of People Experience & HR Technology at Cornerstone Building Brands (September 2022 to December 2023), Chief Talent Strategist North American Customer Fulfillment at Amazon (March 2020 to August 2022). | 2025 | |||
| John T. Kochavatr | 52 | Vice President, Digital Solutions and Chief Information Officer (July 2024 to present) Vice President, Customer & Digital Solutions and Chief Information Officer (May 2022 to July 2024), Vice President, Information Technology and Chief Information Officer (February 2018 to May 2022). | 2018 | |||
| John C. McFarland | 45 | Senior Vice President, Commercial and Customer (February 2026 to present),Vice President, Chief Commercial and Customer Officer, (July 2024 to February 2026) Chief Executive Officer at FirstElement Fuel, Inc (May 2022 to June 2024), Vice President and Chief Customer Officer at Portland General Electric Company (April 2019 to May 2022) | 2024 | |||
| Maria M. Pope | 60 | President (October 2017 to present) and Chief Executive Officer (January 2018 to present). | 2009 | |||
| Joseph R. Trpik | 56 | Senior Vice President, Finance and Chief Financial Officer (June 2023 to present), Senior Vice President, Chief Accounting Officer at Exelon (May 2022 to June 2023), Senior Vice President, Chief Financial Officer and Treasurer at ComEd (November 2021 to May 2022), Senior Vice President, Chief Financial Officer at Exelon Utilities (June 2018 to November 2021). | 2023 | |||
| Martin K. Wyspianski | 49 | Vice President, Power Markets & Grid Operations (April 2025 to present), Vice President, Electric Engineering, Electric Asset Management at Pacific Gas and Electric Company (July 2022 to April | 2025 |
22