# KBR, INC. (KBR) FY 2022 MD&A

Verbatim Item 7 Management's Discussion and Analysis from KBR, INC.'s 10-K for fiscal year 2022.

SEC filing source: https://www.sec.gov/Archives/edgar/data/1357615/000135761523000030/kbr-20221231.htm
Accession: 0001357615-23-000030
Filing date: 2023-02-17
Report date: 2022-12-31
Extracted structurally from real Item 7 body heading to real Item 7A/8 boundary.
Confidence: high

Company profile: /company/KBR/
All MD&A years: /company/KBR/mda/
Previous year: /company/KBR/mda/fy2021/ (FY 2021)
Next year: /company/KBR/mda/fy2023/ (FY 2023)

Item 7.Management’s Discussion and Analysis of Financial Condition and Results of Operations

Introduction

The purpose of the MD&A is to provide our stockholders and other interested parties with information necessary to gain an understanding of our financial condition and disclose changes in our financial condition since the most recent fiscal year-end and results of operations during the current fiscal period as compared to the corresponding period of the preceding fiscal year. The MD&A should be read in conjunction with Part I of this Annual Report on Form 10-K as well as the consolidated financial statements and related notes included in Part II, Item 8 of this Annual Report on Form 10-K.

Company Overview

KBR Inc., a Delaware corporation ("KBR"), delivers science, technology, engineering and logistics support solutions to governments and companies around the world. Drawing from its rich 100-year history and culture of innovation and mission focus, KBR creates sustainable value by combining deep domain expertise with its full life cycle capabilities to help clients meet their most pressing challenges. Our capabilities and offerings include the following:

•Scientific research such as quantum science and computing; health and human performance; materials science; life science research; and earth sciences;

•Defense systems engineering such as rapid prototyping; test and evaluation; aerospace acquisition support; systems and platform integration; and sustainment engineering;

•Operational support such as space domain awareness; C5ISR; human spaceflight and satellite operations; integrated supply chain and logistics; and military aviation support;

•Information operations such as cyber analytics and cybersecurity; data analytics; mission planning systems; virtual/augmented reality and technical training; artificial intelligence and machine learning; and

•Sustainable decarbonization solutions that accelerate and enable energy transition and climate change solutions such as proprietary, sustainability-focused process licensing; advisory services focused on energy transition; high-end engineering, design and management program offerings; and digitally-enabled asset optimization solutions.

KBR's strategic growth vectors include:

•Defense modernization;

•Space superiority;

•Health and human performance;

•Sustainable technology;

•High-end engineering;

•Energy transition and security; and

•Technology-led asset optimization

Key customers include U.S. DoD agencies such as the U.S. Army, U.S. Navy and U.S. Air Force, Missile Defense Agency, National Geospatial-Intelligence Agency, National Reconnaissance Office and other intelligence agencies; U.S. civilian agencies such as NASA, U.S. Geological Survey and National Oceanic and Atmospheric Administration; the U.K. MoD, London Metropolitan Police, and other U.K. Crown Services; the Royal Australian Air Force, Navy and Army; other national governments; and a wide range of commercial and industrial companies.

Our deployment priorities are to fund organic growth, maintain responsible leverage, maintain an attractive dividend, make strategic, accretive acquisitions and repurchase shares. Our acquisition thesis is centered around moving upmarket, expanding capabilities and broadening customer sets across strategic growth vectors. KBR also develops and prioritizes investment in technologies that are disruptive, innovative and sustainability- and safety-focused. These technologies and engineering solutions enable clients to achieve a cleaner, greener, more energy efficient global future.

On October 1, 2020, we acquired Centauri, a provider of high-end engineering and development solutions for critical, well-funded, national security missions associated with space, intelligence, cyber and emerging technologies such as directed energy and missile defense.

On October 20, 2021, we acquired Frazer-Nash Consultancy Limited ("Frazer-Nash"), a leading provider of high-end systems engineering, assurance and technology advisory services used to solve complex challenges. Frazer-Nash provides a broad range of professional advisory services across the defense, renewable energy and critical infrastructure sectors primarily in the U.K. and Australia.

44

On August 2, 2022, we acquired VIMA Group ("VIMA"), a U.K. based leading provider of digital transformation solutions to defense and other public sector clients. VIMA delivers solutions across a number of large-scale, high priority digital transformation programs to support its clients in ensuring availability of effective digital and information technology as guided by the U.K.'s Digital Strategy for Defence. The company is a trusted advisor and a top five supplier to Defence Digital and Navy Digital – both organizations within the UK MoD with several highly strategic, fast-growing programs.

Additional information relating to the Centauri, Frazer-Nash and VIMA acquisitions is described in Part II of this Annual Report on Form 10-K in Note 4 to our consolidated financial statements.

Our Business Segments

KBR's business is organized into two core business segments and one non-core business segment as follows:

Core business segments

•Government Solutions

•Sustainable Technology Solutions

Non-core business segment

•Other

See additional information on our business segments in Note 2 to our consolidated financial statements and under "Item 1. Business" in this Annual Report on Form 10-K.

Business Environment and Trends

Government Outlook

On December 29, 2022, President Biden signed into law the $1.7 trillion Consolidated Appropriations Act of 2023, which included $858 billion in defense spending, of which $817 billion is for the DoD, and $773 billion for non-defense discretionary spending which represents an increase from the fiscal 2022 budget of 10% and 6%, respectively. The U.S. defense spending budget prioritizes and furthers a national security strategy to confront near peer threats around the world, enhances the DoD’s cybersecurity strategy and cyber warfare capabilities, increases the priority of military space superiority, directs innovation to meet long-range emerging threats, continues the restoration of military readiness and increases support for the U.S. European Command. The budget includes several measures to strengthen emerging technologies including cyber-science and technologies, artificial intelligence, directed energy, hypersonics and biotechnologies. The non-defense discretionary spending proposal includes $25 billion, or a 6% increase from the fiscal 2022 budget, in funding for NASA to support the continuation of scientific research, exploration and space technology, as well as increased funding across all agencies to address the climate crisis. However, uncertainty continues to exist regarding the raising of the debt ceiling. The current statutory limit was reached in January 2023, requiring the Treasury Department to take extraordinary measures to continue financing U.S. government obligations while avoiding exceeding the debt ceiling. It is expected, however, the U.S. government will exhaust these measures by June 2023. If the debt ceiling is not raised, the U.S. government may not be able to fulfill its funding obligations and there could be significant disruption to all discretionary programs and wider financial and economic repercussions. The federal budget and debt ceiling are expected to continue to be the subject of considerable congressional debate. Although we believe DoD programs will continue to receive consensus support for increased funding and would likely receive priority if this scenario came to fruition, the effect on individual programs or KBR cannot be predicted at this time.

Internationally, our Government Solutions work is performed primarily for the U.K. MoD and the Australian Department of Defence. In November 2022, the U.K. government announced its intent to maintain its budget to at least 2% of GDP. Recognizing the importance of strong defense and the role the U.K. plays across the globe, the U.K. has prioritized investment in military research and investment in key areas to advance and develop capabilities around artificial intelligence, cyber security and space superiority. The Australian government continues to invest in defense spending, with particular focus on enhancing regional security, modernizing defense capabilities, strengthening cyber defenses and promoting broader economic stability. In October 2022, the Australian government announced that Australia's defense spending for the 2022 - 2023 financial year will increase by 7.8% to AUD 48.7 billion, or 1.96% of GDP.

In November 2021, we announced that HomeSafe Alliance LLC (“HomeSafe”), a KBR led joint venture with Tier One Relocation, was awarded the global household goods contract by U.S. Transportation Command. The contract ceiling value is $20 billion with a potential 9-year term, inclusive of all options periods. HomeSafe is the exclusive household goods move

45

management service provider for the U.S. Armed Forces, U.S. DoD civilians and their families. Under this contract, HomeSafe plans to modernize and infuse technology to improve the global relocation experience for all military personnel and their families. In October 2022, the award was upheld in the Court of Federal Claims, and the period for appeal of the Court's decision has expired. Subsequent to the Court of Federal Claims ruling, U.S. Transportation Command lifted the stop work order on the contract in November 2022 and KBR is proceeding with work under the award.

With defense and civil budgets driven in part by political instability, military conflicts, aging platforms and infrastructure and the need for technology advances, we expect continued opportunities to provide solutions and technologies to mission critical work aligned with our customers’ and our nation’s critical priorities.

Sustainable Technology Outlook

Long-range commercial market fundamentals are supported by global population growth, expanding global development and an acceleration of demand for energy transition, renewable energy sources and climate change solutions. The globe is in search of the solution to the energy trilemma, the balance between energy affordability, ensuring energy security and achieving environmental sustainability. Clients are prioritizing their efforts to solve the energy trilemma by investing in digital solutions to optimize operations, increase end-product flexibility and energy efficiency, reduce unplanned downtime and minimize environmental footprint. As the global focus on energy security intensifies and companies continue to commit to near-term carbon neutrality and longer-range net-zero carbon emissions, we expect spending to continue in areas such as decarbonization; carbon capture, utilization and sequestration; biofuels; and circular economy. Further, leading companies across the world are proactively evaluating clean energy alternatives, including hydrogen and green ammonia which complements KBR's proprietary process technologies, solutions and capabilities.

We expect climate change and energy transition to continue to be areas of priority and investment as many countries, including the U.S., look to boost their economies and invest in a cleaner future. Specifically, on August 16, 2022, the President signed the Inflation Reduction Act into law which includes provisions intended to, among other things, incentivize domestic clean energy, manufacturing and production.

In response to Russia's military invasion of Ukraine, we continue to carry out efforts to wind down operations in Russia in a responsible manner. We expect that the reconfiguration of global supply and demand stemming from expanding sanctions on Russia will result in near and mid-term investments to enable energy, chemical and food production security globally.

In June 2022, we announced that we entered into an agreement to invest an additional £80 million in Mura Technology ("Mura") that will bring KBR's aggregate investment in Mura to approximately 18.5%. This investment provides Mura incremental capital to accelerate development of its plastics recycling projects and enables KBR to participate more fully in this sustainability-focused, high growth sector. Funding will be in two tranches with the first payment made in the quarter ended June 30, 2022 and the remainder in 2023. With a strategic approach to commercializing and scaling its proprietary, differentiated plastics recycling solution, Mura is well positioned for profitable growth and value creation as the plastics circular economy develops and matures.

Additionally, in May 2022, KBR's joint venture with Zachry Group, KZJV, was issued a full notice to proceed with Phase 1 of Plaquemines LNG. KZJV, in which KBR holds a non-majority interest, will integrate highly modularized, owner-furnished equipment for the 13.3 million tonnes per annum (MTPA) nameplate facility. KBR will provide project management, engineering, program integration and interface management and commissioning support under an innovative commercial structure that promotes collaboration and enhances overall program performance.

Change in Fiscal Year End

On December 13, 2022, the Board of Directors approved a change in the fiscal year end from a calendar year ending on December 31 to a 52 – 53 week year ending on the Friday closest to December 31, effective beginning with fiscal year 2023. The Company is making the fiscal year change on a prospective basis and will not adjust operating results for prior periods. The change to our fiscal year will not impact our results for the year ended December 31, 2022. While the change will impact the prior year comparability of each of the fiscal quarters and the annual period in 2023, we do not expect the impact to be material. The Company believes this change will improve comparability between periods by eliminating the year-over-year variability in calendar month productive days and provide a more consistent reporting cadence for operational leaders to aid in strategic decision making.

46

Overview of 2022 Financial Results and Significant Bookings

2022 was a year of significant achievement for KBR as we continued to execute toward our long-term vision. The Company benefits from a significant base of long-term enduring contracts in our government business, a diverse portfolio of high quality proprietary process technologies, market tailwinds that benefit our capabilities and technologies in areas such as defense modernization, energy transition, energy security and high-end engineering and a truly global client base. Together, these attributes distinguish KBR and have contributed directly to the Company’s growth in earnings during the year. Although we experienced significantly reduced volume from the OAW program in 2022 compared to 2021, GS delivered increased profitability attributed to increased activity in 2022 to support exercises, training and other activities of the European Command and the acquisition of Frazer-Nash, and STS delivered significantly increased 2022 earnings growth. Our teams continued to deliver operational performance, healthy profitability and strong cash flow. Importantly, we drove innovation and extended our footprint through new program wins and technology advances, developments and investments, such as our commitment to invest an additional £80 million in Mura Technology for which we have already contributed £48 million in 2022 with the second payment expected to be paid in early 2023. These accomplishments have assisted us in continuing our track record of innovation, bringing new technologies to market and advising, consulting and delivering expertise in the vital area of energy transition, energy security, hydrogen future and plastics circular economy. We progressed in our strategic journey to advance upmarket to deliver digital transformation solutions by completing the VIMA acquisition. Additionally, KZJV received a full notice to proceed on Phase 1 of Plaquemines LNG in which KBR will provide project management, engineering, program integration and interface management and commissioning support. In October 2022, we prevailed in the Court of Federal Claims bid protest actions and, as such, our HomeSafe joint venture is moving forward with transition work. Lastly, we entered into a settlement agreement to resolve outstanding claims and disputes between JKC and the consortium of subcontractors of the Combined Cycle Power Plant.

Our GS business landed new awards, including a $640 million ceiling, 5-year ground systems and mission operations contract to support more than 10 NASA missions, including continued efforts on the James Webb Space Telescope; a $229 million task order as a part of the Axiom team to build the next generation astronaut spacesuits to support the Artemis lunar missions as a part of NASA's 10 year Exploration Extravehicular Activity Services ("xEVAS") contract with a potential value of $3.5 billion across the life of the program; and a $4.8 billion ceiling multiple-award to our Xandar joint venture for the National Air and Space Intelligence Center to support research and development of new and existing hardware, systems and software capabilities enabling scientific and technical intelligence production through 2033. Our STS business landed $4.1 billion in bookings, including our proportionate share of Phase 1 of the Plaquemines LNG project and numerous projects across the ammonia landscape, including traditional, blue and green ammonia, multiple Hydro-PRT licenses and studies and other projects spanning carbon capture, utilization and storage, hydrogen, biofuels and renewables.

47

Results of Operations

The following tables set forth our results of operations for the periods presented, including by segment. A discussion regarding our financial condition and results of operations for the years ended December 31, 2021 and 2020 is included in Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations of our Annual Report on Form 10-K for the year ended December 31, 2021, as filed with the SEC on February 22, 2022.

[[GREPCENT_TABLE]]
[["Consolidated Results"],["","Years Ended December 31,","","Change"],["","","","","","","","2022 vs. 2021","","2021 vs. 2020"],["Dollars in millions","2022","","2021 (1)","","2020 (1)","","$","","%","","$","","%"],["Revenues","$","6,564","","","$","7,339","","","$","5,767","","","$","(775)","","","(11)","%","","$","1,572","","","27","%"],["Cost of revenues","$","(5,736)","","","$","(6,533)","","","$","(5,101)","","","$","(797)","","","(12)","%","","$","1,432","","","28","%"],["Gross profit","$","828","","","$","806","","","$","666","","","$","22","","","3","%","","$","140","","","21","%"],["Equity in earnings (losses) of unconsolidated affiliates","$","(80)","","","$","(170)","","","$","30","","","$","90","","","53","%","","$","(200)","","","n/m"],["Selling, general and administrative expenses","$","(420)","","","$","(393)","","","$","(335)","","","$","27","","","7","%","","$","58","","","17","%"],["Acquisition and integration related costs","$","(2)","","","$","(12)","","","$","(9)","","","$","(10)","","","(83)","%","","$","3","","","33","%"],["Gain on disposition of assets and investments","$","19","","","$","2","","","$","18","","","$","17","","","n/m","","$","(16)","","","89","%"],["Goodwill impairment","$","\u2014","","","$","\u2014","","","$","(99)","","","$","\u2014","","","n/m","","$","(99)","","","(100)","%"],["Restructuring charges, asset impairments and other","$","(2)","","","$","(2)","","","$","(214)","","","$","\u2014","","","\u2014","%","","$","(212)","","","(99)","%"],["Operating income","$","343","","","$","231","","","$","57","","","$","112","","","48","%","","$","174","","","305","%"],["Interest expense","$","(87)","","","$","(80)","","","$","(72)","","","$","7","","","9","%","","$","8","","","11","%"],["Unrealized gain on other investment","$","16","","","$","4","","","$","\u2014","","","$","12","","","300","%","","$","4","","","n/m"],["Other non-operating income (expense)","$","12","","","$","(9)","","","$","1","","","$","21","","","n/m","","$","(10)","","","n/m"],["Income (loss) before income taxes","$","284","","","$","146","","","$","(14)","","","$","138","","","95","%","","$","160","","","n/m"],["Provision for income taxes","$","(92)","","","$","(111)","","","$","(28)","","","$","(19)","","","(17)","%","","$","83","","","296","%"],["Net income (loss)","$","192","","","$","35","","","$","(42)","","","$","157","","","449","%","","$","77","","","183","%"],["Net income attributable to noncontrolling interests","$","2","","","$","8","","","$","21","","","$","(6)","","","(75)","%","","$","(13)","","","(62)","%"],["Net income (loss) attributable to KBR","$","190","","","$","27","","","$","(63)","","","$","163","","","604","%","","$","90","","","143","%"]]
[[/GREPCENT_TABLE]]

(1) As adjusted for the adoption of ASU 2020-06 using the full retrospective method.

n/m - not meaningful

Revenues. Revenues decreased by $775 million, or 11%, to $6.6 billion in 2022, compared to $7.3 billion in 2021. The decrease was primarily attributable to reduced revenues of approximately $1.3 billion from the completion of contingency work associated with the OAW program in early 2022 that commenced in August 2021 and reduced activity in the Middle East associated with the U.S. DoD's exit in early 2021. Additionally, the decrease was driven by the non-cash impact of our efforts to continue winding down operations in Russia in 2022, and the completion or near completion of projects we strategically exited in 2020. This decrease was offset by increased activity in 2022 to support exercises, training and other activities of the European Command, the acquisition of Frazer-Nash in October 2021 and increased revenues in STS primarily from engineering and professional services and technology sales.

Gross profit. The $22 million increase in gross profit was primarily driven by increased activity in the European Command, as described above, and the acquisition of Frazer-Nash in October 2021. We also benefited from lower amortization of intangible assets in 2022 from the Centauri acquisition. These increases were partially offset by decreased gross profit attributable to reduced volume in 2022 from OAW and reduced activity in the Middle East associated with the U.S. DoD's exit in early 2021, as described above, and a net favorable resolution of legacy matters in our STS business in 2021 that did not recur in 2022.

48

Equity in earnings (losses) of unconsolidated affiliates. Equity in earnings (losses) of unconsolidated affiliates increased by $90 million, or 53%, from a loss of $170 million in 2021 compared to a loss of $80 million in 2022. During 2021, a non-cash charge of $203 million was recorded associated with the settlement agreement between JKC and its client, Ichthys LNG Pty, Ltd, compared to a $137 million non-cash charge recorded during 2022 relating to the settlement agreement with the consortium of subcontractors of the Combined Cycle Power Plant. Additionally, the reduction in loss is attributed to equity in earnings from commencement of services on an LNG project in the second quarter of 2022. These reductions in losses were offset by a charge on a joint venture acquired as part of a historical GS acquisition in 2022.

Selling, general and administrative expenses. Selling, general and administrative expenses were $27 million higher in 2022 compared to 2021, which was primarily driven by growth in the core business, incremental expenses from the Frazer-Nash business and other corporate initiatives.

Acquisition and Integration Related Costs. Acquisition and integration related costs in 2021 were primarily comprised of costs associated with our acquisition and integration of Centauri in October 2020 and Frazer-Nash in October 2021. Acquisition and integration costs in 2022 are primarily related to the acquisition of VIMA in August 2022.

Gain on Disposition of Assets and Investments. The 2022 gain on disposition of assets and investments was primarily driven by a gain of $16 million from the sale of our investment interest in three U.K. Road investments and a gain of $5 million for the sale of a property in our GS business offset by a loss on sale of $3 million of a joint venture that was acquired as a part of a historical GS acquisition.

Interest Expense. The increase in interest expense was primarily driven by increases in the U.S. federal reserve funds rate in 2022.

Unrealized Gain on Other Investment. The unrealized gain on other investment in 2022 is related to the appreciation in the value of our Mura Technology investment as a result of revaluations triggered by the observable transactions associated with our additional investment and investments from other third parties. In 2021, the gain is related to the appreciation in the value of our Mura Technology investment as a result of additional investments from other third parties.

Other non-operating income (expense). Other non-operating income (expense) includes interest income, foreign exchange gains and losses and other non-operating income or expense items. The net increase is primarily driven by foreign exchange gains and losses. In 2022, we recorded approximately $8 million in net foreign exchanges gains primarily related to foreign exchange impacts from the Australian dollar tranche of Term Loan A that has since been redenominated into U.S. dollars following the execution of an amendment to our existing Credit Agreement in the fourth quarter of 2022. In 2021, we recorded approximately $8 million in net losses related to the changes in fair values of our balance sheet hedges offset by remeasurement of our balance sheet positions.

Provision for income taxes. The decrease in the provision for incomes taxes in 2022 compared to 2021 was primarily driven by the non-deductibility of losses incurred with respect to the settlement of outstanding matters related to the Ichthys LNG project to which KBR is a joint venture partner. Additionally, the decrease is attributable to a tax benefit recognized in 2022 associated with research and development credits. See Note 13 to our consolidated financial statements for further discussion on income taxes.

Net income attributable to noncontrolling interests. The decrease in net income attributable to noncontrolling interests was primarily driven by decreased income from a Middle East joint venture project in our STS business segment that was sold in the third quarter of 2021.

49

Results of Operations by Business Segment

We analyze the financial results of our two core business segments and one non-core business segment. The business segments presented are consistent with our reportable segments discussed in Note 2 to our consolidated financial statements.

[[GREPCENT_TABLE]]
[["","Years Ended December 31,","","Change"],["","","","","","","","2022 vs. 2021","","2021 vs. 2020"],["Dollars in millions","2022","","2021","","2020","","$","","%","","$","","%"],["Revenues"],["Government Solutions","$","5,320","","","$","6,149","","","$","4,055","","","$","(829)","","","(13)","%","","$","2,094","","","52","%"],["Sustainable Technology Solutions","1,244","","","1,190","","","1,712","","","54","","","5","%","","(522)","","","(30)","%"],["Total revenues","$","6,564","","","$","7,339","","","$","5,767","","","$","(775)","","","(11)","%","","$","1,572","","","27","%"],["Operating income"],["Government Solutions","$","441","","","$","414","","","$","355","","","$","27","","","7","%","","$","59","","","17","%"],["Sustainable Technology Solutions","47","","","(30)","","","(77)","","","77","","","n/m","","47","","","61","%"],["Other","(145)","","","(153)","","","(221)","","","8","","","5","%","","68","","","31","%"],["Operating income","$","343","","","$","231","","","$","57","","","$","112","","","48","%","","$","174","","","305","%"]]
[[/GREPCENT_TABLE]]

n/m - not meaningful

Government Solutions

GS revenues decreased by $829 million, or 13%, to $5.3 billion in 2022 compared to $6.1 billion in 2021. The decrease is primarily attributable to reduced revenues of approximately $1.3 billion from the completion of contingency work associated with the OAW program in early 2022 that commenced in August 2021 and reduced activity in the Middle East associated with the U.S. DoD's exit in early 2021. This decrease was offset by increased activity in 2022 to support exercises, training and other activities of the European Command and the acquisition of Frazer-Nash in October 2021.

GS operating income increased by $27 million, or 7%, to $441 million in 2022, compared to $414 million in 2021. The increase is primarily driven by items discussed above, lower amortization of intangibles from the Centauri acquisition, favorable project close out of an international GS project and net gains from sales of investments completed in 2022. These increases were partially offset by a charge on a joint venture acquired as part of a historical GS acquisition that was divested in the fourth quarter of 2022.

Sustainable Technology Solutions

The increase in STS revenues of $54 million, or 5%, from 2021 to 2022 is primarily driven by increased revenues from technology sales and engineering and professional services, partially offset by a $15 million non-cash impact of our continued efforts to wind down operations in Russia in 2022, timing of certain STS projects and the completion or near completion of projects that we strategically exited in 2020.

STS operating income increased by $77 million from 2021 to 2022. The increase in operating income is primarily driven by increased revenues from technology sales and engineering and professional services and a decrease in equity in losses related to the Ichthys LNG project. During 2021, a non-cash charge of $203 million was recorded for the settlement agreement between JKC and its client, Ichthys LNG Pty, Ltd, compared to a $137 million non-cash charge recorded during 2022 for the settlement agreement with the consortium of subcontractors of the Combined Cycle Power Plant. The increase is also attributed to equity in earnings from commencement of services on an LNG project in the second quarter of 2022. These increases are partially offset by a $22 million non-cash impact of our continued efforts to wind down operations in Russia and a net favorable resolution of legacy matters in our STS business in 2021 that did not recur in 2022.

Other

Other operating loss decreased by $8 million, or 5%, to 145 million in 2022, compared to $153 million in 2021. The decrease in operating loss is primarily attributed to decreased acquisition and integration costs.

50

Backlog of Unfilled Orders    

Backlog generally represents the dollar amount of revenues we expect to realize in the future as a result of performing work on contracts and our pro-rata share of work to be performed by our consolidated and unconsolidated joint ventures. We generally include total expected revenues in backlog when a contract is awarded under a legally binding agreement. In many instances, arrangements included in backlog are complex, nonrepetitive and may fluctuate over the contract period due to the release of contracted work in phases by the customer. Additionally, nearly all contracts allow customers to terminate the agreement at any time for convenience. Certain contracts provide maximum dollar limits, with actual authorization to perform work under the contract agreed upon on a periodic basis with the customer. In these arrangements, only the amounts authorized are included in backlog. For projects where we act solely in a project management capacity, we only include the expected value of our services in backlog.

We define backlog, as it relates to U.S. government contracts, as our estimate of the remaining future revenue from existing signed contracts over the remaining base contract performance period (including customer approved option periods) for which work scope and price have been agreed with the customer. We define funded backlog as the portion of backlog for which funding currently is appropriated, less the amount of revenue we have previously recognized. We define unfunded backlog as the total backlog less the funded backlog. Our GS backlog does not include any estimate of future potential delivery orders that might be awarded under our government-wide acquisition contracts, agency-specific indefinite delivery/indefinite quantity contracts or other multiple-award contract vehicles, nor does it include option periods that have not been exercised by the customer.

Within our GS business segment, we calculate estimated backlog for long-term contracts associated with the U.K. government's PFIs based on the aggregate amount that our client would contractually be obligated to pay us over the life of the project. We update our estimates of the future work to be executed under these contracts on a quarterly basis and adjust backlog if necessary.

Refer to "Item 1A. Risk Factors" contained in Part 1 of this Annual Report on Form 10-K for a discussion of other factors that may cause backlog to ultimately convert into revenues at different amounts.

We have included in the table below our proportionate share of unconsolidated joint ventures' estimated backlog. As these projects are accounted for under the equity method, only our share of future earnings from these projects will be recorded in our results of operations. Our proportionate share of backlog for projects related to unconsolidated joint ventures totaled $3.9 billion and $2.6 billion at December 31, 2022 and 2021, respectively. As a result of our continued efforts to wind down operations in Russia, ending STS backlog was reduced by $47 million as of December 31, 2022. Additionally, as a result of U.S. Transportation Command lifting the stop work order on the HomeSafe contract in November 2022, we have booked $39 million in backlog as of December 31, 2022 for our transition work.

The following table summarizes our backlog by business segment for the years ended December 31, 2022 and December 31, 2021, respectively:

[[GREPCENT_TABLE]]
[["Dollars in millions","December 31, 2022","","December 31, 2021"],["Government Solutions","$","11,543","","","$","12,628"],["Sustainable Technology Solutions","4,012","","","2,345"],["Total backlog","$","15,555","","","$","14,973"]]
[[/GREPCENT_TABLE]]

We estimate that as of December 31, 2022, 36% of our backlog will be executed within one year. Of this amount, 77% will be recognized in revenues on our consolidated statement of operations and 23% will be recorded by our unconsolidated joint ventures. As of December 31, 2022, $98 million of our backlog relates to active contracts that are in a loss position.

As of December 31, 2022, 11% of our backlog was attributable to fixed-price contracts, 40% was attributable to PFIs, 24% was attributable to cost-reimbursable contracts and 25% was attributable to time-and-materials contracts. For contracts that contain fixed-price, cost-reimbursable and time-and-materials components, we classify the individual components as either fixed-price, cost-reimbursable or time-and materials according to the composition of the contract; however, for smaller contracts, we characterize the entire contract based on the predominant component. As of December 31, 2022, $8.3 billion of our GS backlog was currently funded by our customers.

51

As of December 31, 2022, we had approximately $4.2 billion of priced option periods not yet exercised by the customer for U.S. government contracts that are not included in the backlog amounts presented above.

The difference between backlog of $15.6 billion and the remaining performance obligations as defined by ASC 606 of $11.2 billion is primarily due to our proportionate share of backlog related to unconsolidated joint ventures which is not included in our remaining performance obligations. See Note 3 to our consolidated financial statements for discussion of the remaining performance obligations.

Liquidity and Capital Resources

Liquidity is provided by available cash and cash equivalents, cash generated from operations, our Senior Credit Facility (as defined below) and access to capital markets. Our operating cash flow can vary significantly from year to year and is affected by the mix, terms, timing and stage of completion of our projects. We often receive cash in advance on certain of our sustainable technology projects. On time-and-material and cost reimbursable contracts, we may utilize cash on hand or availability under our Senior Credit Facility to satisfy any periodic operating cash requirements for working capital, as we incur costs and subsequently invoice our customers.

Certain STS services projects may require us to provide credit support for our performance obligations to our customers in the form of letters of credit, surety bonds or guarantees. Our ability to obtain new project awards in the future may be dependent on our ability to maintain or increase our letter of credit and surety bonding capacity, which may be further dependent on the timely release of existing letters of credit and surety bonds. As the need for credit support arises, letters of credit may be issued under the Revolver (as defined below) or with lending counterparties on a bilateral, syndicated or other basis.

As discussed in Note 12 "Debt and Other Credit Facilities" of our consolidated financial statements, on December 30, 2022, we entered into Amendment No. 7 under our existing Credit Agreement, dated as of April 25, 2018, consisting of a $1 billion revolving credit facility (the "Revolver"), a $442 million Term Loan A, ("Term Loan A") with debt tranches denominated in US dollars, Australian dollars and British pound sterling and a $512 million Term Loan B ("Term Loan B"), with an aggregate capacity of $1.954 billion ("Senior Credit Facility"). Amendment No. 7 replaces the Australian dollar tranche of Term Loan A with new term loans in an aggregate principal amount of $99 million ("2022 Refinancing Term Loan A tranche") after deducting estimated deferred financing fees and foreign exchange conversion. The amendment redenominates the original loans in the Australian dollar tranche from Australian dollars into U.S. dollars and establishes SOFR as the reference borrowing rate for such loans. Additionally, on February 6, 2023, we entered into Amendment No. 8 under our existing Credit Agreement, dated as of April 25, 2018, to replace the LIBOR-based reference borrowing rate with a SOFR-based reference borrowing rate for the U.S. dollar tranche of Term Loan A and the Revolving Credit Loans under our existing Credit Agreement.

We believe that existing cash balances, internally generated cash flows, availability under our Senior Credit Facility and other lines of credit are sufficient to support our business operations for the next 12 months. As of December 31, 2022, we were in compliance with all financial covenants related to our debt agreements.

Cash and cash equivalents totaled $389 million at December 31, 2022 and $370 million at December 31, 2021 and consisted of the following:

[[GREPCENT_TABLE]]
[["","December 31,"],["Dollars in millions","2022","","2021"],["Domestic U.S. cash","$","27","","","$","34"],["International cash","255","","","220"],["Joint venture and Aspire Defence project cash","107","","","116"],["Total","$","389","","","$","370"]]
[[/GREPCENT_TABLE]]

Our cash balances are held in numerous accounts throughout the world to fund our global activities. Domestic cash relates to cash balances held by U.S. entities and is largely used to support project activities of those businesses as well as general corporate needs such as the payment of dividends to shareholders, repayment of debt and potential repurchases of our outstanding common stock.

Our international cash balances may be available for general corporate purposes but are subject to local restrictions, such

52

as capital adequacy requirements and maintaining sufficient cash balances to support our U.K. pension plan and other obligations incurred in the normal course of business by those foreign entities. Repatriations of our undistributed foreign earnings are generally free of U.S. tax but may incur withholding and/or state taxes. We consider our future U.S. and non-U.S. cash needs as 1) our anticipated foreign working capital requirements, including funding of our U.K. pension plan, 2) the expected growth opportunities across all geographical markets and 3) our plans to invest in strategic growth opportunities, which may include acquisitions around the world, including whether foreign earnings are permanently reinvested.

In 2021, we changed our permanent reinvestment assertion on the unremitted earnings, as well as all current and future earnings in a wholly owned subsidiary in India. Accordingly, we recorded the income tax expense which was less than $2 million. In addition, we changed our permanent reinvestment assertion on all current and future earnings in our subsidiaries in Saudi Arabia. The associated income tax expense is and will be reflected in the periods in which the earnings are generated. The impact is not material to income tax expense. If management were to completely remove the indefinite investment assertion on all foreign subsidiaries, the exposure to local withholding taxes would be less than $9 million.

Joint venture cash and Aspire Defence project cash balances reflect the amounts held by joint venture entities that we consolidate for financial reporting purposes. These amounts are limited to those entities' activities and are not readily available for general corporate purposes; however, portions of such amounts may become available to us in the future should there be a distribution of dividends to the joint venture partners. We expect that the majority of the joint venture cash balances will be utilized for the corresponding joint venture purposes or for paying dividends.

As of December 31, 2022, substantially all of our excess cash was held in interest bearing operating accounts or short-term investment accounts with the primary objectives of preserving capital and maintaining liquidity.

Cash Flows

The following table summarizes our cash flows for the periods indicated:

[[GREPCENT_TABLE]]
[["","","Years ended December 31,"],["Dollars in millions","","2022","","2021","","2020"],["Cash flows provided by operating activities","","$","396","","","$","278","","","$","367"],["Cash flows used in investing activities","","37","","","(428)","","","(877)"],["Cash flows provided by (used in) financing activities","","(399)","","","87","","","225"],["Effect of exchange rate changes on cash","","(15)","","","(3)","","","9"],["Increase (decrease) in cash and cash equivalents","","$","19","","","$","(66)","","","$","(276)"]]
[[/GREPCENT_TABLE]]

Operating activities. Cash provided by operations totaled $396 million and $278 million in 2022 and 2021, respectively as compared to net income of $192 million and $35 million in 2022 and 2021, respectively. Cash flows from operating activities result primarily from earnings and are affected by changes in operating assets and liabilities, which consist primarily of working capital balances for projects. Working capital levels vary from year to year and are primarily affected by the Company's volume of work. These levels are also impacted by the mix, stage of completion and commercial terms of projects. Working capital requirements also vary by project depending on the type of client and location throughout the world.

The primary components of our working capital accounts are accounts receivable, contract assets, accounts payable and contract liabilities. These components are impacted by the size and changes in the mix of our cost-reimbursable and time-and-material projects versus fixed price projects, and as a result, fluctuations in these components are not uncommon in our business. Specifically, the $455 million favorable cash flow impact related to accounts receivable and the $376 million unfavorable cash flow impact related to accounts payable were primarily driven by collections and payments in the first quarter of 2022 related to the significant volume from the OAW program in the fourth quarter of 2021 that was substantially completed in the first quarter of 2022. Additionally, we made an advance payment in October 2022 to our U.K. pension plan for approximately £29 million of the £33 million required minimum annual contributions for the year ending December 31, 2023.

Investing activities. Cash provided by investing activities totaled $37 million in 2022 and was primarily due to a return of investment of approximately $190 million from JKC resulting from the receipt of the first payment from the Subcontractor Settlement Agreement, a return of investment from BRIS of $10 million as our cumulative distributions from inception of the joint venture exceeded our cumulative earnings and proceeds of $55 million from the sale of our investment interest in three U.K. Road Projects. See Note 10 "Equity Method Investments and Variable Interest Entities" for further details. This was partially offset by our first payment related to an additional investment of $61 million in Mura Technology, $71 million in

53

capital expenditures, $13 million net cash paid upon divestiture of a joint venture acquired as part of a historical GS acquisition and $73 million net cash used for the acquisition of VIMA. See Note 4 "Acquisitions" for further details.

Cash used in investing activities totaled $428 million in 2021, which included $406 million of net cash used for the acquisition of Frazer-Nash and Harmonic and the acquisition of a technology license, $29 million of cash used primarily for funding our proportionate share of JKC's ongoing legal and commercial costs, $7 million for our initial investment in Mura Technology and $30 million used for capital expenditures, partially offset by proceeds received of $44 million, which was primarily from the sale of our investment interest in the Middle East Petroleum Corporation (EBIC Ammonia project).

Financing activities. Cash used in financing activities totaled $399 million in 2022 and was primarily due to $193 million of repurchases of common stock under our share repurchase program, $66 million of dividend payments to common shareholders, $116 million in net payments on borrowings related to our Senior Credit Facility, $11 million repayment on our finance lease obligations, $10 million for the repurchase of common stock under our "withheld to cover" program and dividends paid to NCI shareholders of $4 million. These decreases were partially offset by $5 million in net proceeds received from the issuance of common stock and $3 million in investments from NCI shareholders.

Cash provided by financing activities totaled $87 million in 2021 and was primarily due to borrowings of $290 million on our Senior Credit Facility and $12 million in net proceeds received from the issuance of common stock, offset by $78 million for the repurchase of common stock under our share repurchase program, $61 million of dividend payments to common shareholders, $27 million in payments on borrowings related to our Senior Credit Facility, $13 million repayment on our finance lease obligations, $4 million for the repurchase of common stock under our "withheld to cover" program, $4 million repayment on our non-recourse debt associated with our Fasttrax joint venture and dividends paid to NCI shareholders of $23 million (of which $15 million was driven by the dividends paid to the minority interest of the sale of the EBIC Ammonia plant). See Note 12 "Debt and Other Credit Facilities" for further discussion of our Senior Credit Facility and Note 19 "Share Repurchases" for further discussion on our share repurchase program.

Future sources of cash. We believe that future sources of cash include cash flows from operations (including accounts receivable monetization arrangements), cash derived from working capital management and cash borrowings under the Senior Credit Facility.

Future uses of cash. We believe that future uses of cash include working capital requirements, joint venture capital calls, capital expenditures, dividends, pension funding obligations, repayments of borrowings, share repurchases and strategic investments including acquisitions. Our capital expenditures will be focused primarily on facilities and equipment to support our businesses. In addition, we will use cash to make payments under leases and various other obligations, including potential litigation payments, as they arise.

Other factors potentially affecting liquidity

Ichthys LNG Project. In reference to Note 6 "Unapproved Change Orders and Claims Against Clients and Estimated Recoveries of Claims Against Suppliers and Subcontractors” to our consolidated financial statements, in October 2021, JKC entered into a binding settlement agreement (the “Settlement Agreement”) that resolved the outstanding claims and disputes between JKC and its client, Ichthys LNG Pty, Ltd (collectively, “the Parties”). As a result of the Settlement Agreement, the Parties agreed to withdraw all claims and terminate all ongoing arbitration and court proceedings between the Parties. As part of the Settlement Agreement, KBR’s letters of credit were also reduced to $82 million from $164 million.

In April 2022, JKC entered into the Subcontractor Settlement Agreement to resolve outstanding claims and disputes between JKC and the consortium of subcontractors. As a result of the Subcontractor Settlement Agreement, JKC received the first payment of AUD 270 million in April 2022. In May 2022, JKC distributed the payment to KBR at current exchange rates and net of legal expenses resulting in the receipt of approximately $190 million. The second payment of AUD 90 million is expected to be paid to JKC in March 2023. KBR recorded a non-cash charge to equity in earnings (losses) of unconsolidated affiliates in the amount of $137 million during the first quarter of 2022, which reflected KBR’s proportionate share of JKC's claims against the Consortium.

On May 17, 2022, we entered into Amendment No.6 under our existing Credit Agreement, dated as of April 25, 2018, to (i) remove certain provisions requiring that the net cash proceeds received from the Subcontractor Settlement Agreement be applied to prepay principal amounts owed under Term Loan A and (ii) amend a certain provision to permit KBR instead to apply such net cash proceeds for working capital and other general corporate purposes. As such, the net cash proceeds were used for repayment of the Revolver, funding of the first tranche of the Mura investment and other working capital requirements.

54

U.K. pension obligation. We have recognized on our consolidated balance sheets a funding surplus of $46 million (measured as the difference between the fair value of plan assets and the projected benefit obligation as of December 31, 2022) for our frozen U.K. defined benefit pension plan. The total amount of employer pension contributions paid for the year ended December 31, 2022 is $73 million for our defined benefit plan in the U.K. This amount includes an advance payment disbursed in October 2022 to our U.K. pension plan for approximately £29 million of the £33 million required minimum annual contributions for the year ending December 31, 2023. The funding requirements for our U.K. pension plan are determined based on the U.K. Pensions Act 1995. Annual minimum funding requirements are based on a binding agreement with the Trustee of the U.K. pension plan that is negotiated on a triennial basis. In June 2022, KBR and the Trustee executed an agreement requiring minimum annual contributions of approximately £33 million ($39 million at current exchange rates) for the period through March 2028. This schedule of contributions will be reviewed by the Trustee and KBR no later than 15 months after the effective date of each actuarial valuation, due every three years. In the future, pension funding may increase or decrease depending on changes in the levels of interest rates, pension plan asset return performance and other factors. A significant increase in our funding requirements for the U.K. pension plan could result in a material adverse impact on our financial position.

Sales of Receivables. From time to time, we sell certain receivables to unrelated third-party financial institutions under various accounts receivable monetization programs. One such program is with MUFG Bank, Ltd. (“MUFG”) under a Master Accounts Receivable Purchase Agreement (the “RPA”), which provides the sale to MUFG of certain of our designated eligible receivables, with a significant portion of such receivables being owed by the U.S. government. We plan to continue to utilize these programs to ensure we have flexibility in regards to meeting our capital needs. Refer to Note 22 "Financial Instruments and Risk Management" to our consolidated financial statements for further discussion on our sales of receivables.

Mura Technology. In June 2022, we announced that we entered into an agreement to invest an additional £80 million in Mura Technology in which the funding is expected in two tranches. The first payment of £48 million was distributed during the quarter ended June 30, 2022 and the second payment of £32 million is expected to be paid in Q1 of 2023 with cash on hand.

Senior Credit Facility

Information relating to our Senior Credit Facility is described in Note 12 "Debt and Other Credit Facilities" to our consolidated financial statements in Part II, Item 8 of this Annual Report on Form 10-K and the information discussed therein is incorporated by reference into this Part II, Item 7.

Senior Notes

Information relating to our Senior Notes is described in Note 12 "Debt and Other Credit Facilities" to our consolidated financial statements in Part II, Item 8 of this Annual Report on Form 10-K and the information discussed therein is incorporated by reference into this Part II, Item 7.

55

Convertible Senior Notes

On November 15, 2018, we issued and sold $350 million of 2.50% Convertible Senior Notes due 2023 (the "Convertible Notes") pursuant to an indenture between us and Citibank, N.A., as trustee. The Convertible Notes mature on November 1, 2023 and, as such, are classified as current liabilities on our consolidated balance sheets as of December 31, 2022. The Convertible Notes are convertible into cash, shares of our common stock or a combination of cash and shares of our common stock, at our election. It is our current intent to settle the principal balance of the Convertible Notes in cash. We may settle any excess value upon conversion in cash, shares of our common stock or a combination of both at our election.

Concurrent with the issuance of the Convertible Notes, we entered into privately negotiated convertible note hedge transactions (the "Note Hedge Transactions") and warrant transactions (the "Warrant Transactions") with the option counterparties. These transactions represent a call spread overlay, whereby the cost of the Note Hedge Transactions we purchased to cover the cash outlay upon conversion of the Convertible Notes was reduced by the sales price of the Warrant Transactions.

As of December 31, 2022, the if-converted value of the Convertible Notes based on the closing share price exceeded the $350 million principal amount by approximately $381 million. The incremental value over the principal amount would be fully offset by the shares we are allowed to purchase under the Note Hedge Transaction. However, the counterparties holding the warrants would have the right to purchase the same number of shares we would receive at a strike price of $39.63 resulting in value of $182 million that would have been delivered to the counterparties as of December 31, 2022.

For more information relating to our Convertible Notes, Note Hedge Transactions and Warrant Transactions, refer to Note 12 "Debt and Other Credit Facilities" to our consolidated financial statements in Part II, Item 8 of this Annual Report on Form 10-K and the information discussed therein is incorporated by reference into this Part II, Item 7.

Off-Balance Sheet Arrangements

Letters of credit, surety bonds and guarantees. In the ordinary course of business, we may enter into various arrangements providing financial or performance assurance to customers on behalf of certain consolidated and unconsolidated subsidiaries, joint ventures and other jointly executed contracts. Such off-balance sheet arrangements include letters of credit, surety bonds and corporate guarantees to support the creditworthiness or project execution commitments of these entities and typically have various expiration dates ranging from mechanical completion of the project being constructed to a period beyond completion in certain circumstances such as for warranties. We may also guarantee that a project, once completed, will achieve specified performance standards. If the project subsequently fails to meet guaranteed performance standards, we may incur additional costs, pay liquidated damages or be held responsible for the costs incurred by the client to achieve the required performance standards. The potential amount of future payments that we could be required to make under an outstanding performance arrangement is typically the remaining estimated cost of work to be performed by or on behalf of third parties. For cost reimbursable contracts, amounts that may become payable pursuant to guarantee provisions are normally recoverable from the client for work performed under the contract. For lump-sum or fixed-price contracts, the performance guarantee amount is the cost to complete the contracted work, less amounts remaining to be billed to the client under the contract. Remaining billable amounts could be greater or less than the cost to complete the project. If costs exceed the remaining amounts payable under the contract, we may have recourse to third parties, such as owners, subcontractors or vendors for claims.

In our joint venture arrangements, the liability of each partner is usually joint and several. This means that each joint venture partner may become liable for the entire risk of performance guarantees provided by each partner to the customer. Typically each joint venture partner indemnifies the other partners for any liabilities incurred in excess of the liabilities the other party is obligated to bear under the respective joint venture agreement. We are unable to estimate the maximum potential amount of future payments that we could be required to make under outstanding performance guarantees related to joint venture projects due to a number of factors, including but not limited to, the nature and extent of any contractual defaults by our joint venture partners, resource availability, potential performance delays caused by the defaults, the location of the projects and the terms of the related contracts. See “Item 1A. Risk Factors” contained in Part I of this Annual Report on Form 10-K for information regarding our fixed-price contracts and operations through joint ventures and partnerships.

In certain limited circumstances, we enter into financial guarantees in the ordinary course of business, with financial institutions and other credit grantors, which generally obligate us to make payment in the event of a default by the borrower. These arrangements generally require the borrower to pledge collateral to support the fulfillment of the borrower’s obligation. We account for both financial and performance guarantees at fair value at issuance in accordance with ASC 460-10 Guarantees and, as of December 31, 2022, we had no material guarantees of the work or obligations of third parties recorded.

56

As of December 31, 2022, we had $1 billion in a committed line of credit under the Senior Credit Facility and $449 million of uncommitted lines of credit to support the issuance of letters of credit. As of December 31, 2022, with respect to our Senior Credit Facility, we had $260 million of outstanding borrowings previously issued to fund the acquisition of Centauri and $47 million of outstanding letters of credit. With respect to our $449 million of uncommitted lines of credit, we had utilized $248 million for letters of credit as of December 31, 2022. The total remaining capacity of these committed and uncommitted lines of credit was approximately $894 million. Information relating to our letters of credit is described in Note 12 "Debt and Other Credit Facilities" to our consolidated financial statements in Part II, Item 8 of this Annual Report on Form 10-K and the information discussed therein is incorporated by reference into this Part II, Item 7. Other than as discussed in this report, we have not engaged in any material off-balance sheet financing arrangements through special purpose entities.

Contractual Obligations and Commitments

Significant contractual obligations and commercial commitments as of December 31, 2022 are as follows:

[[GREPCENT_TABLE]]
[["","Payments Due"],["Dollars in millions","2023","","2024","","2025","","2026","","2027","","Thereafter","","Total"],["Debt obligations (a)","$","365","","","$","26","","","$","26","","","$","353","","","$","485","","","$","250","","","$","1,505"],["Interest (b)","90","","","77","","","68","","","62","","","16","","","11","","","324"],["Operating leases","44","","","51","","","43","","","32","","","29","","","102","","","301"],["Finance leases","9","","","8","","","3","","","\u2014","","","\u2014","","","\u2014","","","20"],["Pension funding obligation (c)","8","","","39","","","39","","","39","","","39","","","13","","","177"],["Purchase obligations (d)","38","","","11","","","3","","","1","","","\u2014","","","\u2014","","","53"],["Mura Investment (e)","39","","","\u2014","","","\u2014","","","\u2014","","","\u2014","","","\u2014","","","39"],["Total (f)","$","593","","","$","212","","","$","182","","","$","487","","","$","569","","","$","376","","","$","2,419"]]
[[/GREPCENT_TABLE]]

(a)On November 1, 2023, the Convertible Notes will mature. It is our current intent to settle the principal balance of $350 million in cash and any excess value upon conversion in cash, shares of our common stock or a combination of both at our election.

(b)Determined based on long-term debt borrowings outstanding at the end of 2022 using the interest rates in effect for the individual borrowings as of December 31, 2022, including the effects of interest rate swaps. The payments due for interest reflect the cash interest that will be paid, which includes interest on outstanding borrowings and commitment fees. These amounts exclude the amortization of discounts or debt issuance costs.

(c)Included in our pension funding obligations are payments related to our agreement with the trustees of our U.K. pension plan. The agreement for this plan calls for minimum annual contributions of £33 million ($39 million at current exchange rates) from 2023 through the next valuation. On October 17, 2022, we made an advance payment to our U.K. pension plan for approximately £29 million of the £33 million required minimum annual contributions for the year ending December 31, 2023.

(d)In the ordinary course of business, we enter into commitments to purchase software and related maintenance, materials, supplies and similar items. The purchase obligations disclosed above do not include purchase obligations that we enter into with vendors in the normal course of business that support direct project costs on existing contracting arrangements with our customers. We expect to recover such obligations from our customers.

(e)In June 2022, we announced that we entered into an agreement to invest an additional £80 million in Mura Technology in which the funding is expected in two tranches. The first payment of £48 million was distributed during the quarter ended June 30, 2022 and the second payment of £32 million is expected to be paid in Q1 of 2023 with cash on hand.

(f)We have excluded uncertain tax positions totaling $92 million as of December 31, 2022. The ultimate timing of settlement of these obligations cannot be determined with reasonable assurance. See Note 13 to our consolidated financial statements for further discussion on income taxes.

57

Transactions with Joint Ventures

In the normal course of business, we form incorporated and unincorporated joint ventures to execute projects. In addition to participating as a joint venture partner, we often provide engineering, procurement, construction, operations or maintenance services to the joint venture as a subcontractor. Where we provide services to a joint venture that we control and therefore consolidate for financial reporting purposes, we eliminate intercompany revenues and expenses on such transactions. In situations where we account for our interest in the joint venture under the equity method of accounting, we do not eliminate any portion of our subcontractor revenues or expenses, however, we recognize profit on our subcontractor scope of work only to the extent the joint venture's scope of work to the end customer is complete. We recognize revenue over time on our services provided to joint ventures that we consolidate and our services provided to joint ventures that we record under the equity method of accounting. See Note 10 to our consolidated financial statements in Part II, Item 8 of this Annual Report on Form 10-K for more information. The information discussed therein is incorporated by reference into this Part II, Item 7.

Recent Accounting Pronouncements

Information relating to recent accounting pronouncements is described in Note 23 to our consolidated financial statements in Part II, Item 8 of this Annual Report on Form 10-K and the information discussed therein is incorporated by reference into this Part II, Item 7.

U.S. Government Matters

Information relating to U.S. government matters commitments and contingencies is described in Note 15 to our consolidated financial statements in Part II, Item 8 of this Annual Report on Form 10-K and the information discussed therein is incorporated by reference into this Part II, Item 7.

Legal Proceedings

Information relating to various commitments and contingencies is described in Notes 6, 14 and 15 to our consolidated financial statements in Part II, Item 8 of this Annual Report on Form 10-K and the information discussed therein is incorporated by reference into this Part II, Item 7.

Critical Accounting Policies and Estimates

The discussion and analysis of our financial condition and results of operations is based upon our consolidated financial statements which have been prepared in conformity with U.S. GAAP. The preparation of our consolidated financial statements requires us to make estimates and judgments that affect the determination of financial positions, results of operations, cash flows and related disclosures. Our significant accounting policies are described in Note 1 to our consolidated financial statements. The following discussion is intended to highlight and describe those accounting policies that are especially critical to the preparation of our consolidated financial statements and to provide a better understanding of our significant accounting estimates and assumptions about future events that affect the amounts reported in our consolidated financial statements. Significant accounting estimates are important to the representation of our financial position and results of operations and involve our most difficult, subjective or complex judgments. We base our estimates on historical experience and various other assumptions we believe to be reasonable according to the current facts and circumstances through the date of the issuance of our financial statements.

Contract Revenue and Contract Estimates. Our policy on revenue recognition is provided in Note 1 to our consolidated financial statements for the year ended December 31, 2022 and is also applied to the revenues of our equity method investments included in equity in earnings of unconsolidated affiliates. We recognize revenue on substantially all of our contracts over time, as performance obligations are satisfied, due to the continuous transfer of control to the customer. Our contracts are generally accounted for as a single performance obligation and are not segmented between types of services provided. We recognize revenue on those contracts over time using the cost-to-cost method, based primarily on contract costs incurred to date compared to total estimated contract costs at completion. Contract costs include all direct materials, labor and subcontractors costs and indirect costs related to contract performance. We believe this method is the most accurate measure of contract performance because it directly measures the value of the goods and services transferred to the customer. For all other contracts where we have the right to consideration from the customer in an amount that corresponds directly with the value received by the customer based on our performance to date, we recognize revenue when services are performed and contractually billable.

The cost-to-cost method of revenue recognition requires us to prepare estimates of cost to complete for contracts in progress. Due to the nature of the work performed on many of our performance obligations, the estimates of total revenue and

58

cost at completion is complex, subject to many variables and require significant judgment. In making such estimates, judgments are required to evaluate contingencies such as potential variances in schedule and the cost of materials, labor and productivity, the impact of change orders, liability claims, contract disputes and achievement of contractual performance standards. As a significant change in one or more of these estimates could affect the profitability of our contracts, we routinely review and update our significant contract estimates through a disciplined project review process in which management reviews the progress and execution of our performance obligations and estimates at completion. We have a long history of working with multiple types of projects and in preparing cost estimates. However, there are many factors that impact future cost as outlined in “Item 1A. Risk Factors” contained in Part I of this Annual Report on Form 10-K. These factors can affect the accuracy of our estimates and materially impact our future reported earnings. Changes in total estimated contract costs and losses, if any, are recognized on a cumulative catch-up basis in the period in which the changes are identified at the contract level. Such changes in contract estimates can result in the recognition of revenue in a current period for performance obligations which were satisfied or partially satisfied in a prior period. Changes in contract estimates may also result in the reversal of previously recognized revenue if the current estimate differs from the previous estimate.

It is common for our contracts to contain variable consideration in the form of incentive fees, performance bonuses, award fees, liquidated damages or penalties that may increase or decrease the transaction price. Variable consideration may be tied to our performance, cost targets, or achievement of milestones. Other contract provisions also give rise to variable consideration such as unapproved change orders and claims, and on certain contracts, index-based price adjustments. We estimate the amount of variable consideration at the most likely amount we expect to be entitled and include in the transaction price when it is probable that a significant reversal of cumulative revenue recognized will not occur. Variable consideration associated with claims and unapproved change orders is included in the transaction price only to the extent of costs incurred. We recognize claims against suppliers and subcontractors as a reduction in recognized costs when enforceability is established by the contract and the amounts are reasonably estimable and probable of recovery. Reductions in costs are recognized to the extent of the lesser of the amounts management expects to recover or actual costs incurred.

Under cost-reimbursable contracts, the price is generally variable based upon our actual allowable costs incurred for materials, equipment, reimbursable labor hours, overhead and G&A expenses. The FAR provides guidance on types of costs that are allowable in establishing prices for goods and services provided to the U.S. government and its agencies. Pricing, including the types of costs that are allowable, for non-U.S. government agencies and commercial customers is based on specific negotiations with each customer. We recognize revenue on cost-reimbursable contracts to the extent it is not probable a significant reversal will occur.

Our estimates of variable consideration and determination of whether to include such amounts in the transaction price are based largely on our assessment of legal enforceability, anticipated performance and any other information (historical, current or forecasted) that is reasonably available to us.

Goodwill and Intangible Assets. Goodwill is tested annually for possible impairment as of October 1 of each fiscal year, and on an interim basis when indicators of possible impairment exist. For purposes of impairment testing, goodwill is assigned to the applicable reporting units based on our current reporting structure. We have the option to first assess qualitative factors to determine whether it is more likely than not that the fair value of a reporting unit is less than its carrying value. Qualitative factors assessed for each of the applicable reporting units include, but are not limited to, changes in macroeconomic conditions, industry and market considerations, cost factors, discount rates, competitive environments and financial performance of the reporting units. If the qualitative assessment indicates that it is more likely than not that the carrying value of a reporting unit exceeds its estimated fair value, a quantitative test is required.

While we have the option to proceed directly to the quantitative test, for 2022, management performed a qualitative impairment assessment of our reporting units, of which there were no indications that it was more likely than not that the fair value of our reporting units were less than their respective carrying values. As such, a quantitative goodwill test was not required, and no goodwill impairment was recognized in 2022.

In 2020, for reporting units in our STS business segment, fair value was determined using a blended approach utilizing discounted cash flow models with estimated cash flows based on internal forecasts of revenues and expenses over a specified period plus a terminal value. For all other reporting units, fair values were determined using a blended approach including market earnings multiples and discounted cash flow models. Under the market approach, we estimated fair value by applying earnings and revenue market multiples to a reporting unit’s operating performance for the trailing twelve-month period. The income approach estimates fair value by discounting each reporting unit’s estimated future cash flows using a weighted-average cost of capital that reflects current market conditions and the risk profile of the reporting unit. To arrive at our future cash flows, we used estimates of economic and market assumptions, including growth rates in revenues, costs, estimates of future expected

59

changes in operating margins, tax rates and cash expenditures. Other significant estimates and assumptions include terminal value growth rates, future estimates of capital expenditures and changes in future working capital requirements. Under the quantitative impairment test, the estimated fair value of each reporting unit is compared to its carrying value, including goodwill. If the carrying value of the reporting unit including goodwill exceeds its fair value, an impairment charge equal to the excess would be recognized, up to a maximum amount of goodwill allocated to that reporting unit. We can resume the qualitative assessment in any subsequent period for any reporting unit.

Deferred Taxes, Valuation Allowances and Tax Contingencies. As discussed in Note 13 to our consolidated financial statements, deferred tax assets and liabilities are recognized for the expected future tax consequences of events that have been recognized in our consolidated financial statements or tax returns. We record a valuation allowance to reduce certain deferred tax assets to amounts that are more likely than not to be realized. We evaluate the realizability of our deferred tax assets by assessing the valuation allowance and by adjusting the amount of such allowance, if necessary. The factors used to assess the likelihood of realization include our forecast of the timing and character of future taxable income exclusive of reversing temporary differences and carryforwards, future reversals of existing taxable temporary differences, income available from carryback years and available tax planning strategies that could be implemented to realize the net deferred tax assets.

We consider both positive and negative evidence when evaluating the need for a valuation allowance on our deferred tax assets in accordance with ASC 740. Available evidence includes historical financial information supplemented by currently available information about future years. Generally, historical financial information is more objectively verifiable than projections of future income and is therefore given more weight in our assessment. We consider cumulative losses in the most recent twelve quarters to be significant negative evidence that is difficult to overcome in considering whether a valuation allowance is required. Conversely, we consider a cumulative income position over the most recent twelve quarters, to be significant positive evidence that a valuation allowance may not be required. Changes in the amount, timing and character of our forecasted taxable income could have a significant impact of our ability to utilize deferred tax assets and related valuation allowance.

Our ability to utilize the unreserved foreign tax credit carryforwards is based on our ability to generate income from foreign sources of approximately $557 million prior to their expiration whereas our ability to utilize other net deferred tax assets exclusive of those associated with indefinite-lived intangible assets is based on our ability to generate U.S. forecasted taxable income of approximately $676 million. Changes in our forecasted taxable income, in the appropriate character and source as well as jurisdiction, could affect the ultimate realization of deferred tax assets.

    Income tax positions must meet a more likely than not recognition threshold to be recognized. Income tax positions that previously failed to meet the more likely than not threshold are recognized in the first subsequent financial reporting period in which that threshold is met. Previously recognized tax positions that no longer meet the more likely than not threshold are derecognized in the first subsequent financial reporting period in which that threshold is no longer met. We recognize potential interest and penalties related to unrecognized tax benefits in income tax expense.

Legal, Investigation and Other Contingent Matters. We record liabilities for loss contingencies when it is probable that a liability has been incurred and the amount is reasonably estimable. We disclose matters when we believe a material loss is at least reasonably possible but not probable or if the loss is not reasonably estimable but probable and is expected to be material to our financial statements. Generally, our estimates related to these matters are developed in consultation with internal and external legal counsel. Our estimates are based upon an analysis of potential results, assuming a combination of litigation and settlement strategies. The precision of these estimates and the likelihood of future changes depend on a number of underlying assumptions and a range of possible outcomes. When possible, we attempt to resolve these matters through settlements, mediation and arbitration proceedings. If the actual settlement costs, final judgments or fines differ from our estimates, our future financial results may be materially and adversely affected. We record adjustments to our initial estimates of these types of contingencies in the periods when the change in estimate is identified. All legal expenses associated with these matters are expensed as incurred. See Notes 6, 14 and 15 to our consolidated financial statements for further discussion of our significant legal, investigation and other contingent matters.

60

Pensions. Our pension benefit obligations and expenses are calculated using actuarial models and methods. The more critical assumption and estimate used in the actuarial calculations is the discount rate for determining the current value of benefit obligations. Other assumptions and estimates used in determining benefit obligations and plan expenses include expected rate of return on plan assets, inflation rates and demographic factors such as retirement age, mortality and turnover. These assumptions and estimates are evaluated periodically and are updated accordingly to reflect our actual experience and expectations.

The discount rate used to determine the benefit obligations was computed using a yield curve approach that matches plan specific cash flows to a spot rate yield curve based on high quality corporate bonds. The expected long-term rate of return on assets was determined by a stochastic projection that takes into account asset allocation strategies, historical long-term performance of individual asset classes, an analysis of additional return (net of fees) generated by active management, risks using standard deviations and correlations of returns among the asset classes that comprise the plans' asset mix. Plan assets are comprised primarily of equity securities, fixed income funds and securities, hedge funds, real estate and other funds. As we have both domestic and international plans, these assumptions differ based on varying factors specific to each particular country or economic environment.

The discount rate utilized to calculate the projected benefit obligation at the measurement date for our U.S. pension plan increased to 4.91% at December 31, 2022 from 2.45% at December 31, 2021. The discount rate utilized to determine the projected benefit obligation at the measurement date for our U.K. pension plan, which constitutes 98% of all international plans, increased to 5.00% at December 31, 2022 from 1.80% at December 31, 2021. Our expected long-term rates of return on plan assets utilized at the measurement date increased to 6.63% from 5.19% for our U.S. pension plans and increased to 6.00% from 4.67% for our U.K. pension plans, for the years ended December 31, 2022 and 2021, respectively.

The following table illustrates the sensitivity to changes in certain assumptions, holding all other assumptions constant, for our pension plans:

[[GREPCENT_TABLE]]
[["","Effect on"],["","Pretax Pension Cost in 2023","","Pension Benefit Obligation at December 31, 2022"],["Dollars in millions","U.S.","","U.K.","","U.S.","","U.K."],["25-basis-point decrease in discount rate","$","\u2014","","","$","(1)","","","$","1","","","$","37"],["25-basis-point increase in discount rate","$","\u2014","","","$","1","","","$","(1)","","","$","(35)"],["25-basis-point decrease in expected long-term rate of return","$","\u2014","","","$","4","","","N/A","","N/A"],["25-basis-point increase in expected long-term rate of return","$","\u2014","","","$","(4)","","","N/A","","N/A"]]
[[/GREPCENT_TABLE]]

Unrecognized actuarial gains and losses are generally recognized using the corridor method over a period of approximately 22 years, which represents a reasonable systematic method for amortizing gains and losses for the employee group. Our unrecognized actuarial gains and losses arise from several factors, including experience and assumption changes in the obligations and the difference between expected returns and actual returns on plan assets. The difference between actual and expected returns is deferred as an unrecognized actuarial gain or loss on our consolidated statement of comprehensive income (loss) and is recognized as a decrease or an increase in future pension expense. Our pretax unrecognized net actuarial loss in accumulated other comprehensive loss at December 31, 2022 was $771 million.

The actuarial assumptions used in determining our pension benefits may differ materially from actual results due to changing market and economic conditions, changes in the legislative or regulatory environment, higher or lower withdrawal rates and longer or shorter life spans of participants. While we believe that the assumptions used are appropriate, differences in actual experience, expectations or changes in assumptions may materially affect our financial position or results of operations. Our actuarial estimates of pension expense and expected return on plan assets are discussed in Note 11 in the accompanying consolidated financial statements.

61
