Item 7. Management's Discussion and Analysis of Financial Condition and Results of Operations.
The following combined discussion is separately filed by OGE Energy and OG&E. However, OG&E does not make any representations as to information related solely to OGE Energy or the subsidiaries of OGE Energy other than itself.
Overview
OGE Energy is a holding company whose primary investment provides electricity in Oklahoma and western Arkansas. OGE Energy's electric company operations are conducted through its wholly-owned subsidiary, OG&E, which generates, transmits, distributes and sells electric energy in Oklahoma and western Arkansas and are reported through OGE Energy's electric company business segment. OG&E's rates are subject to regulation by the OCC, the APSC and the FERC. OG&E was incorporated in 1902 under the laws of the Oklahoma Territory and is the largest electric company in Oklahoma, with a franchised service territory that includes Fort Smith, Arkansas and the surrounding communities. OG&E sold its retail natural gas business in 1928 and is no longer engaged in the natural gas distribution business.
The accounts of OGE Energy and its wholly-owned subsidiaries, including OG&E, are included in OGE Energy's consolidated financial statements. All intercompany transactions and balances are eliminated in such consolidation.
Prior to the December 2, 2021 closing of the Enable and Energy Transfer merger, OGE Energy's former natural gas midstream operations segment included its investment in Enable. Subsequent to the merger and throughout 2022, OGE Energy's natural gas midstream operations segment included OGE Energy's investment in Energy Transfer's equity securities acquired in the Enable and Energy Transfer merger. For the period of December 2, 2021 through September 30, 2022, OGE Energy accounted for its investment in Energy Transfer as an investment in equity securities and reported the Energy Transfer investment, along with legacy Enable seconded employee pension and postretirement costs, through OGE Energy's natural gas midstream operations segment. As of the end of September 2022, OGE Energy sold all of its Energy Transfer limited partner units. Therefore, beginning in 2023, OGE Energy no longer has a natural gas operations reporting segment. Prior to OGE Energy's sale of all Energy Transfer limited partner units, the investment in Energy Transfer's equity securities was held through wholly-owned subsidiaries and ultimately OGE Holdings.
Recent Developments
Global Macroeconomic Pressures
Geopolitical events and related governmental and business responses continue to have an impact on the Registrants' operations, supply chains and end-user customers. The Registrants have experienced, and are pursuing mitigation strategies for, raw material inflation, logistical challenges and certain component shortages. Supply chain disruption, including disruptions related to utility-scale solar components, may result in delays in construction activities and equipment deliveries related to OGE Energy's capital projects. Rising interest rates have increased the cost of debt that OG&E has incurred during 2023 in order to help fund its capital investment program. The timing and extent of the financial impact from these events have not been material to the Registrants' operations at this time but are still uncertain, and the Registrants cannot predict the magnitude of the impact to the results of their business and results of operations.
OG&E's Regulatory Matters
Completed regulatory matters affecting current period results are discussed in Note 14 within "Item 8. Financial Statements and Supplementary Data." OG&E filed an Oklahoma general rate review on December 29, 2023 and expects to submit its final 2024 IRP for Oklahoma and Arkansas in the first quarter of 2024.
Infrastructure Investment and Jobs Act
In early 2023, OG&E applied for federal grants funded through the Infrastructure Investment and Jobs Act and in October 2023 was awarded a $50 million grant under the Grid Resilience and Innovation Partnerships Program, which will be used, along with other investments by OG&E, to fund an adaptable grid project that is expected to provide grid automation and improve system reliability for OG&E customers. The grant funds will be used to reduce the total cost for investments in this adaptable grid project.
31
Summary of OGE Energy 2023 Operating Results Compared to 2022
OGE Energy's net income was $416.8 million, or $2.07 per diluted share, in 2023 as compared to $665.7 million, or $3.32 per diluted share, in 2022. The decrease in net income of $248.9 million, or $1.25 per diluted share, in 2023 as compared to 2022 is further discussed below.
•
A decrease in net income at OG&E of $13.1 million, or $0.07 per diluted share of OGE Energy's common stock, was primarily due to higher depreciation and amortization expense as a result of additional assets being placed into service, higher interest expense related to two senior note issuances in January and April of 2023 and higher other operation and maintenance expense, partially offset by higher operating revenues (excluding the impact of recoverable fuel, purchased power and direct transmission expense not impacting earnings) driven by the recovery of capital investments, which offset the impact of milder weather compared to 2022, higher net other income and lower income tax expense.
•
An increase in net loss of other operations (holding company) of $4.5 million, or $0.02 per diluted share of OGE Energy's common stock, was primarily due to higher interest expense driven by increased short-term debt outstanding, partially offset by a higher income tax benefit.
•
OGE Holdings' net income of $231.3 million, or $1.16 per diluted share of OGE Energy's common stock in 2022 included a $282.1 million pre-tax gain on OGE Energy's investment in Energy Transfer limited partner units. As further discussed in Note 12 within "Item 8. Financial Statements and Supplementary Data," OGE Energy sold all of Energy Transfer's limited partner units by the end of September 2022; therefore, beginning in 2023 OGE Energy no longer has a natural gas midstream operations reporting segment.
A more detailed discussion regarding the financial performance for the year ended December 31, 2023 as compared to December 31, 2022 can be found under "Results of Operations" below. A discussion of the financial performance for the year ended December 31, 2022 compared to December 31, 2021 for OGE Energy and OG&E can be found within "Item 7. Management's Discussion and Analysis of Financial Condition and Results of Operations" of the Registrants' 2022 Form 10-K.
2024 Outlook
Key assumptions for the 2024 outlook are discussed below.
OGE Energy is projected to earn approximately $415 million to $439 million, or $2.06 to $2.18 per average diluted share, with a midpoint of $427 million, or $2.12 per average diluted share in 2024 and is based off the following assumptions:
•
OGE Energy forecasts earnings for OG&E of $447 million, or $2.22 per average diluted share;
•
OGE Energy forecasts a loss of $20 million for other operations (primarily the holding company), or a loss of $0.10 per average diluted share;
•
OG&E experiences normal weather patterns for the year; OG&E has significant seasonality in its earnings; OG&E typically shows minimal earnings in the first and fourth quarters with a majority of its earnings in the third quarter due to the seasonal nature of air conditioning demand;
•
operating revenues growth driven by OG&E total approximate load growth (weather normalized) in the residential class of 1 percent, commercial class of between 8 percent and 15 percent, oilfield class of 3 percent, public authority class of 3 percent, and a slight decline in the industrial class of 1 percent; total retail load growth up to approximately 3 percent to 5 percent;
•
operating expenses of approximately $1.145 billion to $1.150 billion, with operation and maintenance expenses comprising approximately 44 percent of the total;
•
net interest expense of approximately $250 million to $252 million which assumes a $16 million allowance for borrowed funds used during construction reduction to interest expense, and assumes a debt issuance at OG&E of $300 million to $350 million and a debt issuance at other operations (primarily the holding company) of $300 million in 2024;
•
other income of approximately $30 million including $17 million of allowance for equity funds used during construction;
•
an effective consolidated tax rate of approximately 15.0 percent; and
•
approximately 201.5 million average diluted shares outstanding.
32
Results of Operations
The following discussion and analysis presents factors that affected the Registrants' results of operations for the years ended December 31, 2023 and 2022 and the Registrants' financial positions at December 31, 2023 and 2022. The following information should be read in conjunction with the financial statements and notes thereto. Known trends and contingencies of a material nature are discussed to the extent considered relevant.
| OGE Energy | Year Ended December 31, | ||||||
|---|---|---|---|---|---|---|---|
| (In millions except per share data) | 2023 | 2022 | |||||
| Net income | $ | 416.8 | $ | 665.7 | |||
| Basic average common shares outstanding | 200.3 | 200.2 | |||||
| Diluted average common shares outstanding | 200.9 | 200.8 | |||||
| Basic earnings per average common share | $ | 2.08 | $ | 3.33 | |||
| Diluted earnings per average common share | $ | 2.07 | $ | 3.32 | |||
| Dividends declared per common share | $ | 1.6646 | $ | 1.6482 |
Results by Business Segment
| Year Ended December 31, | ||||||||
|---|---|---|---|---|---|---|---|---|
| (In millions) | 2023 | 2022 | ||||||
| Net income: | ||||||||
| OG&E (Electric Company) | $ | 426.4 | $ | 439.5 | ||||
| Other operations (A) | (9.6 | ) | (5.1 | ) | ||||
| OGE Holdings (Natural Gas Midstream Operations) (B) | — | 231.3 | ||||||
| OGE Energy net income | $ | 416.8 | $ | 665.7 |
(A)
Other operations primarily includes the operations of the holding company, other energy-related investments and consolidating eliminations.
(B)
As a result of OGE Energy's sale of all Energy Transfer units by the end of September 2022, OGE Energy no longer has a natural gas midstream operations reporting segment, beginning in 2023. More information regarding the change in reporting segments is discussed in Note 12 within "Item 8. Financial Statements and Supplementary Data."
33
The following discussion of results of operations by business segment includes intercompany transactions that are eliminated in OGE Energy's consolidated financial statements.
OG&E (Electric Company)
| Year Ended December 31 (Dollars in millions) | 2023 | 2022 | ||||||
|---|---|---|---|---|---|---|---|---|
| Operating revenues | $ | 2,674.3 | $ | 3,375.7 | ||||
| Fuel, purchased power and direct transmission expense | 911.7 | 1,662.4 | ||||||
| Other operation and maintenance | 505.0 | 491.9 | ||||||
| Depreciation and amortization | 506.6 | 460.9 | ||||||
| Taxes other than income | 99.4 | 98.0 | ||||||
| Operating income | 651.6 | 662.5 | ||||||
| Allowance for equity funds used during construction | 19.4 | 6.9 | ||||||
| Other net periodic benefit income | 6.5 | 1.2 | ||||||
| Other income | 23.9 | 6.5 | ||||||
| Other expense | 6.3 | 3.4 | ||||||
| Interest expense | 199.9 | 157.8 | ||||||
| Income tax expense | 68.8 | 76.4 | ||||||
| Net income | $ | 426.4 | $ | 439.5 | ||||
| Operating revenues by classification: | ||||||||
| Residential | $ | 1,040.4 | $ | 1,307.0 | ||||
| Commercial | 688.4 | 818.3 | ||||||
| Industrial | 240.5 | 327.5 | ||||||
| Oilfield | 211.9 | 308.8 | ||||||
| Public authorities and street light | 234.9 | 299.0 | ||||||
| System sales revenues | 2,416.1 | 3,060.6 | ||||||
| Provision for rate refund | 2.0 | (1.2 | ) | |||||
| Integrated market | 71.6 | 163.8 | ||||||
| Transmission | 143.0 | 131.7 | ||||||
| Other | 41.6 | 20.8 | ||||||
| Total operating revenues | $ | 2,674.3 | $ | 3,375.7 | ||||
| MWh sales by classification (In millions) | ||||||||
| Residential | 9.6 | 10.4 | ||||||
| Commercial | 8.5 | 7.8 | ||||||
| Industrial | 4.2 | 4.3 | ||||||
| Oilfield | 4.4 | 4.4 | ||||||
| Public authorities and street light | 3.0 | 3.1 | ||||||
| System sales | 29.7 | 30.0 | ||||||
| Integrated market | 0.8 | 1.1 | ||||||
| Total sales | 30.5 | 31.1 | ||||||
| Number of customers | 896,102 | 888,759 | ||||||
| Weighted-average cost of energy per kilowatt-hour (In cents) | ||||||||
| Natural gas | 2.976 | 7.032 | ||||||
| Coal | 3.385 | 3.253 | ||||||
| Total fuel | 2.926 | 5.480 | ||||||
| Total fuel and purchased power | 2.837 | 5.096 | ||||||
| Degree days (A) | ||||||||
| Heating - Actual | 3,092 | 3,652 | ||||||
| Heating - Normal | 3,568 | 3,568 | ||||||
| Cooling - Actual | 2,215 | 2,385 | ||||||
| Cooling - Normal | 1,893 | 1,893 |
(A)
Degree days are calculated as follows: The high and low degrees of a particular day are added together and then averaged. If the calculated average is above 65 degrees, then the difference between the calculated average and 65 is expressed as cooling degree days, with each degree of difference equaling one cooling degree day. If the calculated average is below 65 degrees, then the difference between the calculated average and 65 is expressed as heating degree days, with each degree of difference equaling
34
one heating degree day. The daily calculations are then totaled for the particular reporting period. The calculation of heating and cooling degree normal days is based on a 30-year average and updated every ten years.
OG&E's net income decreased $13.1 million, or 3.0 percent, in 2023 as compared to 2022. The following section discusses the primary drivers for the decrease in net income in 2023 as compared to 2022.
Operating revenues decreased $701.4 million, or 20.8 percent, primarily driven by the below factors.
| (In millions) | $ Change | |||
|---|---|---|---|---|
| Fuel, purchased power and direct transmission expense (A) | $ | (750.7 | ) | |
| Quantity impacts (includes weather) (B) | (14.5 | ) | ||
| Industrial and oilfield sales | (2.6 | ) | ||
| Other | (2.0 | ) | ||
| Price variance (C) | 10.0 | |||
| Non-residential demand and related revenues | 11.4 | |||
| New customer growth | 11.8 | |||
| Wholesale transmission revenue | 12.3 | |||
| Guaranteed Flat Bill program (D) | 22.9 | |||
| Change in operating revenues | $ | (701.4 | ) |
(A)
These expenses are generally recoverable from customers through regulatory mechanisms and are offset in Fuel, Purchased Power and Direct Transmission Expense in the statements of income. The primary drivers of the changes in fuel, purchased power and direct transmission expense during the period are further detailed in the table below.
(B)
Decreased primarily due to a 15.3 percent decrease in heating degree days and a 7.1 percent decrease in cooling degree days.
(C)
Increased primarily due to the Oklahoma general rate review order received in September 2022 that approved new rates effective July 1, 2022 and increased recovery through rider mechanisms.
(D)
The Guaranteed Flat Bill program allows qualifying customers the opportunity to purchase their electricity needs at a set monthly price for an entire year which can result in variances when actual fuel and purchased power prices differ from what is included in Guaranteed Flat Bill rates.
Fuel, purchased power and direct transmission expense for OG&E consists of fuel used in electric generation, purchased power and transmission related charges. As described above, the actual cost of fuel used in electric generation and certain purchased power costs are generally recoverable from OG&E's customers through fuel adjustment clauses. The fuel adjustment clauses are subject to periodic review by the OCC and the APSC. OG&E's fuel, purchased power and direct transmission expense decreased $750.7 million, or 45.2 percent, primarily driven by the below factors.
| (In millions) | $ Change | |||
|---|---|---|---|---|
| Fuel expense (A) | $ | (355.1 | ) | |
| Purchased power costs: | ||||
| Purchases from SPP (B) | (389.6 | ) | ||
| Wind | (9.2 | ) | ||
| Other (C) | 13.0 | |||
| Transmission expense | (9.8 | ) | ||
| Change in fuel, purchased power and direct transmission expense | $ | (750.7 | ) |
(A)
Decreased primarily due to lower fuel costs related to the generating assets utilized during 2023.
(B)
Decreased primarily due to lower market prices for fuel during 2023.
(C)
Increased partially due to new capacity agreements during 2023.
Other operation and maintenance expense increased $13.1 million, or 2.7 percent, primarily driven by the below factors.
| (In millions) | $ Change | |||
|---|---|---|---|---|
| Corporate overheads and allocations | $ | 11.5 | ||
| Payroll and benefits, net of capitalized labor | 10.4 | |||
| Materials and supplies | (2.3 | ) | ||
| Other | (3.1 | ) | ||
| Contract technical and construction services | (3.4 | ) | ||
| Change in other operation and maintenance expense | $ | 13.1 |
35
Depreciation and amortization expense increased $45.7 million, or 9.9 percent, primarily due to an increase in depreciation rates effective as of July 1, 2022 resulting from the most recent Oklahoma general rate review order and additional assets being placed into service.
Net other income increased $32.3 million, primarily due to the carrying charge for the increased fuel under recovery balance during 2023, higher allowance for equity funds used during construction and lower pension cost.
Interest expense increased $42.1 million, or 26.7 percent, primarily due to higher interest on long-term debt driven by the $450.0 million and $350.0 million senior note issuances in January 2023 and in April 2023, respectively.
Income tax expense decreased $7.6 million, or 9.9 percent, primarily related to lower pre-tax income and additional amortization of net unfunded deferred taxes, partially offset by decreased state tax credit generation.
OGE Holdings (Natural Gas Midstream Operations)
OGE Energy's former natural gas midstream operations reporting segment included OGE Energy's investment in Energy Transfer's equity securities and legacy Enable seconded employee pension and postretirement costs. As of the end of September 2022, OGE Energy sold all of its Energy Transfer limited partner units; therefore, beginning in 2023, OGE Energy no longer has a natural gas midstream operations reporting segment. See "Investment in Equity Securities of Energy Transfer" in Note 1 within "Item 8. Financial Statements and Supplementary Data" for further discussion of the activity of Energy Transfer's equity securities during the year ended 2022.
OGE Holdings' income tax expense decreased $48.1 million, due to OGE Energy's divestiture of all Energy Transfer limited partner units in 2022.
Liquidity and Capital Resources
Cash Flows
OGE Energy
| Year Ended December 31 (In millions) | 2023 | 2022 | $ Change | % Change | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Net cash provided from operating activities (A) | $ | 1,232.3 | $ | 952.4 | $ | 279.9 | 29.4 | |||||||
| Net cash used in investing activities (B) | $ | (1,272.1 | ) | $ | (96.4 | ) | $ | (1,175.7 | ) | * | ||||
| Net cash used in financing activities (C) | $ | (48.1 | ) | $ | (767.9 | ) | $ | 719.8 | 93.7 |
* Change is greater than 100 percent.
(A)
Changed primarily due to decreased vendor payments driven by lower amounts due to vendors, including those for fuel and purchased power, increased fuel recoveries from customers and decreased income tax payments primarily relating to the sale of Energy Transfer's limited partner units in 2022, partially offset by the one-time receipt of securitization funds in 2022 from the Oklahoma Development Finance Authority.
(B)
Changed primarily due to proceeds received in 2022 from the sale of Energy Transfer's limited partner units and increased investments in technology.
(C)
Changed primarily due to an increase in short-term debt of $499.2 million and OG&E's $450.0 million and $350.0 million senior note issuances in January 2023 and April 2023, respectively, partially offset by the repayment of $1.0 billion in senior notes that matured in May 2023.
Working Capital
Working capital is defined as the difference in current assets and current liabilities. OGE Energy's working capital requirements are driven generally by changes in accounts receivable, accounts payable, commodity prices, credit extended to and the timing of collections from OG&E's customers, the level and timing of spending for maintenance and expansion activity, inventory levels and fuel recoveries. The following discussion addresses changes in OGE Energy's working capital balances at December 31, 2023 compared to December 31, 2022.
36
Cash and Cash Equivalents decreased $87.9 million, or 99.8 percent, primarily due to the use of cash that had been held at December 31, 2022 to help fund the repayment of $1.0 billion in senior notes that matured in May 2023.
Accounts Receivable and Accrued Unbilled Revenues decreased $42.8 million, or 13.2 percent, primarily due to a decrease in billings to OG&E's retail customers reflecting lower usage and a reduction in the fuel factors beginning in early November 2023.
Fuel Inventories increased $49.7 million, or 45.7 percent, primarily due to net purchase activity of coal and natural gas for operational resiliency.
Materials and Supplies, at Average Cost increased $73.8 million, or 40.9 percent, primarily due to increased inventory which is partly a result of the acquisition of stock to alleviate supply chain disruptions, fulfillment of near-term capital needs, and inflation impacts of the recent economic environment.
Fuel Clause Recoveries moved from an under recovery position of $514.9 million as of December 31, 2022 to an over recovery position of $20.5 million as of December 31, 2023, primarily due to higher recoveries from OG&E retail customers as compared to the actual cost of fuel and purchased power driven by updated fuel factors implemented in early 2023 to address the existing fuel under recovery balance. In November 2023, OG&E implemented reduced fuel factors.
Other Current Assets decreased $44.7 million, or 43.2 percent, primarily due to a decrease in SPP deposits.
Short-term Debt increased $499.2 million primarily due to increased borrowings for general operating needs. The Registrants borrow on a short-term basis, as necessary, through the issuance of commercial paper under their revolving credit agreements.
Accounts Payable decreased $172.5 million, or 38.4 percent, primarily due to timing of vendor payments and a decrease in fuel and purchased power payables.
Customer Deposits increased $14.7 million, or 16.6 percent, primarily due to new customer growth and additional deposits required to be posted as customer creditworthiness is reevaluated on a periodic basis.
Accrued Interest increased $16.3 million, or 39.7 percent, primarily due to the interest costs associated with OG&E's $450.0 million and $350.0 million senior note issuances in January 2023 and April 2023, respectively.
Accrued Compensation increased $9.8 million, or 26.5 percent, primarily due to higher accruals for incentive compensation based on company performance in 2023.
Long-Term Debt Due Within One Year decreased $999.9 million, due to the repayment of the $1.0 billion in senior notes that matured in May 2023.
2023 Capital Requirements, Sources of Financing and Financing Activities
In 2023, OGE Energy's primary sources of capital were cash generated from operations and the proceeds from the issuance of long- and short-term debt. Changes in working capital reflect the seasonal nature of OGE Energy's business, the revenue lag between billing and collection from customers and fuel inventories. See "Working Capital" for a discussion of significant changes in net working capital requirements as it pertains to operating cash flow and liquidity.
Future Material Cash Requirements
OGE Energy's primary material cash requirements are related to acquiring or constructing new facilities and replacing or expanding existing facilities at OG&E. Other working capital requirements are expected to be primarily related to maturing debt, operating lease obligations, fuel clause under recoveries and other general corporate purposes. Further, working capital requirements can be seasonal. OGE Energy generally meets its cash needs through a combination of cash generated from operations, short-term borrowings (through a combination of bank borrowings and commercial paper) and permanent financings. We believe our cash flows from operations, existing borrowing capacity, and access to debt and equity capital markets as needed, should be sufficient to satisfy our material cash requirements over the short-term and long-term.
37
Capital Expenditures
The following table presents OGE Energy's estimates of capital expenditures for the years 2024 through 2028. These capital investments are customer-focused and targeted to maintain and improve the safety, resiliency and reliability of OG&E's distribution and transmission grid and generation fleet, enhance the ability of OG&E's system to perform during extreme weather events and to serve OG&E's growing customer base.
| (In millions) | 2024 | 2025 (A) | 2026 (A) | 2027 (A) | 2028 (A) | Total | |||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Transmission economic expansion & reliability | $ | 145 | $ | 180 | $ | 195 | $ | 225 | $ | 240 | $ | 985 | |||||||||||
| Oklahoma distribution economic expansion & reliability | 400 | 520 | 665 | 705 | 725 | 3,015 | |||||||||||||||||
| Arkansas distribution economic expansion & reliability | 20 | 25 | 25 | 25 | 25 | 120 | |||||||||||||||||
| Generation reliability | 140 | 150 | 155 | 160 | 165 | 770 | |||||||||||||||||
| Generation capacity projects | 165 | 160 | 35 | — | — | 360 | |||||||||||||||||
| Technology, fleet & facilities | 230 | 115 | 125 | 135 | 145 | 750 | |||||||||||||||||
| Total | $ | 1,100 | $ | 1,150 | $ | 1,200 | $ | 1,250 | $ | 1,300 | $ | 6,000 |
(A)
OG&E expects to continually evaluate the capital prioritization for transmission, distribution, technology, and generation investments based on the evolving capacity, reliability, and economic growth needs of the electrical power system.
Additional capital expenditures beyond those identified in the table above, including additional incremental growth opportunities, will be evaluated based upon the requirements of OG&E's power supply, transmission and distribution operational teams and the expected resultant customer benefits. OG&E intends to issue requests for proposals for resources to satisfy the new generation capacity needs identified in OG&E's draft 2024 IRP. OG&E also intends to file for approval of generation capacity investments and would expect to update its capital plan based on final orders received by state regulators. The annual level of investments in the transmission and distribution system could vary depending on the amount and timing of incremental generation capacity investments.
Contractual Obligations
The following table presents OGE Energy's total contractual obligations for the next five years at December 31, 2023. For further detail of OGE Energy's contractual obligations, which include operating leases, long-term debt and purchase obligations and commitments (including information for maturities beyond the next five years), see Notes 4, 9 and 13, respectively, within "Item 8. Financial Statements and Supplementary Data."
| (In millions) | 2024 | 2025 | 2026 | 2027 | 2028 | Total | ||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Total contractual obligations | $ | 352.4 | $ | 477.7 | $ | 225.1 | $ | 350.0 | $ | 611.1 | $ | 2,016.3 | ||||||||||||
| Amounts recoverable through fuel adjustment clause and other regulatory mechanisms (A) | (208.1 | ) | (190.9 | ) | (167.2 | ) | (156.1 | ) | (105.0 | ) | (827.3 | ) | ||||||||||||
| Total contractual obligations, net | $ | 144.3 | $ | 286.8 | $ | 57.9 | $ | 193.9 | $ | 506.1 | $ | 1,189.0 |
(A)
Includes expected recoveries of costs incurred for OG&E's railcar operating lease obligations, OG&E's minimum fuel purchase commitments, OG&E's expected wind purchase commitments and OG&E's capacity agreements.
The actual cost of fuel used in electric generation (which includes the operating lease obligations for OG&E's railcar leases shown in Note 4 within "Item 8. Financial Statements and Supplementary Data") and certain purchased power costs are passed on to OG&E's customers through fuel adjustment clauses and other regulatory mechanisms. Accordingly, while the cost of fuel related to operating leases and the vast majority of minimum fuel purchase commitments of OG&E noted in Notes 4 and 13, respectively, within "Item 8. Financial Statements and Supplementary Data" may increase capital requirements, such costs are generally recoverable through fuel adjustment clauses and have little, if any, impact on net capital requirements and future contractual obligations. OG&E's fuel adjustment clauses are subject to periodic review by the OCC and the APSC. Otherwise, as discussed above, OGE Energy expects to meet these cash requirement needs through cash generated from operations, short-term borrowings and permanent financings.
Pension and Postretirement Benefit Plans
At December 31, 2023, 23.3 percent of the Pension Plan investments were in listed common stocks with the balance primarily invested in corporate fixed income and other securities, U.S. Treasury notes and bonds and mutual funds, as presented in Note 11 within "Item 8. Financial Statements and Supplementary Data." During 2023, the actual return on the Pension Plan was $27.6 million,
38
compared to an expected return on plan assets of $16.2 million. During the same time, corporate bond yields, which are used in determining the discount rate for future pension obligations, increased. Funding levels are dependent on returns on plan assets and future discount rates. OGE Energy did not make any contribution to its Pension Plan for years 2023 and 2022 but does expect to make a $10.0 million contribution to its Pension Plan in 2024. OGE Energy could be required to make additional contributions if the value of its pension trust and postretirement benefit plan trust assets are adversely impacted by a major market disruption in the future.
The following table presents the status of OGE Energy's Pension Plan, the Restoration of Retirement Income Plan and the postretirement benefit plans at December 31, 2023 and 2022. These amounts have been recorded in Accrued Benefit Obligations with the offset in Accumulated Other Comprehensive Loss (except OG&E's portion, which is recorded as a regulatory asset as discussed in Note 1 within "Item 8. Financial Statements and Supplementary Data") in the balance sheets. The amounts in Accumulated Other Comprehensive Loss and those recorded as a regulatory asset represent a net periodic benefit cost to be recognized in the statements of income in future periods.
| Pension Plan | Restoration of Retirement Income Plan | Postretirement Benefit Plans | ||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| December 31 (In millions) | 2023 | 2022 | 2023 | 2022 | 2023 | 2022 | ||||||||||||||||||
| Benefit obligations | $ | 303.7 | $ | 358.5 | $ | 5.5 | $ | 5.8 | $ | 103.3 | $ | 101.9 | ||||||||||||
| Fair value of plan assets | 243.7 | 293.0 | — | — | 32.7 | 32.8 | ||||||||||||||||||
| Funded status at end of year | $ | (60.0 | ) | $ | (65.5 | ) | $ | (5.5 | ) | $ | (5.8 | ) | $ | (70.6 | ) | $ | (69.1 | ) |
Common Stock Dividends
OGE Energy's dividend policy is reviewed by the Board of Directors at least annually and is based on numerous factors, including management's estimation of the long-term earnings power of its businesses. In 2023, the Board of Directors reviewed a recommendation from management of an increase in the quarterly dividend to $0.4182 per share from $0.4141 per share and subsequently approved the recommendation to become effective with the dividend payment in October 2023.
Financing Activities and Future Sources of Financing
Management expects that cash generated from operations, proceeds from the issuance of long- and short-term debt, proceeds from the sales of common stock to the public through OGE Energy's Automatic Dividend Reinvestment and Stock Purchase Plan, or other offerings will be adequate over the next three years to meet anticipated cash needs and to fund future growth opportunities. OGE Energy utilizes short-term borrowings (through a combination of bank borrowings and commercial paper) to satisfy temporary working capital needs and as an interim source of financing capital expenditures until permanent financing is arranged.
Short-Term Debt and Credit Facilities
OGE Energy borrows on a short-term basis, as necessary, by issuance of commercial paper and borrowings under its revolving credit agreements and term credit agreements maturing in one year or less.
OGE Energy has unsecured five-year revolving credit facilities totaling $1.1 billion ($550.0 million for OGE Energy and $550.0 million for OG&E), which can also be used as letter of credit facilities. OGE Energy also has a $100.0 million floating rate unsecured three-year credit agreement, of which $50.0 million is considered a revolving loan. The following table presents information about OGE Energy's revolving credit agreements as of December 31, 2023.
| (Dollars in millions) | December 31, 2023 | |||
|---|---|---|---|---|
| Balance of outstanding supporting letters of credit | $ | 0.4 | ||
| Weighted-average interest rate of outstanding supporting letters of credit | 1.20 | % | ||
| Net available liquidity under revolving credit agreements, commercial paper borrowings and letters of credit | $ | 650.4 | ||
| Balance of cash and cash equivalents | $ | 0.2 |
39
The following table presents information about OGE Energy's total short-term debt activity for the year ended December 31, 2023.
| (Dollars in millions) | Year Ended December 31, 2023 | |||
|---|---|---|---|---|
| Average balance of short-term debt | $ | 269.5 | ||
| Weighted-average interest rate of average balance of short-term debt | 5.63 | % | ||
| Maximum month-end balance of short-term debt | $ | 499.2 |
OG&E must obtain regulatory approval from the FERC in order to borrow on a short-term basis. OG&E has the necessary regulatory approvals to incur up to $1.0 billion in short-term borrowings at any one time for a two-year period beginning January 1, 2023 and ending December 31, 2024.
Long-Term Debt
In January 2023, OG&E issued $450.0 million of 5.40 percent Senior Notes due January 15, 2033, and in April 2023, OG&E issued $350.0 million of 5.60 percent Senior Notes due April 1, 2053. The proceeds from these issuances were added to OG&E's general funds to be used for general corporate purposes, including to help fund the repayment of its $500.0 million of 0.553 percent Senior Notes that matured on May 26, 2023, as well as the funding of its capital investment program and working capital needs.
In 2024, OGE Energy expects to issue $300.0 million of long-term debt and OG&E expects to issue $300 million to $350 million in long-term debt to help fund general operating needs.
Security Ratings
| Moody's Investors Service | | S&P's Global Ratings | | Fitch Ratings | ||||
|---|---|---|---|---|---|---|---|---|
| | Rating | Outlook | | Rating | Outlook | | Rating | Outlook |
| OG&E Senior Notes | A3 | Stable | | A- | Stable | | A | Stable |
| OG&E Commercial Paper | P2 | Stable | | A2 | Stable | | F2 | Stable |
| OGE Energy Senior Notes | Baa1 | Stable | | BBB | Stable | | BBB+ | Stable |
| OGE Energy Commercial Paper | P2 | Stable | | A2 | Stable | | F2 | Stable |
Access to reasonably priced capital is dependent in part on credit and security ratings. Generally, lower ratings lead to higher financing costs. Pricing grids associated with OGE Energy's credit facilities could cause annual fees and borrowing rates to increase if an adverse rating impact occurs. The impact of any future downgrade could include an increase in the costs of OGE Energy's short-term borrowings, but a reduction in OGE Energy's credit ratings would not result in any defaults or accelerations. Any future downgrade could also lead to higher long-term borrowing costs and, if below investment grade, would require OGE Energy to post collateral or letters of credit.
A security rating is not a recommendation to buy, sell or hold securities. Such rating may be subject to revision or withdrawal at any time by the credit rating agency, and each rating should be evaluated independently of any other rating.
Future financing requirements may be dependent, to varying degrees, upon numerous factors such as general economic conditions, abnormal weather, load growth, commodity prices, acquisitions of other businesses and/or development of projects, actions by rating agencies, inflation, changes in environmental laws or regulations, rate increases or decreases allowed by regulatory agencies, new legislation, and market entry of competing electric power generators.
Common Stock
OGE Energy expects to issue between $15 million to $25 million of common stock from its Automatic Dividend Reinvestment and Stock Purchase Plan in 2024. See Note 8 within "Item 8. Financial Statements and Supplementary Data" for a discussion of OGE Energy's common stock activity.
40
Critical Accounting Policies and Estimates
The financial statements and notes thereto contain information that is pertinent to management's discussion and analysis. In preparing the financial statements, management is required to make estimates and assumptions that affect the reported amounts of assets and liabilities and disclosure of contingent assets and contingent liabilities at the date of the financial statements and the reported amounts of revenues and expenses during the reporting period. Actual results could differ from those estimates. Changes to these assumptions and estimates could have a material effect on the Registrants' financial statements. However, the Registrants believe they have taken reasonable positions where assumptions and estimates are used in order to minimize the negative financial impact to the Registrants that could result if actual results vary from the assumptions and estimates.
In management's opinion, the areas where the most significant judgment is exercised include the determination of pension and postretirement plan assumptions, income taxes, contingency reserves, and regulatory assets and liabilities. The selection, application and disclosure of the following critical accounting estimates have been discussed with the Audit Committee of OGE Energy's Board of Directors. The Registrants discuss their significant accounting policies, including those that do not require management to make difficult, subjective or complex judgments or estimates, in Note 1 within "Item 8. Financial Statements and Supplementary Data."
Pension and Postretirement Plan Assumptions
OGE Energy has a Pension Plan that covers certain employees, including OG&E's employees, hired before December 1, 2009. Effective December 1, 2009, OGE Energy's Pension Plan is no longer being offered to employees hired on or after December 1, 2009. OGE Energy also has defined benefit postretirement plans that cover certain employees, including OG&E's employees hired prior to February 1, 2020. Pension and other postretirement plan expenses and liabilities are determined on an actuarial basis and are affected by the market value of plan assets, estimates of the expected return on plan assets, assumed discount rates, and the level of funding. Actual changes in the fair market value of plan assets and differences between the actual return on plan assets and the expected return on plan assets could have a material effect on the amount of pension expense ultimately recognized. The Pension Plan rate assumptions are shown in Note 11 within "Item 8. Financial Statements and Supplementary Data." The assumed return on plan assets is based on management's expectation of the long-term return on the plan assets portfolio. The discount rate used to compute the present value of plan liabilities is based generally on rates of high-grade corporate bonds with maturities similar to the average period over which benefits will be paid. Funding levels are dependent on returns on plan assets and future discount rates. Higher returns on plan assets and an increase in discount rates will reduce funding requirements to the Pension Plan.
The following table presents the sensitivity of the Pension Plan funded status to these variables.
| Change | Impact on Funded Status | |||
|---|---|---|---|---|
| Actual plan asset returns | +/- 1 percent | +/- $2.4 million | ||
| Discount rate | +/- 0.25 percent | +/- $5.4 million | ||
| Contributions | +/- $10 million | +/- $10.0 million |
Income Taxes
The Registrants use the asset and liability method of accounting for income taxes. Under this method, a deferred tax asset or liability is recognized for the estimated future tax effects attributable to temporary differences between the financial statement basis and the tax basis of assets and liabilities, as well as tax credit carry forwards and net operating loss carry forwards. Deferred tax assets and liabilities are measured using enacted tax rates expected to apply to taxable income in the years in which those temporary differences are expected to be recovered or settled. The effect on deferred tax assets and liabilities of a change in tax rates is recognized in the period of the change.
The application of income tax law is complex. Laws and regulations in this area are voluminous and often ambiguous. Interpretations and guidance surrounding income tax laws and regulations change over time. Accordingly, it is necessary to make judgments regarding income tax exposure. As a result, changes in these judgments can materially affect amounts the Registrants recognized in their financial statements. Tax positions taken by the Registrants on their income tax returns that are recognized in the financial statements must satisfy a more likely than not recognition threshold, assuming that the position will be examined by taxing authorities with full knowledge of all relevant information.
41
Contingency Reserves
In the normal course of business, the Registrants are confronted with issues or events that may result in a contingent liability. These generally relate to lawsuits or claims made by third parties, including governmental agencies. When appropriate, management consults with legal counsel and other experts to assess the claim. If, in management's opinion, the Registrants have incurred a probable loss as set forth by GAAP, an estimate is made of the loss, and the appropriate accounting entries are reflected in the financial statements.
Regulatory Assets and Liabilities
OG&E, as a regulated electric company, is subject to accounting principles for certain types of rate-regulated activities, which provide that certain incurred costs that would otherwise be charged to expense can be deferred as regulatory assets, based on the expected recovery from customers in future rates. Likewise, certain actual or anticipated credits that would otherwise reduce expense can be deferred as regulatory liabilities, based on the expected flowback to customers in future rates. Management's expected recovery of deferred costs and flowback of deferred credits generally results from specific decisions by regulators granting such ratemaking treatment.
OG&E records certain incurred costs and obligations as regulatory assets or liabilities if, based on regulatory orders or other available evidence, it is probable that the costs or obligations will be included in amounts allowable for recovery or refund in future rates. Management continuously monitors the future recoverability of regulatory assets. When in management's judgment future recovery becomes impaired, the amount of the regulatory asset is adjusted, as appropriate.
Accounting Pronouncements
See Note 2 within "Item 8. Financial Statements and Supplementary Data" for further discussion of recently adopted accounting standards and recently issued accounting standards that are not yet effective that could have a material impact on the Registrants' financial position, results of operations or cash flows upon adoption.
Commitments and Contingencies
In the normal course of business, the Registrants are confronted with issues or events that may result in a contingent liability. These generally relate to lawsuits or claims made by third parties, including governmental agencies. When appropriate, management consults with legal counsel and other experts to assess the claim. If, in management's opinion, the Registrants have incurred a probable loss as set forth by GAAP, an estimate is made of the loss, and the appropriate accounting entries are reflected in the financial statements. If the assessment indicates that a potential loss is not probable but reasonably possible, the nature of the contingent matter, together with an estimate of the range of possible loss, if determinable and material, would be disclosed. At the present time, based on currently available information, the Registrants believe that any reasonably possible losses in excess of accrued amounts arising out of pending or threatened lawsuits or claims would not be quantitatively material to their financial statements and would not have a material adverse effect on their financial position, results of operations or cash flows. See Notes 13 and 14 within "Item 8. Financial Statements and Supplementary Data" and "Item 3. Legal Proceedings" for further discussion of the Registrants' commitments and contingencies.
Environmental Laws and Regulations
The activities of OG&E are subject to numerous stringent and complex federal, state and local laws and regulations governing environmental protection. These laws and regulations can change, restrict or otherwise impact the Registrants' business activities in many ways, including the handling or disposal of waste material, planning for future construction activities to avoid or mitigate harm to threatened or endangered species and requiring the installation and operation of emissions or pollution control equipment. Failure to comply with these laws and regulations could result in the assessment of administrative, civil and criminal penalties, the imposition of remedial requirements and the issuance of orders enjoining future operations. Management believes that all of the Registrants' operations are in substantial compliance with current federal, state and local environmental standards.
President Biden's Administration has taken a number of actions that adopt policies and affect environmental regulations, including issuance of executive orders that instruct the EPA and other executive agencies to review certain rules that affect OG&E with a view to achieving nationwide reductions in greenhouse gas emissions. OG&E is monitoring these actions which are in various stages of
42
implementation. At this point in time, the impacts of these actions on the Registrants' results of operations, if any, cannot be determined with any certainty.
Environmental regulation can increase the cost of planning, design, initial installation and operation of OG&E's facilities. Management continues to evaluate its compliance with existing and proposed environmental legislation and regulations and implement appropriate environmental programs in a competitive market.
Air
OG&E's operations are subject to the Federal Clean Air Act of 1970, as amended, and comparable state laws and regulations. These laws and regulations regulate emissions of air pollutants from various industrial sources, including electric generating units and also impose various monitoring and reporting requirements. Such laws and regulations may require that OG&E obtain pre-approval for the construction or modification of certain projects or facilities expected to produce air emissions or result in the increase of existing air emissions, obtain and strictly comply with air permits containing various emissions and operational limitations or install emission control equipment. OG&E likely will be required to incur certain capital expenditures in the future for air pollution control equipment and technology in connection with obtaining and maintaining operating permits and approvals for air emissions.
Cross State Air Pollution Rule
The EPA revised the NAAQS for ozone in 2015. Although Oklahoma complies with the revised standard, the Federal Clean Air Act of 1970, as amended, requires states to submit to the EPA for approval a SIP to prohibit in-state sources from contributing significantly to nonattainment of the NAAQS in another state. On October 28, 2018, Oklahoma submitted its SIP to the EPA related to these "Good Neighbor" requirements. On January 31, 2023, the EPA disapproved the SIPs of 21 states, including Oklahoma. On March 2, 2023, the Oklahoma Attorney General and the ODEQ jointly filed a Petition for Review of the SIP disapproval in the Tenth Circuit. On March 16, 2023, OG&E filed a Petition for Review of the SIP disapproval in the Tenth Circuit. On June 6, 2023, OG&E, together with the Oklahoma Attorney General, the ODEQ, Tulsa Cement LLC and Western Farmers Electric Cooperative, jointly filed a motion with the Tenth Circuit requesting a stay of the EPA’s disapproval of the Oklahoma SIP. On July 27, 2023, the Tenth Circuit granted a stay of the EPA's disapproval of the Oklahoma SIP. On February 16, 2024, the Tenth Circuit granted a motion to transfer venue to the U.S. Court of Appeals for the District of Columbia. The oral argument originally scheduled for March 21, 2024 is now vacated. Currently, the timing of when oral argument will take place in the D.C. Circuit is unknown, and OG&E is evaluating the effects of the transfer of venue.
In a separate but related matter, on April 6, 2022, the EPA also published a proposed FIP related to the "Good Neighbor" requirements intended to reduce interstate NOX emissions contributions. OG&E filed comments to the proposed FIP with the EPA on June 21, 2022. On June 5, 2023, the EPA published a final FIP for 23 states, including Oklahoma. The issuance of the FIP resulted from the EPA's aforementioned SIP disapprovals. Among other changes, the EPA finalized a revision of the current Oklahoma NOX emissions budget for electric generating units, including OG&E's units, which began in 2023. Under the terms of the FIP, the emissions budget will decline over time based on the level of reductions that the EPA has determined is achievable through particular emissions controls. OG&E’s preliminary analysis indicates that Oklahoma’s state budget for 2026 will be reduced by 34.5 percent from 2023 levels and that for 2027 it will be reduced by 50 percent from 2021 levels. On July 7, 2023, the Attorney General of Oklahoma and other petitioners filed a motion in the Tenth Circuit Court to stay the EPA's final FIP for Oklahoma. On July 31, 2023, the petitioners filed a joint, unopposed motion requesting that the court abate further proceedings pending resolution of the Utah and Oklahoma SIP disapproval challenges, and the court granted this motion on August 2, 2023. The petitioners will be required to notify the court within five days after the SIP disapproval challenge is resolved. The FIP became effective August 4, 2023; however, as long as the stay of the EPA's disapproval of the Oklahoma SIP discussed above remains in place, the EPA may not enforce the Good Neighbor FIP. In an interim final rule published in the Federal Register on September 29, 2023, the EPA stayed the Good Neighbor Plan's requirements for emissions sources in Oklahoma. In addition, in October 2023, several state and industry petitioners filed emergency applications for a stay of the EPA’s Good Neighbor FIP in the U.S. Supreme Court. Oral argument to decide whether to grant these applications is scheduled for February 21, 2024.
In light of the issuance of the FIP, OG&E has been evaluating various control strategies to reduce emissions at its generating units, which can range from some combination of purchase of emission allowances, installation of selective catalytic reduction controls, conversion of coal-fired units to gas-fired units or retirement and replacement of capacity. OG&E expects to submit its final 2024 IRP to the OCC and APSC in the first quarter of 2024, which will evaluate various potential compliance options related to the EPA's Good Neighbor FIP. Due to the uncertainty relating to the disapproval of the SIP and implementation of the FIP, OG&E cannot determine
43
the cost to comply with certainty, as such costs are dependent upon the timing and outcome of the litigation discussed above, the particular control strategies ultimately selected for each unit, the terms and timing of regulatory approvals required from the OCC and the time period necessary to complete the projects. However, OG&E preliminarily estimates that the cost of compliance with the FIP as issued could be approximately $2.7 billion in total, including $100 million to $300 million over the 12- to 18-month period following effectiveness of the FIP. OG&E expects that it would seek recovery of any necessary environmental expenditures to handle state and federally mandated environmental upgrades, but there is no guarantee that all of such expenditures will be approved for recovery or will be approved for recovery on a timely basis.
Particulate Matter NAAQS
On February 7, 2024, the EPA issued a final rule resulting from its reconsideration of the primary (health-based) and secondary (welfare-based) NAAQS for PM, which were set in 2013 and which the EPA declined to revise in 2020. The final rule lowers the primary annual PM2.5 NAAQS from 12.0 µg/m3 to 9.0 µg/m3 and retains the other PM standards at their current levels, including the 24-hour PM2.5 NAAQS.
The EPA will determine which areas of the country meet the standards, such as making initial attainment/nonattainment designations, no later than two years after new standards are issued. States must develop and submit attainment plans no later than 18 months after the EPA finalizes nonattainment designations. The revised NAAQS could impact regional air quality goals and emission limits for emission sources; however, it is unknown at this time what, if any, potential material impacts to OG&E individual operating permit emission limits will result from the EPA actions.
Regional Haze
In July 2020, the ODEQ notified OG&E that the Horseshoe Lake generating units would be included in Oklahoma's second Regional Haze implementation period evaluation of visibility impairment impacts to the Wichita Mountains. OG&E submitted an analysis of all potential control measures for NOX on these units to the ODEQ. The ODEQ submitted a revised SIP to the EPA on August 12, 2022. It is unknown at this time what the outcome, or any potential material impacts, if any, will be from the evaluations by OG&E, the ODEQ and the EPA.
Mercury and Air Toxics Standards
On April 24, 2023, the EPA published in the Federal Register a proposed rule, National Emission Standards for Hazardous Air Pollutants: Coal- and Oil-Fired Electric Utility Steam Generating Units - Review of the Residual Risk and Technology Review. The proposal contains the results of the EPA’s review of the May 2020 risk and technology review for the Mercury and Air Toxics Standards and proposes changes to certain emission standards and compliance measures. OG&E participated with trade associations to provide comments to the EPA on June 23, 2023. It is unknown what potential material impacts, if any, will be from the final action by the EPA. The EPA has indicated they anticipate finalizing the rule in April 2024.
Greenhouse Gas
OG&E monitors possible changes in legal standards for emissions of greenhouse gases, including CO2, sulfur hexafluoride and methane, including President Biden Administration's target of a 50 to 52 percent reduction in economy-wide net greenhouse gas emissions from 2005 levels by 2030 with full decarbonization of the electric power industry by 2035. If legislation or regulations are passed at the federal or state levels in the future requiring mandatory reductions of CO2 and other greenhouse gases at OG&E's facilities, this could result in significant additional compliance costs that would affect OG&E's future financial position, results of operations and cash flows if such costs are not recovered through regulated rates.
On May 23, 2023, the EPA proposed rules to reduce emissions of greenhouse gases from fossil fuel-fired electric generating units under Clean Air Act Section 111. The proposal encompasses both Section 111(b) and 111(d) rulemakings for new units and existing units, respectively. In particular, the proposed rules would (i) strengthen the current New Source Performance Standards for newly built fossil fuel-fired stationary combustion turbines (generally natural gas-fired); (ii) establish emission guidelines for states to follow in limiting carbon pollution from existing fossil fuel-fired steam electric generating units (including coal, oil, and natural gas-fired units); and (iii) establish emission guidelines for large, frequently used existing fossil fuel-fired stationary combustion turbines (generally natural gas-fired). OG&E filed comments regarding the proposal on August 8, 2023 and participated with trade associations to develop
44
industry-focused comments. Regional transmission organizations, including the SPP, separately filed a joint comment letter to the EPA on August 8, 2023, noting that there is a need for the EPA to add specific measures to the proposed greenhouse gas rules to address reliability. On November 20, 2023, the EPA published in the Federal Register a request for additional comments focused on reliability. OG&E participated with industry groups to provide comments to the EPA on December 20, 2023. The EPA has indicated they anticipate finalizing the regulations in April 2024. It is unknown what the outcome, or any potential material impacts, if any, will be from the final action by the EPA.
As a member of the SPP Integrated Marketplace, OG&E customers have access to clean energy resources while maintaining reliability and affordability. With respect to its direct emissions, compared to 2005 levels, OG&E has reduced carbon dioxide emissions by over 60 percent, emissions of ozone-forming NOX have been reduced by approximately 80 percent, and emissions of SO2 have been reduced by approximately 95 percent. Direct emission reductions are due to factors such as OG&E’s conversion of certain coal units to natural gas units, its participation in the SPP integrated market, and its active engagement with customers in OG&E’s SmartHours and Load Reduction Programs which helps reduce the amount of generation required to serve peak demand. OG&E is also planning to deploy more renewable energy sources that do not emit greenhouse gases. OG&E has leveraged its geographic position to develop renewable energy resources and completed transmission investments to deliver the renewable energy.
Endangered Species
Certain federal laws, including the Bald and Golden Eagle Protection Act, the Migratory Bird Treaty Act and the Endangered Species Act, provide special protection to certain designated species. These laws and any state equivalents provide for significant civil and criminal penalties for unpermitted activities that result in harm to or harassment of certain protected animals and plants, including damage to their habitats. If such species are located in an area in which OG&E conducts operations, or if additional species in those areas become subject to protection, OG&E's operations and development projects, particularly transmission, wind or solar projects, could be restricted or delayed, or OG&E could be required to implement expensive mitigation measures.
On September 14, 2022, the USFWS published a proposal to list the Tricolored Bat as endangered under the Endangered Species Act. According to the proposal, the current known range of the Tricolored Bat extends to 36 states, including Oklahoma and Arkansas. A listing decision is expected by September 2024. OG&E is closely monitoring this issue due to possible future impacts; however, it is unknown at this time what, if any, material impacts will result from the USFWS action.
Waste
OG&E's operations generate wastes that are subject to the Federal Resource Conservation and Recovery Act of 1976 as well as comparable state laws which impose detailed requirements for the handling, storage, treatment and disposal of waste.
During 2023, approximately 94 percent of the ash from OG&E's River Valley, Muskogee and Sooner facilities was recovered and reused in various ways, including soil stabilization, landfill cover, road base construction and cement and concrete production. Reusing fly ash reduces the need to manufacture cement resulting in reductions in greenhouse gas emissions from cement and concrete production. Based on estimates from the American Coal Ash Association, OG&E fly ash reuse helped avoid over 3.5 million tons of CO2 emissions in the last 16 years.
OG&E has sought and will continue to seek pollution prevention opportunities and to evaluate the effectiveness of its waste reduction, reuse and recycling efforts. In 2023, OG&E obtained refunds of $2.0 million from the recycling of scrap metal, salvaged transformers and used transformer oil. This figure does not include the additional savings gained through the reduction and/or avoidance of disposal costs and the reduction in material purchases due to the reuse of existing materials. Similar savings are anticipated in future years.
Water
OG&E's operations are subject to the Federal Clean Water Act and comparable state laws and regulations. These laws and regulations impose detailed requirements and strict controls regarding the discharge of pollutants into state and federal waters.
In 2015, the EPA issued a final rule addressing the effluent limitation guidelines for power plants under the Federal Clean Water Act. The final rule establishes technology- and performance-based standards that may apply to discharges of six waste streams
45
including bottom ash transport water. On April 12, 2017, the EPA granted a Petition for Reconsideration of the 2015 Rule. On October 13, 2020, the EPA published a final rule to revise the technology-based effluent limitations for flue gas desulfurization wastewater and bottom ash transport water. On August 3, 2021, the EPA published notice in the Federal Register that it will undertake a supplemental rulemaking to revise the effluent limitation guidelines rule after completing its review of the October 2020 rule. The existing effluent limitation guidelines will remain in effect while the EPA undertakes this new rulemaking, with a compliance date of no later than December 31, 2025. On March 29, 2023, the EPA published a proposed rule to revise the effluent limitation guidelines for flue gas desulfurization wastewater, bottom ash transport water and combustion residual leachate. The proposed rule would prohibit any discharge from bottom ash transport water systems and has a compliance date of December 31, 2029. OG&E has begun installation of dry bottom ash handling technology that will comply with the rule. The final rule is expected in April 2024.
Since the purchase of the Redbud facility in 2008, OG&E made investments in the infrastructure that have led to OG&E's average use of approximately 2.4 billion gallons per year of treated municipal effluent for cooling water at Redbud and McClain. This use of treated municipal effluent offsets the need for fresh water as cooling water, making fresh water available for other beneficial uses like drinking water, irrigation and recreation.
Site Remediation
The Comprehensive Environmental Response, Compensation and Liability Act of 1980 and comparable state laws impose liability, without regard to the legality of the original conduct, on certain classes of persons responsible for the release of hazardous substances into the environment. Because OG&E utilizes various products and generates wastes that are considered hazardous substances for purposes of the Comprehensive Environmental Response, Compensation and Liability Act of 1980, OG&E could be subject to liability for the costs of cleaning up and restoring sites where those substances have been released to the environment. At this time, it is not anticipated that any associated liability will cause a significant impact to OG&E.