PURE CYCLE CORP (PCYO) Risk Factors
This page reproduces the company's own Item 1A Risk Factors text from the linked SEC filing. It is filer text, not grepcent analysis, scoring, or investment advice.
Informational only - not investment advice. See Disclaimer.
Item 1A – Risk Factors
The following section describes the material risks and uncertainties that we believe could have a material adverse effect on our business, financial condition, results of operations, and the market price of our common stock. These risks should be read in conjunction with the other information set forth in this report, including the accompanying consolidated financial statements and notes thereto. The risks described below are not the only risks we face. Additional risks and uncertainties not currently known to us, or that we currently consider immaterial, could also materially and adversely affect our business, financial condition, results of operations or the market price of our common stock.
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| 1. | Risks Related to the Impacts the Economy and External Forces May Have on Our Operations |
Our operations are concentrated in the Front Range area of Colorado; we are subject to general economic conditions in Colorado. Our assets and operations are located solely in the Front Range area of Colorado. Our performance could be adversely affected by economic conditions in, and other factors relating to, Colorado, including supply and demand for housing and zoning and other regulatory conditions. The oil and gas industry remains an important segment of the Colorado economy, and new statutes, regulations or other initiatives that limit oil and gas exploration or increase its cost, or declines in the price of oil and gas, could lead to a downturn in the Colorado economy and its housing market. To the extent that the general economic conditions in the Front Range area of Colorado deteriorate, the value of our assets, our results of operations and our financial condition could be materially adversely affected.
We are dependent on the housing market and development in our targeted service areas for future revenue. The homebuilding industry is cyclical and a deterioration in industry conditions or downward changes in general economic or other business conditions could adversely affect our business, results of operations, cash flows and financial condition. The timing and amount of our lot sales, tap fees and water and wastewater revenue and reimbursement of our public improvement advances depend on housing developments being built near our water assets, and the development of Sky Ranch, the Lowry Ranch and other properties is subject to many factors that are outside our control, including levels of employment, consumer confidence and income, the availability of mortgage financing, interest rate levels and inflation, the cost and availability of raw materials and labor, federal and state tax and housing finance policies, immigration policy and enforcement, and tariffs on products used in construction. Rising interest rates since 2022 have significantly reduced demand for new home starts, and demand for new homes remains constrained. If development in our targeted service areas is delayed or curtailed, we could experience declines in the market value of and demand for our lots and rental homes, and we may need to use our capital resources, incur additional short or long-term debt obligations, or seek to sell additional equity, which may not be available on acceptable terms.
Significant competition from other development projects could adversely affect our results. Land development is a highly competitive business. There are numerous land developers, as well as properties and development projects, near Sky Ranch. Many of our land development competitors may have advantages over us, such as more favorable locations, which may provide more desirable schools and easier access to roads and shopping, or amenities that we may not offer, as well as greater financial resources. If other development projects are found to be more attractive to home buyers, homebuilders or other developers or operators of real estate based on location, price, or other factors, then we may be pressured to reduce our prices or delay further development, either of which could materially adversely affect our business, results of operations, cash flows and financial condition. Our rental homes also compete with other rental housing in the Sky Ranch area, as described below.
Our water business is subject to seasonal fluctuations and weather conditions that could affect demand for our water service and our revenue and that could become more extreme with climate change. Drought and overuse may limit the availability of water to serve our customers, and such droughts may become more frequent and prolonged with climate change. Cool, wet weather, drought restrictions and our customers’ conservation efforts may reduce consumption, and freezing weather may cause pipe breakage that interrupts water transmission. Demand for our water is generally greater during warmer summer months because of irrigation and other outside water use, so cooler or wetter than expected summers may reduce our revenue. If we experience an interruption in our water supply, it could have a material adverse effect on our financial condition and results of operations.
The physical impacts of natural disasters and severe weather conditions could reduce consumer demand for housing, result in service disruptions, delay the closing of the sale of residential lots at Sky Ranch and increase our costs, any of which could harm our sales and results of operations. We conduct our operations in the Colorado Front Range, which is subject to natural disasters, including droughts, tornadoes, wildland fires, hail, and severe weather. The occurrence of natural disasters or severe weather conditions in Colorado or elsewhere could result in interruptions in our water and wastewater operations, delay our construction activities, increase costs, and lead to shortages of labor and materials. These events may become more frequent and intense with climate change. If our
15
insurance or the insurance of our subcontractors does not fully cover business interruptions or losses resulting from these events, our results of operations could be adversely affected.
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| 2. | Risks Related to Our Business and Operations |
We may not generate sufficient cash flows from operations or other capital resources to pursue our business objectives. Our continuing development of Sky Ranch requires significant cash expenditures. We have advanced the Sky Ranch CAB $104.2 million for construction of public improvements in Phases 1 and 2 at Sky Ranch and we expect to advance approximately $10.8 million more for the completion of Phase 2 public improvements. Further, the Sky Ranch CAB is not required to repay us until it and the Sky Ranch Districts generate sufficient funds, as described below. We have funded and expect to continue to fund such expenditures with cash on hand, cash flows from operations and, for our rental homes, borrowings secured by those homes. As of August 31, 2026, we had $15.4 million of cash and cash equivalents, and we had $14.0 million of available borrowing capacity under our SFR Facility Agreement and Working Capital LOC, of which $8.7 million may be used only to finance rental homes (these and other capitalized terms relating to our debt agreement are defined in Note 7 to the accompanying consolidated financial statements). If our cash on hand and future cash flows from operations are not sufficient to fund our operations and the significant capital expenditures required to continue to develop Sky Ranch, we may be forced to seek additional debt or equity capital or sell assets. Economic conditions and disruptions have previously caused substantial volatility in capital markets, including credit markets and the banking industry, increasing the cost, and significantly reducing the availability of financing, which may recur in the future. There can be no assurance that financing will be available on acceptable terms or at all.
Our debt agreements contain financial covenants and require balloon payments. Our SFR Facility Agreement and SFR Notes require us to maintain minimum tangible net worth, liquidity and debt service coverage and contain events of default, including upon a change in control. A portion of our borrowings bears interest at variable rates, SFR Note 1 requires a balloon payment of approximately $0.9 million in December 2026 and SFR Note 2 requires a balloon payment of approximately $2.9 million in August 2028. If we fail to comply with these covenants or cannot refinance maturing debt on acceptable terms, our lenders could accelerate our obligations and foreclose on the collateral securing them. The SFR Notes are secured by the rental homes they financed and the Lost Creek Note is secured by the Lost Creek water rights. Borrowings under our SFR Facility Agreement, including the Working Capital LOC and letters of credit issued under it, are secured by the rental homes financed under it and by substantially all of our other personal property, including our cash and deposit accounts, receivables and notes receivable.
The rates that the Rangeview District is allowed to charge customers on the Lowry Ranch for water services are limited by the lease with the Land Board and our contract with the Rangeview District and may not be sufficient to cover our costs of construction and operation. Under our lease, both the tap fees and usage rates and charges for water service on the Lowry Ranch are capped at the average of the rates of three nearby water providers, which the Rangeview District surveys annually. Our costs associated with the construction of water systems and the production, treatment and delivery of water, including the cost of extracting our groundwater, are subject to market conditions and factors beyond our control, such as government regulations, tariffs and other charges, changes in insurance and labor markets, drought, water contamination and severe weather conditions, and may increase at a significantly higher rate than those rates. If our costs exceed our revenue, we would be providing water service to the Rangeview District for use at the Lowry Ranch at a loss. The Rangeview District may petition the Land Board for rate increases; however, there can be no assurance that the Land Board would approve a rate increase request, or that any increase would be granted in a timely manner or in a sufficient amount. In addition, our share of the Rangeview District’s revenue is subject to renegotiation, as described below under “Our share of revenue under our agreements with the Rangeview District is not fixed and may be reduced.”
A significant portion of our water supplies comes from non-renewable aquifers and inadequate water and wastewater supplies could have a material adverse effect on us. A significant portion of our water supplies comes from non-renewable Denver Basin aquifers. The State of Colorado regulates development and withdrawal of water from the Denver Basin aquifers to a rate of 1 percent of the aggregate amount of water determined to be in storage each year, which means our supply should last approximately 100 years even if no efforts were made to conserve or recharge the supply. Nonetheless, we may need to seek additional water supplies to prove our supply can last for 300 years as our non-renewable supplies are depleted. In many areas of Colorado, water supplies are limited, and our ability to obtain new water rights depends on factors beyond our control. If we are unable to obtain sufficient replacement supplies or wastewater treatment capacity to serve expected customer growth, it would have a material adverse impact on our business and financial condition. Additionally, the cost of developing and withdrawing water from the aquifers is expected to increase over time, and we may not be able to recover the increased costs through our rates and charges.
16
To utilize our water resources as intended, we may need to apply for a change of use with the water court from time to time. This may take several years to complete, and there is no assurance that we will be able to obtain a favorable ruling, which may adversely impact our business and financial condition. Water resources that have been historically used for purposes other than municipal and industrial uses or in other locations, such as our Lost Creek Water, require a favorable change of use ruling by the water court before we can use the water as planned. These proceedings can be costly and contentious: we must demonstrate contractual obligations to provide water service to customers (anti-speculation), the transfer is expected to be limited to the historic “consumptive use” portion of the water right, and we expect opposition to our consumptive use calculations. The water court may impose conditions, such as requiring us to mitigate the loss of the farming tax base, revegetate formerly irrigated land, adopt water quality measures or limit the timing and location of transfers, that would increase our costs or require us to develop alternative water resources. In addition, because our water rights are decreed for specific uses within our service area, including Sky Ranch and the Elbert 86 District’s service area at Wild Pointe, a sale or transfer of water rights would be subject to this restriction and may be considered a breach of our Rangeview Water Agreements, which would have a significant negative impact on our business, results of operations, cash flows and financial condition.
A failure of the water wells or distribution networks we own or control could result in losses and damages that may affect our business and financial condition. We distribute water through a network of pipelines and store water in storage tanks and ponds. A failure of these pipelines, tanks or ponds could result in injuries and damage to property for which we may be responsible, in whole or in part. The failure of these pipelines, tanks, or ponds may also result in the need to shut down some facilities or parts of our water distribution network to conduct repairs. Such failures or shutdowns may limit our ability to supply water to our customers and to meet the water delivery requirements prescribed by our contracts, which could adversely affect our business, results of operations, cash flows, and financial condition. Any business interruption or other losses might not be covered by insurance policies or be recoverable through rates and charges, and such losses may make it difficult for us to secure insurance in the future at acceptable rates.
Development on the Lowry Ranch is not within our control and is subject to obstacles. Development on the Lowry Ranch is controlled by the Land Board, which is governed by a five-person citizen board of commissioners, each appointed for a four-year term by the Colorado Governor and approved by the Colorado Senate. The Land Board’s focus with respect to issues such as development and conservation on the Lowry Ranch tends to change as membership on the Land Board changes. In addition, there are often significant delays in the adoption and implementation of plans with respect to property administered by the Land Board because the process involves many constituencies with diverse interests. If development of the Lowry Ranch is delayed or abandoned, our future water and wastewater revenue from the Lowry Ranch would be reduced or delayed.
Because of the prior use of the Lowry Ranch as a military facility, environmental clean-up may be required prior to development, including the removal of unexploded ordnance. The U.S. Army Corps of Engineers has been conducting unexploded ordnance removal activities at the Lowry Ranch for more than 30 years. Continued activities are dependent on federal appropriations, and the Army Corps of Engineers has no assurance from year to year of such appropriations for its activities at the Lowry Ranch.
Dependence on third-party utilities for power and gas could delay our projects, increase costs, and adversely affect our results of operations and financial condition. Our development timelines and delivery of finished lots to national homebuilders depend on timely availability of electric and natural gas service from third-party utilities, including Xcel Energy and other providers. Permitting or siting delays, labor or equipment shortages, capacity constraints, storm or wildfire response priorities, interconnection backlogs or changes in a utility’s construction plans could force us to delay or resequence phases at Sky Ranch, increasing carrying and construction costs and postponing lot closings, water and wastewater service revenues and rental home lease-up. Utility design changes, cost allocations or line extension rules could also increase our infrastructure costs beyond our estimates, and we may be unable to recover those increases through pricing.
The funds we are advancing to the Sky Ranch CAB for construction of public improvements might not be repaid, which would negatively impact our income, gross margin on selling lots, and cash flows. Since the start of development at Sky Ranch, we have advanced the Sky Ranch CAB $104.2 million for construction of public improvements and expect to fund approximately $10.8 million more to complete the public improvements in Phase 2. At August 31, 2026, the balance owed to us by the Sky Ranch CAB, including accrued interest and project management fees, was $61.8 million, representing approximately 33% of our total assets. The Sky Ranch CAB is not required to repay us unless and until it and the Sky Ranch Districts generate sufficient funds from property taxes, fees or the issuance of bonds, and the Sky Ranch CAB, whose board includes our officers and employees, determines the timing of bond issuances and of remittances of available funds. Repayment therefore depends on the pace of home sales and commercial development at Sky Ranch, the assessed value of property within Sky Ranch, the mill levies the Sky Ranch Districts may impose, Colorado laws limiting residential assessment rates and growth in local government property tax revenue, the volume and value of oil and gas produced within Sky Ranch, which declines as wells deplete, conditions in the municipal bond market, and the rights of bondholders. Any amounts not repaid by December 31, 2058 for Phase 1 or December 31, 2060 for Phase 2 will be deemed forever discharged and satisfied in full.
17
Interest accrues on the outstanding balance at 6%, so the balance grows when repayments lag, and accrued interest that is not ultimately collected would reduce our income. We evaluate the collectability of the note each reporting period using estimates of the Sky Ranch CAB’s future revenue and a discount rate, both of which involve significant judgment. If development at Sky Ranch is delayed or curtailed for any reason, including regulatory restrictions, an inability to construct a new interchange at I-70, an economic downturn or default by one or more homebuilders, or if our estimates change, we may be required to record a credit loss allowance, which could be material. The note receivable is not a source of near-term liquidity.
Delays in property development may extend the time it takes us to recover our property development costs and delay our revenue from water and wastewater resource development services. We incur many costs, such as the costs of preparing land, finishing and entitling lots, installing roads, sewers, water systems and other utilities, and taxes and other costs of owning the land, before we close on the sale of finished lots to homebuilders. If the rate at which we develop residential lots slows, we may incur additional costs, and it may take longer for us to recover our costs. In addition, if sales of homes on the finished lots are delayed, our revenue from water and wastewater resource development services will be delayed. A significant downturn in the housing market could cause our builders to delay building homes on their lots until market conditions improve. Builders with contracts that do not require them to purchase a lot until we deliver a finished, ready-to-build lot could walk away from the contract prior to closing without consequence other than the forfeiture of their upfront deposits, which we would keep as liquidated damages but which would not be sufficient to cover the expenses we expect to incur to finish the lots. We would not be able to recover our costs until we were able to sell the finished lots to another builder, which would be difficult in a poor housing market.
Fluctuations in real property values may require us to write down the book value of our land interests. The land development industry is subject to significant variability and fluctuations in real property values. As a result, we may be required to write down the value of our Sky Ranch single-family home rentals, or other land interests in accordance with accounting principles generally accepted in the United States of America, and some of those write-downs could be material. Indicators of impairment include soft demand for housing, pricing pressure on finished lots, sales absorption below our expectations, declines in home or land values, including because of actual or perceived risks from nearby oil and gas operations, and a decrease in projected cash flows for a project.
Our land development segment may be subject to risks related to oil and gas operations in the vicinity of our Sky Ranch development, which could have an adverse impact on the marketability and/or value of our Sky Ranch property. We have leased the minerals underlying Sky Ranch to a major exploration and production company, which may limit the location of development on the land. Oil and gas extraction is an inherently dangerous activity that can potentially lead to air and water contamination, fire, explosion, subsidence, and other hazards. The existence of oil and gas wells and drilling activity in or near our property and public concern regarding the negative health impacts from emissions near drilling and hydraulic fracturing sites may adversely impact the marketability and/or value of the lots at Sky Ranch and decrease demand for homes in proximity to oil and gas operations, negatively impacting our land development segment, which could also negatively impact our business and financial condition.
We may not realize the carrying value of our rental homes as we sell them, and we remain exposed to the risks of owning and leasing them until they are sold. We began constructing single-family homes for rent at Sky Ranch in fiscal 2021. At August 31, 2026, we owned 51 rental homes, 50 of which were leased, and had contracts with a homebuilder to construct 21 additional homes, which we are working with the homebuilder to reduce. In fiscal 2026, we reduced the planned size of the portfolio and resold, or contracted to resell, 19 lots previously reserved for rental homes, and subsequent to fiscal 2026 our Board of Directors determined that we will not invest in new rental homes beyond our existing portfolio and existing construction contracts and will sell our rental homes in an orderly manner. We may not be able to reduce the number of homes completed under those contracts, or we may incur costs to do so. All of our rental homes are located in Sky Ranch, and we may not be able to sell them at prices at or above their carrying value ($18.3 million at August 31, 2026) or on the schedule we expect. The homes will compete for buyers with new homes being built at Sky Ranch, including by our homebuilder customers, who may offer incentives that we cannot, and with other resale homes, and higher mortgage rates may reduce the number of buyers able to purchase them. When we sell a home that secures our SFR Notes or SFR Facility Agreement borrowings, we must use the proceeds to repay the related borrowings. Until the homes are sold, we remain exposed to the risks of owning and leasing them, including the failure of newly constructed homes to lease at the rents or occupancy levels we anticipate; tenant defaults, turnover and maintenance costs; competition from other rental housing in our market; and federal and state legislation affecting institutional ownership of single-family homes, as described below. A decline in rental income or home values could affect our ability to service our SFR borrowings, and our results of operations and the value we are able to realize from the portfolio could be adversely affected.
18
We will depend on our tenants for all of our rental home revenue. Poor tenant selection and defaults and nonrenewal by our tenants may adversely affect our reputation and financial performance. The success of our rental business depends in large part upon our ability to attract and retain qualified tenants. Tenants may default on rent payments, damage our properties beyond their security deposits, use our properties for illegal purposes, refuse to leave the property upon termination of the lease or otherwise fail to comply with their leases or local regulations, which could delay re-leasing, require expensive repairs and reduce our returns. Increases in unemployment levels and other adverse changes in the economic conditions in our market could result in substantial tenant defaults.
It would be difficult for us to quickly generate cash from sales of our properties. Real estate investments, particularly large portfolios of properties, are relatively illiquid. If we had a sudden need for significant cash, depending on market conditions it may be difficult for us to fund such need quickly through a sale of our rental properties.
Legislation restricting institutional ownership of single-family homes could reduce demand for single-family rental homes and the value we could realize on future sales of our rental portfolio. The 21st Century ROAD to Housing Act became law on July 11, 2026. Beginning January 7, 2027, the Act restricts for-profit investors that control 350 or more single-family homes from purchasing single-family homes, subject to an exception for homes acquired or constructed under a build-to-rent program, and imposes reporting requirements on those investors. Because our portfolio is well below that threshold and we develop our rental homes on a build-to-rent basis, we do not currently expect the act to restrict our development or rental operations. However, the act may reduce the number of institutional buyers for single-family rental homes and portfolios, which could reduce the price we could obtain if we sold some or all of our rental homes, and implementing regulations or future legislation could impose additional restrictions. Because we expect to sell our rental homes individually, generally as existing leases expire, we expect most buyers to be individuals rather than institutional investors.
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| 3. | Risks Related to Legal, Regulatory, and Environmental, Health and Safety Matters |
Government regulations and legal challenges may delay the closing of the sale of our residential lots, increase our expenses or limit other activities, which could have a negative impact on our results of operations. The approval of numerous governmental authorities must be obtained in connection with both our water and wastewater projects and our land development activities, and these governmental authorities often have broad discretion in exercising their approval authority. We incur substantial costs to comply with local, state and federal statutes, ordinances, rules and regulations concerning health and safety, site and building design, environmental, zoning, and similar matters, and any increase in these requirements may cause us to incur substantial additional costs. Our ability to obtain or renew permits or approvals, and the continued effectiveness of permits already granted, depends on factors beyond our control, such as changes in federal, state, and local policies, rules and regulations and their interpretation. Local and state governments also have broad discretion to impose development fees and to require developers and homebuilders to construct improvements to public places such as parks and streets or to fund schools. State and local oil and gas setback rules adopted under SB 19-181, including Arapahoe County regulations adopted in 2021 and amended in 2023 and December 2024, which impose setbacks of up to one mile from existing and planned reservoirs and 3,000 feet from occupied structures (subject to variances), financial assurance, air quality monitoring and electrification requirements, and Adams County’s 2,000-foot setback from residences, schools, and certain waterbodies, may restrict the use of the land we own or wish to acquire and reduce its value. New building and energy codes, including Colorado’s Model Low Energy and Carbon Code, which became Colorado’s minimum energy code on July 1, 2026, may also increase our costs of construction.
We must provide water that meets all federal and state regulatory water quality standards and operate our water and wastewater facilities in accordance with these standards. Changes in regulations governing the supply of drinking water and treatment of wastewater may have a material adverse impact on our business. See Item I- Business, Environmental, Health and Safety Regulations for discussion of certain changes in applicable environmental regulations that may affect us. New or changed requirements could require additional treatment and capital investment. With respect to service of customers on the Lowry Ranch, the Rangeview District’s rates, which are limited by our lease, might not be sufficient to cover the cost of compliance with additional or more stringent requirements, and we may be required to reserve more water than necessary for use on the Lowry Ranch to ensure the proper level of service to Lowry Ranch customers.
19
Laws and regulations related to climate change, greenhouse gases, and energy may adversely affect us by directly and indirectly increasing the cost of or restricting our planned future growth activities. Colorado has enacted legislation, regulations, and policies relating to energy, climate change, greenhouse gas emissions reporting and controls, land use, and energy efficient building codes, including HB 22-1362, which requires energy efficient and low carbon building codes; HB 23-1233, which requires multifamily buildings to be solar-ready and electric vehicle-ready; and HB 23-1161 and earlier efficiency standards for appliances, plumbing fixtures, and buildings (e.g., HB 19-1231, HB 19-1260). These requirements, together with the oil and gas regulations described below, could increase our and our homebuilders’ development and construction costs and the cost of operating and maintaining housing at Sky Ranch.
Our construction of water and wastewater projects and improvements at Sky Ranch may expose us to completion, performance, and financial risks. We rely on independent contractors to construct our water and wastewater facilities and Sky Ranch lot improvements. These construction activities involve risks, including shortages of materials and labor, work stoppages, labor relations disputes, injuries to third parties, damages to property, weather interference, engineering, environmental, permitting, or geological problems and unanticipated cost increases, which could cause delays, cost overruns, quality problems or equipment failures, cause us to miss deadlines under our sale and construction contracts, or result in claims against us. The sales contracts at Sky Ranch and the contracts for the water and wastewater facilities that we design and construct are fixed-price contracts, in which we bear all or a significant portion of the risk for cost overruns, and their prices are based in part on subcontractor quotes and cost and scheduling estimates that may prove inaccurate.
Our water sales are concentrated among oil and gas operators, can fluctuate significantly and may decline as a result of changes in oil and gas prices or increasing regulation. We have no long-term contractual commitments that will ensure that our water sales to oil and gas operators continue in the future. Investment in oil and gas development depends on the price of, and demand for, oil and gas, as well as drilling results and technology, and periods of low prices or reduced demand have significantly reduced the amount of water we sell to these operators. The oil and gas industry is also heavily regulated, particularly in Colorado. SB 19-181 changed the mission of the Colorado Energy and Carbon Management Commission to regulating oil and gas development to protect and minimize adverse impacts to public health, safety, welfare and the environment, and authorized local governments to regulate the siting and surface impacts of oil and gas development more stringently than the state. Existing, new or amended rules addressing emissions, chemicals and water used in production, fees on wells, permitting, setbacks of wells from homes, schools and water bodies, and greenhouse gas emissions may reduce oil and gas activity and therefore the amount of water we sell, and setback requirements may also limit the development of our mineral rights and our residential and commercial development activities at Sky Ranch.
We may be subject to significant potential liabilities because of warranty and liability claims made against us. Design, construction, or system failures related to our water and wastewater delivery systems could result in injury to third parties or damage to property, and as a property developer, we are subject in the ordinary course of our business to warranty claims and to claims for losses or injuries that occur during our property development activities. We and many of our subcontractors have general liability, property, workers’ compensation, and other business insurance, subject to self-insured retentions, deductibles, and coverage limits, but this insurance may not be adequate to address all claims. Insurance for construction defects is limited, costly and often subject to exclusions, so our subcontractors may be unable to obtain it and we may have to waive our customary insurance requirements. Losses that exceed our recoveries from contractors, performance bonds and insurance could result in claims against us, and customers that dispute our performance may delay or withhold payment.
Growth limitations or moratoriums imposed by governmental authorities could adversely affect our land development activities or the land development activities of our customers, which could adversely impact both the land development and water and wastewater segments of our business. HB 23-1255, enacted in 2023, generally prohibits Colorado local governments from enacting or enforcing local housing growth-restriction laws that would limit housing supply, development applications, or building permits, but under certain circumstances permits a temporary moratorium of up to two years, and municipalities or state water agencies may restrict or place moratoriums on the availability of water and sewer taps. Because all of the property in Sky Ranch has been zoned, we do not expect future growth moratoriums to restrict Sky Ranch as currently planned; however, a temporary moratorium or restriction in the areas in which we provide services or develop land could delay, limit or halt development and reduce the number of water and wastewater service customers we expect, which would have a negative impact on our business and financial condition.
Contamination to our water supply may result in disruption in our services and litigation, which could adversely affect our business, operating results and financial condition. Our water supplies are subject to the risk of potential contamination, including contamination from naturally occurring compounds, pollution from man-made sources and intentional sabotage, and oil and gas exploration and development on Sky Ranch and a portion of the Lowry Ranch could expose us to additional contamination risks from related leaks or spills. In addition, we handle certain hazardous materials at our water treatment facilities, primarily sodium hypochlorite. Contamination of our supplies, sewage spills, noncompliance with water quality standards, hazardous materials leaks and spills, and similar events could expose us to environmental liabilities, claims and litigation costs, and we may have to interrupt the use of that water supply until
20
we are able to substitute the supply from another source or treat the contaminated supply. The costs to treat or decontaminate a water source, including through expansion of our treatment facilities or new treatment methods, could be significant and may not be recoverable in rates.
We may be adversely affected by any future decision by the Colorado Public Utilities Commission to regulate us as a public utility. The Colorado Public Utilities Commission (CPUC) regulates investor-owned water companies operating for the purpose of supplying water to the public, including their rates and fees. We do not believe that we are a public utility under Colorado law, because we currently provide services by contract mainly to the Rangeview District, which supplies public and quasi-municipal metropolitan districts such as the Rangeview District and the Sky Ranch Districts, are exempt by statute from regulation by the CPUC. However, the CPUC could attempt to regulate us as a public utility, or laws and regulations may be revised, reinterpreted or adopted that make us subject to regulation. If this were to occur, we might incur significant expense challenging the CPUC’s assertion of jurisdiction, and if we become regulated as a public utility, our ability to generate profits could be limited, and we might incur significant costs associated with regulatory compliance.
The Rangeview District’s and our rights under our lease have been challenged by third parties. In the past the Rangeview District’s and our rights under our lease have been challenged by third parties, including the Land Board. In 2014, in connection with settling a lawsuit filed by us and the Rangeview District against the Land Board, the Land Board, the Rangeview District and Pure Cycle amended and restated the lease to clarify and update a number of provisions. However, there are issues still subject to disagreement and negotiation, including our rights with respect to revenue from our Export Water after 2081, and it is likely that during the remaining term (through 2081) of the lease, the parties will disagree over interpretations of provisions in the lease again. The Rangeview District’s or our rights under the Lease could be challenged in the future, which could require potentially expensive litigation to enforce our rights.
Our Lowry Ranch surface water rights are “conditional decrees” and require findings of reasonable diligence. Our surface water interests and reservoir sites at the Lowry Ranch are conditionally decreed and are subject to a finding of reasonable diligence from the Colorado water court every six years, which requires the water court to determine that we continue to diligently pursue the development of these water rights. If the water court is unable to make such a finding, we could lose the water right under review. The water court entered a finding of reasonable diligence on the Lowry Ranch surface water decrees in January 2025, and our next diligence review will be in 2032. If the water court does not make a determination of reasonable diligence, the value of our interests in the Rangeview Water supply would be materially adversely impacted.
Our operations are affected by local politics and governmental procedures that are beyond our control. We operate in a highly political environment. We market our water rights to municipalities and other governmental entities run by elected or politically appointed officials, and our principal competitors are municipalities and other water districts. Various constituencies, including our competitors, developers, environmental groups, conservation groups, and agricultural interests, have competing agendas with respect to the development of water rights in Colorado, which means that decisions affecting our business are based on many factors other than economic and business considerations. Turnover of elected and appointed officials, changes in policies from election to election, and a lack of institutional history in these entities concerning their prior courses of dealing with the Company may hinder or delay our ability to enter into service agreements or develop our water rights or infrastructure to deliver our water.
The number of connections we can serve is affected by local governmental policies that are beyond our control. We market our water rights through service agreements with developers, municipalities and other governmental entities. We believe that our water rights can serve approximately 60,000 single-family connections based on standards applied to water providers in Arapahoe, Douglas, and Adams Counties. These standards are policy driven, are based on assumed life and reliability of water supplies and may become more restrictive at the discretion of the governmental entity. If these standards become more restrictive, our water supplies may not serve the number of connections that we currently estimate we can serve.
The number of homes we can construct is affected by local governmental policies relating to the construction of infrastructure. We are required to construct certain roads and drainage and other infrastructure to serve the communities in which we build. We have certain access restrictions relating to the number of homes we can construct at Sky Ranch totaling 1,400 SFEs. Through Phases 1 and 2A-E, we have permitted 1,319 of these SFEs. The Company, together with Arapahoe County and the Colorado Department of Transportation, has been working on the design, permitting and financing of a new interchange which will accommodate traffic from the full buildout of Sky Ranch and the surrounding areas and on the ratable participation in the financing of the cost of the interchange. We may have to advance funds to other parties to finance construction of the interchange and solicit reimbursement in the future. We cannot guarantee that we will be able to secure a permit to construct the interchange or finance the construction of the interchange, which may limit the number of homes we can construct at Sky Ranch, and future efforts to obtain reimbursement for funds we advance may be unsuccessful.
21
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| 4. | Risks Related to Our Agreements with Governmental Counterparties and Related Party Arrangements |
Conflicts of interest may arise relating to the operation of the Rangeview District, the Sky Ranch Districts and the Sky Ranch CAB. Our Chief Executive Officer and two of our other employees constitute a majority of the directors of the Rangeview District, and our Chief Executive Officer, our Chief Financial Officer and one other employee serve as directors of the Sky Ranch CAB and the Sky Ranch Districts, constituting a majority of the Sky Ranch CAB’s board. Our Chief Executive Officer is President of the Rangeview District and the Sky Ranch CAB, and our Chief Financial Officer is Treasurer of the Sky Ranch CAB and Sky Ranch Districts. Our Chief Executive Officer also votes the Rangeview District’s interest in the South Metro WISE Authority. These officers and employees and three unrelated individuals, own certain property interests in the acres that constitute the Rangeview District and the acreage that constitutes the Sky Ranch Districts and are elected to serve as directors independent of their roles as employees or officers of the Company. We have made loans to the Rangeview District to fund its operations, and as of August 31, 2026, total principal and interest owed to us by the Rangeview District was $1.1 million. Beginning October 1, 2026, the Rangeview District leases from a third party the office and warehouse space that we previously leased and subleases that space to us. Pursuant to our water and wastewater service agreements with the Rangeview District, the Rangeview District retains two percent of the revenue from the sale of water to its end-use customers and 10% of the revenue from the provision of wastewater services to its end-use customers, net of applicable royalties. Proceeds from the fee collections will initially be used to repay the Rangeview District’s obligations to us, but after these loans are repaid, the Rangeview District is not required to use the funds to benefit us.
Similarly, we have made loans to and incurred expenses reimbursable by the Sky Ranch Districts and the Sky Ranch CAB. As of August 31, 2026, the Sky Ranch CAB owed us $61.8 million related to construction of public improvements on the Sky Ranch property, including project management fees and interest on these amounts. We have received benefits from our activities undertaken in conjunction with the Rangeview and Sky Ranch Districts and the Sky Ranch CAB, but conflicts may arise between our interests and those of the Rangeview and Sky Ranch Districts and the Sky Ranch CAB and our officers and employees who are acting in dual capacities in negotiating contracts to which we and a district and/or the Sky Ranch CAB are parties. We expect that the Rangeview and Sky Ranch Districts will expand when more properties are developed and become part of the respective districts, and our officers and employees acting as directors of these districts will have fiduciary obligations to those other constituents. Conflicts may not be resolved in our best interest. In addition, other landowners coming into a district will be eligible to vote and to serve as directors of these districts. Our officers and employees may not remain as directors of these districts, or the interest of the districts may not align with ours, and the actions of elected boards could have an adverse impact on our operations. We seek to manage these conflicts through procedures that include certification of reimbursable costs by an independent engineer, independent audits of the Sky Ranch CAB and the Rangeview District, disclosure and abstention by interested directors as required by Colorado law, and review of related party transactions by the Audit Committee of our Board of Directors, but these procedures may not prevent a conflict from being resolved in a manner adverse to us.
Our water and wastewater business depends on contractual rights granted by a governmental entity and the Land Board, which we do not control and which are conditioned on our continued performance and investment. Substantially all of our water and wastewater revenue is derived from service agreements with the Rangeview District, a quasi-municipal corporation and political subdivision of the State of Colorado that is not our subsidiary, is governed by an elected board of directors, and our rights to serve Lowry Ranch customers derive from the Rangeview District’s lease with the Land Board. Our exclusive right to provide service was granted in consideration of our obligation to finance, construct, operate and maintain the water and wastewater systems owned by the Rangeview District or the Land Board at our cost. If we fail to perform a material obligation and do not cure the failure within the applicable cure period, the Rangeview District may terminate our service agreements and may recover the water, our interest in the related infrastructure and the associated revenue stream free of liens. Because the Rangeview District owns the water and wastewater systems we have financed and constructed, a termination would require us to write off our investment in those systems and could require us to impair other water and wastewater assets that depend on our service agreements with the Rangeview District to generate revenue. At August 31, 2026, our net investment in water and wastewater systems totaled $72.8 million, or 39% of our total assets. A breach by us of our related agreements could result in, among other things, title to the improvements, equipment, permits and rights-of-way on the Lowry Ranch used to deliver Non-Export Water reverting automatically to the Land Board without compensation to us. Further, we may have no assured role in serving Lowry Ranch water users, who must be served under new agreements. Our Export Water is also at risk: the Land Board or the Rangeview District may terminate our rights to Export Water not yet conveyed if we fail to pay required royalties within ten business days of the due date or, after notice and an opportunity to cure, take or fail to take action that materially harms the water rights, the aquifers or the Lowry Ranch. In addition, the Rangeview District may terminate the Lowry Wastewater Agreement without cause on one year’s notice by paying us a buy-out amount determined under a contractual formula, the amount and timing of which are uncertain and subject to arbitration. Any of these events could eliminate substantially all of our water and wastewater revenue, including the tap fees that support our Sky Ranch land development, and result in a material impairment charge.
22
Our share of revenue under our agreements with the Rangeview District is not fixed and may be reduced. The Rangeview District sets the rates and fees charged to its customers, subject, for Lowry Ranch customers, to the rate limits in the lease. Our service agreements provide that if the share of revenue retained by the Rangeview District is insufficient to cover its costs of providing service, including its general, legal, administrative, engineering, regulatory compliance and long-term planning costs and its required operating reserve, the parties must negotiate in good faith an amendment that provides the Rangeview District sufficient revenue, with disputes resolved by binding arbitration. The wastewater agreement also permits a rate increase as an alternative. Under the WISE agreement, the Rangeview District remits WISE-related receipts to us only after deducting its own WISE costs, including its reasonable general, legal and administrative costs, which are not capped. The Rangeview District also has contractual rights to cure our defaults and offset the cost against amounts it owes us. An increase in the Rangeview District’s costs could increase the amounts it retains or require us to accept a lower revenue share, which would reduce our revenue and margins.
We have open-ended funding obligations to the Rangeview District, and amounts the Rangeview District owes us may never be repaid. We are obligated to advance funds to cover the Rangeview District’s operating shortfalls within 15 days of its request under an operating funding agreement; to fund the Rangeview District’s obligations as a member of the South Metro WISE Authority, which we assumed under an agreement that has no fixed term and may be terminated only by written agreement of the parties or as otherwise provided in that agreement; and to fund the Rangeview District’s operating reserve. The Lease requires the Rangeview District to maintain a reserve equal to at least one-third of its budgeted operating expenses. If the reserve falls below that level and the Rangeview District cannot reasonably be expected to reestablish it from its own revenues within one year, we must fund the shortfall within 30 days of notice, and we must restore the reserve to that level when our service agreement terminates. The amount of these obligations depends on the Rangeview District’s budgets and the WISE Authority’s costs, which we do not control. Repayment of our advances under the operation funding agreement is not a debt of the Rangeview District, is subject to annual appropriation in the Rangeview District’s absolute discretion, and will be forever discharged if not repaid when the lease expires. The Rangeview District’s obligation to repay those advances also terminates automatically if we dissolve, wind up, cease to carry on business as a going concern or become subject to a bankruptcy or receivership proceeding. Under the WISE agreement, we and the Rangeview District have each waived the right to sue the other for damages, limiting our remedies to equitable relief. At August 31, 2026, the Rangeview District owed us $1.1 million, including accrued interest.
Restrictions on the transfer and financing of our contractual rights may limit our ability to raise capital against, sell or otherwise realize value from our water and wastewater business. Many of our agreements may not be assigned without the consent of the other party, and other agreements limit our ability to encumber related revenue. In addition, because our water supplies, including Export Water, are decreed for a specific type and place of use within our service area and Sky Ranch, the sale or transfer of these water rights may result in a breach of our obligations under the service agreements. These provisions could limit the forms of financing available to us, restrict any independent sale of our water or water and wastewater segment or limit financing sources for our water and wastewater business or particular assets.
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| 5. | Risks Related to Our Governance and Common Stock |
We are the subject of a proxy contest, which has caused and may continue to cause us to incur substantial costs, divert the attention of our Board of Directors and management, and create uncertainty about our future. In January 2026, we entered into a cooperation agreement with Maran Capital Management, LLC and certain of its affiliates (collectively, Maran) under which we appointed two Maran designees to our Board of Directors and formed a Strategy and Capital Allocation Committee. On May 21, 2026, one Maran designee resigned from our Board of Directors, and on July 7, 2026, the second Maran designee resigned. The cooperation agreement has since expired in accordance with its terms, and our Board has continued the Strategy and Capital Allocation Committee as a standing committee. On August 4, 2026, Maran, which together with the other members of its reporting group has reported beneficial ownership of approximately 14.7% of our outstanding common stock, delivered notice of its intent to nominate five candidates for election to our Board of Directors at our 2027 annual meeting of shareholders, which we expect to hold on or about February 10, 2027. Our Board of Directors has nominated eight candidates for election at that meeting. The proxy contest, and any related litigation or other activism, has required and may continue to require significant time and attention from our Board of Directors and management. We expect to incur substantial legal, advisory, proxy solicitation and other costs in connection with the proxy contest, substantially all of which will be incurred in fiscal 2027 and which we expect will exceed $1 million in the aggregate. If some or all of the nominees proposed by Maran are elected, the composition of our Board of Directors would change, which could result in changes to our strategy, capital allocation priorities, management or operations. Uncertainty about our future direction could affect our relationships with homebuilders, lenders, contractors, governmental entities and other counterparties, make it more difficult to attract and retain qualified personnel, and cause the market price of our common stock to fluctuate based on temporary or speculative market perceptions that may not reflect the fundamentals of our business. In addition, a change in our Board of Directors or management could trigger change in control provisions in certain of our agreements. Under our SFR Facility Agreement, a “Change in Control” is an event of default, and no cure period
23
applies. The agreement defines it as a material change in the day-to-day management, including a change in officers or other senior management, of the operations of the borrowers or guarantor. Upon an event of default, the lender may terminate its commitments, declare all outstanding borrowings (approximately $11.3 million at August 31, 2026) immediately due and payable, require us to cash-collateralize the approximately $4.7 million of letters of credit issued under the Working Capital LOC, charge interest at the default rate and exercise its remedies against the collateral. If a change in the composition of our Board of Directors results in changes to our officers or senior management, we may need to seek a waiver or amendment from the lender, which may not be available on acceptable terms or at all.
We are dependent on a small number of key employees, and the loss of any of them could disrupt our operations. Our success largely depends on the continued services of our President and Chief Executive Officer, Mark W. Harding. We believe Mr. Harding possesses valuable knowledge, experience and leadership abilities that would be difficult to replace in the short term. Mr. Harding also serves on the boards of directors of the Rangeview District, the Sky Ranch Districts, the Sky Ranch CAB and SMWSA. The loss of Mr. Harding as an officer and as a director could cause a significant interruption to our operations. In addition to Mr. Harding, we operate with a lean staff and rely heavily on a small number of individuals in key roles, including our Chief Financial Officer, our Controller, our Vice President of Engineering and head of water and wastewater operations, our Vice President of Land Development and the certified Operators in Responsible Charge (ORCs) of the Rangeview District’s water and wastewater systems, whose certification is required under Colorado law to operate those systems. The loss of these individuals, or our inability to attract and retain qualified replacements, could disrupt our operations and financial reporting and our ability to meet our obligations under our service agreements with the Rangeview District. Changes in the composition of our Board of Directors, including as a result of the pending proxy contest, may create uncertainty among our key employees and increase the risk that one or more of them leaves the Company.
Our stock price has been volatile in the past and may decline in the future. Our common stock has experienced significant price and volume fluctuations in the past and may experience significant fluctuations in the future depending upon several factors, some of which are beyond our control. Factors that could affect our stock price and trading volume include, among others, the perceived prospects of our business; differences between anticipated and actual operating results; changes in analysts’ recommendations or projections; the commencement and/or results of litigation and other legal proceedings; and future sales of our common stock by us or by significant shareholders, officers and directors. In addition, stock markets in general have experienced price and volume volatility from time to time, which may adversely affect the market price of our common stock for reasons unrelated to our performance.
Our share repurchases may not enhance long-term shareholder value. Our Board of Directors has authorized the repurchase of up to 200,000 shares of our common stock, of which 78,474 shares remained available at August 31, 2026. Our repurchases have been temporarily suspended due to the substantial cost and uncertainty created by the Maran proxy contest.
6.General Risk Factors
Unauthorized access to confidential information and data on our information technology systems and security and data breaches could materially adversely affect our business, financial condition, and operating results. We rely on computer and information technology systems to conduct our business and communicate with our suppliers and other third parties. Our systems require continued and unimpeded access to secure network connections. We have physical, technical and procedural safeguards in place that are designed to protect information and protect against security and data breaches as well as fraudulent transactions and other activities. Despite these safeguards and our other security processes and protections, we cannot provide assurance that all of our systems and processes are free from vulnerability to security breaches. Cyber-attacks are evolving and becoming increasingly sophisticated. Cyberattacks may take various forms, including through hacking, ransomware attacks, malware, viruses and phishing scams. A successful attack could disrupt our water, wastewater or billing operations, result in the loss or misuse of customer or employee data, expose us to liability and regulatory action and require significant remediation costs, any of which could adversely affect our business.
Failure to maintain effective internal control over financial reporting could result in material misstatements in our financial statements and affect our ability to meet our reporting requirements. Our management is responsible for establishing and maintaining adequate internal control over our financial reporting, as defined in Rule 13a-15(f) under the Exchange Act. A material weakness is a deficiency, or a combination of deficiencies, in internal control over financial reporting, such that there is a reasonable possibility that a material misstatement of the Company’s annual or interim financial statements will not be prevented or detected on a timely basis. Any failure to maintain effective internal control over financial reporting, including in connection with changes to our systems and processes, could result in a material misstatement of our financial statements, cause us to fail to meet our reporting obligations and adversely affect the market price of our common stock.
24
Our operations could be adversely impacted by increases in material, labor and other operating costs, tariffs and trade restrictions, and supply chain delays and shortages, which could cause lower margins or delays and adversely impact our business, financial position, results of operations and cash flows. The market prices for certain materials and components we purchase, primarily concrete, asphalt, steel and PVC piping, have been volatile, and some supplies are subject to long lead times. Our development, construction, and water operations rely on materials and equipment that may be subject to U.S. and foreign tariffs, duties, quotas, sanctions, “Buy America”/local-content mandates and similar trade measures, which can raise procurement costs, lengthen lead times, limit availability, or require alternative suppliers or redesigns, and frequent changes in trade policy create pricing uncertainty. Suppliers may impose surcharges or assert force majeure tied to tariff changes or shipping constraints, and tariffs and trade restrictions affecting our homebuilding partners and oil and gas customers may also reduce demand for our residential lots and industrial water sales. Our margins may also be adversely affected by increases in labor, logistics and energy costs. Because our lot sale contracts and many of our construction contracts are fixed-price, we may be prevented, in whole or in part, from passing cost increases through to our customers, which could have a material adverse impact on our margins, business, financial position, results of operations and cash flows.