Item 1. Business.
Unless the context otherwise requires, references in this Annual Report to the “Company,” “Cipher,” “Cipher Digital,” “we,” “us” or “our” refers to Cipher Digital Inc. and its consolidated subsidiaries, unless otherwise indicated.
Business Overview
We are dedicated to developing and operating industrial-scale data centers engineered for next-generation computing at the highest standards of innovation, precision, and excellence. Over the past several years, we have intentionally evolved from a pure-play bitcoin miner into a vertically integrated data center development and operations platform focused on energy-intensive compute infrastructure. Our vertical integration spans critical stages of the data center value chain, including land and power origination and interconnection, site development, data center design and construction, oversight and ongoing facility operations.
Fundamentally, we bring together construction, engineering, operations, power, real estate and technology expertise to deliver high quality, purpose-built data centers that meet tenants’ needs. Our in-house teams source and control industrial-scale sites with access to substantial electric power capacity, advance grid interconnection and substation development, and manage the design and construction of data center campuses. We also operate and maintain energy-intensive data center facilities, leveraging operational expertise developed through our employees’ extensive experience managing Tier III HPC data centers and large, flexible electrical loads. Against a backdrop of increasing demand for artificial intelligence (“AI”) technology and access to energized HPC data centers to meet consumers’ demands for such technology, we believe we play an important part of the AI economy and we expect to benefit from powerful, long-term growth drivers.
While bitcoin mining has been an important component of our business model in prior years, our strategy increasingly emphasizes the development of industrial-scale data centers that can be leased to hyperscalers and other HPC customers under long-term contracts, while retaining the flexibility to deploy bitcoin mining as an interim or complementary use of power.
On February 20, 2026, we changed our name to “Cipher Digital Inc.” Rebranding to “Cipher Digital” aligns with our corporate strategy to scale into a leading HPC data center developer and operator, as we leverage our existing site pipeline and source additional sites, partnering with premier tenants, and developing and operating industry-leading data centers purpose-built for HPC. Our goal is to monetize our power assets and manage capital efficiently through market cycles in order to align our infrastructure with the growing global demand for AI-driven compute capacity.
Data Center Portfolio
Our data center portfolio consists of 4.2 gigawatts (“GW”) of capacity across 10 sites, at various stages of interconnection. We are currently developing 600 megawatts (“MW”) of HPC data center facilities across two sites for hyperscaler tenants, and we currently operate approximately 207 MW of power at one bitcoin mining data center in Texas. We also maintain a pipeline of approximately 3.4 GW across seven sites in Texas and one additional site in Ohio.
We believe we have secured key HPC leases for our data centers and expect to continue to do so for the additional sites in our portfolio due to several key strengths and strategies. We believe we have a demonstrated ability to source high-quality sites suitable for HPC tenants, with characteristics like proximity to major metropolitan areas, ample acreage, diverse fiber routes, and available interconnection infrastructure. We have experienced in-house construction, engineering and operations teams and project management competencies. We have demonstrated an ability to access and manage capital in a disciplined manner.
A significant component of our current and future growth is expected to be generated through the development of our existing portfolio and acquisition of new sites. We are focused on developing the remaining sites in our pipeline for future HPC tenants, and evaluating additional sites, locations, and partnerships to expand our pipeline that are suitable for HPC tenants. From time to time, we may also look to sell individual assets that we do not consider to be core to our business and growth strategy. For further details on our pipeline of future sites that we expect to be suitable for HPC, see “—Site Pipeline.”
1
HPC Leases
In 2025, we entered into two leases with HPC tenants. As a result of these developments, our HPC-related contracts represent a significant portion of our expected future revenues. Additionally, we acquired two sites in 2025 that expanded our total development pipeline to approximately 3.4 GW of site capacity. The remainder of our portfolio of sites also continues to attract interest from potential HPC tenants and possible leasing opportunities.
Fluidstack/Google Data Center Lease
In the third quarter of 2025, through our wholly-owned subsidiary Cipher Barber Lake LLC (“Cipher Barber Lake”), we entered into long-term HPC leases with Fluidstack USA II Inc. (“Fluidstack”) to construct a data center at our Barber Lake site (“Barber Lake” or the “Barber Lake Facility”), located near Colorado City, Texas, supported by a lease recognition agreement, pursuant to which Google LLC (“Google”) has agreed to backstop certain obligations of Fluidstack under our HPC leases with Fluidstack.
The Barber Lake Facility is being constructed on 250 acres of land owned by Cipher Barber Lake, and will have a gross capacity of 300 MW. 244 MW of gross capacity will be allocated to Fluidstack in Barber Lake Phase I, and the remaining 56 MW will be allocated to Fluidstack in Barber Lake Phase II. Cipher Barber Lake has received approvals for 300 MW of interconnection without any restrictions on the load profile and has entered into agreements necessary to participate in the Electric Reliability Council of Texas (“ERCOT”) market.
Cipher Barber Lake is targeting delivery of Barber Lake Phase I by September 30, 2026, and of Barber Lake Phase II by January 31, 2027. Construction commenced in 2025 and is proceeding under a structured delivery framework emphasizing off-site manufacturing, modular construction, and early procurement of long-lead equipment.
Amazon Data Center Lease
In October 2025, through our wholly-owned subsidiary Cipher Black Pearl LLC (“Cipher Black Pearl”), we entered into a 15-year lease agreement with Amazon Web Services, Inc. (“Amazon”) to deliver approximately 300 gross MW of turnkey data center capacity at the site (“Black Pearl” or the “Black Pearl Facility”), with phased delivery expected to commence in 2026.
The Black Pearl Facility is being constructed on approximately 75 acres of land owned by a wholly-owned Cipher subsidiary near Wink, Texas. The Black Pearl Facility has received approvals for 300 MW of interconnection and has entered into agreements necessary to participate in the ERCOT market.
Cipher Black Pearl is targeting rent commencement for the initial subphase of Black Pearl Phase I by the fourth quarter of 2026 and the initial subphase for Black Pearl Phase II by the first quarter of 2027. Rent for the lease is expected to fully ramp by the first quarter of 2027 upon completion of the final subphase. The retrofit and development of the 300 MW data center commenced in 2025 and is proceeding under a structured delivery framework emphasizing off-site manufacturing, modular construction, and early procurement of long-lead equipment.
Site Pipeline
Below we discuss our pipeline of sites, totaling 3.4 GW of capacity, that we anticipate energizing between 2026 and 2030.
Colchis Site
In November 2025, we purchased a majority interest in a joint venture entity to develop a new HPC site in West Texas capable of providing 1-GW, referred to as Colchis (the “Colchis Site”), under which we expect to hold a majority equity interest subject to final lease and development terms. The Colchis Site includes a fully executed direct interconnection agreement with American Electric Power (“AEP”) for a dual interconnection facility targeting energization in 2028 and options to buy approximately 620 acres of land adjacent to an existing substation.
Ulysses Site
In December 2025, we acquired a 200 MW data center site in Ohio, referred to as Ulysses (the “Ulysses Site”). The acquisition secured capacity from AEP Ohio to support development of the site. In a separate transaction, we acquired land options to purchase approximately 195 acres of land at the site. The Ulysses Site is expected to energize in the fourth
2
quarter of 2027 and, once energized, will provide us with direct access to PJM Interconnection L.L.C., the largest wholesale electricity market in the United States. The site is well-suited for HPC applications given its acreage, expected energization timeline, availability of diverse fiber paths, and proximity to a major metropolitan area. The Ulysses Site represents our first acquisition outside of Texas and expands our development pipeline to approximately 3.4 GW across eight sites, reflecting our strategy to diversify geographically and source power-advantaged sites capable of supporting industrial-scale, turnkey HPC data center deployments.
Stingray Site
Our Stingray site (the “Stingray Site”) is located in West Texas. The Stingray Site has conditional ERCOT interconnection approval of up to 100 MW. We expect to energize the site in the first half of 2026.
Reveille Site
Our Reveille site (“Reveille” or the “Reveille Site”) is located in Cotulla, Texas. The Reveille Site has ERCOT interconnection approval of up to 70 MW, with the possibility for expansion. We expect to energize the site in 2027.
McLennan Site
In October 2024, we entered into an option agreement to acquire a special purposes entity holding the rights to purchase a site, referred to as McLennan (the “McLennan Site”), located in central Texas. The McLennan Site has targeted capacity of up to 500 MW and estimated energization in 2028. In February 2026, we exercised the option to acquire the special purpose entity holding the right to purchase the McLennan Site, and acquired such rights. We are also currently in the process of exercising such rights to purchase the McLennan Site.
Mikeska Site
In October 2024, we entered into an option agreement to acquire a special purposes entity holding a ground lease with an option to purchase a site, referred to as Mikeska (the “Mikeska Site”), located in West Texas. The Mikeska Site has targeted capacity of up to 500 MW and estimated energization in 2028. In February 2026, we exercised the option to acquire the special purpose entity holding the ground lease with an option to purchase the Mikeska Site, and acquired such rights.
Milsing Site
In October 2024, we entered into an option agreement to acquire a special purposes entity holding the rights to purchase a site, referred to as Milsing (the “Milsing Site”), located in East Texas. The Milsing Site has targeted capacity of up to 500 MW and estimated energization between 2028 and 2029. In December 2025, we exercised the option to acquire the special purpose entity holding the right to purchase the Milsing Site and acquired such rights.
Bitcoin Mining Operations
Odessa Facility
Our Odessa data center (the “Odessa Facility”) is our wholly-owned 207 MW facility located in Odessa, Texas. The Odessa Facility is an approximately 52 acre site, located next to a natural gas power production facility. We began bitcoin mining operations on this site in November 2022 and completed the build out of the site in September 2023.
The power at the Odessa Facility is supplied by Luminant ET Services Company LLC (“Luminant”) under a power purchase agreement, pursuant to which we have access, until at least July 2027, to electricity at a cost of approximately 2.7 c/kWh, subject to certain increases related to certain tariffs, price increased in October 2025 to 2.8 c/kWh. For further details on our power purchase agreement with Luminant, see “—Business Agreements—Luminant Power Agreement.”
The Odessa Facility may also be suitable for retrofitting for HPC tenants.
Black Pearl Facility
Our Black Pearl data center is our wholly-owned 300 MW facility located in Wink, Texas. We commenced mining bitcoin at the Black Pearl data center in June 2025 and ramped up to 150 MW of capacity by September 2025. In November 2025, we entered into a 15-year lease agreement with Amazon to deliver approximately 300 MW of turnkey
3
data center capacity at the site, with phased delivery expected to commence in 2026. As a result, in February 2026 bitcoin mining operations ceased at the Black Pearl Facility.
WindHQ Joint Venture (“JV”) Sites
From 2022 through February 2026, we had 49% equity interests in three 40 MW bitcoin mining data centers, each of which was partially-owned through a joint venture with WindHQ LLC (“WindHQ”); the Alborz data center (the “Alborz Facility”), the Bear data center (the “Bear Facility”), and the Chief data center (the “Chief Facility”). We had a 49% membership interest in Alborz LLC, which owns the Alborz Facility, a 49% membership interest in Bear LLC, which owns the Bear Facility, and a 49% membership interest in Chief Mountain LLC, which owns the Chief Facility. On February 19, 2026, we sold our 49% interests in our WindHQ JV sites to Canaan U.S. Inc.
Data Center Sourcing, Development and Operation
Our core business model is centered on sourcing, designing, constructing, and operating data centers in power-advantaged locations. As demand for electricity-intensive AI and HPC infrastructure has accelerated, we have expanded our focus to include turnkey data center campuses capable of supporting hyperscaler requirements, including high power density, advanced cooling, redundancy, and long-term scalability. We believe this process and our team’s expertise are key to our operational success and maintaining our competitiveness. Our team conducts a rigorous process of sourcing, technical design, construction and operations, procurement and supply chain management.
Power Origination and Control
Our team takes a power-first approach to sourcing sites, and our power origination process is informed by experience and strong industry relationships that offer insight into sourcing attractive sites that will meet our high standards. In addition to required power capacity, we consider other important requirements for HPC operations, such as energization timing, access to fiber connectivity and water resources, size, regulatory approvals, location, anticipated power costs and other factors in evaluating potential sites.
Our team begins sourcing potential sites up to a few years in advance of planned development. We source new data center locations by acquiring options to purchase, purchasing or leasing property that we can develop for use as data center facilities. Our site origination process involves identifying sites with viable grid interconnection potential and advancing them through the applicable interconnection queue through energization. We also develop the requisite electrical infrastructure to support data center operations and evaluate opportunities for behind-the-meter generation where appropriate. Site acquisition typically involves securing necessary site improvements and addressing potential development constraints to support construction and long-term operational viability. We also evaluate alternative water sourcing solutions, in particular for sites located in regions experiencing high baseline water stress, which may expose us to risks related to water scarcity, increased water costs, or regulatory constraints on water consumption. We also further assess opportunities to convert existing facilities for our data center operations or to acquire data centers from other companies.
Based on our experience, we believe there is significant competition for power capacity and energized facilities, in part due to limited availability and significant interconnection queue backlogs, and that such competition will continue for the foreseeable future.
Hyperscale-Ready Design, Engineering and Construction
After procuring a site, we design and, through cooperation with developers, contractors, and suppliers, build out a facility that meets specific design and technical requirements. The design, engineering and construction approach considers a range of requirements and site characteristics, including power and water capacity, redundancy, power density, cooling, rack configuration and other technical specifications. We believe our team’s industry experience and design process serve as a foundation for ensuring our data centers meet the highest standards for operational efficiency and safety.
In addition to managing engineering and design work, our in-house team oversees construction project management, including vendor selection, procurement, budgeting, quality supervision, and more. We believe that these elements are important to ensure the project is completed on time, within budget, and to specific quality standards. We have also secured key purchasing agreements and developed relationships with major equipment manufacturers, reducing costs and shortening delivery timeframes on key components, including major mechanical and electrical equipment. We have also secured a key partnership with Quanta Services, Inc. (NYSE:PWR), a key engineering, construction and procurement partner for our development of sites like Black Pearl and Barber Lake.
4
Operational Excellence
Our data center operations team manages the daily operation of our data center facilities. Our team’s extensive industry experience and commitment to operational excellence help us meet our goal of safely operating data centers at the highest standards. In 2024, the Odessa Facility was the first bitcoin mining data center awarded the Management and Operations, or M&O, Stamp of Approval award from the Uptime Institute, an independent organization focused on improving the performance, efficiency, and reliability of business-critical infrastructure that has established standards and performance certifications for data center design and construction.
Our team oversees all aspects of our data center’s operations, which include data center performance, operating data centers pursuant to strict service level agreements for our gross modified HPC leases, miner performance at our bitcoin mining operations, network performance and incident response management.
Our technology team has also developed proprietary software for data center management and optimization, which provides critical real-time information on our data centers’ performance and enables us to optimize our operations. For more information on our proprietary software, see “—Intellectual Property.”
We believe that our team’s experience and high standards for data center operations set us apart from many of our competitors.
Capital Discipline
We seek to maintain a disciplined approach to capital allocation and financing to support scalable growth while managing balance sheet risk and preserving financial flexibility. Our development model has focused on using project-level financing arrangements, non-recourse where possible, together with long-term lease structures, to fund the construction and operation of our data center assets. These structures are intended to align capital investment with asset-level cash flows and reduce reliance on corporate leverage.
We typically pursue structuring projects with phased development, non-recourse or limited-recourse debt, to reduce downside risk and enhance return visibility while maintaining control over critical development and operational decisions. Long-term leases with high-quality counterparties further support financing by improving cash flow visibility and credit quality at the project level. Management’s emphasis on disciplined deployment of capital and forecasting future capital needs ensures that capital is deployed selectively and efficiently across market environments, reinforcing our ability to grow responsibly and sustain long-term value creation.
We believe this approach to capital discipline provides flexibility across market cycles, isolates project-specific construction risks, supports the efficient deployment of capital, and allows us to pursue growth opportunities while preserving liquidity and maintaining a prudent financial profile.
Revenue Structure
Bitcoin Mining Business
Through the end of 2025, our revenue has been derived from mining bitcoin. Specifically, at our bitcoin mining data centers we purchase electrical power and use it to run miners that produce computing power. We contribute the computing power we produce to one or more mining pools confirming transactions on the Bitcoin blockchain in exchange for block rewards and transaction fees. This means that we provide our computing power, or hashrate, to the mining pool in exchange for a proportionate share of bitcoin mined by the network. To the extent that we can produce bitcoin through mining at a cost that is lower than the market price of bitcoin, we expect to generate profits.
Block rewards are subsidies paid in bitcoin that are programmed into the Bitcoin software and awarded to a miner, or a group of miners, for providing a valid solution to the cryptographic problem required to publish a new block of transactions on the Bitcoin blockchain. Block rewards are fixed in the short term and the Bitcoin network is designed to reduce them periodically through halving. Most recently, in April 2024, the block reward was reduced from 6.25 to 3.125 bitcoin, and it will halve again, to 1.5625 bitcoin, which is estimated to occur in April 2028.
Bitcoin miners also collect transaction fees for each transaction they confirm. Miners batch unconfirmed transactions into new blocks to be published and added to the blockchain. Miners are not forced to confirm any specific transaction, but they are economically incentivized to confirm valid transactions as a means of collecting fees. Miners have
5
historically accepted relatively low transaction fees, but transaction fees vary and it is difficult to predict what transaction fees will be in the future.
We have a portfolio of electrical power assets that was developed to allow us to profitably mine bitcoin. We purchase a majority of the power for our currently operational bitcoin mining data centers at a fixed cost. To the extent that we do not use purchased electrical power to mine bitcoin, we seek to sell that electrical power back to the wholesale power market. To the extent we can sell such surplus power at a price greater than our cost to purchase it, we expect to generate profits. If we are curtailed by our power provider, we may purchase power from the electrical grid.
Business Agreements
HPC Leases
In 2025, we executed HPC leases with Fluidstack and Amazon, which represent a significant portion of our expected future revenues. For more information, see “—HPC Leases.”
Luminant Power Agreement
In June 2021, we entered into a power purchase agreement with Luminant for the supply of electric power to the Odessa Facility, which was subsequently amended and restated, most recently on August 23, 2023 (as amended, the “Luminant Power Agreement”), pursuant to which we have access, until at least July 2027, to a cost of electricity of approximately 2.7 c/kWh, subject to certain increases related to certain tariffs, price increased in October 2025 to 2.8 c/kWh. The Luminant Power Agreement provides for a take or pay arrangement, whereby, Luminant will supply, and we are obligated to accept and pay for, a total electrical power capacity equal to at least 66.7% of the full 207 MW capacity each year at a predetermined MWh rate. The agreement also provides for certain curtailment events pursuant to which Luminant has a right to curtail the electrical power delivered in each contractual year. Subject to certain early termination exceptions, the agreement provides for a subsequent automatic annual renewal, unless either party provides written notice to the other party of its intent to terminate the agreement at least six months prior to the expiration of the then-current term.
Our Strengths
We believe we have the following strengths that give us a competitive advantage in the data center development and operations business, and position us as a preferred partner for hyperscalers seeking new capacity in power-constrained markets.
Power-first site sourcing approach in a competitive landscape
We have demonstrated industry-leading expertise in originating and securing industrial-scale, greenfield data center sites with attractive power economics and take a power-first approach to site origination. We focus on locations with access to power and fiber, scalable interconnection, ample acreage, and favorable long-term development characteristics. To date, we have sourced approximately 4.2 GW of power capacity at various stages of interconnection by engaging early with landowners, utilities, and grid operators and securing site control and interconnection in advance of demand.
We have secured a valuable pipeline of best-in-class sites by leveraging our industry expertise, strategic partnerships, and a disciplined, power-first approach to identifying high-value locations for HPC tenants. See “— Data Center Sourcing, Development and Operation—Power Origination and Control.” We believe demands for data center infrastructure have increased substantially, and that the data center industry is poised for continued significant growth, driven by rapid adoption of digital technologies across all sectors. Simultaneously, we believe this continued growth occurs in the face of a power shortfall, which we believe makes our valuable portfolio of data center sites and our ability to continue sourcing and developing sites a key strategic advantage in a competitive landscape.
Deep experience in hyperscale development
Our development and construction team brings significant experience building and operating hyperscale data centers, including prior leadership roles at leading global technology and infrastructure firms. The team has demonstrated the ability to take industrial-scale sites from initial concept and permitting through construction and energization on time and at scale.
Our execution capability, combined with disciplined capital management, technical credibility, and a proven ability to deliver in power-constrained environments, has enabled us to build relationships with leading hyperscalers, infrastructure investors, utilities, and financing partners.
6
Operational excellence led by experienced leadership team
Our leadership team brings deep experience in construction, operations, capital allocation, capital markets, real estate, and technology. Our construction and operations teams in particular have extensive HPC data center delivery experience, via their roles at hyperscalers prior to joining Cipher. We believe that our senior management team’s knowledge of such industries provides us with a key competitive advantage.
Under this leadership, we operate industrial-scale data centers engineered for high reliability, efficiency, and performance. Our operating model emphasizes disciplined processes, data-driven decision-making, and continuous optimization, with teams experienced in managing infrastructure under demanding conditions across both bitcoin mining and HPC workloads. Management’s ability to manage our portfolio is supported by our dedicated asset management function, which provides centralized oversight of our portfolio of data center development projects and operating facilities. Such function facilitates cross-functional coordination across the company and supports management’s ability to anticipate and respond to portfolio-level challenges, thereby enabling timely operational and capital allocation decision-making.
We believe management’s proven track record of execution, combined with operational rigor and a long-term, cycle-aware strategy, underpins our strong unit economics and ability to monetize power assets effectively across market cycles. Further, a significant portion of compensation for our senior management team, as well as our employees, is in the form of common stock of our Company, aligning their interests with those of external stockholders.
Strong balance sheet with disciplined capital management
We actively manage our balance sheet to support ongoing operations and development while maintaining flexibility to finance large projects and manage downside risk. Management has demonstrated discipline in capital allocation by investing through various market cycles, structuring project-level financing, accessing capital markets, and preserving liquidity. We believe this financial posture supports our ability to fund growth, withstand volatility, and pursue opportunistic investments without compromising long-term stability.
Our Strategy
Our strategy involves:
•Leveraging our power-first site sourcing to address the growing power shortfall facing hyperscalers
•Developing and constructing industrial-scale, turnkey HPC data centers
•Building relationships with credit-worthy tenants and negotiating economically-attractive long-term leases
•Sourcing efficient capital for the development and construction of HPC-ready data centers
•Maintaining cost leadership, operational excellence, and balance sheet discipline through market cycles
•Expanding our portfolio through strategic acquisitions to enhance our development pipeline and increasing capacity at existing sites through on-site power generation or additional grid interconnection
We believe this strategy positions us at the intersection of energy, digital infrastructure, and compute, with a differentiated platform to service demand for industrial-scale data center capacity.
Developing industrial-scale, turnkey HPC data centers with long-term leasing potential
We focus on developing industrial-scale, turnkey data center sites designed to support HPC workloads under long-term contracted lease structures. We have had significant interest in the sites in our pipeline, and we have established robust internal guidelines for reviewing and approving lease transactions, which we believe will drive attractive risk-adjusted returns. Sites are planned with ample acreage, modular layouts, and infrastructure designs that support phased construction, enabling capacity to be delivered in alignment with tenant demand while preserving flexibility for future expansion.
Our development model allows us to maintain control over schedule, cost, and the technical specifications required by our tenants. This approach supports long-duration leasing opportunities with hyperscalers and enhances financeability by enabling project-level debt and joint venture structures. As a result, our campuses are well-suited to support long-term contracted cash flows while maintaining optionality over the life of the asset.
7
Prudent allocation of capital to operate and expand our business
Our disciplined capital allocation has helped us limit corporate balance sheet risk, preserve liquidity, and ensure that our expansion is aligned with attractive risk-adjusted return thresholds. We maintain a focus on moderate consolidated leverage and seek to create long-term shareholder value by prioritizing strategies that we expect will generate strong returns on equity.
As Cipher transitioned from a development-stage company to an operating platform with energized facilities, contracted power, and growing cash flow visibility, our capital strategy evolved accordingly. In addition, the Company’s ability to partner with large, creditworthy counterparties, including hyperscale and investment-grade customers, has enhanced the overall credit profile of our projects and improved access to debt and structured financing solutions. As a result, we have increasingly incorporated project-level financing structures that better align the duration and risk profile of our assets with our sources of capital, and structured such financing as non-recourse where possible. This evolution has been intentional and disciplined, with a focus on reducing dilution, lowering our cost of capital, and maintaining balance sheet flexibility across market cycles. We expect to continue to evaluate a range of financing alternatives as the Company grows, including equity, debt, joint ventures, and asset-level financing, consistent with our objective of supporting long-term shareholder value.
We have developed expertise in sourcing, financing, and executing data center investment opportunities. In particular, we have been able to identify sites in certain markets that had not yet seen significant hyperscale data center development, such as West Texas, where we could secure land and site control on more favorable terms than in more established data center markets. Our investment process emphasizes a collaborative and disciplined approach to deal analysis, risk management, and capital allocation, with a focus on factors such as underlying market fundamentals, access to power and fiber infrastructure, and the applicable regulatory and permitting environment.
The specialized nature of data center assets can present underwriting complexities that differ from more traditional real estate investments, which may limit participation by certain investors. We believe that our experience and focus in this area allow us to evaluate and pursue opportunities where competitive dynamics may differ from other property types. As a result, we believe this approach may support the generation of attractive risk-adjusted returns over time, although no assurance can be given that such returns will be achieved.
In 2025, we raised approximately $3.2 billion of gross proceeds through convertible notes offerings and senior secured notes offerings. We endeavor to maintain financial flexibility while using our liquidity and access to capital to support operations, acquisitions, investments, developing data centers for current and future tenants, and expanding our site pipeline, which are important sources of our growth.
Operational scale, experience, and industry engagement
We actively manage our sites to maximize cash flow and control costs by leveraging our scale to drive operating efficiencies. The Company’s operating history in developing, constructing, and operating data centers, together with the depth of experience of our management team and personnel, many of whom have spent years building and operating industrial-scale data center and digital infrastructure assets, supports consistent execution across our portfolio. We believe this experience, combined with our established industry relationships, provides us with a differentiated perspective to identify and evaluate emerging secular trends relevant to digital infrastructure and data center development.
We focus our industry relationship efforts on innovative and best-in-class counterparties to ensure we incorporate best practices across the data center ecosystem as well as anticipate trends. Our industry collaboration includes engagements with industry associations, technology service providers, telecommunications providers, systems integrators, power management firms, and companies across multiple end-market segments, including manufacturing, transportation and logistics, financial services, and digital media. We believe these relationships inform our investment decisions, support the delivery of differentiated solutions for tenants, and contribute to long-term growth and returns for stockholders.
Expanding the development pipeline through partnerships, joint ventures, and strategic acquisitions
We have actively expanded our development pipeline through a combination of strategic partnerships, joint ventures, and targeted acquisitions. We leverage our sourcing expertise, execution track record, and balance sheet strength to partner with utilities, landowners, infrastructure investors, and hyperscalers to originate and scale new opportunities efficiently.
8
Joint venture structures allow us to share development risk, optimize capital deployment, and align incentives with long-term partners, while strategic acquisitions provide opportunities to secure power, land, or interconnection capacity that may be difficult to replicate organically. Using both enables us to grow our pipeline in a disciplined manner, maintaining control over asset quality and development standards while scaling our platform to meet increasing demand for power-secure data center capacity.
Competition
We define our principal competitors as other data center developers, HPC infrastructure providers and publicly traded bitcoin miners that have diversified into the HPC services industry.
The HPC services industry is rapidly evolving and new competitors or incumbent traditional data center operators and cloud services providers could enter the market and affect our competitiveness in any HPC services we offer.
Several companies compete in this industry, including: CoreWeave, Digital Realty, Equinix, Vantage Data Centers and Aligned Data Centers.
Recently, several of our competitors in the bitcoin mining business have expanded their operations to include HPC services and have signed leases with hyperscalers and HPC tenants, including: Hut 8 Corp., IREN Limited, TeraWulf Inc., Core Scientific, Inc., and Applied Digital Corporation.
Other bitcoin and digital asset mining companies may make similar strategic decisions to diversify into the HPC and AI services segment.
Though we are transitioning away from the bitcoin mining business, we have previously defined our principal competitors as other publicly traded bitcoin miners because there is widely available information about their operations.
We also face competition over scarce resources, such as power. The majority of our data centers are currently located in Texas, and we may face significant and increasing competition, because Texas is an attractive market for sourcing power for industrial-scale data centers. Our two leased sites and our pipeline of sites are primarily located in Texas, as well, which is also an attractive market for locating HPC data centers. See “Risk Factors—Risks Related to Our Business, Industry and Operations—We have concentrated our operations and, thus, are particularly exposed to the performance of our data centers located in Texas and changes in the regulatory environment, market conditions and natural disasters in Texas.”
Government Regulation
We are committed to maintaining a proactive and adaptive approach to regulatory compliance. We monitor legislative and regulatory developments and seek expert advice as appropriate to ensure our business practices align with the evolving legal and regulatory framework. Despite uncertainties posed by a changing regulatory landscape, we remain committed to maintaining innovative and responsible business practices in markets pertaining to data center developers and operators for HPC tenants.
We operate in a complex and rapidly evolving regulatory environment and we are subject to a wide range of laws and regulations enacted by U.S. federal, state and local governments, governmental agencies and regulatory authorities, including the SEC, the Commodity Futures Trading Commission (“CFTC”), the Federal Trade Commission (the “FTC”) and the Financial Crimes Enforcement Network of the U.S. Department of the Treasury (“FinCEN”), as well as similar entities in other countries.
The primary legislative efforts that affect us as a data center operator in an energy-intensive industry like HPC have been those on the state level, particularly in Texas where our operations are most concentrated. Recently, there have been several legislative and regulatory efforts to manage power consumption and support grid reliability, which affect our business as an operator of industrial-scale data centers. In 2025, the Texas legislature enacted legislation, Senate Bill 6 (“SB 6”), to support ERCOT’s grid reliability by proposing minimum transmission rates on certain large loads and removing phantom loads from its interconnection queue to enhance accuracy of actual future load growth. SB 6 requires the Public Utility Commission of Texas (the “PUCT”) and ERCOT to create new processes and impose new requirements for the interconnection of facilities with large electrical loads of at least 75 MWs to the ERCOT system. SB 6 also requires security type payments as part of the initial interconnection request, and creates a new approval that is required for co-location of generation with large loads.
9
In addition, ERCOT has amended and continues to evaluate its processes for interconnection of large electrical loads to the ERCOT grid. In December 2025, ERCOT announced amendments to the approval process for large load interconnection requests and is designing and implementing a process that may batch multiple large load interconnection requests together to evaluate system impacts on a portfolio basis for purposes of transmission planning. These developments, along with potential requirements relating to grid stability, voltage ride-through, frequency ride-through and curtailment obligations, could increase costs, delay project timelines, or impose additional operational constraints. In 2024, the PUCT also required operators of large virtual currency mining operations connected to register their facilities with the PUCT.
Other regulatory bodies, governmental or semi-governmental, have shown an interest in regulating or investigating companies engaged in the blockchain or cryptocurrency businesses. As the regulatory and legal environment evolves, we may become subject to new laws and further regulation by the SEC, the CFTC, other federal agencies and state and local governments, which may affect our mining and other activities. For example, relevant to our bitcoin mining operations, on January 23, 2025, the Trump Administration signed an executive order titled “Strengthening American Leadership in Digital Financial Technology,” which established an interagency working group tasked with “proposing a Federal regulatory framework governing the issuance and operation of digital assets” in the United States. Pursuant to this executive order, the working group released a report in July 2025 outlining the administration's recommendations to Congress and various agencies reflecting the administration’s "pro-innovation mindset toward digital assets and blockchain technologies." In particular, the report recommends that Congress enact legislation regarding self-custody of digital assets, clarifying the applicability of Bank Secrecy Act obligations with respect to digital asset service providers, granting the CFTC authority to regulate spot markets in non-security digital assets, prohibiting the adoption of a CBDC, and clarifying tax laws as relevant to digital assets. In addition, the report recommends that agencies reevaluate existing guidance on digital asset activities, use existing authorities to enable the trading of digital assets at the federal level, embrace DeFi, launch or relaunch crypto innovation efforts, and promote U.S. private sector leadership in the responsible development of cross-border payments and financial markets technologies, among others. The establishment of this working group within the National Economic Council could lead to significant changes in market structure, oversight, consumer protection, and risk management. The evolving regulatory environment may pose challenges to our operations, particularly if new regulations introduce additional compliance costs or restrict certain activities. Additionally, various bills have been proposed in the U.S. Congress related to our business, which may be adopted and have an impact on us, and governmental agencies and regulatory authorities, such as the SEC, the CFTC, the FTC and FinCEN, may also enact regulations related to our business, which may have an impact on us.
The regulatory landscape surrounding HPC is evolving rapidly, and we anticipate increased scrutiny and potential regulation in the near and long term. These developments may affect our business and operations in ways that are difficult to predict. For additional discussion regarding our belief about the potential risks existing and future regulation pose to our business, see “Risk Factors—Risks Related to Our Business—Operating HPC data centers is energy-intensive, which may have a negative environmental impact. Changing environmental regulation and public energy policy may expose our business to new risks.” and “Risk Factors—Risks Related to HPC—Regulatory developments surrounding AI may negatively impact our HPC data center operations.”
Intellectual Property
We use specific hardware and software for our data center operations. In certain cases, source code and other software assets may be subject to an open source license, as much technology development underway in this sector is open source. For these works, we intend to adhere to the terms of any license agreements that may be in place.
In addition, we have developed and continue to refine certain proprietary trade secrets and software applications to enhance the profitability and operational effectiveness of our data center operations and may continue to develop those applications or others in the future. We hold four granted United States patents and one issued patent in Taiwan. Our granted patents are expected to expire between July 2043 and July 2044, assuming payment of all appropriate maintenance, renewal, annuity or other governmental fees. Additionally, we have pending U.S. and foreign patent applications for our proprietary technology used in our data center operations. We rely upon trade secrets, trademarks, service marks, trade names, copyrights and other intellectual property rights and license the use of intellectual property rights owned and controlled by others.
Insurance
We maintain insurance coverage for our properties and development projects that we believe is appropriate given the nature of the assets and their stage of development or operation. Our coverage includes, among other types, property
10
insurance, builders’ risk, commercial general liability, and business interruption insurance, as well as other customary policies for comparable assets. Our insurance program is placed with third-party commercial insurers and structured with the assistance of professional insurance brokers.
The types and levels of coverage may vary by property and project and are periodically evaluated and adjusted as projects progress and business needs evolve. We believe our insurance program is aligned with prevailing industry standards and market practices for comparable assets and similar companies and reflects a risk management approach appropriate for our portfolio; however, certain risks may be uninsured or underinsured, and insurance may not be available on commercially reasonable terms or in amounts sufficient to cover all losses.
Human Capital Management
As of the date of this filing, we have 66 full-time employees, including officers. We aim to attract and retain talented and dedicated employees who contribute to the execution of our business model. To support this objective, we have recruited employees with experience and expertise in data center construction and operations, power procurement, asset management, compliance, real estate, finance, capital markets, human resources, data science, computer science, and logistics.
We aim to foster a culture of ownership across all areas of our business. Our compensation and benefits philosophy is designed to retain high-performing employees and attract new talent.
To support these goals, and to help our employees maintain healthy, balanced lives, while meeting their financial and retirement objectives, we offer market-competitive compensation and a comprehensive benefits package. This includes healthcare coverage, vacation benefits, parental leave, a 401(k) company match, an incentive award plan, a fitness reimbursement program, commuter benefits and other employee-focused programs and resources.
Seasonality
With respect to our bitcoin mining operations, our annual and quarterly operating results have the potential to be significantly affected by seasonality related to weather and the related energy commodity price volatility. The price of electric power typically peaks during the winter and summer months, and more generally during extreme weather events, which can potentially impact our results. Additionally, extreme weather conditions may affect the efficiency and uptime of our mining operations which will have an impact on operating results. As we expect a greater percentage of our revenue to be comprised of lease payments from hyperscaler tenants in future years, we expect seasonality to play a lesser role on our results of operations.
Corporate Information
Cipher Mining Inc. was incorporated as a Delaware corporation on August 27, 2021 in connection with the closing of a transaction (the “Business Combination”) pursuant to which Good Works Acquisition Corp. (“GWAC”), a special purpose acquisition company, consummated the merger of a wholly-owned direct subsidiary of GWAC with and into Cipher Mining Technologies Inc. (“CMTI”). Following the Business Combination, the combined company was named Cipher Mining Inc. (“Cipher” or the “Company”). The Company comprises all of GWAC’s and CMTI’s operations.
On February 20, 2026, we filed an amended and restated charter amending our name to “Cipher Digital Inc.”
Our principal executive office is located at 1 Vanderbilt Avenue, Floor 54, New York, NY 10017, and our telephone number is (332) 262-2300.
Available Information
Our website address is www.cipherdigital.com. The contents of, or information accessible through, our website are not part of this Annual Report on Form 10-K. We make our filings with the SEC, including our Annual Report on Form 10-K, Quarterly Reports on Form 10-Q, Current Reports on Form 8-K and all amendments to those reports, as well as beneficial ownership filings available free of charge on our website as soon as reasonably practicable after we file such reports with, or furnish such reports to, the SEC.
Investors and others should note that the Company announces material financial and operational information to its investors using press releases, SEC filings and public conference calls and webcasts, as well as its investor relations site at investors.cipherdigital.com. The Company may also use its website as a distribution channel of material Company information. In addition, you may automatically receive email alerts and other information about the Company when you
11
enroll your email address by visiting the “Email Alerts” option under the Investor Resources tab on investors.cipherdigital.com.
The reference to our website address does not constitute incorporation by reference of the information contained on or available through our website, and you should not consider such information to be a part of this Annual Report on Form 10-K.