ITEM 1. Business
Business Overview
We are a water solutions provider with a unique combination of land, water, pipeline and water filtration assets located in Southern California between major water systems serving population centers in the Southwestern United States. Our portfolio of assets includes 2.5 million acre-feet of permitted water supply, 1 million acre-feet of groundwater storage capacity, 220 miles of existing, underground pipeline, 43 miles of right-of-way entitlements for pipeline construction, and versatile, scalable and cost-effective water filtration technology that removes contaminants and constituents of concern from groundwater. Our customers are public and private water systems, government agencies and commercial businesses.
We own approximately 46,000 acres of land with high-quality, naturally recharging groundwater resources in Southern California’s Mojave Desert (“Cadiz Property”). Our land holdings with vested water rights were assembled by our founders in the early 1980s, relying on NASA satellite imagery that identified a desert aquifer system beneath a vast 2,000 square mile Southern California watershed. The aquifer system underlying the watershed is estimated to hold 30 - 50 million acre-feet of groundwater in storage, comparable in size to the capacity of the largest reservoir in the United States - Lake Mead. Since the late 1980s, we have farmed at our contiguous property at the base of the watershed (“Cadiz Ranch”) relying on groundwater for irrigation.
In 2008, we entered into a 99-year lease with the Arizona & California Railroad Company (“ARZC”) to co-locate and construct a water conveyance pipeline system (“Southern Pipeline”) within ARZC’s existing, active railroad right-of-way (“ROW”) that extends 43-miles from the Cadiz Ranch to the Colorado River Aqueduct (“CRA”), one of Southern California’s primary sources of water supply, allowing water supply to be moved between the Cadiz Ranch and the CRA for off property beneficial uses.
1
Cadiz Inc.
In 2012, we received permits and entitlements from public agencies for our groundwater storage project (the “Mojave Groundwater Bank”), which will (1) conserve 2.5 million acre-feet of water from the aquifer system over a 50-year period (average of 50,000 acre-feet per year) for off-property beneficial uses in underserved California communities and (2) store up to 1 million acre-feet of imported water in the aquifer system. The permits were challenged through litigation and were upheld and sustained in their entirety by judgements in the California Superior Court in 2014 and the California Court of Appeal in 2016.
In 2021, we completed the acquisition of a 30” steel natural gas pipeline (“Northern Pipeline”) that extends 220-miles from the Cadiz Ranch across Kern and San Bernardino Counties terminating in California’s Central Valley. The pipeline, originally constructed to transport fossil fuels, is idle, and we are preparing to convert the pipeline to transport water. The route of the Northern Pipeline intersects several water conveyance facilities that serve Southern California, including the California Aqueduct, the Los Angeles Aqueduct, and the Mojave River Pipeline.
In 2022, we completed the acquisition of the assets of ATEC Systems, Inc., a producer of specialized filtration systems for removal of common groundwater contaminants that pose health risks in drinking water, including iron, manganese, arsenic, nitrates, Chromium 6 and other constituents of concern.
In 2024, we entered into agreements with multiple public water systems for their purchase of 21,275 acre-feet per year (“AFY”) of annual water supply from the Mojave Groundwater Bank to be delivered via the Northern Pipeline.
To finance construction of all improvements and required facilities to operate the Mojave Groundwater Bank project including the Northern Pipeline, Southern Pipeline and related facilities, we established a new special purpose business entity, Mojave Water Infrastructure Company LLC (“MWI”), that will fund these capital costs in partnership with public sector, tribal and other investors.
In October 2025, we entered into a definitive agreement (“Lytton Credit Agreement”) with Lytton Rancheria of California, a federally recognized Native American Tribe (“Lytton”), pursuant to which we may require Lytton to provide up to $51 million in an unsecured loan facility, convertible into a majority interest in the storage cash flows from the Mojave Groundwater Bank (“Storage Cash Flows Right”), which Lytton would then contribute to MWI, in exchange for equity interests in MWI on the same economic terms offered to other equity investors in MWI. The Lytton Credit Agreement represents the first tranche of up to approximately $451 million in total equity capital being raised by us through MWI, to construct, own and operate the Mojave Groundwater Bank (see Note 7 to the Consolidated Financial Statements – “Long-Term Debt”).
In addition, we are currently engaged in the completion of due diligence with private equity investors for up to a targeted $400 million in equity commitment to MWI.
2
Cadiz Inc.
Upon completion of definitive agreements for an additional $400 million in equity capital investments in MWI, we expect to contribute to MWI our pipeline infrastructure assets, including the Northern Pipeline and the Southern Pipeline right-of-way. In addition, Lytton would contribute to MWI its Storage Cash Flows Right (see Note 7 to the Consolidated Financial Statements – “Long Term Debt”), so that the MWI investors would share in the cash flows generated from the constructed facilities, including from the supply agreements and the Storage Cash Flows Right. Under this potential structure, in consideration of our transfer of assets, we expect to receive an upfront capital reimbursement payment at closing and an equity interest in MWI, entitling us to share in the long-term cash flows generated by MWI, among other consideration. Additionally, we would retain the right to 49% of the cash flows generated from the Company’s water-storage operations that we would not be contributing to MWI.
MWI investors are expected to coordinate with us and project participants to seek available infrastructure grants and/or other financing alternatives, including potential revenue bond issuances through a to-be-formed Joint Powers Authority, to fund any remaining construction costs.
The Water Industry Value Chain
The water industry value chain today includes water supply, water storage, wastewater treatment, long-range conveyance, local distribution systems, and a wide range of products, technologies and services for monitoring, moving, trading, treating and integrating water resources across thousands of miles to address the challenges and demands of a diverse customer base. The water industry customer base includes regional wholesale water agencies responsible for acquiring, distributing and managing imported water resources; water and wastewater utilities that supply, treat and monitor clean water or transport, treat and analyze wastewater or storm water through an infrastructure network; government agencies responsible for public safety, environmental protection and economic security; and commercial and industrial customers requiring long-term, reliable supplies of clean, affordable water for their customers and businesses.
Climate change has disrupted hydrological cycles around the world. Extreme weather has created extreme unpredictability regarding water supply for human consumption. Increasingly frequent and intense storms and swings between wet and dry years have created an urgent demand for technologies, services and infrastructure investment to capture, store and transport fresh water. Moreover, violent weather, extreme flooding and increasingly stringent regulatory restrictions on water quality have exceeded the capacity of existing water infrastructure and increased the cost of water over the last decade.
Water industry customers today require products, services, technology, and integrated solutions that address the challenges of scarcity of freshwater supplies, rising pollution, stricter regulations, infrastructure limitations and increasing operational costs.
Business Strategy
Our diversified portfolio of related water assets enables us to offer products and services to public water systems and other water industry customers in an integrated manner to meet the growing need for reliable access to clean water.
3
Cadiz Inc.
Description of Assets
Assets in our portfolio include Land, Water Supply, Water Storage, Water Conveyance, and Water Filtration Technology. Our land assets support agricultural development that currently provides operating revenue to us. Our water filtration technology business also currently provides us with revenue. Our water supply, water storage, and water conveyance assets are being developed for use and do not yet provide us with revenue. All development activities related to the water, supply, storage and conveyance assets are reflected in our land and water resources segment. The development process and revenue model for our assets is described below.
Land
The Cadiz Property includes 46,000 acres of landholdings consisting of:
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| ● | 9,600 acres of land permitted for agriculture; |
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| ● | 9,600 acres of land adjacent to the existing permit area that could be used for future agricultural development, but which are not yet permitted; and |
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| ● | 26,800 acres of rangeland some of which is considered sensitive habitat for Desert Tortoise and other wildlife. |
The land is underlain with high quality, groundwater resources capable of supporting a variety of surface activities including agriculture, renewable energy, and water supply and storage banking.
Since the 1980s, we have developed the land for our agricultural use and we either farm the property directly or via leases to private farming operators. We currently farm approximately 1,000 acres of grain crops, primarily in alfalfa plantings, and have leased 2,100 acres for farming activities by Fenner Valley Farms LLC. Our agricultural wellfield currently includes six wells, with a production capacity of up to 25,000 AFY.
In 2024, we entered into a lease agreement with RIC Energy (“RIC”) to build a hydrogen production facility at the Cadiz Ranch. Under the agreement, RIC is pursuing the development of a solar powered green hydrogen production facility on up to 3,000 acres of land at the Cadiz Ranch. In the current development phase, RIC makes lease payments of $35,000 per year. Upon approval of permitting and start of construction, lease payments will increase to $1,000 per acre (2024 dollars), subject to annual inflation adjustments. Once operational, RIC is expected to purchase water from the Cadiz Ranch for $850 per AF (2024 dollars), subject to annual inflation adjustments. Additionally, RIC is expected to make surplus energy supply available at the facility for use by facilities of the Mojave Groundwater Bank. RIC is expecting to begin processing state and local environmental permitting in 2026.
Water Supply
In 2012, we received approval from the County of San Bernardino to conserve an average of 50,000 acre-feet per year from the aquifer system at the Cadiz Ranch for 50 years (2.5 million acre-feet in total) and make this new water supply available off-property to underserved communities in Southern California. One acre-foot is approximately 326,000 gallons or enough water to serve two average households of four people for 1 year.
4
Cadiz Inc.
Under the extensive groundwater monitoring plan approved by the County of San Bernardino and local permitting authorities, Mojave Groundwater Bank operations and withdrawals of groundwater are limited to sustainable amounts that preserve the health of the aquifer system and safeguard the desert ecosystem. Because water in the aquifer system would otherwise be lost to evaporation, surplus water that is captured and withdrawn for beneficial uses before it evaporates is recognized as a new water supply (i.e. “conserved” water).
In 2024, we entered into agreements with multiple water providers for the purchase of a total of 21,275 AFY of annual water supply to be delivered via the Northern Pipeline. Based upon value engineering of the design for the Northern Pipeline, we may reduce the number of pump stations initially constructed for the Northern Pipeline conversion which will reduce the expected throughput of the Northern Pipeline to between 20,000 – 23,000 AFY contracted from the maximum potential capacity of 25,000 AFY.
We expect the remaining approximately 30,000 AFY of water supply available under our current permit to be contracted for delivery via the Southern Pipeline. We have approximately 15,000 AFY under option or conditional definitive agreements for delivery to Southern California based water users via the Southern Pipeline and are in discussion with several parties interested in contracting for remaining supply from the Southern Pipeline, including multiple water providers, municipalities and tribes in Arizona that could take delivery from the Colorado River’s Central Arizona Project under exchange agreements.
In August 2025, we entered into a non-binding Memorandum of Understanding (“EPCOR MOU”) with EPCOR NR Holdings Inc. (“EPCOR”) to support development of the Mojave Groundwater Bank to provide long-term water for the benefit of EPCOR customers in Arizona (“Arizona off-takers”). The EPCOR MOU contemplated entering into a marketing agreement that would provide EPCOR with exclusively rights to market up to 25,000 AFY of conserved water from the Mojave Groundwater Bank to Arizona off-takers. The exclusive marketing agreement with EPCOR was terminated in December 2025 which allows us to directly engage with potential off-takers in Arizona, including EPCOR, for the remaining water supply from the Southern Pipeline. For clarity, termination of exclusive marketing rights does not preclude EPCOR from purchasing water supply from the project. We have entered into direct discussions with multiple potential off-takers in Arizona.
Under our water supply agreements, it is anticipated that we will contribute our annual supply of 50,000 AFY of water into Fenner Gap Mutual Water Company ("FGMWC"), a mutual water company that we presently manage that will ultimately be jointly owned by all participating public water agencies that have acquired water supply from the Mojave Groundwater Bank. Through membership in the mutual water company, public water agencies will purchase, for up to a 50-year term (take on delivery), their share of the 50,000 AFY of water at our wellhead at an agreed upon market price estimated to net to us approximately $850/AFY (2024 dollars) subject to annual inflation adjustment, after payment of a pro rata portion of capital costs for construction of all facilities of the Mojave Groundwater Bank project and operations and maintenance costs. The cost to participating water providers is estimated to be between $1,450 - $1,950/AFY (2024 dollars) without applying expected grant funding or low-interest government loans toward reduction in capital costs.
5
Cadiz Inc.
Water supply contracts and/or the construction of off-take facilities may be subject to local regulatory review and environmental compliance depending on distribution system requirements.
Water Storage
In addition to making available new water supply, the Mojave Groundwater Bank also offers storage, or “banking,” in the aquifer system at the Cadiz Ranch for up to one-million acre-feet of fresh water that would be imported and held in storage underground until needed in future dry years. The Mojave Groundwater Bank is also approved for up to 150,000 acre-feet of storage capacity that could be used to carryover and store water purchases of our water supply (“carryover storage”). There are currently no groundwater banking programs along the Colorado River Aqueduct or lower Colorado River system. The storage capacity of the Mojave Groundwater Bank would be comparable to Southern California’s largest surface reservoir, Diamond Valley Lake, but unlike a surface reservoir, the Mojave Groundwater Bank would not suffer significant losses from surface evaporation.
Similar to the contracts for supply discussed above, we expect water providers and entities with access to surplus water would contract for reserved storage capacity in our aquifer system through FGMWC. Such storage capacity could be used for carryover storage or could be used for imported water (once sufficient conveyance infrastructure is available). We entered into option agreements in 2010 that reserved storage capacity for $1,500 per AF of carryover storage, a market rate that we expect has escalated since that time and may be as much as $3,000 per AF. Agencies with water storage contracts are also expected to pay annual maintenance fees up to approximately $35 per AF subject to annual inflation adjustments in addition to operations and maintenance costs during put or take operations into or out of storage.
We are in discussion with several parties interested in contracting for imported or carryover storage. Given the expected interconnection of the Mojave Groundwater Bank to the State Water Project and Colorado River systems, entities with access to surplus water on either system could contract for banking at the Mojave Groundwater Bank. Entry into water storage contracts or the construction of required facilities may be subject to public agency review.
In October 2025, we executed a Memorandum of Understanding with the US Bureau of Reclamation to explore opportunities to integrate our project into long-term planning for the Colorado River system including to support access to emergency supply, such as a strategic water reserve program, or facilitation of trades and exchanges available among the seven states that receive Colorado River supplies (“Basin States”). Reclamation is currently processing a Draft Environmental Impact Statement (“DEIS”) for new operational guidelines for the Colorado River system to address systemic decline in available supply to the seven Basin States and low elevation in Lake Powell and Lake Mead and is expected to issue final guidelines by October 2026. We believe the Mojave Groundwater Bank could play a positive role in long-term management of the Colorado River system.
Water Conveyance
Water conveyance facilities are required to effectuate the sale of water supply and water storage. These water conveyance facilities must be the appropriate size and in the right locations to meet customer needs. We have invested in physical pipeline assets and the acquisition of rights-of-way to build water conveyance facilities that can transport our own water supplies and also be utilized by public water systems across California to trade and transport water supplies.
6
Cadiz Inc.
To deliver conserved water off-property or import water for storage at the Cadiz Ranch, we are currently developing two pipeline routes for the Mojave Groundwater Bank – (1) the Southern Pipeline , which would extend southwards from the Cadiz Ranch to the Colorado River Aqueduct in Rice, California, and (2) the Northern Pipeline, which extends northwards from the Cadiz Ranch to Barstow, Antelope Valley, and Wheeler Ridge, California.
The Southern Pipeline is approved to be constructed within the ARZC ROW minimizing impacts to undisturbed desert and will provide railroad improvements. The capacity of the Southern Pipeline is anticipated to be approximately 120,000 AFY subject to final pipeline design and will accommodate dedicated supply deliveries and storage operations.
Our Northern Pipeline crosses an underserved area of southern California and intersects several regional water storage and conveyance facilities, including the California Aqueduct, the Los Angeles Aqueduct, and the Mojave River Pipeline, and is expected to improve water access to approximately 23 state-designated disadvantaged communities along the route. Conversion of the existing pipeline from its previous designed use for natural gas to water conveyance would require the construction of pump stations, the installation of air release/air vacuum valves and blow-off valves along the pipeline, and other improvements. Once converted to water conveyance, the annual delivery throughput of the Northern Pipeline for water conveyance is currently anticipated to be between 20,000 – 23,000 AFY.
When both the Northern Pipeline and Southern Pipeline become operational, the Mojave Groundwater Bank would interconnect Southern California’s primary water delivery systems for the first time, enabling more flexible trading among participants on these systems.
Engineering, Procurement & Construction
In 2025, we entered into an agreement with Stantec Inc. (NYSE: STN), a global leader in sustainable design and engineering, to oversee the engineering, procurement and construction management process for the Mojave Groundwater Bank as Owner’s Engineer and to support the selection of the lead construction contractor under a Construction Management at Risk (“CMAR”) delivery model to bring the project online on an accelerated construction timeline. Stantec has completed 30% design on the Northern Pipeline and continues to progress the design. In 2025, we selected W.M. Lyles as CMAR for the Northern Pipeline and executed a CMAR contract for pre-construction services. We anticipate updating the CMAR contract to include a Guaranteed Maximum Price (“GMP”) related to the Northern Pipeline during the second quarter of 2026 prior to the start of construction activities.
We have begun procurement of project components to support construction of facilities by entering into an option agreement for purchase of 36” steel pipe and contracting for use of linear generators to supply power at the pump stations and wellfield. The option agreement for the purchase of up to 180 miles of existing 36” steel pipe provides a 3-year option to purchase all or part of the pipeline assets at $155 per linear foot for a $5 million initial payment with certain rights to credit the initial payment against final purchase.
7
Cadiz Inc.
As we have progressed with the design work by the Owner’s Engineer and pre-construction services by the CMAR, the estimated cost to construct all required facilities to complete the Mojave Groundwater Bank, including conversion of the Northern Pipeline to water conveyance and construction of the Southern Pipeline, the wellfield and power facilities have increased from our previous estimate of approximately $800 million to our current estimate of between $1.25 and $1.5 billion. The increase is due to a number of factors including higher anticipated labor and installation costs, increased cost of generating power for the pump stations and wellfield to meet air quality requirements, increased anticipated costs for performing work in such a remote location, and overall inflationary increases in construction costs over the past few years. These costs are expected to be capped under GMPs in the construction contracts for the Mojave Groundwater Bank and recovered in fees collected from agencies contracting for water supply and storage. We are progressing toward GMP for the Northern Pipeline during the second quarter of 2026 prior to the start of construction activities and expect a GMP after we move through design and pre-construction services for the Southern Pipeline during second half of 2026.
Project Infrastructure Finance
Since forming MWI in December 2024, we have advanced a capital strategy for project financing of the Mojave Groundwater Bank centered on the combination of equity investment through public or private investors and tribal interests, low-cost federal loans or municipal bonds, and grant funding with a goal to maximize value to our shareholders. Our target capital structure includes approximately $451 million of equity, supplemented by municipal and government debt financing and grant funding to fund total expected capital infrastructure costs of between approximately $1.25 to $1.5 billion to complete a full buildout of the Mojave Groundwater Bank. Full buildout of the Northern Pipeline, Southern Pipeline, wellfield and groundwater banking facilities will be designed to manage the groundwater basin to cost-effectively serve multiple off-takers, including public agencies contracting for supply and storage as well as hydrogen development and on-going agricultural operations at the Cadiz Ranch. Capital costs for construction, operations and maintenance of these facilities will be apportioned to each off-taker and is expected to be fully recovered by contracted cash flows received from those off-takers.
In October 2025, we entered into the Lytton Credit Agreement pursuant to which we may require Lytton to provide up to $51 million in an unsecured loan facility, convertible into the Storage Cash Flows Right, which Lytton would then contribute to MWI, in exchange for equity interests in MWI on the same economic terms offered to other equity investors in MWI. The Lytton Credit Agreement represents the first tranche of up to approximately $451 million in total equity capital being raised by us through MWI, to construct, own and operate the Mojave Groundwater Bank (see Note 7 to the Consolidated Financial Statements – “Long-Term Debt”).
We are currently engaged in the completion of due diligence with private equity investors for up to a targeted $400 million in equity commitment to MWI. Upon completion of definitive agreements for an additional $400 million in equity capital investments in MWI, we expect to contribute to MWI our pipeline infrastructure assets, including the Northern Pipeline and the Southern Pipeline right-of-way. Accordingly, MWI investors would share in the cash flows generated from the constructed facilities including from the supply agreements and the Storage Cash Flows Right. Under this potential structure, in consideration of our transfer of assets, we expect to receive an upfront capital reimbursement payment at closing and an equity interest in MWI, entitling us to share in the long-term cash flows generated by MWI, among other consideration. Additionally, we would retain the right to 49% of the cash flows generated from our water-storage operations that would not be contributed to MWI.
8
Cadiz Inc.
In addition to financing arrangements above, we have also made progress in securing debt financing for the Mojave Groundwater Bank. In February 2026 we qualified to receive an invitation from the U.S. Environmental Protection Agency (“EPA”) to apply for up to $194 million under the Water Infrastructure Finance and Innovation Act (“WIFIA”) program to support Northern Pipeline conversion costs. This invitation reserves federal funding for the project while we advance through the underwriting process. In addition to WIFIA, we are evaluating the potential issuance of other debt financing including revenue bonds or other municipal debt instruments through a to-be-formed Joint Powers Authority (“JPA”).
We also continue to coordinate with our partners through the Fenner Gap Mutual Water Company to pursue a range of state and federal grant opportunities that support water supply resilience, infrastructure modernization, renewable energy integration, and projects benefiting disadvantaged communities and tribal entities. These include programs administered by federal agencies such as the EPA, Department of Commerce, Bureau of Reclamation, and Department of Energy, as well as California state funding programs.
Permits
The value of our assets and the anticipated revenues from water supply, water storage contracts and profit sharing with MWI is supported by several permits and entitlements secured by us and our partners.
From 2010 – 2012, we completed a California Environmental Quality Act (“CEQA”) review process including the approval of a comprehensive Final Environmental Impact Report (“FEIR”) for the conservation of 2.5 million acre-feet of water from the aquifer system over a 50-year period (50,000 AFY for 50 years) and the storage and banking of up to one million acre-feet of water in the aquifer system at the Cadiz Property which is now called the Mojave Groundwater Bank. The FEIR concluded that operations would not cause any significant adverse environmental impacts. The FEIR was certified on July 31, 2012, by Santa Margarita Water District (“SMWD”), the lead participating water agency.
San Bernardino County, the local agency responsible for groundwater use at the Cadiz Property, also approved a Groundwater Monitoring, Management and Mitigation Plan (‘GMMMP”) for the project in 2012 that requires regular reporting of groundwater levels and conditions. The FEIR and GMMMP permits were challenged through litigation and were upheld and sustained in their entirety by judgements in the California Superior Court in 2014 and the California Court of Appeal in 2016 and are no longer subject to legal challenge.
In August 2019, an Addendum to the FEIR was adopted by the Fenner Valley Water Authority (“FVWA”), the joint powers authority comprised of SMWD, the County of San Bernardino and other public agencies participating in the project, to address updates to the project proposal, including a water treatment program and changes to the pipeline route. The Addendum also assessed new studies published about natural springs in the surrounding watershed at the project area. The Addendum concluded that there are no significant adverse impacts associated with the minor changes to the project and further summarized that the spring studies did not change the conclusions of the FEIR’s analysis. The Addendum was not challenged in court and the statute of limitations to challenge has expired.
9
Cadiz Inc.
In September 2025, FVWA approved a 2nd Addendum to the project’s final EIR analyzing the conversion of the Northern Pipeline from oil/natural gas use to a water conveyance facility, including construction of pump stations, air-relief and blow-off valves and related improvements. The 2nd Addendum identified no new significant impacts from the project modifications and was adopted by the FVWA Board without any objections. FVWA also approved a memorandum of understanding for entry into a lease with MWI to operate the Northern Pipeline facilities and the groundwater management plan in coordination with the FGMWC. The 2nd Addendum was not challenged in Court and the statute of limitations to challenge the approval has expired.
While the 2012 FEIR and GMMMP approvals authorized carryover storage up to 150,000 acre-feet and provided a programmatic assessment of imported storage up to 1 million acre-feet, additional project level environmental study and amendments to the GMMMP are required prior to utilizing the project facilities for storage of imported surplus water. We currently anticipate submitting a 3rd Addendum to the Final EIR analyzing storage operations in Q2 2026 for consideration by the County of San Bernardino and FVWA.
Hydrological and geological study required under our permits is ongoing and we regularly monitor and report groundwater conditions to the County of San Bernardino as part of our agricultural use. The County of San Bernardino and SMWD through FVWA established an inter-agency Technical Review Panel (“TRP”) in 2024 mandated by the GMMMP approvals to provide scientific and environmental monitoring of the project area. The TRP assesses pre-operational data and makes recommendations for monitoring protocols to be implemented upon commencement of operations.
Northern Pipeline
The 220-mile Northern Pipeline is a former segment of a 1,200 mile, 30” steel pipeline constructed in 1985 by All American Pipeline Company to convey oil. In 2001, the pipeline was acquired by El Paso Natural Gas (“EPNG”) and authorized for natural gas conveyance. In 2011, we entered into an option agreement with EPNG to explore using the pipeline segment for water conveyance. In June 2021, we completed the acquisition of the pipeline for $19 million and presently own the entire 220-mile asset in fee.
Changing the use of the Northern Pipeline to water conveyance is subject to applicable local, state and federal laws.
In December 2023, after a public review process, the US Bureau of Land Management (“BLM”) and the US Air Force assigned to our subsidiary Cadiz Real Estate LLC EPNG’s existing right-of-way for federal lands crossed by the Northern Pipeline authorizing continued maintenance as an idle natural gas pipeline. The right-of-way was not challenged in court and the statute of limitations to challenge has expired.
Prior to operating the Northern Pipeline for water conveyance, we require change of use authorizations from the BLM, the Air Force, and the California State Lands Commission ("CLSC"). We have filed applications with each agency for these authorizations, and these applications are all in process. The CSLC application also includes a request for a finding that conveying water from the Cadiz Ranch will not adversely affect the desert environment in accordance with California Water Code Section 1815, the 2019 law that requires desert groundwater projects to apply for a review by the CSLC prior to moving water in conveyance facilities.
10
Cadiz Inc.
Southern Pipeline
In 2008, we entered into a 99-year lease agreement with the ARZC to utilize a portion of its existing ROW southwest from the Cadiz Property to the Colorado River Aqueduct for a conveyance pipeline and related facilities. As part of the lease arrangement, we agreed to provide necessary railroad improvements in furtherance of railroad purposes. This includes providing water and power to the railroad for fire protection and improving access roads and transloading operations, among other things. By co-locating the conveyance pipeline within this existing railroad ROW, pipeline construction would avoid impacts to desert habitats. The route and construction within the railroad ROW were evaluated and approved during the CEQA permitting process in 2012.
Our proposed co-location in the ROW was also separately assessed by the BLM to determine the need for any federal permitting related to the proposed use of the ARZC railroad ROW, which is a federal ROW originally granted to the railroad in accordance with the General Railroad Right-of-Way Act of 1875 (“1875 Act”). BLM’s evaluation, which was issued in February 2020, concluded that the proposed Southern Pipeline will further railroad purposes at least in part, is within the scope of the ROW, and requires no additional BLM approvals. In February 2022, the US Department of the Interior’s Solicitor Office issued a new legal opinion regarding third party use of 1875 Act ROWs that preserved the railroad purposes assessment for third party uses. The opinion was not specific to any railroad and did not alter our 2020 evaluation.
To deliver water from the Mojave Groundwater Bank to any participating agencies via the Southern Pipeline, the operating parties will require an agreement with Metropolitan Water District of Southern California (“MWD”) to move water supplies from the Mojave Groundwater Bank using the CRA; and a finding by CSLC that conveying water from the Cadiz Ranch will not adversely affect the desert environment in accordance with California Water Code Section 1815. MWD and CSLC approvals will be bound by the existing CEQA record of review, study, and approvals.
Water Filtration Technology
Acquired in 2022, our wholly owned subsidiary ATEC Water Systems, LLC (“ATEC”) provides innovative water treatment solutions for impaired or contaminated water sources. Adding the ATEC water treatment solutions and services to our business portfolio has diversified our range of innovative, sustainable clean water solutions offered in support of our mission to provide safe, affordable drinking water to communities in need.
ATEC, based in Hollister, California, has produced water treatment systems since 1982. It pioneered technology to provide cost-effective, high-rate removal of iron and manganese and then expanded its reach to a full range of contaminants, including, arsenic, Chromium-6, nitrates, PFAS and other contaminants found in source waters that limit the available supply of drinking water for many communities. ATEC has four U.S. patent applications pending for unique treatment processes and filter designs and plans to file for two additional patents in 2026.
11
Cadiz Inc.
ATEC manufactures and sells an array of small, modular vertical steel tanks ranging from 14-inch to 60-inch in diameter coupled with filter media to remove water contaminants for our customers. ATEC’s modular, vertical tank systems can be scaled in size to serve small, rural communities as well as larger municipalities with system treatment capacities up to 60 million gallons per day (MGD) and require less ancillary infrastructure, maintenance and upkeep than traditional filtration systems. Our customers include municipalities, public and private utilities, industries, and engineering and construction firms constructing new plants. During the 4th quarter of 2025, we added a second welding line to provide an anticipated increase of 100% in our production capacity.
ATEC has built more than 500 water filtration systems for cities, water districts, investor-owned utilities and small communities and businesses throughout the U.S., Canada, and Asia.
Since our acquisition of the business, ATEC has experienced a significant increase in demand and in 2025 delivered the largest project in its history, completing 320 filters for the Central Utah Water Conservancy District 60 MGD Vineyard Wellfield Groundwater Polishing Project. In 2025, ATEC also experienced record revenue growth, with revenues reaching $14.5 million in 2025 (compared to $7.9 million in 2024). Additionally, with a greater contracted sales force, we also expanded our geographic and marketing channel reach, seeing 74% growth in business orders during the year.
In 2026, ATEC is expected to further expand its reach in the PFAS and Chromium-6 treatment markets, which are growing following implementation of more stringent state and federal regulations, as it continues to develop its market position beyond its traditional iron and manganese treatment business.
Equity, Sustainability and Environmental Justice
Water insecurity is one of the most pressing challenges of the 21st century, driven primarily by lack of infrastructure and the impacts of climate change creating an imbalance in supply and demand around the world. We recognize that our land and water assets can play a valuable role in addressing the growing issue of water insecurity in many communities. Our vision is a world where wealth and geography do not dictate access to clean, fresh, affordable water. We have made a commitment to delivering clean, reliable, and affordable water to disadvantaged communities through innovative and sustainable approaches. The following is a list of highlights of our programs to achieve these objectives:
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| 1. | Water for disadvantaged communities. We have committed to make available clean affordable water supply from the Cadiz Property to rural, underserved, tribal and disadvantaged communities that lack reliable access to California’s traditional sources of water supply. To date, we have committed to make available more than 250,000 AF of water supply to serve disadvantaged communities in California’s High Desert, Inland Empire and Coachella Valley communities. Additionally, all public agency participants with agreements to contract for water from the Mojave Groundwater Bank must serve at least one disadvantaged community within their service area. |
12
Cadiz Inc.
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| 2. | Ownership of Water Infrastructure by Native American Tribes. We are partnering with Lytton Rancheria of California, a federally recognized Native American Tribe, to build, own and operate the Mojave Groundwater Bank and we anticipate that Lytton and other Tribes will maintain lasting ownership of a portion of the largest groundwater bank in the Southwest. This will be the first major water infrastructure project off tribal lands to be majority-owned by Native American Tribes in U.S. history. |
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| 3. | Improve local water quality. Utilizing our ATEC filtration systems, we can improve water quality in communities affected by contaminated groundwater. Beginning in 2024, we donated ATEC filtration systems to communities in the Coachella Valley affected by high levels of arsenic. Approximately $3.1 million has been invested in farmworker and tribal communities at the Torres Martinez tribal reservation to provide residential well treatment systems at homes relying on well water. In January 2026, the EPA lifted the bottled water order for the community due to the sustained success of the ATEC system in bringing arsenic levels to safe levels. |
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| 4. | Repurposing fossil fuel assets. The use of the Northern Pipeline for water conveyance will convert a former oil and gas pipeline for the beneficial use of water conveyance. The repurposing of this existing fossil fuel pipeline and use of advanced non-combustion distributed energy technologies will contribute to a reduction in harmful emissions in the region and reduce the energy load on the state’s electric grid and vital water resources. |
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| 5. | Creation of new renewable energy. Our Southern Pipeline will feature in-line turbines that will generate renewable hydropower. The project wellfield and pump stations are expected to be powered at least in part by renewable energy and natural gas. In 2025, we converted three of our diesel operated agricultural wells to natural gas to reduce emissions. In addition, we are working with RIC Energy to site California’s largest green hydrogen production facility at the Cadiz Ranch. RIC Energy is expected to begin permitting on the facility this year. |
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| 6. | Protection of habitats. All Mojave Groundwater Bank facilities will be built on disturbed lands or within existing transportation corridors to avoid any impacts on habitats. Approximately 7,400 acres of our 46,000 acres of landholdings are permanently dedicated to conservation. as the Fenner Valley Desert Tortoise Conservation Bank (“Fenner Bank”), a land conservation bank that makes available these properties for mitigation of impacts to tortoise and other sensitive species. Credits sold by the Fenner Bank are dedicated to funding the permanent preservation of the land by the San Diego Habitat Conservancy and research by San Diego Zoo Global into desert tortoise health and species protection. |
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| 7. | Support stable, affordable water rates. Water supply from the Mojave Groundwater Bank is expected to be among the lowest cost supplemental water supply available in the region when compared to other supplemental water supply programs such as desalination, recycling, stormwater capture and surface storage. We have also entered into agreements with public water agencies that serve disadvantaged communities to supply water from the Mojave Groundwater Bank at reduced cost. |
13
Cadiz Inc.
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| 8. | Create and support good-paying jobs. The Mojave Groundwater Bank is expected to create and support nearly 6,000 jobs across the local economy during two phases of construction, including 3,000 from the Northern Pipeline project; 10% of jobs are reserved for veterans. We maintain a Project Labor Agreement with building trades and labor unions to pay our workforce prevailing wage and employ union members during construction of the Mojave Groundwater Bank facilities. |
Seasonality
Our water resource development and water filtration activities are not seasonal in nature.
Farming operations at the Cadiz Ranch include the year-round cultivation of grain crops, including alfalfa. These operations are subject to general seasonal trends that are characteristic of the agricultural industry.
Competition
We face competition in the acquisition, development and sale of water and land assets from a variety of parties. We also experience competition in the market for our water supply, storage and conveyance solutions and agriculture products associated with our water and land assets. Since California has scarce water resources and an increasing demand for available water, we believe that location, price and reliability of delivery are the principal competitive factors affecting agriculture and the demand for water supply and storage in California. We believe the Cadiz Ranch and Mojave Groundwater Bank projects are competitive with other sources of water and farmland.
In the groundwater treatment market, we compete with companies that offer products similar to ours. Some of these companies have greater financial resources, operational experience, and technical capabilities than we do. When bidding for groundwater treatment projects, however, our current experience suggests that the market opportunity is very large, our products and services are highly competitively, and there is no clear dominant or preferred competitor in the markets in which we compete.
Human Capital Resources
As of December 31, 2025, we employed 31 full-time employees (i.e. those individuals working more than 1,000 hours per year) including 22 full-time employees at ATEC. Our business operations also rely on third-party contracted seasonal and temporary workers, as well as consultants and other professional vendors to help augment specialized human capital and talent needs. Our full-time and third-party contracted workers, as well as consultants and vendors, must follow our code of conduct and ethics policy, as well as our whistleblower and information security policies.
We appreciate the importance of retention, growth and development of our employees. The average tenure of our full-time employees is approximately 5 years, reflecting our positive work environment that offers opportunities to develop new skills and advance to new positions. We believe we offer competitive compensation (including salary, incentive bonus, and equity) and benefits packages to our employees, including a 401(k) plan. Further, we urge professional development opportunities and mentorship to cultivate talent throughout our company.
14
Cadiz Inc.
As a small workforce, we focus on skill sharing and experience diversity in the workplace. Our full-time employees have regular opportunities to work with senior leadership and/or Board members in pursuit of business objectives. Management and Board leadership provide annual reviews of employee performance. Human capital is generally managed by our CEO, COO and CFO, and employment policies are overseen by the Board, particularly the Compensation Committee. Our Board encourages diversity in the workforce. Approximately 45% of our senior executives are female.
We are focused on executing on our objectives of implementing our projects and realizing the cash flow potential of our assets, while also evaluating opportunities to ensure our workforce reflects the diversity of the communities in which we operate.
Regulation
Our operations are subject to various federal, state and local laws and regulations, as detailed throughout Item 1. In the normal course of developing our land, water and infrastructure assets, we are required to demonstrate to various regulatory authorities that we are in compliance with the laws, regulations and policies enforced by such authorities.
Groundwater use and development, and the import and export of groundwater and surface supplies by public water agencies via conveyance pipelines, is subject to regulation by local, state and federal existing statutes pertaining to water supply and land use, but also general environmental statutes applicable to all forms of development. We have successfully obtained several approvals and permits from local, state and federal regulatory authorities with respect to our water supply, water storage and water conveyance assets over the last 25 years. Prior to the operation of the Northern and Southern Pipelines for water conveyance, we will obtain additional permits regulating the use of those pipelines and related facilities. Because of the discretionary nature of these approvals, our ability to secure these approvals and receive income from our water assets could be delayed, reduced or eliminated based on regulatory processes. See also more information in “Risk Factors”.
Our agricultural operations are also generally subject to regulation by local agencies, such as county governments, as well as state environmental and water statutes. We are in compliance with all material applicable regulations.
Our water filtration products are manufactured to the specifications of our water provider customers in coordination with state and federal water quality and treatment regulatory approvals obtained by these providers in the ordinary course of permitting water treatment or groundwater well and pumping facilities. We are not directly impacted by these regulations.
Access to Our Information
Our annual, quarterly and current reports, proxy statements and other information are filed with the Securities and Exchange Commission (“SEC”) and are available free of charge on the internet through our website, http://www.cadizinc.com, as soon as reasonably practical after electronic filing of such material with the SEC. Our website address provided in this Annual Report on Form 10-K is not intended to function as a hyperlink and the information on our website is not, nor should it be considered, part of this report or incorporated by reference into this report.
15
Cadiz Inc.
Our SEC filings are also available to the public on the internet at the SEC’s website http://www.sec.gov.